code of practice - Main Roads

13 downloads 491 Views 977KB Size Report
E-mail: [email protected]. The Code of Practice, including subsequent amendments, is also available on
U t i l i t y P rov i d e r s

C o d e o f P r ac t i c e for Western Australia

C ode of P rac t i c e

U TILITY P ROVIDERS C ODE OF P RAC TI C E FOR W ESTER N A U STRALIA This Code of Practice has been endorsed by the Infrastructure Co-ordinating Committee of the Western Australian Planning Commission

Produced by the Utility Providers Services Committee. Applicable from February 1, 2010. Supersedes all previous Information Manuals and Codes of Practice. Amendments:

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



1

Co d e o f P rac t i c e

O r g a n i s at i o n s Represented on the U t i l i t y P r ov i d e r s S e rv i c e s C o m m i t t e e ( U P S C )

Western Power (Chairman/Co-ordinator) Main Roads WA Department of Planning City of Perth Water Corporation Western Power (Member) WestNet Energy Services (Gas Distribution) Telstra Horizon Power Western Australian Local Government Association Institute of Public Works Engineering, Australia (WA Division) Civil Contractors Federation (WA) Public Transport Authority (PTA) (Rail) Urban Development Institute of Australia Dial Before You Dig (WA) Roadside Conservation Committee Stakeholder Organisations not represented on the UPSC

A c c o u n ta b i l i t y a n d E n v i ro n m e n t

WA Local Government Association (Chairman) Department of Planning City of Fremantle City of Perth Roadside Conservation Committee

Correspondence should be addressed to:

Organisations Represented on Sub-Committees: S i t e w o r k s a n d Sa f e t y

City of Perth (Chairman) City of Fremantle Civil Contractors Federation (WA) Institute of Public Works Engineering, Australia (WA Division) WA Police Service WorkSafe WA Energy Safety WA U t i l i t y

Water Corporation (Chairman) Telstra WestNet Energy Services (Gas Distribution) Western Power Horizon Power Urban Development Institute of Australia Institute of Public Works Engineering, Australia (WA Division) Civil Contractors Federation Main Roads WA Dial Before You Dig (WA)

This Code of Practice is subject to review and amendment by the Utility Providers Services Committee.

WA Police Service WorkSafe WA Energy Safety WA City of Fremantle State Land Services WA Planning Commission Department of Environment and Conservation

2

S e rv i c e A l i g n m e n t a n d C o - o r d i n at i o n

Robert Rogerson Chairman/Co-ordinator Utility Providers Services Committee Western Power 85 Princep Road JANDAKOT WA 6164 (Locked Bag 2511, PERTH WA 6001) E-mail: [email protected] The Code of Practice, including subsequent amendments, is also available on the Main Roads WA Website, which can be accessed at www.mainroads.wa.gov.au (‘Using Roads’>‘Road & Traffic Information’>‘Works on Main Roads’> State and Local Roads – Utility Providers Code of Practice for WA).

P r o v i d e r s

C o d e

o f

P r a c t i c e

index Section Page No. 1. Terms of reference and accountability........................................................4 2. History.........................................................................................................5 3. Standard allocation of space in road reserves............................................5 4. Standard procedures prior to commencing work.......................................6 5. Minimum standard of cover for underground utility services and clearance of overhead power lines and telecommunication cables..........14 6. Standard restoration and reinstatement of infrastructure........................16 7. Emergency procedure and contacts..........................................................16 8. Environment and heritage........................................................................18 9. Special notes.............................................................................................20 appendix A.............................................................................. 22 Directory of Information on Utility Service Providers, Road Authorities, PTA (Rail) and other applicable organisations regarding plant in road reserves and rail reserves appendix B.............................................................................. 38 Road Reserve Allocations for Utility Service Providers: Figures showing Standard Alignment; Green Field Development; Narrow Road Reserves; and Paved Laneways Table B1.................................................................................. 50 Clearance Zones Guide – Clearance Limits to Underground Utility Services when Undertaking Works in Road Reserves appendix C.............................................................................. 54 Traffic Control and Safety appendix D............................................................................. 57 Utilities Located in Rail Reserves – Process and Information appendix E.............................................................................. 67 Utility Services Located in the Dampier to Bunbury Natural Gas Pipeline (DBNGP) Corridor– Process and Information appendix F.............................................................................. 71 Environmental checklist Emergency procedures and contacts.....................................................73 U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



3

Co d e o f P rac t i c e

1. TERMS OF REFERE N C E A N D AC C O U N TA B ILITY

In addition there may be a requirement for telecommunication service providers to obtain development approvals and building licences from Local Governments for works other than those defined as ‘low impact’ facilities in the Telecommunications (Low-impact Facilities) Determination 1997 and subsequent amendments.

The Utility Providers Services Committee (UPSC) operates as an independent entity and a subcommittee of the Western Australian Planning Commission (WAPC) with a formal reporting link to the Infrastructure Co-ordinating Committee (ICC) of the WAPC. The ICC includes the following State Government agencies and organisations: Department of Planning, Main Roads WA, Water Corporation, Department of Environment and Conservation, Local Government representative, Office of Energy, Department of Housing, Department of Mines and Petroleum, Department of State Development, LandCorp, Department of Health, Department of Water, Department of Education and Training and Department of Treasury and Finance.

