701 E Apache Blvd,. Tempe-AZ. Room 14
. (219)321-2714. BIM Manager. Solve Design and. Construction. A
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
BIM PROJECT EXECUTION PLAN FOR BIMedical Providers Group DEVELOPED BY SOLVE Construction & Management This BIM Project Execution Plan (PxP) was developed by Solve Design and Construction to create an overall vision along with the implementation details of the construction of CON 453 Healthcare clinic to be built in Northwest Corner Lot at intersection of West University Drive and South Ash Avenue, Tempe, Arizona. This proposed Health care facility, project number 1, will be a 27,600 square foot projected area and 17- 32 foot high, two story building, and has prevision to begin the construction in January of 2015, and to be completed in 24 months.
Team Members:
Artur Feitosa Fabricio Barbosa Marco Torres Priscilla Basto
December - 2014 BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
1
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
BIM PROJECT EXECUTION PLAN FOR BIMedical Providers Group DEVELOPED BY SOLVE Design & Construction TABLE OF CONTENTS
SECTION A: BIM PROJECT EXECUTION PLAN OVERVIEW .....................................................................................4 SECTION B: PROJECT INFORMATION .......................................................................................................................5 SECTION C: KEY PROJECT CONTACTS ....................................................................................................................7 SECTION D: PROJECT GOALS / BIM USES ...............................................................................................................8 1.
Major BIM Goals / Objectives:...........................................................................................................................8
2.
BIM USE ANALYSIS W ORKSHEET: ATTACHMENT 1 ..................................................................................................8
3.
BIM Uses: .........................................................................................................................................................9
SECTION E: ORGANIZATIONAL ROLES / STAFFING .............................................................................................. 10 1.
BIM Roles and Responsibilities:...................................................................................................................... 10
2.
BIM Use Staffing: ............................................................................................................................................ 10
SECTION F: BIM PROCESS DESIGN ........................................................................................................................ 11 1.
Level One Process Overview Map: Attachment 2 ........................................................................................... 11
2.
List of Level Two – Detailed BIM Use Process Map(s): Attachment 3 ............................................................ 11
SECTION G: BIM INFORMATION EXCHANGES........................................................................................................ 12 1.
List of Information Exchange Worksheet(s): Attachment 4 ............................................................................. 12
2.
Model Definition Worksheet: Attachment 5 ..................................................................................................... 12
SECTION H: BIM AND FACILITY DATA REQUIREMENTS ........................................................................................ 13 SECTION I: COLLABORATION PROCEDURES......................................................................................................... 14 1.
Collaboration Strategy:.................................................................................................................................... 14
2.
Meeting Procedures: ....................................................................................................................................... 14
3.
Model Delivery Schedule of Information Exchange for Submission and Approval: ......................................... 15
4.
Interactive Workspace..................................................................................................................................... 16
5.
Electronic Communication Procedures ........................................................................................................... 16
SECTION J: QUALITY CONTROL............................................................................................................................... 18 1.
OVERALL STRATEGY FOR QUALITY CONTROL: ....................................................................................... 18
2.
QUALITY CONTROL CHECKS: ..................................................................................................................... 18
3.
Model Accuracy and Tolerances: .................................................................................................................... 19
SECTION K: TECHNOLOGICAL INFRASTRUCTURE NEEDS .................................................................................. 20 1.
Software: ......................................................................................................................................................... 20
2.
Computers / Hardware: ................................................................................................................................... 20
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
2
SOLVE Design & Construction - CON 453 Healthcare Clinic
3.
Date: 27 October 2014
Modeling Content and Reference Information................................................................................................. 21
SECTION L: MODEL STRUCTURE ............................................................................................................................ 22 1.
File Naming Structure: .................................................................................................................................... 22
2.
Model Structure: .............................................................................................................................................. 22
3.
Measurement and Coordinate Systems: ......................................................................................................... 24
4.
BIM and CAD Standards: ................................................................................................................................ 24
SECTION M: PROJECT DELIVERABLES ................................................................................................................... 24 SECTION O: ATTACHMENTS..................................................................................................................................... 26 1.
BIM USE SELECTION WORKSHEET [FROM SECTION D] .......................................................................... 26
2.
LEVEL 1 PROCESS OVERVIEW MAP [FROM SECTION F] ......................................................................... 27
................................................................................................................................................................................. 27 3.
LEVEL 2 DETAILED BIM USE PROCESS MAP(S) [FROM SECTION F] ...................................................... 28
4.
INFORMATION EXCHANGE REQUIREMENT WORKSHEET(S) [FROM SECTION G] ............................... 38
5.
MODEL DEFINITION WORKSHEET [FROM SECTION G] ............................................................................ 41
TABLE OF FIGURES FIGURE 1 - FIRST FLOOR ................................................................................................................... 23 FIGURE 2 - SECOND FLOOR ............................................................................................................... 23
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
3
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION A: BIM PROJECT EXECUTION PLAN OVERVIEW
To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. The mission of this BIM Project Execution Plan is primarily to outline the implementation of the BIM uses that are of high interest to BIMedical Providers Group (the owner) such as: ● Design/Constructability Reviews; ● Cost Estimation; ● 3D Coordination; ● Site Utilization Planning; ● Phase Planning; ● Record Modeling. We will also present the BIM uses that SOLVE Design & Construction has identified as potential BIM uses that would bring value to this and future similar projects, which include: ● Design Authoring; ● Lighting Analysis; ● Digital Fabrication; ● Energy Analysis. BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
4
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION B: PROJECT INFORMATION i. Project Owner: BIMedical Providers Group (BPG); ii. Project Name: CON 453 Healthcare Clinic; iii. Project Location and Address: NW. Corner lot at intersection of W. University Dr. and S. Ash Ave., Tempe, AZ; iv. Contract Type / Delivery Method: Design-Bid-Build; v. Brief Project Description: A 27,600 square foot projected area and 17- 32 foot high, two story Healthcare facility in Tempe, Arizona, with medical and dental offices; vi. Additional Project Information: The BIM uses required for this project are: Design/Constructability Reviews, Cost Estimation, 3D Coordination, Site Utilization Planning, Phase Planning, and Record Modeling. The suggested BIM Uses are: Design Authoring, Lighting Analysis, Digital Fabrication, and Energy Analysis. vii. Project Numbers: PROJECT INFORMATION
NUMBER
CONTRACT NUMBER:
453-2014
TASK ORDER:
001
PROJECT NUMBER:
001
BUILDING NUMBER
001
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
5
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
viii. Project Schedule / Phases / Milestones: PROJECT PHASE / MILESTONE
ESTIMATED START DATE
ESTIMATED COMPLETION DATE
PROJECT STAKEHOLDERS INVOLVED
FEASIBILITY STUDIES
01/06/14
01/07/14
BPG, DesignCo
PRELIMINARY PLANNING
01/07/14
15/07/14
BPG, DesignCo
PROGRAMMING
15/07/14
01/08/14
BPG, DesignCo
DESIGN DOCUMENTS
01/08/14
01/09/14
BPG, DesignCo
STRUCTURAL ANALYSIS AND DESIGN
01/09/14
01/10/14
BPG, DesignCo,
CONSTRUCTION DOCUMENTS
01/10/14
01/11/14
BPG, DesignCo
COST ESTIMATION
01/11/14
10/11/14
BPG, DesignCo
BIDDING
10/11/14
10/12/14
BPG, DesignCo
NOTICE TO PROCEED
10/12/14
10/12/14
BPG, DesignCo, SOLVE
SITE UTILIZATION PLANNING
15/12/14
20/12/14
BPG, DesignCo, SOLVE
MECHANICAL CLASH DETECTION
15/12/14
20/12/14
BPG, DesignCo, SOLVE
CREW MOBILIZATION
20/12/14
01/01/15
BPG, DesignCo, SOLVE
CONSTRUCTION
01/01/15
01/01/17
BPG, DesignCo, SOLVE
RECORD MODELING
01/01/17
31/01/2017
BPG, DesignCo, SOLVE
ENERGY ANALYSIS
31/02/2017
31/03/2017
BPG, DesignCo, SOLVE
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
6
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION C: KEY PROJECT CONTACTS ROLE
ORGANIZATION
CONTACT NAME
LOCATION
E-MAIL
PHONE
Project Manager
Solve Design and Construction
Fabricio Barbosa
701 E Apache Blvd, Tempe-AZ Room 14
[email protected]
(219)321-2714
BIM Manager
Solve Design and Construction
Artur Feitosa
701 E Apache Blvd, Tempe-AZ Room 13
[email protected]
(480)738-6488
Structural Chief Engineer
The Terminal Engineering
Viktor Navorski
101 Jamaica, New York-NY
[email protected]
(646)287-3277
Energy and Lighting Chief Engineer
Dilbert Electrical Engineering
Scott Adams
7501 Rural Rd, Tempe-AZ
[email protected]
(215)322-2414
Architectural Leader
How I Drew your House
Ted Mosby
150 W. 85th Street, New York-NY
[email protected]
(260)838-6458
Contractor Representative
Solve Design and Construction
Marco Torres
701 E Apache Blvd, Tempe-AZ Room 12
[email protected]
(646)287-3277
Digital Fabrication Manager
Pixar Digital Fabrication
Walt Disney
05 Lake Buena Vista, Orlando-FL
[email protected]
(714)347-6539
Mechanical Sub Representative
Stark Corporation
Tony Stark
[email protected]
(717)287-3374
Electrical Sub Representative
Pikachu SA
Ash Ketchum
[email protected]
(123)356-5673
Plumbing Sub Representative
Mario Brothers SA
Mario Risotto
105 Yoshi Avenue, Italy Town-PA
[email protected]
(223)321-2414
Legal Issues Manager
Pearson Specter
Harvey Specter
601 E 59th Street, New York-NY
[email protected] om
(480)772-5373
Facility Manager
Batman Butler SA
Alfred Pennyworth
1007 Mountain Drive, Gothan-MI
[email protected]
(347)652-7170
Site Logistics Coordinator
Solve Design and Construction
Bob the Builder
701 E Apache Blvd, Tempe-AZ Room 10
[email protected]
(460)345-5673
Materials Tracking Manager
Agent 47 Tracking
Hitman Codebar
[email protected] m
(223)345-2774
Cost Estimation Manager
Solve Design and Construction
Priscilla Basto
[email protected]
(646)287-3277
10880 Malibu Point, Malibu-CA 543 Pokemon Street, Pallet Town-NC
007 Secret Street, Unknown City-NY
701 E Apache Blvd, Tempe-AZ Room 13
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
7
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION D: PROJECT GOALS / BIM USES 1. Major BIM Goals / Objectives: PRIORIT (HIGH/ MED/ LOW)
GOAL DESCRIPTION
POTENTIAL BIM USES
Med
Increase Field Productivity
Design Reviews, 3D Coordination
Low
Increase Sustainable Applications for the Project
Energy Analysis
High
Early Clash Detection
3D Coordination
Med
Track Progress During Construction
4D Modeling
Med
Increase Effectiveness of Site Utilization
Site Utilization Planning
High
Identify Cost Associated with Design Modifications
Cost Estimation
High
Incorporate Data for Future Facilities
Record Modeling, Digital Fabrication
High
Quickly Assess Design Performance
Design Review, 3D Coordination
Med
Increase Effectiveness of Building Performance
Building System Analysis
High
Accurate 3D Record Model for FM Team
Record Model, 3D Coordination
Low
Increase Energy Effectiveness of the Facility
Energy Analysis, Lighting Analysis
Med
Decrease Overall Maintenance Costs
Record Modeling
2. BIM USE ANALYSIS WORKSHEET: ATTACHMENT 1 The BIM Use Analysis Worksheet is attached at Section O of this Report as Attachment 1.
