Sep 1, 2017 - Interior Wall Framing: Area A (Library) 85% / Area B (Public) 95% / Area C 95%. Installation of drywall on
9/1/2017

September 5, 2017

CITY OF BUDA 2014 BOND PROGRAM UPDATE Heritage Tree Relocation Proposition 1 – City Hall/Library Proposition 2 – Public Safety Building

Project Update • • •

Proposition 1 & 2 – Site Development As of September 5, 2017 Work in Progress: • 1. Underground Utilities: 100% Complete – • Power: Transformer has been set, PEC connection complete, CH/L building is pending completion of the main electrical panels. • Drainage: 100% complete. Pedestrian Bridge 60% complete • Domestic Water and Sanitary Sewer: 100% complete. • Fire Systems : Site Fire Hydrants complete and active. • 2. Drainage Channel: Stone walls and bed100% complete. Apron at the east end of culverts steel set, concrete pour pending. Landscaping along channel pending completion of the building. • 3. Parking lots: Curb and gutters 100% complete for PSB, 85% complete for CH/L, main drive through the site 100% complete. Irrigation sleeves installed at islands. • 4. Landscaping: Final grade and start of landscaping pending towards end of exterior work. • 5. Heritage Tree: Weekly feeding and watering of the tree continues. According to the Arborist, the tree is progressing and re-establishing as expected. Latest report received August 20, 2017.

1

9/1/2017

Project Update

2

9/1/2017

Project Update • Proposition 1 - City Hall / Library: • As of September 5, 2017 • Work Completed to date: • 1. Exterior: Waterproofing 75%, Stone 60% complete. • 2. Interior Wall Framing: Area A (Library) 85% / Area B (Public) 95% / Area C 95%.

Installation of drywall on one side has started – 10% Complete. Elevator shaft and hardware installed 75%. • 3. Glass and Glazing: Installation of window frames – 75% complete. Glazing for Area C is 70% complete. • 4. OH MEP Rough-in: Installation of the OH and in-wall MEP rough-in 60% complete. All Roof top units installed. Mechanical duct work 85% complete. • 5. Polished Concrete: Polished concrete for area B (Public Space) is 100% complete. First stage of grinding 100% complete. Final finish polishing – 60% complete.

Project Update

3

9/1/2017

Project Update

Project Update

4

9/1/2017

Project Update

Project Update

5

9/1/2017

Project Update

Project Update

6

9/1/2017

Project Update

Project Update • Proposition 2 – Public Safety Building: • As of week September 5, 2017 • Work In Progress: • 1. Site Work: Curb and Gutter – 95% complete / PSB Garage Slab 100% Complete • 2. Exterior Wall Finishes: Stone 100% / Stucco 45%. • 3. Interior Wall Framing and Ceilings: Framing, Drywall and Hard Ceilings 100% / Finishes 35% • 4. Interior Finishes: Polished Concrete 100% / Floor & Wall Tile 85%. / Paint 1st coat 70% / Hard Ceilings installed, Door frames complete / Lay-in Ceiling frames installed • 5. Glass and Glazing: All window frame installation 100% framing is complete, glass installation is 90% complete. • 6. Roofing: TPO roof is 100% complete, standing seam roofing 35% • 7. MEP: MEP Complete, Roof top units installed and operating. Final trim pending • 8. Fire Protection System: Complete • 9. Polished Concrete: Complete

7

9/1/2017

Project Update

Project Update

8

9/1/2017

Project Update

Project Update

9

9/1/2017

Project Update

Project Update

10

9/1/2017

QUESTIONS?