Based on this framework, the aims of the UPSC are: (a) to secure the co-operation of all authorities concerned to co-ordinate the use of space within road reserves and assist in the approval of utility services located within rail reserves; (b) to develop and issue Codes of Practice agreed in principle by the authorities concerned; (c) to determine methods of control and to co-ordinate the use of agreed Codes of Practice; (d) to facilitate co-ordinated works-programs to achieve maximum efficiency and to minimise costs to communities through the mutual co-operation of the authorities concerned;

The UPSC focuses on establishing standards for operational issues including the co-ordination of utility service works, siteworks safety, environment, allocation of alignments and corridors for utility services within road reserves and indicating requirements for utility services located within rail reserves. Recommendations from the UPSC on strategic and public policy matters about the control and enforcement of utility providers’ plant within road reserves are referred to the ICC for endorsement.

(e) to develop and implement guidelines for activities within environmentally sensitive areas to minimise impact on streetscapes and to maintain acceptable safety standards; (f) to enable authorities concerned to share information on technological ‘best practices’; and (g) to obtain endorsement from the Infrastructure Co-ordinating Committee (ICC) to UPSC resolutions: sanctioning by the ICC will constitute policy endorsement.

The Utility Providers Code of Practice is referenced in Liveable Neighbourhoods produced by the WA Planning Commission. Telecommunication Carriers are defined in and subject to Commonwealth legislation under the Telecommunications Act (1997)(Cth) and the Telecommunications Code of Practice (1997) (Cth), including subsequent amendments. Licensed Telecommunications Carriers are exempt from some State or Territory laws. Where these laws are not consistent with the Telecommunications Act, the Commonwealth legislation will apply. 4

U t i l i t y

Although the above compliance obligations have been established for the UPSC, investigation is being done to determine the most appropriate framework, be that legislative or otherwise, to provide Main Roads WA and Local Government with clear jurisdiction to manage services within road reserves in a consistent and fair manner.

P r o v i d e r s

C o d e

o f

P r a c t i c e

Roads in WA are managed by either the relevant Local Government, Main Roads WA or the Department of Environment and Conservation (within National Parks). However, land within dedicated public roads is Crown Land subject to the Land Administration Act 1997. State Land Services (SLS), a Business Unit of the Department of Regional Development and Lands (RDL), administers this Act and Crown land and has a key role in relation to policy, legal and land management issues impacting on roads (refer also to Planning and Land Management in Appendix A7).

Government Departments and public utility providers met in the Council Chambers, Town Hall, Hay Street, Perth. 2.2

Following a period between mid 1994 and the end of 1996 in which the PUSC did not meet, the PUSC was reconstituted at a meeting on February 11 1997, with Main Roads WA providing the new role of Chairperson and Co-ordinator of the Committee. The Committee was chaired and co-ordinated by the Department for Planning and Infrastructure between 2003 and 2006. This role was transferred back to Main Roads WA between 2006 and 2009.

Note: (a) In this Code of Practice ‘road authority’ refers to Main Roads WA and Local Governments. (b) Refer also to Main Roads WA document ‘Utility Services in Road Reserves – Policy Statement; Application Guidelines; Approval Guidelines; Technical Guidelines; and Administration Guidelines’ regarding location of utility services in road reserves, including structures, managed by Main Roads WA. In particular note Policy and Guidelines applicable to declared Control of Access road reserves and rural/regional road reserves outside urban/townsite areas. This document is located on the Main Roads WA Website (refer to page 2).

During 2009, the Committee appointed a representative from Western Power as Chairman/ Co-ordinator for a fixed period of two years. 2.3

Due to the commercialisation and privatisation of Utility owners, the PUSC was changed to the Utility Providers Services Committee (UPSC). 3. STA N DARD ALLO C ATIO N OF S PAC E I N ROAD RESERVE s

(c) Maps of State Roads and Local Roads managed by Main Roads WA and Local Governments, including those declared Control of Access, are located on Main Roads WA Website: ‘Using Roads’ > ‘Touring WA & Maps’ > ‘State Road Network Maps’.

3.1

This Code of Practice applies to both urban (townsite and built up areas) and rural/regional road reserves (outside townsites and built up areas). Applications of this Code of Practice apply to standard service alignments, green field developments, utilities located in narrow road reserves (nominally 14 – 16m) and paved laneways.

2. HISTORY

In rural/regional road reserves utility providers are to refer to either Main Roads WA or the Local Government for advice, as urban type standard allocations may not apply. In the case of Main Roads, it is policy to locate utility services outside

2.1

The Public Utilities Services Committee (PUSC) was founded on June 22, 1923 when a meeting of representatives of the Perth City Council, various U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



5

Co d e o f P rac t i c e

the road reserve unless there are exceptional circumstances that preclude this position. Special easements may be required for these cases. It is also recommended that utility services are located outside of Local Government road reserves where this minimises the impact on native vegetation.