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
8
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
3. BIM Uses: X
X
PLAN
DESIGN
PROGRAMMING
X
DESIGN AUTHORING
SITE ANALYSIS
X
DESIGN REVIEWS
X
3D COORDINATION
CONSTRUCT
X
SITE UTILIZATION PLANNING CONSTRUCTION SYSTEM DESIGN
X
X
OPERATE BUILDING MAINTENANCE SCHEDULING
X
ENERGY ANALYSIS
3D COORDINATION
ASSET MANAGEMENT
DIGITAL FABRICATION
SPACE MANAGEMENT / TRACKING
LIGHTING ANALYSIS
3D CONTROL AND PLANNING
DISASTER PLANNING
ENERGY ANALYSIS
RECORD MODELING
STRUCTURAL ANALYSIS
X
X
X
X
RECORD MODELING
MECHANICAL ANALYSIS OTHER ENG. ANALYSIS SUSTAINABLITY (LEED) EVALUATION CODE VALIDATION PHASE PLANNING (4D MODELING)
PHASE PLANNING (4D MODELING)
X
COST ESTIMATION
COST ESTIMATION
X
EXISTING CONDITIONS MODELING
EXISTING CONDITIONS MODELING
PHASE PLANNING (4D MODELING)
PHASE PLANNING (4D MODELING)
COST ESTIMATION
COST ESTIMATION
EXISTING CONDITIONS MODELING
EXISTING CONDITIONS MODELING
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
9
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION E: ORGANIZATIONAL ROLES / STAFFING 1. BIM Roles and Responsibilities: BIM ROLE
RESPONSIBILITIES
BIM Manager
Manage the process of virtually constructing the facility and documenting the design contract documents accurately. In addition, he leads the BIM coordination meetings.
Client Facing Staff & Have a great experience with BIM in order to speak the language, show the vision of the company, make Business Developers achievable promises and establish a great relationships\ with the client. BIM Legal Team
Update contracts and create contents that meet the BIM scope.
Initial Design Team
Work in the first stages, making design collaboration meetings with the client to initiate the design within a BIM environment.
Project Production Staff
Performed by the BIM technicians who detail and materialize the design ideas produced by the Initial Design into the BIM models, designs, engineering, and construction documentation. They are BIM software modeling expert with solid understanding of their specific design discipline.
Estimators
Adjust the BIM Models for the quantity take-off and the cost analysis and calculate the costs to obtain the cost estimation.
2. BIM Use Staffing: NUMBER OF ESTIMATED TOTAL STAFF FOR WORKER HOURS BIM USE
BIM USE
ORGANIZATION
Design Reviews
How I Drew Your House
4
Cost Estimating
Solve Engineering
3
3D coordination
How I Drew Your House, Solve Engineering, The Terminal Engineering
5
40 hours
Solve Engineering
2
20 hours
Phase Planning
Solve Engineering
3
30 hours
701 E Apache Blvd, Tempe-AZ
Artur Feitosa
Record Modeling
How I Drew Your House / Solve Engineering
4
40 hours
150 W. 85th Street, New York-NY / 701 E Apache Blvd, Tempe-AZ
Ted Mosby / Artur Feitosa
Design Authoring
How I Drew Your House
5
50 hours
701 E Apache Blvd, Tempe-AZ
Marco Torres
Viktor Navorski / Scott Adams
Site Utilization Planning
LOCATION(S)
LEAD CONTACT
40 hours
150 W. 85th Street, New York-NY
Ted Mosby
20 hours
701 E Apache Blvd, Tempe-AZ
Priscilla Basto
150 W. 85th Street, New York-NY / 701 E Ted Mosby, Priscilla Apache Blvd, Tempe-AZ Basto, Viktor Navorski / 101 Jamaica, New York-NY 701 E Apache Blvd, Tempe-AZ
Fabricio Barbosa
The Terminal Engineering / Dilbert Electrical Engineering
6
36 hours
101 Jamaica, New York-NY / 7501 Rural Rd, TempeAZ
Digital Fabrication
Pixar Digital Fabrication
3
25 hours
701 E Apache Blvd, Tempe-AZ
Walt Disney
Energy Analysis
BIMedical Providers Group
2
20 hours
701 E Apache Blvd, Tempe-AZ
Doctor House
Lighting Analysis
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
10
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION F: BIM PROCESS DESIGN 1. Level One Process Overview Map: Attachment 2 The Level One Process Overview Map is attached at Section O of this Report as Attachment 2.
2. List of Level Two – Detailed BIM Use Process Map(s): Attachment 3 The Detailed BIM Use Process Maps of the BIM Uses listed below are attached at Section O of this Report as Attachment 3. a. Design/Constructability Reviews b. Cost Estimation c. 3D Coordination d. Site Utilization Planning e. Phase Planning f. Record Modeling g. Design Authoring h. Lighting Analysis i. Digital Fabrication j. Energy Analysis
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
11
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION G: BIM INFORMATION EXCHANGES 1. List of Information Exchange Worksheet(s): Attachment 4 The List of Information Exchange Worksheet is attached at Section O of this Report as Attachment 4. a. Design/Constructability Reviews b. Cost Estimation c. 3D Coordination d. Site Utilization Planning e. Phase Planning f. Record Modeling g. Design Authoring h. Lighting Analysis i. Digital Fabrication j. Energy Analysis
2. Model Definition Worksheet: Attachment 5 The Model Definition Worksheet is attached at Section O of this Report as Attachment 5.
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
12
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION H: BIM AND FACILITY DATA REQUIREMENTS For this project several BIM uses were previously listed by the owner, as show at section A of this BIM Project Execution Plan. The BIMedical Providers Group will build a new health-care clinic in Tempe, AZ, and they are particularly interested in investing resources on planning this facility because they intent to eventually create additional, similar health-care facilities throughout the Phoenix metropolitan area. The owner has specifically identified several BIM uses – Design/Constructability Reviews, Cost Estimation, 3D Coordination, Site Utilization Planning, Phase Planning and Record Modeling – and also required Solve Design & Construction to define some additional BIM uses that would add value for this particular project.
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
13
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION I: COLLABORATION PROCEDURES 1. Collaboration Strategy:
For a full coordination and collaboration of the team, the communication to the development of the project will occur through weekly in-person meetings at Wednesday afternoons. In addition, the company’s members will maintain a virtual communication by Google Hangout and Gmail. The project data and information sharing will be established using Google Drive online storage. All members will have access to the company’s Google account and they will update the project files periodically. In case of disagreement between team members, all members should gather to analyze each side and find a solution that better achieve the project goals. If some member starts to have lack of performance, participation, or attendance, the rest of the team will talk with him/her to understand the situation. Thus, a way to compensate this will be established.