3.5

In the case of road reserves with declared Control of Access, location of utility services is generally not permitted. Refer to Section 1, Note (b) regarding Main Roads WA Policy and Guidelines for ‘Utility Services in Road Reserves’.

3.6

Co-location of similar utility services is most desirable and encouraged. 3.2

In developed road reserves the previously agreed alignments already occupied may continue to apply, but the green field development, narrow road reserve and paved laneway alignments will be adhered to for all new utility services including non-active utility services for future use. Alteration to standard positions may be made following negotiation between engineers or qualified officers of the road authority concerned and the Utility Provider and between affected Utility Providers. Refer to Special Notes, Sections 9.1 and 9.2. When alteration from allocated alignments is made, a written agreement is required for future reference. 3.3

Diagrams showing the standard location of utility services in the road reserve together with associated notes are detailed in Appendix B.

Unless otherwise directed, road authorities are responsible for the management of the total road reserve and associated structures eg bridges and tunnels.

‘Third Pipe’ for Non-Drinking (non-potable) Water The Water Corporation and GHD are investigating options for service connections and trunk main alignments. A pipe up to 600mm diameter is envisaged. A proposal is expected to be available shortly and will be included as an amendment to this Code of Practice. 4. STA N DARD P RO C ED U RES P RIOR TO C OMME N C I N G W OR K

Prior to commencing any work involving excavation or boring in the road reserve or on private land, contact shall be made with Dial Before You Dig, and other relevant authorities (eg utility providers, road authority, etc). 4 . 1 D i a l B e f o r e Yo u D i g

3.4

Although standard allocation of space in road reserves is provided as a desirable practice, environmental considerations described in Sections 8 may impact on these standard allocations.

Digging Without Disasters

The provision of reduced verge width adjacent to parks/public open space may require services to be located within the parks/public open space with the approval of the Local Government. A special easement may be required.

Dial Before You Dig (DBYD) provides a single Australia wide point of contact between excavators and major utilities that own buried pipes and cables, as well as the owners of other buried services.

6

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

This service makes it easier and safer for people undertaking excavation activities by enabling them to determine what services exist in the area of proposed work.

(c) Be aware that not all owners of underground assets are members of Dial Before You Dig. Also note that not all DBYD Members provide DBYD information: depends on the type of membership.

Note: The individual utility provider members may charge for provision of maps and information.

(d) For further information on Dial Before You Dig, visit the Website: www.1100.com.au or Telephone: 1100 during office hours.

This service does not include railway infrastructure in rail reserves for which information should be sought from PTA (Rail). Refer to Appendix D.

(e) Contact the relevant road authority.

To use of the DBYD service simply lodge your enquiry at least two working days in advance of your intention to excavate. Enquiries may also be lodged by Website: www.1100.com.au; Phone: 1100; or Facsimile: 1300 652 077.

(f) For activities and works in the Dampier to Bunbury Natural Gas Pipeline (DBNGP) corridor, contact State Land Services (RDL), Infrastructure Corridors (refer also to Appendix A, A7 Planning and Land Management and Appendix E).

The requested information needs to clearly identify the precise location where the excavation is proposed. If you have not received your requested information from DBYD members after two working days from the date of your request, contact the member directly as listed on your DBYD Request Confirmation.

4 . 2 D u t y o f Ca r e a n d P r e v e n t i o n o f Da m a g e to S e rv i c e s

To assist a person(s) or Agency proposing to undertake excavation work in meeting their duty of care and to prevent or minimise damage to services, the following actions need to be implemented as a minimum requirement: • Plan • Pothole • Protect – and only then • Proceed

Note: (a) No work is to commence until all relevant information has been received. Refer also to WorkSafe WA Regulation 3.21. It is a requirement of the Regulation 3.21 that all underground assets are located in a job site prior to excavation. Those underground assets owners who choose not to register with Dial Before You Dig make it difficult for the excavator/contractor to be aware of the underground assets and to take precautionary measures to avoid damaging those assets.

P LA N

Obtain all applicable plant drawings available. In addition contact the relevant road authority as Dial Before You Dig does not represent all asset owners.

(b) If you have received information from DBYD and require further data and/or other information, it can be obtained by telephoning the contacts listed on the Confirmation response. Further information regarding Telstra can be obtained by telephoning 1800 806 246. U t i l i t y

P r o v i d e r s

C o d e

Contact utility providers for their recommended safe digging practices to protect their plant and comply with any specific requirements. For services intended to enter or cross rail reserves in the Metropolitan Area, which are usually o f

P r a c t i c e



7

Co d e o f P rac t i c e

fenced with gates, contact PTA (Rail) for advice on accessing the rail reserve even for preliminary reconnaissance. Refer to Appendix D. P O T H O LE

Using the plant drawings and onsite location markings as an indication of plant presence, DIG BY HAND SHOVEL to expose ALL applicable plant within 2.5m of the job to be performed.

Dept of Regional Development and Lands

Dampier to Bunbury Gas Pipeline

DBP Transmission – Land Management

Karratha to Port Hedland

Epic Energy

Pilbara to Goldfields

Agility APA Group

Cape Lambert Pipeline

Agility APA Group

Parmelia Pipeline (Dongara to Pinjarra)

Agility APA Group

Mid-West Pipeline (Geraldton to Murchison)

Agility APA Group

8

U t i l i t y

Agility APA Group

Kambalda to Esperance Pipeline

WorleyParsons Asset Mgt P/L

Protect all applicable plant in either a bore or trench that has been exposed (barricades, parra webbing, flags, etc).

Note: (a) No digging shall be done over high pressure gas transmission mains or within the easement set aside for high pressure gas transmission mains (or laterals) without written permission from the owner or manager of the pipeline, or in the case of activities and works in the DBNGP corridor, State Land Services (DRDL), Infrastructure Corridors. The table below lists the major Pipelines and Managers.

DBNGP Corridor

Port Hedland to Telfer Pipeline

PROTECT

Where the job is parallel to specific plant, pothole every 5m along the route.

Manager

Manager

(b) For railway crossings, buried signals and communications services need to be located or exposed by WestNet or PTA (Rail) staff.

Check that ALL plant and crossings have been exposed.

Pipeline

Pipeline

Ensure Supervision or monitoring of the operator of the trenching or boring machine when near plant. Advise ALL personnel working on site of existing hazards. P R O C EED

When ALL checks have been completed – then proceed with care. For emergencies refer to the contact numbers listed in Section 7 or inside back cover. ‘As Constructed’ Detail of Works Any agency or contractor constructing works shall ensure that adequate ‘as constructed’ detail of the works is recorded. The ‘as constructed’ information shall be submitted to the appropriate agency for inclusion in their records. This is a Mandatory requirement. When an agency or contractor receives ‘as constructed’ information from a DBYD member that proves to be inaccurate, they shall provide the accurate information to the appropriate agency for updating of their records.

P r o v i d e r s

C o d e

o f

P r a c t i c e

Why you should:

(b) Check for potential environmental and heritage impacts and obtain approvals from Regulatory Agencies (eg. Heritage Council of WA, Department of Environment and Conservation, Department of Indigenous Affairs, Local Government, etc).

Dial Before You Dig. Refer to the following pictures of events that caused major damage and injury which could have been avoided if the worker had used:

(c) Where applicable walk the route of proposed works with the road authority representative to identify native vegetation, possible locations of conflict and alternative routes.

Dial Before You Dig.

(d) Utility Providers must submit a required Application and obtain approval in writing from the road authority for works proposed in the road reserve at least ten working days before commencing work. The Application must include a completed Environmental Checklist (as detailed in Appendix F or equivalent) applicable to the proposed works. This is a mandatory requirement. Note: A clearing permit is likely to be required from the DEC where any clearing of native vegetation (herbs, shrubs, trees [dead or alive] occurs and can take several months to complete the process.

In the case of Main Roads WA, Utility Providers are required to submit an Application Form, which includes an Environmental Checklist advising Main Roads WA of the proposed works and reference to any current Agreement or Memorandum of Understanding between Main Roads WA and the Utility Provider. These documents can be accessed from the Main Roads WA Website: www.mainroads.wa.gov.au (Refer to Page 2).



In the case of Telstra, for activities that are defined as ‘low-impact facilities’ in accordance with the Telecommunications (Low-impact Facilities) Determination 1997, the use of the Application Form and other approval processes (eg environmental check list) set out in 4.3.1 (d) are not applicable. Unless otherwise agreed

4 . 3 P ro j e c t P l a n n i n g – U t i l i t y P ro v i d e r s a n d Ro a d A u t h o r i t i e s 4.3.1

Plant that is to be installed on the alignment specified in Section 3 and detailed in Appendix B drawings. (a) Obtain information on the location of all other utility providers’ plant throughout the length of the proposed route. Refer to Dial Before You Dig (4.1). U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



9

Co d e o f P rac t i c e

(within an MOU or other formal Agreement), Telstra will provide 10 Business days notification to road authorities, in accordance with the Telecommunications Code of Practice 1997, using a standard Telstra Land Access and Activity Notice. The road authority may object to the proposed activity in accordance with the Telecommunications Act 1997 and Telecommunications Code of Practice 1997 (eg incomplete information and environmental assessment). (e) Obtain an agreement with the road authority on the Reinstatement Requirement applicable in the road reserve and applies to trenched pavements and cleared vegetation in the road verge area. Main Roads WA or Local Government (endorsed Institute of Public Works Engineering, Australia document) specifications are available. Refer to 6.1. (f) Prior to commencing the works, traffic management and safety permits may be required from the road authority.

Refer to Appendix C, Traffic Control and Safety.