2. Meeting Procedures:
MEETING TYPE
PROJECT STAGE
FREQUENCY
PARTICIPANTS
LOCATION
BIM REQUIREMENTS KICK-OFF
Planning
One Time
Solve Engineering and stakeholders
Villas at Vista Front Desk - 701 E Apache Blvd. Tempe, AZ.
BIM EXECUTION PLAN DEMONSTRATION
Planning
Monthly
Solve Engineering and stakeholders
Villas at Vista Front Desk - 701 E Apache Blvd. Tempe, AZ.
DESIGN COORDINATION
Construction
Weekly or as-needed
Solve Engineering and stakeholders
Villas at Vista Front Desk - 701 E Apache Blvd. Tempe, AZ.
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
14
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
MEETING TYPE
PROJECT STAGE
FREQUENCY
PARTICIPANTS
LOCATION
CONSTRUCTION OVER-THESHOULDER PROGRESS REVIEWS
Construction
Weekly or as-needed
Solve Engineering and stakeholders
Villas at Vista Front Desk - 701 E Apache Blvd. Tempe, AZ.
ANY OTHER BIM MEETINGS THAT OCCURS WITH MULTIPLE PARTIES
Any Stage
As-needed
Solve Engineering and stakeholders
Villas at Vista Front Desk - 701 E Apache Blvd. Tempe, AZ.
3. Model Delivery Schedule of Information Exchange for Submission and Approval: Below are some information exchanges that are going to be handled within Google Drive between project team members and stakeholders. The most common software used in this project are listed below: ● Revit 2014 (Design Build Suite - Autodesk); ● Navisworks Manage 2014 (Autodesk); ● Sketch UP Make 2014 (Google); ● Bluebeam Revu (Bluebeam Software); ● etc.
INFORMATION EXCHANGE
Design Exchange
FILE SENDER
FILE RECEIVER
DUE NATIVE FILE ONE-TIME or DATE or MODEL MODEL FILE EXCHANGE FREQUENCY START FILE SOFTWARE TYPE TYPE DATE
Architect (Ted Google Drive One Time or 01/09/14 Mosby) (stakeholders) as-needed
Arch
Revit 2014 Bluebeam Revu
.rvt .pdf
.rvt .ifc .pdf
3D Coordination models
Solve Engineering
Google Drive (stakeholders)
Weekly or 20/12/14 Constr as-needed
Navisworks Manage 2014 Bluebeam Revu
.nwd .pdf
.nwd .ifc .rvt
Fabrication Coordination Model
Mechanical Engineer
Google Drive (stakeholders)
Weekly or 20/12/14 Constr as-needed
Revit 2014 Bluebeam Revu
.rvt .pdf
.rvt .ifc .pdf
.rvt .pdf
.rvt .ifc .pdf
Design Intent Models
Architect (Ted Google Drive Mosby) (stakeholders)
Revit 2014 Weekly
01/11/14 Design Bluebeam Revu
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
15
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
4. Interactive Workspace The headquarter of Solve Design & Construction is located at 701 E Apache Blvd., Tempe, AZ. The initial phases of planning and design of the facility will be executed at this location, as well as the regular meetings with the other parties involved in the project. All the organizations involved in the project, such as the Design Company –How I Drew Your House, the Engineering Company –The Terminal Engineering, and legal Issues Firm –Pearson Specter, have also their own facilities. Solve Design & Construction will also have a temporary facility installed at the construction site to facilitate a proper execution of the BIM uses during construction phases.
5.
Electronic Communication Procedures
All electronic communication is going to be performed through Google Drive and Google Hangout. The email of the company has enough capacity to store all data required for this project. The file location and file structure name for our project files are defined at the following table.
FILE LOCATION
FILE STRUCTURE / NAME FILE TYPE
Google Drive server
PROJECT FOLDER
Google Drive server>PROJECT FOLDER
CONSTRUCTION_DOCUME FOLDER NTS FOLDER
Google Drive server>PROJECT ARCH FOLDER FOLDER>CONSTRUCTI ON_DOCUMENTS
FOLDER
FOLDER
PASSWORD FILE PROTECT MAINTAINER
UPDATED
YES
Solve Engineering
ONCE
No
Solve Engineering
ONCE
No
Solve Engineering
ONCE
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
16
SOLVE Design & Construction - CON 453 Healthcare Clinic
FILE LOCATION
FILE STRUCTURE / NAME FILE TYPE
Date: 27 October 2014
PASSWORD FILE PROTECT MAINTAINER
UPDATED
Google Drive server>PROJECT MECH FOLDER FOLDER>CONSTRUCTI ON_DOCUMENTS
FOLDER
No
Solve Engineering
ONCE
Google Drive server>PROJECT STRUCT FOLDER FOLDER>CONSTRUCTI ON_DOCUMENTS
FOLDER
No
Solve Engineering
ONCE
No
Solve Engineering
DAILY
Google Drive server>PROJECT FOLDER>CONSTRUCTI PROJECT FILES ON_DOCUMENTS>(ARC H/MECH/PROJECT FILES)
.NWD .RVT .PDF .SKP
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
17
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION J: QUALITY CONTROL 1. OVERALL STRATEGY FOR QUALITY CONTROL: The quality inspections will be implemented during the execution of each activity, during the equipment and material delivery, and by the development of a virtual mock up. For each activity, inspection will occur at the beginning of the work, permitting the early identification of issues. In the case of equipment and material delivery, the inspection will be executed when they arrive in the construction site, identifying non-conformity before they be used, such as defects in equipment, broken material or wrong material model. Finally, the virtual mock up permits an early agreement between the project stakeholders about the design intent, function and look.
2. QUALITY CONTROL CHECKS: The following checks should be performed to assure quality.
CHECKS
DEFINITION
RESPONSIBLE PARTY
SOFTWARE PROGRAM(S)
FREQUENCY
Contractor
NAVISWORKS MANAGE
Sampling Prior to Model Delivery
BIM Manager
NAVISWORKS MANAGE
Prior to Model Delivery
VISUAL CHECK
Ensure there are no unintended model components and the design intent has been followed
INTERFERENCE CHECK
Detect problems in the model where two building components are clashing including soft and hard
STANDARDS CHECK
Ensure that the BIM and AEC CADD Standard have been followed (fonts, BIM techinicias dimensions, line styles, levels/layers, etc)
MODEL INTEGRITY CHECKS
Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans
BIM Manager
NAVISWORKS MANAGE REVIT
NAVISWORKS MANAGE
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Prior to Model Delivery
THROUGHOUT DEVELOPMENT
18
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
3. Model Accuracy and Tolerances: The accuracy of the models is going to be the greatest degree of accuracy possible. Tolerances are going to be based on team expertise, experience, and field observations. Also, surveys and construction drawings are going to be used as reference. Note: Conditions shall be verified by the contractor in-loco prior to fabrication.
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
19
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION K: TECHNOLOGICAL INFRASTRUCTURE NEEDS 1. Software: BIM USE
DISCIPLINE (if applicable)
SOFTWARE
VERSION
❏
Design/Constructability Reviews
All Disciplines
Bluebeam Revu CAD, Navisworks
2014, Manage - 2014
❏
Phase Planning
Construction
Revit, MS Project, Navisworks
2014, 2014, Manage - 2014
❏ ❏ ❏ ❏ ❏ ❏
Cost Estimation Digital Fabrication Record Modeling Design Authoring Lighting Analysis Energy Analysis
All Disciplines
Revit
2014
❏
Site Utilization Planning
Construction
Google Sketch UP
Make - 2014
❏
3D Coordination
Construction
Navisworks
Manage - 2014
2. Computers / Hardware: Solve Design & Construction members shall utilize computer hardware that is sufficient to efficiently handle single model files in Revit 2014 and Navisworks Manage 2014, the following hardware was chosen to perform the job.
❏ ❏ ❏ ❏ ❏ ❏ ❏ ❏ ❏ ❏
BIM USE
HARDWARE
Design/Constructability Reviews Design Authoring Cost Estimation 3D Coordination Site Utilization Planning Phase Planning Record Modeling Lighting Analysis Digital Fabrication Energy Analysis
Lenovo Yoga 2 ProWindows 8.1 (2013) 64bits Computer System
OWNER OF HARDWARE
SPECIFICATIONS
Solve Design & Construction
Intel(R) Core(™) i7-4500U CPU @ 1.80GHz 2.39 GHz., 8.00GB, Intel(R) HD Graphics Family (1792MB), Intel(R) Wireless-N 7260.
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
20
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
3. Modeling Content and Reference Information Identify items such as families, work spaces, and databases.
DISCIPLINE (if applicable)
MODELING CONTENT / REFERENCE INFORMATION
Design/Constructability Reviews
All Disciplines
N/A
Phase Planning
Construction
Crew and Productivity information; Lead Times and Scheduling Patterns
Cost Estimation
All Disciplines
Cost Reports from previous works; Cost Data Base
Digital Fabrication
All Disciplines
N/A
Record Modeling
All Disciplines
Equipment Information; Project Submittal Information
Design Authoring
All Disciplines
Parametric Modeling Content
Lighting Analysis
All Disciplines
Construction Type library; Energy Takeoff; Weather Data; Soil Data; Solar Data
Energy Analysis
All Disciplines
Sensor Data; Performance targets; Performance Costs, Weather Data.