(g) It is the responsibility of road authorities and utility providers and their contractors or subcontractors to be fully conversant with all relevant Codes, Regulations, Policies and Acts that apply to their work. Consultation with relevant road authorities and utility providers may be necessary to obtain this information (eg notification of proposed works, environmental assessment, traffic management plans, reinstatements, etc). (h) Telecommunications within Road Reserves – Austroads Guidelines and subsequent amendments: Austroads has produced two documents for use by road authorities when Telecommunication Carriers plan to install ‘Low-impact Facilities’ (particularly cables/ conduits) in road reserves:

1 0

U t i l i t y

• Operational Guidelines (2007) – also equivalent document produced by the Communication Alliance for use by Carriers; and • Administrative Guidelines (2007). Regarding facilities that are not ‘Low-impact Facilities’, planning approvals are required in addition to established policies in Main Roads, Local Government and the Western Australian Planning Commission. Main Roads WA owns and manages many major roads, such as highways and main roads in WA. Local roads are managed by the relevant Local Government. Land in dedicated public roads is, however, Crown land owned by the State of WA. SLS (RDL) administers Crown land on behalf of the State. The Telecommunications Code of Practice provides for comment from both the land owner (SLS (RDL), in relation to local public roads) and occupier (Local Government, as road manager) to proposed installations of ‘Low-impact Facilities’. SLS (RDL) has an interim Memorandum of Understanding (MOU) with Telstra, which avoids the need for specific SLS (RDL) Land Access Notifications of most ‘Low – impact Facilities’ to be installed in roads. However, this applies to Telstra only, while the MOU remains in existence. All other Carriers will need to notify and seek comment from SLS (RDL) for installations in road reserves, except those owned by Main Roads WA. Note: Main Roads WA has a MOU (currently being updated) with Telstra to assist in the management of Telstra facilities in Main Roads WA road reserves and applies to activities for which Telstra is required to give notices under the Telecommunications Act 1997 (C’th) and the Telecommunications Code of Practice 1997 and subsequent amendments.

P r o v i d e r s

C o d e

o f

P r a c t i c e

4.3.2

4.3.3

Plant (utility service) which is to be installed in alignments other than those specified in Section 3.

Maintenance work on existing services plant in the road reserve.

(a) Obtain information on the location of other utility providers’ plant and proposed street alignments throughout the length of the proposed route in consultation with all authorities concerned. Consult with affected land owner’s if applicable, the appropriate land use planning authority for long term planning if necessary and ensure all land matters are in order before proceeding. Refer to Dial Before You Dig (4.1). A NOTICE OF INTENT or PRELIMINARY TO WORKS (in accordance with Land and Planning Acts) may not be adequate in all cases.

(a) Notify any utility provider or road authority that may be affected (eg. Excavation in a busy street or footpath) to expedite reinstatement. Refer to Dial Before You Dig (4.1).

(b) There may be instances where plant is located in existing and/or future reserves or easements that may impact on adjoining property as identified in Special Note Section 8.8.

In areas where special conditions apply, such as excavation of busy streets and pedestrian ways, appropriate preparations and notifications are to be made by the utility provider undertaking the work to minimise inconvenience to the public and to comply with legal requirements.

(b) Utility providers must obtain an agreement with the road authority on the Reinstatement Requirement applicable in the road reserve. Refer to Section 4.3.1 (e). This is a mandatory requirement. (c) Refer to 4.3.1 (f) and Appendix C regarding Traffic Control and Safety. 4.3.4

Special Precautions.

(c) Formally notify all utility providers and appropriate road authorities at least ten working days in advance of proposed work including provision of a route plan showing street alignments. Approvals must be obtained or Notifications undertaken in accordance with 4.3.1(d) prior to proceeding with the works. This is a mandatory requirement.

4.3.5

For road construction in new areas and upgrading work in other areas. The constructing authority is to notify and consult all utility providers in advance including a plan showing extent of earthworks and finished levels of the proposed construction. This consultation process should allow for delays in obtaining appropriate information and approvals. As a mandatory requirement service relocation issues, including cost, must be resolved before proceeding with any works.

(d) Obtain an agreement with the road authority on the Reinstatement Requirement applicable in the road reserve. Refer to 4.3.1 (e). (e) Refer to 4.3.1 (f) and Appendix C regarding Traffic Control and Safety.

In the case of rural/regional areas, where services may not be on allocated alignments, it is essential to resolve relocation issues prior to proceeding with any works.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



1 1

Co d e o f Prac t i c e

4.3.6

4.3.9

Where the work is for the connection of a utility service to a street main.

Attachment of Non-Visible Utility Services to Bridges and Structures Managed by Road Authorities (generally Main Roads WA).

The utility providers concerned shall be responsible for determining the exact location of existing plant in the road reserve before starting work eg ‘pot-holing’ by hand. The utility provider shall provide as much guidance and control as possible, particularly when contractors and sub-contractors are involved. Refer to Standard Procedures Prior to Commencing Work in Sections 4.1 and 4.2 with emphasis on PLANNING, POTHOLING, PROTECTING and PROCEEDING.

Non-visible utility services include conduits, pipes, etc, but exclude microwave dishes, mobile phone antennae, etc. The Utility Provider shall consult with Main Roads WA and obtain a Utility Service Management Agreement prior to the installation and attachment of a utility service facility to existing or new traffic bridges, traffic structures, tunnels and other road service structures. Refer to Section 3.4.3 of Main Roads WA ‘Utility Services Application and Approval Guidelines’ located on Main Roads WA Website (refer to page 2).

4.3.7

For sub-surface works in the road reserve other than for service connection. (a) Obtain information on the location of all utility provider plant in the area affected. Refer to Dial Before You Dig (Section 4.1).