Site Utilization Planning
Construction
Schedule; Existing Site Conditions Information; Construction Equipment libraries
3D Coordination
Construction
Company Implementation Standards; Contract Requirements; Information Exchange Requirements
BIM USE
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
21
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION L: MODEL STRUCTURE 1. File Naming Structure: The following table shows how our files shall be formatted: FILE NAMES FOR MODELS SHOULD BE FORMATTED AS: ARCHITECTURAL MODEL CIVIL MODEL
ARCH-001-BLDG001.RVT CIVIL-001-BLDG001.RVT
MECHANICAL MODEL PLUMBING MODEL
MECH-001-BLDG001.RVT PLUMB-001-BLDG001.RVT
ELECTRICAL MODEL STRUCTURAL MODEL
ELEC-001-BLDG001.RVT STRUCT-001-BLDG001.RVT
ENERGY MODEL CONSTRUCTION MODEL
ENERGY-001-BLDG001.RVT CONST-001-BLDG001.RVT
COORDINATION MODEL
COORD-001-BLDG001.RVT
2. Model Structure: Since we just have one simple building, it is going to be separated by floors (First Floor, Second Floor, Roof - Main, Roof - High, and TOF Footing) and disciplines (architecture; mechanical, electrical and plumbing; structural). Also, zones and areas might be specified during the BIM project execution planning.
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
22
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
Figure 1 - First Floor
Figure 2 - Second Floor
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
23
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
3. Measurement and Coordinate Systems: Our standard measurement system is the Imperial and our referenced coordinated system is the Cartesian.
4. BIM and CAD Standards: Identify items such as the BIM and CAD standards, content reference information, and the version of IFC, etc. Standard
Version
BIM Uses Applicable
Organizations Applicable
National BIM Standard
Version 2.0
ALL
Solve Design & Construction
IFC
VERSION/MVD(s)
Record Modeling
Solve Design & Construction
As-Built Modeling National CAD Standard
Version 5.0
Drawing Production
Solve Design & Construction
COBie
Version 2.4
Record Modeling
Solve Design & Construction
SECTION M: PROJECT DELIVERABLES In this section, the BIM deliverables for the project and the format in which the information will be delivered are shown. BIM SUBMITTAL ITEM
STAGE
APPROXIMATE DUE DATE
FORMAT
STRUCT-01-BL001.rvt
Construction Documents
01/11/14
Revit (.rvt)
MEP-01-BL001.rvt
Construction Documents
01/11/14
Revit (.rvt)
ARCH-01-BL001.rvt
Construction Documents
01/11/14
Revit (.rvt)
SiteUtilizationPlanning_BL001.skp
Construction
20/12/14
SketchUP(.skp)
3D_Coordination_BL001.nwd
Construction
20/12/14
Naviswork Manage 2014 (.nwd)
Cost_Estimation_BL001.xls
Design
10/11/14
Microsoft Excel (.xls)
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
NOTES
24
SOLVE Design & Construction - CON 453 Healthcare Clinic
BIM SUBMITTAL ITEM
STAGE
Date: 27 October 2014
APPROXIMATE DUE DATE
FORMAT
Lighting _Analysis_01_BL001.pdf
Design
01/10/14
Bluebeam Revu (.pdf)
Lighting _Analysis_02_BL001.pdf
Design
01/10/14
Bluebeam Revu (.pdf)
Lighting _Analysis_03_BL001.pdf
Design
01/10/14
Bluebeam Revu (.pdf)
Lighting_Analysis_04_BL001.pdf
Design
01/10/14
Bluebeam Revu (.pdf)
Record_Model_BL001.rvt
Close out
31/01/2017
Revit (.rvt)
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
NOTES
25
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
SECTION O: ATTACHMENTS 1. BIM USE SELECTION WORKSHEET [FROM SECTION D] BIM Use*
Value to Project
Responsible Party
Notes
Proceed with Use YES / NO / MAYBE
Experience
Scale 1-3 (1 = Low) Competency
High / Med / Low
Additional Resources / Competencies Required to Implement
Resources
High / Med / Low
Value to Capability Resp Rating Party
Design/Constructability Reviews
MED
Architect Facility Manager Contractor
MED HIGH HIGH
2 2 1
2 2 3
3 2 2 Need training on latest software
Cost Estimation (Planning)
MED
Engineer
LOW
1
2
2 Requires training and basic software
Cost Estimation (Construction)
HIGH
Contractor
HIGH
3
2
2
Yes
3D Coordination (Design)
HIGH
Architect Engineer
HIGH HIGH
3 2
3 2
2 2 Coordination software required
Yes
3D Coordination (Construction)
HIGH
Architect Contractor Subcontractor
MED HIGH HIGH
3 2 1
2 3 2
2 2 2 Need training on latest software
Yes
Overall Cost Estimation
Yes
Yes Modeling learning curve possible
Site Utilization Planning
MED
Contractor
HIGH
3
2
3
Phase Planning (4D Modeling)
HIGH
Contractor
HIGH
2
2
2
Record Modeling
HIGH
Contractor Architect Facility Manager
LOW MED HIGH
2 2 2
2 3 2
2 3 3
Building Maintenance Schedule
LOW
Facility Manager
LOW
1
2
1 Large learning curve
No
Design Authoring
HIGH
Architect Engineer
HIGH HIGH
3 2
2 3
3 2
Yes
Engineering Analysis
HIGH
Engineer
MED
2
3
2
Yes
Digital Fabrication
HIGH
Digital Fabricator
HIGH
3
2
3
Sustainability (LEED) Analysis
MED
Architect Engineer
MED LOW
1 2
2 1
2 Requires training and software 2
No
Building System Analysis
MED
Facility Manager
MED
2
2
3
Yes
Disaster Planning
LOW
Engineer
LOW
2
2
1
Yes
Use for Phasing & Construction
High value to owner due to intention of future similar facility construction
High value to owner due to intention of future similar facility construction
Local is not susceptible to force majeur disaster
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Yes
Yes
Yes
No
26
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
2. LEVEL 1 PROCESS OVERVIEW MAP [FROM SECTION F]
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
27
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
3. LEVEL 2 DETAILED BIM USE PROCESS MAP(S) [FROM SECTION F]
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
28
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
29
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
30
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
31
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
32
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
33
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
34
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
35
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
36
SOLVE Design & Construction - CON 453 Healthcare Clinic
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Date: 27 October 2014
37
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
4. INFORMATION EXCHANGE REQUIREMENT WORKSHEET(S) [FROM SECTION G] Design Authoring
Engineering Analysis
3D Coordination
Design Reviews
Phase Planning (4D Modeling)
Cost Estimation
Digital Fabrication
Site Utilization Planning
3D Coordination
Record Modeling
Design
Design
Design
Design
Design
Construction
Construction
Construction
Construction
Operations
BIM Use Title Project Stage Time of Exchange (SD, DD, CD, Construction)
SD
DD
DD
DD
CD
CD
CD
CD
Construction
Operations
Architect
CM/Trade Contractors
Contractor, Facility Manager
Contractor
CM/Trade Contractors
Digital Fabricator
Contractor
CM/Trade Contractors
Facility Manager/Owner
Facility Manager/Owner
.RVT Revit 2014
.RVT Revit 2014
.RVT and .NWD Revit 2014 and Navisworks Manage 2014
.PDF and .NWD Bluebeam Revu CAD 2014 and Navisworks Manage 2014
.RVT, .MSP and .NWD Revit 2014, MS Project 2014, Navisworks Manage 2014
.RVT Revit 2014
.RVT Revit 2014
.SKP Google SketchUP make2014
.RVT and .NWD Revit 2014 and Navisworks Manage 2014
.RVT Revit 2014
.RVT Revit 2014
Application & Version
Model Element Breakdown SUBSTRUCTURE 10 Foundations 10 10 Standard Foundations 10 20 Special Foundations 20 Subgrade Enclosures 20 10 Walls for Subgrade Enclosures 40 Slabs-On-Grade 40 10 Standard Slabs-On-Grade 40 20 Structural Slabs-On-Grade 40 30 Slab Trenches 40 40 Pits and Bases 40 50 Slab-On-Grade Supplementary Components 60 Water and Gas Mitigation 60 10 Building Subdrainage 60 20 Off-Gassing Mitigation 90 Substructure Related Activities 90 10 Substructure Excavation 90 20 Construction Dewatering 90 30 Excavation Support 90 40 Soil Treatment SHELL 10 Superstructure 10 10 Floor Construction 10 20 Roof Construction 10 30 Stairs 20 Exterior Vertical Enclosers 20 10 Exterior Walls 20 20 Exterior Windows 20 50 Exterior Doors and Grilles 20 70 Exterior Louvers and Vents 20 80 Exterior Wall Appurtenances 20 90 Exterior Wall Specialties 30 Exterior Horizontal Encloses 30 10 Roofing 30 20 Roof Appurtenances 30 40 Traffic Bearing Horizontal Enclosures 30 60 Horizontal Openings 30 80 Overhead Exterior Enclosures INTERIORS 10 Interior Construction 10 10 Interior Partitions 10 20 Interior Windows 10 30 Interior Doors 10 40 Interior Grilles and Gates 10 60 Raised Floor Construction 10 70 Suspended Ceiling Construction 10 90 Interior Specialties 20 Interior Finishes 20 10 Wall Finishes 20 20 Interior Fabrications 20 30 Flooring 20 40 Stair Finishes 20 50 Ceiling Finishes SERVICES 10 Conveying 10 10 Vertical Conveying Systems 10 30 Horizontal Conveying Systems 10 50 Material Handling 10 80 Operable Access Systems 20 Plumbing 20 10 Domestic Water Distribution 20 20 Sanitary Drainage 20 30 Building Support Plumbing Systems 20 50 General Service Compressed-Air 20 60 Process Support Plumbing Systems
Design
SD,DD
CM/Trade Contractors Responsible Party (Information Receiver) Receiver File Format
01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 04 04 04 04 04 04 04 04 04 04 04 04
Building Systems Analysis
Info
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
A-300 A-300
Eng Eng
A-300 A-300
Eng Eng
A-300 A-300
Eng Eng
B-200 B-200
Eng Eng
B-200 B-200
Eng Eng
A-300
Eng
A-200
Eng
A-300
Eng
B-200
Eng
B-200
Eng
A-300 A-300 C-100 C-100 C-100
Eng Eng Eng Eng Eng
A-200 A-300 C-100 C-100 C-100
Eng Eng Eng Eng Eng
A-300 A-300 C-100 C-100 C-100
Eng Eng Eng Eng Eng
A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng
B-200 B-200 B-200 B-200 B-200
Eng Eng Eng Eng Eng
A-400 A-400
Eng Eng
Eng Eng
B-200 B-200
Eng Eng
C-100 C-100
Eng Eng
C-200 C-200 C-200 C-100
Eng Eng Eng Eng
N/A N/A N/A N/A
N/A N/A N/A N/A
A-200 A-200
Eng Eng
A-300 A-300
C-300 C-300 C-200 C-300
Eng Eng Eng Eng
N/A N/A N/A N/A
Notes
Info
Resp Party
A-300 A-300
Eng Eng
Notes
Info
Resp Party
Notes
Info
Resp Party Notes
Info
Resp Party Notes
N/A N/A
A-350 A-350
Eng Eng
A-350 A-350
Eng Eng
N/A
A-350
Eng
A-350
Eng
A-200 A-200 A-300 A-300 A-300
Eng Eng Eng Eng Eng
A-350 A-350 B-200 B-200 B-200
Eng Eng Eng Eng Eng
A-350 A-350
Eng Eng
A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A
A-300 A-300
Eng Eng
A-400 A-400
N/A N/A
C-100 C-100 C-100 C-100
Eng Eng Eng Eng
N/A N/A N/A N/A
A-350 A-350 A-400 A-200
Eng Eng Eng Eng
N/A N/A N/A N/A
A-350 A-300 A-300
Contractor Contractor Contractor
A-400 A-400 A-400
Info
A-500 A-500
Resp Party Notes
CM CM
Info
A-500 A-500
Resp Party Notes
Owner Owner
A-500
Owner
A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner
A-500 A-500
CM CM
A-500 A-500
Owner Owner
C-100 C-100 C-100 C-100
CM CM CM CM
B-200 B-200 B-200 B-200
Owner Owner Owner Owner
Eng Eng Eng
A-400 A-400 A-400
CM CM CM
A-500 A-500 A-500
Owner Owner Owner
B-200 B-200 A-400
Eng Eng Eng
B-200 B-300 A-400
Eng Eng Eng
A-350 A-350 A-350
Eng Eng Eng
A-400 A-400 A-400
Eng Eng Eng
B-200 B-200 B-200
Eng Eng Eng
A-300 A-300 A-300
Eng Eng Eng
N/A N/A N/A
B-200 B-200 B-200 B-200 B-200 B-200
Eng Eng Eng Eng Eng Eng
A-500 A-350 A-350 B-200 A-200 A-300
Eng Eng Eng Eng Eng Eng
B-200 B-200 B-200 B-200 B-200 B-200
Arch Arch Arch Arch Arch Arch
A-300 A-300 A-300 A-300 A-300 A-300
Arch Arch Arch Arch Arch Arch
B-200 B-200 B-200 B-200 B-200 B-200
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
A-400 A-350 A-350 A-350 A-350 A-350
Dig Fab Dig Fab Dig Fab Dig Fab Dig Fab Dig Fab
A-200 A-200 A-200 A-200 A-200 A-200
Contractor Contractor Contractor Contractor Contractor Contractor
A-300 A-300 A-300 A-300 A-300 A-300
Arch Arch Arch Arch Arch Arch
A-500 A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner Owner
B-200 B-200 B-200 B-200 B-200
Eng Eng Eng Eng Eng
B-200 B-200 B-200 B-200 B-300
Eng Eng Eng Eng Eng
A-300 B-200 B-200 B-200 B-200
Arch Arch Arch Arch Arch
A-400 A-350 A-300 A-300 A-300
Arch Arch Arch Arch Arch
B-200 B-200 B-200 B-200 B-200
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-400 A-350 A-350 A-350 A-350
Dig Fab Dig Fab Dig Fab Dig Fab Dig Fab
C-300 C-300 C-300 C-300 C-300
Contractor Contractor Contractor Contractor Contractor
A-350 A-300 A-300 A-300 A-300
Arch Arch Arch Arch Arch
A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner
A-300 A-300 A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng Eng Eng
A-500 A-300 A-300 B-300 B-300 A-300 B-300
Eng Eng Eng Eng Eng Eng Eng
A-200 A-300 A-300 A-300 A-300 A-300 A-300
Arch Arch Arch Arch Arch Arch Arch
A-350 A-350 A-350 A-350 A-350 A-350 A-300
Arch Arch Arch Arch Arch Arch Arch
B-200 B-200 B-200 B-200 B-200 B-200 B-200
Eng Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400 A-400
Arch Arch Arch Arch Arch Arch Arch
A-400 A-350 A-350 N/A N/A N/A N/A
Dig Fab Dig Fab Dig Fab
C-200 C-200 C-200 C-200 C-200 C-200 C-200
Contractor Contractor Contractor Contractor Contractor Contractor Contractor
A-350 A-350 A-350 A-350 A-350 A-350 A-350
Arch Arch Arch Arch Arch Arch Arch
A-400 A-400 A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner Owner Owner
A-300 A-300 A-300 A-300 A-300
Arch Arch Arch Arch Arch
N/A B-200 N/A N/A N/A
Arch Arch Arch Arch Arch
B-200 B-200 B-200 B-200 B-200
Arch Arch Arch Arch Arch
A-300 A-400 A-400 A-350 A-350
Arch Arch Arch Arch Arch
B-200 A-300 B-200 B-200 B-200
Arch Arch Arch Arch Arch
A-400 A-400 A-400 A-400 A-400
Arch Arch Arch Arch Arch
N/A N/A N/A N/A N/A
A-200 A-200 A-200 A-200 A-200
Contractor Contractor Contractor Contractor Contractor
A-350 A-400 A-350 A-350 A-350
Arch Arch Arch Arch Arch
A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner
C-200 C-200 N/A N/A
Eng Eng
N/A N/A N/A N/A
N/A N/A N/A N/A
A-300 A-301 A-302 A-303
Contractor Contractor Contractor Contractor
N/A N/A N/A N/A
A-400 A-400 A-400 A-400
Owner Owner Owner Owner
A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner
N/A N/A N/A N/A A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A
A-350 A-350 A-350 A-350 A-350
N/A N/A N/A N/A Eng Eng Eng Eng Eng
A-400 A-400 A-350 A-350 A-350
N/A N/A N/A N/A Eng Eng Eng Eng Eng
B-100 B-100 B-100 B-100 B-100
N/A N/A N/A N/A Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Dig Fab Dig Fab Dig Fab Dig Fab Dig Fab
N/A N/A N/A N/A N/A
38
A-400 A-400 A-400 A-400 A-400
N/A N/A N/A N/A Eng Eng Eng Eng Eng
A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM
SOLVE Design & Construction - CON 453 Healthcare Clinic
04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 05 05 05 05 05 05 05 05 05 05 05 06 06 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 07 07 07