4.3.10

Redundant or Abandoned Utility Services.

(b) The design of the work shall take into account the existing plant in the road reserve, shall conform with this Code of Practice and the road authority advised of proposed works. 4.3.8

Rural/Regional Areas. Traditionally most utility services in rural areas have been located within the road reserve. They may be located outside road reserves, particularly those managed by Main Roads WA. However, road reserves often contain important native vegetation and thus every effort should be made to avoid the placement of new utility services in the road reserve. Should it be necessary to locate utility services in road reserves, methods such as thrust boring should be utilised to minimise the disturbance to vegetation. In these situations and undertaking vegetation maintenance within the utility service corridor, consultation with both the road authority and other utility service providers (as applicable) is mandatory. 1 2

U t i l i t y

When utility services have become redundant, decommissioned from service or abandoned, the utility provider must remove the service from the road reserve or make the service safe regarding interference to adjacent infrastructure and environment and keep records of these abandoned services to enable information to be provided to DBYD as required. In the case of utility services attached to bridges or other structures managed by road authorities, detail of managing redundant services, including the removal of the service from the structure, is included in a Service Management Agreement (refer to Main Roads WA Application and Approval Guidelines, Section 3.4.3). Note: Essential Requirements (a) For those organisations other than utility providers and road authorities planning to work in road reserves,

P r o v i d e r s

C o d e

o f

P r a c t i c e

obtain approval in writing from the road authority before commencing work. This is a mandatory requirement.

Refer to Standard procedures Prior of Commencing Work Sections 4.1 and 4.2 with emphasis on PLANNING, POTHOLING, PROTECTION and PROCEEDING.

(b) For information on utility services in regional locations, contact DBYD or the relevant regional office of the utility provider – refer to Appendix A. DBYD covers all of the State but not all asset owners are associated with the DBYD service.

4.4.2

Closure of Roads or Major Interference to Traffic. When project construction requires closure of roads or major interference to vehicular or pedestrian traffic, detailed discussion/liaison is to be initiated and maintained with the WA Police Service and approval obtained from the road authority not less than 30 working days prior to the proposed road closure or interference to traffic. Also notify Fire and Emergency Services Authority, St John Ambulance Association, Transperth (Department of Transport) and the Taxi Council of WA (Refer to Appendix A for contact phone numbers and Facsimile numbers).

4 . 4 P ro j e c t C o n s t r u c t i o n 4.4.1

Duty of Care Constructing authorities and others operating in the public road reserve or rail reserve have a duty of care to protect the existing service assets of Utility Providers, the infrastructure of Road Authorities, the infrastructure of PTA (Rail) and the adjacent environment in addition to the duty of care to protect the safety of employees and public in the vicinity of the work area (refer to Section 4.3.1 (f) and Appendix C).

All traffic management and safety must comply with Australian Standards, Road Traffic Act 1974, Road Traffic Code 2000, Occupational Health and Safety Act 1984 and Traffic Management for Works on Roads Code of Practice 2009 referenced in Appendix C.

It is essential to determine the location of existing assets by obtaining plans and proving the exact location prior to commencement of excavation. Location plans of utility services are obtained in the first instance upon lodgement of a request to Dial Before You Dig (refer to Section 4.1).

4.5 Use of long term C o n t r a c to r s a n d S u b C o n t r a c to r s

The use of Contractors or Sub-Contractors on a long-term basis by both the road authority and utility providers is a common method of service delivery on behalf of the Principal Agency. It is emphasised that it is the Principal Agency’s responsibility to ensure that contractors and sub-contractors acting on their behalf are fully conversant with the requirements of this Code of Practice and obligation to consult relevant parties prior to proceeding with the works.

Failure to exercise this duty of care may result in a utility provider or road authority taking action to halt works and to recover the full cost of damages. Where it is not practical to comply with clearance requirements of this Code, approval shall be obtained from the utility provider. Any damage to underground services, however minor, shall be reported to the utility provider.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



1 3

Co d e o f Prac t i c e

5. MI N IM U M STA N DARD o f C OVER f o r U N DERGRO U N D U TILITY SERVI C ES a n d C LEARA N C E o f OVERHEAD P O W ER LI N ES a n d TELE C OMM U N I C ATIO N C A B LES

5.1.1

Gas (Yellow Pipe or Yellow Striped Pipe) (a) Distribution Mains (WestNet Energy Services and Agility) Street mains • 750 mm in road reserve (verge or under road pavement) Consumer services • 600 mm in road reserve (verge or under road pavement)

5 . 1 M i n i m u m S ta n da r d o f C o v e r f o r U n d e r g ro u n d U t i l i t y S e rv i c e s

(b) High Pressure Distribution Pipelines (WestNet Energy Services)

Although Utility Providers have a commitment to comply with allocated alignments and depths, no assurance can be given that the depths of cover stated will exist for all existing facilities. Before any excavation is planned or commenced contact Dial Before Your Dig for the appropriate procedure and information (refer to Section 4.1).

Street mains • 1 200 mm in road reserve (verge or under road pavement) Consumer services • 1 200 mm in road reserve (verge or under road pavement)

The minimum depths of cover required for new services buried in Rail Reserves are defined in AS4799-2000.