30 Heating, Ventilation and Air Conditioning (HVAC) 30 10 Facility Fuel Systems 30 20 Heating Systems 30 30 Cooling Systems 30 50 Facility HVAC Distribution Systems 30 60 Ventilation 30 70 Special Purpose HVAC Systems 40 Fire Protection 40 10 Fire Suppression 40 30 Fire Protection Specialties 50 Electrical 50 10 Facility Power Generation 50 20 Electrical Service and Distribution 50 30 General Purpose Electrical Power 50 40 Lighting 50 50 Miscellaneous Electrical Systems 60 Communications 60 10 Data Communications 60 20 Voice Communications 60 30 Audio-Video Communication 60 60 Distributed Communications and Monitoring 60 90 Communications Supplementary Components 70 Electronic Safety and Security 70 10 Access Control and Intrusion Detection 70 30 Electronic Surveillance 70 50 Detection and Alarm 70 70 Electronic Monitoring and Control 70 90 Electronic Safety and Security Supplementary Compoenents 80 Integrated Automation 80 10 Integrated Automation Facility Controls EQUPMENT AND FURNISHINGS 10 Equipment 10 10 Vehicle and Pedestrian Equipment 10 30 Commercial Equipment 10 40 Institutional Equipment 10 60 Residential Equipment 10 70 Entertainment and Recreational Equipment 10 90 Other Equipment 20 Furnishings 20 10 Fixed Furnishings 20 50 Movable Furnishings SPECIAL CONSTRUCATION AND DEMOLITION 10 Special Construction 10 10 Integrated Construction 10 20 Special Structures 10 30 Special Function Construction 10 50 Special Facility Components 10 60 Athletic and Recreational Special Construction 10 80 Special Instrumentation 20 Facility Remediation 20 10 Hazardous Materials Remediation 30 Demolition 30 10 Structure Demolition 30 30 Selective Demolition 30 50 Structure Moving SITEWORK 10 Site Preparation 10 10 Site Clearing 10 20 Site Elements Demolition 10 30 Site Element Relocation 10 50 Site Remediation 10 70 Site Earthwork 20 Site Improvements 20 10 Roadways 20 20 Parking Lots 20 30 Pedestrian Plazas and Walkways 20 40 Airfields 20 50 Athletic, Recreational, and Playfield Areas 20 60 Site Development 20 80 Landscaping
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
N/A N/A N/A N/A C-300 N/A
A-400 A-400
Eng Eng
N/A N/A
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-400 A-500 A-500 A-500 A-400
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Date: 27 October 2014
A-350 A-350 A-350 A-350 A-350 A-350
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
B-100 B-100 B-100 B-100 B-100 B-100
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400
A-350 A-350
Eng Eng
A-350 A-350
Eng Eng
B-100 B-100
Eng Eng
A-400 A-400
Eng Eng
N/A N/A
C-300 A-200
A-350 A-350 A-350 A-350 A-350
Eng Eng Eng Eng Eng
A-350 A-400 A-400 A-400 A-350
Eng Eng Eng Eng Eng
B-100 B-100 B-100 B-100 B-100
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A
A-350 A-350 A-350 A-350 A-350
N/A N/A N/A N/A N/A
A-350 A-350 A-350 A-350 A-350
Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A
B-100 B-100 B-100 B-100 B-100
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A
A-350 A-350 A-350 A-350 A-350
Eng Eng Eng Eng Eng
B-200 B-200 B-200 C-200 C-200
Eng Eng Eng Eng Eng
B-100 B-100 B-100 B-100 B-100
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A
B-300 B-300 B-300 B-300 B-300
A-400
Eng
C-300
A-350
Eng
C-200
Eng
B-100
Eng
N/A
C-100 C-100 C-100 C-100 C-100 C-100
Owner Owner Owner Owner Owner Owner
N/A N/A N/A N/A N/A N/A
B-200 B-200 B-200 B-200 B-200 C-100
Owner Owner Owner Owner Owner Owner
N/A N/A N/A N/A N/A N/A
B-100 B-100 B-100 B-100 B-100 B-100
Owner Owner Owner Owner Owner Owner
B-200 B-200 B-200 B-200 B-200 B-200
Owner Owner Owner Owner Owner Owner
N/A N/A N/A N/A N/A N/A
C-100 C-100
Owner Owner
C-300 N/A
Owner
B-200 C-100
Arch Arch
B-300 B-300
Arch Arch
B-100 B-100
Owner Owner
B-200 B-200
Owner Owner
A-400 A-350
A-350 A-300 A-350 A-200 A-200 C-200
Eng Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A N/A
A-400 A-400 A-400 A-400 A-350 A-200
Eng Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A N/A
N/A
N/A
N/A
N/A
N/A
A-200
Contractor
Eng Eng Eng
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
A-200 A-200 A-200
Contractor Contractor Contractor
C-100 C-100 C-100 C-100 C-100
CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM
N/A N/A N/A N/A N/A
A-400 A-400 A-400 A-350 A-500
Contractor Contractor Contractor Contractor Contractor
B-200 B-200 B-200 B-200 B-200
Contractor Contractor Contractor Contractor Contractor
C-200 C-200 C-200 C-200 C-200
B-100 B-100 B-100 B-100 B-100 B-100 B-100
CM CM CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM CM CM
N/A N/A N/A N/A N/A N/A N/A
A-300 A-300 A--300 A-300 A-200 A-350 C-200
Contractor Contractor Contractor Contractor Contractor Contractor Contractor
B-200 B-200 B-200 B-200 B-200 B-200 B-200
Arch Arch Arch Arch Arch Arch Arch
C-200 C-200 C-200 C-200 C-200 C-200 C-200
N/A N/A N/A N/A N/A N/A N/A
N/A
N/A N/A N/A
A-300 A-300 A-300
C-100 C-100 C-100 C-100 C-100
CM CM CM CM CM
N/A B-300 C-200 N/A B-300
C-100 C-100 C-100 C-100 C-100 C-100 C-100
CM CM CM CM CM CM CM
C-100 C-100 C-100 C-100 C-100 N/A N/A
Eng
Eng Eng Eng Eng Eng
Eng
CM CM CM CM CM CM CM CM
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
N/A N/A N/A N/A N/A
B-100 B-100 B-100 B-100 B-100 B-100 B-100
Arch Arch Arch Arch Arch Arch Arch
A-400 A-400 A-350 A-300 A-400 A-300 A-300
Eng Eng Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A N/A
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
N/A N/A N/A N/A N/A N/A
Dig Fab Dig Fab Dig Fab Dig Fab Dig Fab Dig Fab
Dig Fab Dig Fab
N/A N/A N/A N/A N/A N/A
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
A-500 A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner Owner
Contractor Contractor
A-400 A-400
Eng Eng
A-500 A-500
CM CM
A-500 A-500
Owner Owner
Contractor Contractor Contractor Contractor Contractor
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner
Contractor Contractor Contractor Contractor Contractor
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-500 A-500 A-500 A-500 A-500
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
Owner Owner Owner Owner Owner
B-300
Contractor
A-400
A-200 A-200 A-200 A-200 A-200 A-200
Contractor Contractor Contractor Contractor Contractor Contractor
A-300 A-300 A-300 A-300 A-300 A-300
Owner Owner Owner Owner Owner Owner
A-300 A-300 A-300 A-300 A-300 A-300
Owner Owner Owner Owner Owner Owner
A-400 A-400 A-400 A-400 A-400 A-400
Owner Owner Owner Owner Owner Owner
A-200 A-200
Owner Owner
A-300 A-300
Owner Owner
A-500 A-500
Owner Owner
N/A N/A N/A N/A N/A N/A
A-350 A-350 A-350 A-350 A-350 A-350
Owner Owner Owner Owner Owner Owner
N/A
N/A
A-350
Owner
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Owner Owner Owner
CM CM CM CM CM
N/A N/A N/A N/A N/A
Owner Owner Owner Owner Owner
CM CM CM CM CM CM CM
N/A N/A N/A N/A N/A N/A N/A
Owner Owner Owner Owner Owner Owner Owner
N/A N/A
A-350 A-350 A-350 A-350 A-200 A-200
39
Contractor Contractor Contractor Contractor Contractor Contractor
A-400
N/A N/A N/A N/A N/A N/A
SOLVE Design & Construction - CON 453 Healthcare Clinic
07 07 07 07 07 07 07 07 07 07 07 07 07 07 A
30 Liquid and Gas Site Utilities 30 10 Water Utilities 30 20 Sanitary Sewerage Utilities 30 30 Storm Drainage Utilities 30 50 Site Energy Distribution 30 60 Site Fuel Distribution 30 90 Liquid and Gas Site Utilites Supplementary Components 40 Electrical Site Improvements 40 10 Site Electric Distribution Systems 40 50 Site Lighting 50 Site Communications 50 10 Site Communications Systems 60 Miscellaneous Site Construction 60 10 Tunnels Additional Information A Construction Systements A Construction Equipment B Temporary Safety C Temporary Security D Temporary Facilities E Weather Protection B Space A Construction Activity Space B Analysis Space C Information A Construction Information B Engineering Information C Record Information C Datum A Grid B Levels C Orgin
Date: 27 October 2014
A-300 A-300 A-300 A-300 A-300 A-300
CM CM CM CM CM CM
N/A N/A C-100 A-200 C-100 C-100
CM CM CM CM
A-350 A-350 A-350 A-350 A-350 A-350
Eng Eng Eng Eng Eng Eng
A-300 A-300 A-200 A-200 A-200 A-200
Eng Eng Eng Eng Eng Eng
B-200 B-200 B-200 B-200 B-200 B-200
CM CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 N/A N/A N/A
A-300 A-300 A-100 A-300 A-300 A-300
Contractor Contractor Contractor Contractor Contractor Contractor
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
C-200 C-200 C-200 C-200 C-200 C-200
Eng Eng Eng Eng Eng Eng