(c) For specific details applied to WestNet Energy Services or Agility contact these utility providers or relevant pipeline managers direct (refer to Appendix A3).

It is emphasised that Utility Providers and associated contractors have a Duty of Care whilst undertaking service works. Refer to Section 4.4.1. Note: (a) DISCLAIMER: Colours of pipe relate only to PVC and polyethylene pipe and other materials could be used, particularly in older established areas unless otherwise stated. Some services can be buried directly in the ground and not in conduits. All buried service assets should be treated as ‘Live’ unless otherwise confirmed. (b) The term ‘under road pavement’ means under the road pavement surface, that is, the area of the road reserve upon which motor vehicles travel.

1 4

U t i l i t y

5.1.2

Electricity (Orange pipe or Orange Striped Black Poly Pipe or Orange Electrical Tape for directly buried black cable). Some underground cables installed by directional drilling may not have tape above and are black. CAUTION It is possible that power cables may be located in multiple layers. Most mains and services (Western Power and Horizon Power) • 850 mm in verge and under road pavement, or as otherwise agreed between Western Power/ Horizon Power and the road authority. • Non Western Power and Horizon Power Street Light and low voltage private cables may

P r o v i d e r s

C o d e

o f

P r a c t i c e

The Water Corporation and GHD in association with Local Government are investigating options for service connections and trunk main alignments. A proposal is expected to be available shortly and will be included as an amendment to this Code of Practice.

be buried at a minimum depth of 600mm. Refer to Appendix B, Figure B2 and Note 18 of service allocations applied to Green Field Development. WARNING – Western Power supplies Un Metered Services to Local Governments for street lights, parks, etc. These services are typically service pillars of cable pits and are required to be shown on Western Power Plans. Cabling beyond these services are Local Government assets, the recording of which is their responsibility.

5.1.5

Sewerage (Cream Pipe or Grey Pipe or Cream/ Grey Striped Pipe) Sewer mains • 900 mm in road reserve (verge or under road pavement)

5.1.3

Telecommunications (White Pipe or White striped Black Poly Pipe)

Consumer services • 900 mm in road reserve (verge or under road pavement).

Street mains • 450 mm for excavation installations

5.1.6

• 600 mm for trench less installations

Main Drainage (Water Corporation)

Consumer services • 450 mm for excavation installations

Stormwater mains • 750 mm in verge

• 600 mm for trench less installations

• 900 mm under road pavement.

Note: There may be multi-Carriers with separate plant located within the allocated telecommunications alignment.

5.1.7

Street Drainage (Main Roads WA or Local Government)

5.1.4

Street Mains • 600 mm in road reserve (verge or under road pavement)

Water (Blue Pipe, Blue Striped or Black Pipe) Distribution mains • 750 mm in road reserve (verge or under road pavement)

Consumer services • 600 mm in road reserve (verge or under road pavement).

Reticulation mains • 600 mm in road reserve (verge or under road pavement)

5.1.8

Traffic Signals, Roadway Lighting and Intelligent Transport Systems (ITS) Cables

Consumer services • 450 mm in road reserve (verge or under road pavement).

(a) Traffic Signals MRWA Specification 712 Street mains (Orange Pipe) • 600 – 800 mm in verge and under road pavement

‘Third Pipe’/Effluent Reuse for NonDrinking (non-potable) Water (Purple Pipe)

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



1 5

Co d e o f Prac t i c e

Detectors (Orange Pipe or White Pipe) • 35 mm in carriageway asphalt • 300 mm in verge encased in PVC conduit. (b) Roadway Lighting MRWA Specification 701 (Orange Pipe) • 600 mm in verge and under road pavement (c) ITS Cable Conduits MRWA Specification 704 (Orange Pipe for power source) and (White Pipe for communications) • 600 mm in verge. 5 . 2 C l e a r a n c e o f Ov e r h e a d P ow e r L i n e s a n d T e l e c o m m u n i c at i o n s Ca b l e s

Clearance of overhead power lines and telecommunications cables above the ground in road reserves is to be in accordance with Western Power’s, Horizon Power’s or Telecommunications Carrier’s requirements. For clearances above road pavements, the organisation responsible for the overhead power lines or telecommunications cables is to obtain from the applicable road authority the maximum combined vehicle and load height for the road, and together with the overhead power line or telecommunication cable route data determine the clearance requirement. 6. STA N DARD RESTORATIO N A N D REI N STATEME N T OF I N FRASTR U C T U RE 6.1

It is a requirement that reinstatements be carried out as soon as practicable following work by a utility provider in a road reserve or rail reserve as agreed with the Road Authority or PTA (Rail).