N/A N/A N/A N/A N/A N/A
Owner Owner Owner Owner Owner Owner
C-100 C-100
CM CM
C-300 C-300
CM CM
A-350 A-350
Eng Eng
A-200 A-300
Eng Eng
B-200 B-200
CM CM
A-400 A-400
Eng Eng
N/A N/A
A-350 A-400
Contractor Contractor
A-400 A-400
Eng Eng
C-200 C-200
Eng Eng
N/A N/A
Owner Owner
C-100
CM
N/A
A-350
Eng
N/A
B-200
CM
A-400
Eng
N/A
A-400
Contractor
A-400
Eng
C-200
Eng
N/A
Owner
N/A
A-200
A-350
Eng
A-350
Eng
N/A
N/A
Owner
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A
N/A N/A
B-200
N/A
N/A
A-400
Contractor
A-400
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
A-400 A-400 A-350 A-500 A-200
Contractor Contractor Contractor Contractor Contractor
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A A-500
Owner
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
A-200 A-300
Contractor Contractor
N/A N/A
N/A N/A
A-500 A-500
Owner Owner
A-300 A-300 A-300
CM Eng Arch
N/A
A-400 A-400 A-400
CM Eng CM
N/A N/A N/A
A-300 Contractor A-300 Eng A-300 Eng/Arch/CM
N/A N/A N/A
C-200 C-200 C-200
CM Eng CM
A-400 A-400 A-500
Owner Owner Owner
B-300 B-300 A-300
Eng Eng Eng
B-300 B-300 B-300
A-400 A-400 A-400
Eng/CM Eng/CM Eng/CM
N/A N/A N/A
C-200 C-200 C-200
Eng/CM Eng/CM Eng/CM
A-400 A-400 A-400
Owner Owner Owner
A-300 A-300 A-300
CM Eng CM
A-300 A-300 A-300
Eng Eng Eng
N/A
A-300 A-300 A-300
Eng/CM Eng/CM Eng/CM
A-300 A-300 A-300
Eng Eng Eng
A-350 A-350 A-350
Eng/Arch Eng/Arch Eng/Arch
Eng
Eng/CM Eng/CM Eng/CM
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
N/A N/A N/A
40
A-400 A-400 A-400
Eng/Arch Eng/Arch Eng/Arch
SOLVE Design & Construction - CON 453 Healthcare Clinic
Date: 27 October 2014
5. MODEL DEFINITION WORKSHEET [FROM SECTION G]
Project Stage Deliverable
10
Conception Stage
15
Resp Party
Info
Project Delivery Selection Stage
Design Stage
20
25
Construction Document Stage
30
Procument Stage
Execution Stage
40
Utilization Stage
50
60
Closure Stage
Author File Format (if varies, specify in notes) Application & Version
Model Element Breakdown 01 SUBSTRUCTURE 01 10 Foundations 01 10 10 Standard Foundations 01 10 20 Special Foundations 01 20 Subgrade Enclosures 01 20 10 Walls for Subgrade Enclosures 01 40 Slabs-On-Grade 01 40 10 Standard Slabs-On-Grade 01 40 20 Structural Slabs-On-Grade 01 40 30 Slab Trenches 01 40 40 Pits and Bases 01 40 50 Slab-On-Grade Supplementary Components 01 60 Water and Gas Mitigation 01 60 10 Building Subdrainage 01 60 20 Off-Gassing Mitigation 01 90 Substructure Related Activities 01 90 10 Substructure Excavation 01 90 20 Construction Dewatering 01 90 30 Excavation Support 01 90 40 Soil Treatment 02 SHELL 02 10 Superstructure 02 10 10 Floor Construction 02 10 20 Roof Construction 02 10 30 Stairs 02 20 Exterior Vertical Enclosers 02 20 10 Exterior Walls 02 20 20 Exterior Windows 02 20 50 Exterior Doors and Grilles 02 20 70 Exterior Louvers and Vents 02 20 80 Exterior Wall Appurtenances 02 20 90 Exterior Wall Specialties 02 30 Exterior Horizontal Encloses 02 30 10 Roofing 02 30 20 Roof Appurtenances 02 30 40 Traffic Bearing Horizontal Enclosures 02 30 60 Horizontal Openings 02 30 80 Overhead Exterior Enclosures 03 INTERIORS 03 10 Interior Construction 03 10 10 Interior Partitions 03 10 20 Interior Windows 03 10 30 Interior Doors 03 10 40 Interior Grilles and Gates 03 10 60 Raised Floor Construction 03 10 70 Suspended Ceiling Construction 03 10 90 Interior Specialties 03 20 Interior Finishes 03 20 10 Wall Finishes 03 20 20 Interior Fabrications 03 20 30 Flooring 03 20 40 Stair Finishes 03 20 50 Ceiling Finishes 04 SERVICES 04 10 Conveying 04 10 10 Vertical Conveying Systems 04 10 50 Material Handling 04 10 80 Operable Access Systems 04 20 Plumbing 04 20 10 Domestic Water Distribution 04 20 20 Sanitary Drainage 04 20 30 Building Support Plumbing Systems 04 20 50 General Service Compressed-Air 04 20 60 Process Support Plumbing Systems 04 30 Heating, Ventilation and Air Conditioning (HVAC) 04 30 10 Facility Fuel Systems 04 30 20 Heating Systems 04 30 30 Cooling Systems 04 30 50 Facility HVAC Distribution Systems 04 30 60 Ventilation 04 30 70 Special Purpose HVAC Systems
Info
Notes
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
Notes
Info
Resp Party
Notes
C-100 Arch C-100 Arch
C-100 Arch C-100 Arch
A-300 A-300
Eng Eng
A-400 Arch/Eng A-400 Arch/Eng
A-400 A-400
CM CM
A-500 A-500
CM/Trade Contractor CM/Trade Contractor
B-200 Eng B-200 Eng
A-300 Eng/CM/Trade Contractors A-300 Eng/CM/Trade Contractors
C-100 Arch
C-100 Arch
A-300
Eng
A-400 Arch/Eng
A-400
CM
A-500
CM/Trade Contractor
B-200 Eng
A-300 Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100 C-100
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
B-200 B-200 B-200 B-200 B-200
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Arch/Eng Arch/Eng Arch/Eng Arch/Eng Arch/Eng
A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
B-200 B-200 B-200 B-200 B-200
A-300 A-300 A-300 A-300 A-300
C-100 Arch C-100 Arch
C-100 Arch C-100 Arch
B-200 B-200
Eng Eng
A-400 Arch/Eng A-400 Arch/Eng
A-400 A-400
CM CM
A-500 A-500
CM/Trade Contractor CM/Trade Contractor
B-200 Eng B-200 Eng
A-300 Eng/CM/Trade Contractors A-300 Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100
C-100 C-100 C-100 C-100
Arch Arch Arch Arch
B-200 B-200 B-200 B-200
Eng Eng Eng Eng
A-300 A-300 A-300 A-300
Arch/Eng Arch/Eng Arch/Eng Arch/Eng
A-300 A-300 A-300 A-300
CM CM CM CM
A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
B-200 B-200 B-200 B-200
A-300 A-300 A-300 A-300
C-100 Arch C-100 Arch C-100 Arch
C-100 Arch C-100 Arch C-100 Arch
A-300 A-300 A-300
Eng Eng Eng
A-400 Arch/Eng A-400 Arch/Eng A-400 Arch/Eng
A-400 A-400 A-400
CM CM CM
A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-300 Eng/CM/Trade Contractors A-300 Eng/CM/Trade Contractors A-300 Eng/CM/Trade Contractors
A-400 Eng/CM/Trade Contractors A-400 Eng/CM/Trade Contractors A-400 Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100 C-100 C-100
C-100 C-100 C-100 C-100 C-100 C-100
A-300 A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400
A-400 A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-300 A-300 A-300 A-300 A-300 A-300
A-400 A-400 A-400 A-400 A-400 A-400
Arch Arch Arch Arch Arch
Arch Arch Arch Arch
Arch Arch Arch Arch Arch Arch
Arch Arch Arch Arch Arch Arch
Arch/Eng Arch/Eng Arch/Eng Arch/Eng Arch/Eng Arch/Eng
Eng Eng Eng Eng Eng
Eng Eng Eng Eng
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
C-100 Arch
C-100 Arch
A-300
Eng
A-400 Arch/Eng
A-400
CM
A-500
CM/Trade Contractor
A-300 Eng/CM/Trade Contractors
A-400 Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100
Arch Arch Arch Arch
C-100 C-100 C-100 C-100
Arch Arch Arch Arch
A-300 A-300 A-300 A-300
Eng Eng Eng Eng
A-400 A-400 A-400 A-400
Arch/Eng Arch/Eng Arch/Eng Arch/Eng
A-400 A-400 A-400 A-400
CM CM CM CM
A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-300 A-300 A-300 A-300
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
A-400 A-400 A-400 A-400
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch Arch Arch
B-200 B-200 B-200 B-200 B-200 B-200 B-200
Arch Arch Arch Arch Arch Arch Arch
A-400 A-400 A-400 A-400 A-400 A-400 A-400
Arch/Eng Arch/Eng Arch/Eng Arch/Eng Arch/Eng Arch/Eng Arch/Eng
A-400 A-400 A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400 A-400 A-400
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
B-200 B-200 B-200 B-200 B-200 B-200 B-200
Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor
A-300 A-300 A-300 A-300 A-300 A-300 A-300
Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
B-200 B-200 B-200 B-200 B-200
Arch Arch Arch Arch Arch
A-300 A-300 A-300 A-300 A-300
Arch/Eng Arch/Eng Arch/Eng Arch/Eng Arch/Eng
A-300 A-300 A-300 A-300 A-300
CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
B-200 B-200 B-200 B-200 B-200
Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor
A-300 A-300 A-300 A-300 A-300
Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor Arch/CM/Trade Contractor
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-500 A-500 A-500 A-500 A-500
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
A-300 A-300 A-300 A-300 A-300
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch Arch
A-300 A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-500 A-500 A-500 A-500 A-500 A-500
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
A-400 A-400 A-400 A-400 A-400 A-400
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
41
SOLVE Design & Construction - CON 453 Healthcare Clinic
04 40 Fire Protection 04 40 10 Fire Suppression 04 40 30 Fire Protection Specialties 04 50 Electrical 04 50 20 Electrical Service and Distribution 04 50 30 General Purpose Electrical Power 04 50 40 Lighting 04 50 50 Miscellaneous Electrical Systems 04 60 Communications 04 60 10 Data Communications 04 60 20 Voice Communications 04 60 30 Audio-Video Communication 04 60 60 Distributed Communications and Monitoring 04 60 90 Communications Supplementary Components 04 70 Electronic Safety and Security 04 70 10 Access Control and Intrusion Detection 04 70 30 Electronic Surveillance 04 70 50 Detection and Alarm 04 70 70 Electronic Monitoring and Control 04 70 90 Electronic Safety and Security Supplementary 04 80 Integrated Automation 04 80 10 Integrated Automation Facility Controls 05 EQUPMENT AND FURNISHINGS 05 10 Equipment 05 10 10 Vehicle and Pedestrian Equipment 05 10 30 Commercial Equipment 05 10 40 Institutional Equipment 05 10 60 Residential Equipment 05 10 70 Entertainment and Recreational Equipment 05 10 90 Other Equipment 05 20 Furnishings 05 20 10 Fixed Furnishings 05 20 50 Movable Furnishings 06 SPECIAL CONSTRUCATION AND DEMOLITION 06 10 Special Construction 06 10 10 Integrated Construction 06 10 20 Special Structures 06 10 30 Special Function Construction 06 10 50 Special Facility Components 06 10 60 Athletic and Recreational Special Construction 06 10 80 Special Instrumentation 06 20 Facility Remediation 06 20 10 Hazardous Materials Remediation 06 30 Demolition 06 30 10 Structure Demolition 06 30 30 Selective Demolition 06 30 50 Structure Moving 07 SITEWORK 07 10 Site Preparation 07 10 10 Site Clearing 07 10 20 Site Elements Demolition 07 10 30 Site Element Relocation 07 10 50 Site Remediation 07 10 70 Site Earthwork
Date: 27 October 2014
C-100 Arch C-100 Arch
C-100 Arch C-100 Arch
A-300 A-300
Eng Eng
A-400 Eng A-400 Eng
A-400 A-400
CM CM
A-500 A-500
CM/Trade Contractor CM/Trade Contractor
A-500 Eng/CM/Trade Contractors A-500 Eng/CM/Trade Contractors
A-500 Eng/CM/Trade Contractors A-500 Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100
Arch Arch Arch Arch
C-100 C-100 C-100 C-100
Arch Arch Arch Arch
A-300 A-300 A-300 A-300
Eng Eng Eng Eng
A-400 A-400 A-400 A-400
Eng Eng Eng Eng
A-400 A-400 A-400 A-400
CM CM CM CM
A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-500 A-500 A-500 A-500
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
A-500 A-500 A-500 A-500
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-500 A-500 A-500 A-500 A-500
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
A-300 A-300 A-300 A-300 A-300
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
A-300 A-300 A-300 A-300 A-300
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-400 A-400 A-400 A-400 A-400
CM CM CM CM CM
A-500 A-500 A-500 A-500 A-500
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
A-500 A-500 A-500 A-500 A-500
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
A-500 A-500 A-500 A-500 A-500
Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors Eng/CM/Trade Contractors
Arch
C-100 Arch
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
C-100 C-100 C-100 C-100 C-100
07 20 Site Improvements 07 20 10 Roadways C-100 07 20 20 Parking Lots C-100 07 20 30 Pedestrian Plazas and Walkways C-100 07 20 40 Airfields C-100 07 20 50 Athletic, Recreational, and Playfield Areas C-100 07 20 60 Site Development C-100 07 20 80 Landscaping C-100 07 30 Liquid and Gas Site Utilities 07 30 10 Water Utilities C-100 07 30 20 Sanitary Sewerage Utilities C-100 07 30 30 Storm Drainage Utilities C-100 07 30 50 Site Energy Distribution C-100 07 30 60 Site Fuel Distribution C-100 07 30 90 Liquid and Gas Site Utilites Supplementary Components C-100 07 40 Electrical Site Improvements 07 40 10 Site Electric Distribution Systems C-100 07 40 50 Site Lighting C-100 07 50 Site Communications 07 50 10 Site Communications Systems C-100 07 60 Miscellaneous Site Construction 07 60 10 Tunnels N/A A Additional Information A Construction Systements A Construction Equipment N/A B Temporary Safety N/A C Temporary Security N/A D Temporary Facilities N/A E Weather Protection N/A B Space A Construction Activity Space N/A B Analysis Space N/A C Information A Construction Information C-100 B Engineering Information C-100 C Record Information C-100 C Datum A Grid C-100 B Levels C-100 C Orgin C-100
Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch
A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng
A-300 A-300 A-300 A-300 A-300
Eng/Arch Eng/Arch Eng/Arch Eng/Arch Eng/Arch
A-300 A-300 A-300 A-300 A-300
CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
C-100 C-100 C-100 C-100 C-100
Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM
C-100 C-100 C-100 C-100 C-100
Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM
Arch Arch Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch Arch Arch
A-400 A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng Eng
A-300 A-300 A-300 A-300 A-300 A-300 A-300
Eng/Arch Eng/Arch Eng/Arch Eng/Arch Eng/Arch Eng/Arch Eng/Arch
A-300 A-300 A-300 A-300 A-300 A-300 A-300
CM CM CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400 A-400 A-400
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
C-100 C-100 C-100 C-100 C-100 C-100 C-100
Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM
C-100 C-100 C-100 C-100 C-100 C-100 C-100
Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM Arch/CM
Arch Arch Arch Arch Arch Arch
C-100 C-100 C-100 C-100 C-100 C-100
Arch Arch Arch Arch Arch Arch
A-400 A-400 A-400 A-400 A-400 A-400
Eng Eng Eng Eng Eng Eng
A-300 A-300 A-300 A-300 A-300 A-300
Eng/Arch Eng/Arch Eng/Arch Eng/Arch Eng/Arch Eng/Arch
A-300 A-300 A-300 A-300 A-300 A-300
CM CM CM CM CM CM
A-400 A-400 A-400 A-400 A-400 A-400
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
C-100 C-100 C-100 C-100 C-100 C-100
Eng/CM Eng/CM Eng/CM Eng/CM Eng/CM Eng/CM
A-300 A-300 A-300 A-300 A-300 A-300
Eng/CM Eng/CM Eng/CM Eng/CM Eng/CM Eng/CM
Arch Arch
C-100 Arch C-100 Arch
A-400 A-400
Eng Eng
A-300 Eng/Arch A-300 Eng/Arch
A-300 A-300
CM CM
A-400 A-400
CM/Trade Contractor CM/Trade Contractor
C-100 Eng/CM C-100 Eng/CM
A-300 Eng/CM A-300 Eng/CM
Arch
C-100 Arch
A-400
Eng
A-300 Eng/Arch
A-300
CM
A-400
CM/Trade Contractor
C-100 Eng/CM
A-300 Eng/CM
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
Arch Arch Arch
C-100 Arch C-100 Arch C-100 Arch
A-300 A-300 A-300
Eng Eng Eng
A400 A400 A400
N/A N/A Eng Eng Eng
N/A N/A N/A
A-400 A-400 A-400
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
C-100 Arch/CM C-100 Arch/CM C-100 Arch/CM
N/A N/A N/A
Arch Arch Arch
C-100 Arch C-100 Arch C-100 Arch
A-300 A-300 A-300
Eng Eng Eng
A-500 Eng A-500 Eng A-500 Eng
N/A N/A N/A
A-400 A-400 A-400
CM/Trade Contractor CM/Trade Contractor CM/Trade Contractor
C-100 Arch/CM C-100 Arch/CM C-100 Arch/CM
C-100 Eng/CM C-100 Eng/CM C-100 Eng/CM
BUILDING INFORMATION MODELING PROJECT EXECUTION PLAN
42