1 6

U t i l i t y

The specification for reinstatement work and backfill of trenches including sign off of works undertaken and maintenance period is obtained from the Road Authority or PTA (Rail). Refer to Section 4.3.1(e). The Restoration and Reinstatement Specification produced by the Institute of Public Works Engineering, Australia (WA Division), for use by Local Governments is printed as a companion document with this Code of Practice. The Specification is also available on Main Roads WA Website with this Code of Practice. The utility provider or contractor is responsible for the Duty of Care in ensuring the safety of the public as well as employees during all works and reinstatement, until the site is accepted as satisfactory by the Road Authority or PTA (Rail). 6 . 2 C o s t o f R e i n s tat e m e n t

A utility provider or contractor is responsible for the cost of the reinstatement, inspections and any subsequent related work required during the maintenance period of the road, footpath, verge and other applicable infrastructure or damaged plant and property in accordance with the agreement. 7. EMERGE N C Y P RO C ED U RE A N D C O N TAC TS

In an event of damage to a Utility Provider’s asset, Main Roads WA asset, Local Government asset or PTA (Rail) asset, the person/Agency responsible for causing the damage shall immediately advise all asset owners affected. Refer to emergency numbers as follows to be used in Emergency (Hazardous Situations) only: Fire (Fire, Rescue, Hazardous Material), Police and Ambulance (life threatening) Dial 000.

P r o v i d e r s

C o d e

o f

P r a c t i c e

Non Life threatening Fire and Emergency Services (08) 9323 9300 Police 131 444 St John Ambulance (08) 9334 1234

Telecom Providers AAPT Telecommunications 13 88 86 AMCOM Pty Ltd 1800 262 663 Bright Communications 1300 661 393 Broadcast Engineering Services (08) 9248 5200 Cable and Optus 1800 505 777 Telstra Office hours (08) 9491 6389 Outside office hours 13 22 03 Uecomm Operations Pty Ltd 1800 707 447 Visionstream 1800 336 886 Vodaphone (08) 9322 6444

Gas Providers WestNet Energy Services 13 13 52 Agility 1800 151 016 1800 019 966 (Parmelia Pipeline) Epic Energy 1800 625 665 Land Fill Gas and Power (office) (08) 9475 0144 (Managing Director) 0412 314 002 DBNGP (WA) Transmission 1800 019 919 or (08) 9223 4300 WorleyParsons Asset Mgt Group (08) 9072 1422 or 0429 886 016 Land Authority Crown Land State Land Services (RDL) (08) 9347 5000

Water Providers AQWEST Bunbury Water Corporation (08) 9791 3272 Busselton Water 0408 933 589 Water Corporation 13 13 75

Dampier – Bunbury Natural Gas Pipeline Corridor only: State Land Services – Infrastructure Corridors (RDL) 0407 988 550

Miscellaneous Agility Management Pty Ltd (08) 9422 4100 BHP Supply Authority 1800 677 639 or (08) 9175 3303 BP Refinery (08) 9419 9500 Coogee Chemicals 1800 800 655 Co-op Bulk Handling(08) 9237 9600 Curtin University (08) 9266 9266 or (24hr Security) (08) 9266 4444 Defence, communications cables etc 0427 196 000 Defence, Property Management (08) 9311 2685 or (08) 9311 2680 Fax: (08) 9311 2670 (24 hour emergency) 1300 139 788 Department of Industry and Technology C/ – Zernike Australia Pty Ltd 0408 877 215 Ensite Claude 0414 225 826 Fremantle Ports (08) 9430 3442 or (08) 9335 1300 Pilbara Iron Utilities (Tom Price) (08) 9143 3271 (Paraburdoo) (08) 9143 4647 (Dampier) (08) 9143 5650 Adshel (08) 9387 7444 or 0438 253 557 People Telecom (08) 9318 6555

Power Providers Western Power 13 13 51 Horizon Power 13 23 51 Road Authorities Local Governments (Refer to Appendix A for contact number details) Main Roads WA (Faultline) 1800 800 009 or 138 138 (Refer to Appendix A for Regional Numbers) Rail Authorities Public Transport Authority MetroRail (24hr Emergency) (08) 9220 9999 WestNet Rail Level Crossing Faults 1800 150 107 Midland Train Control 1300 987 246 Avon Train Control 1300 087 246 Safety Authorities Worksafe WA (08) 9327 8777 (24hr Accident Reporting) 1800 305 791 Energy Safety WA (08) 9422 5200 (24hr Accident Reporting) 1800 678 198 U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



1 7

Co d e o f P rac t i c e

(24 hour emergency) 1300 736 877 University of WA (08) 6488 2025 For further information contact Dial Before You Dig – dial 1100 during office hours. Safety of the public as well as employees shall be paramount. Note: A copy of these emergency numbers is printed on the inside back cover of this Code. 8.

Large projects with extensive environmental impacts may require referral to the Environmental Protection Authority (EPA). Clearing should be avoided wherever possible by installing utility services in already cleared land or through the use of thrust boring and other trenchless technology. If clearing is necessary, rehabilitation must occur using local species. DEC can provide advice regarding appropriate and successful rehabilitation of cleared areas.

E N VIRO N ME N T a n d HERITAGE

Note: Fines for illegally clearing native vegetation are significant.

8 . 1 Nat i v e V e g e tat i o n

Refer to the DEC Website: www.dec.wa.gov.au/nvc or contact DEC (Refer to Appendix A Section A12) for more information regarding clearing regulations.

Native vegetation has been extensively cleared from much of the south – west of WA. As a result, special attention and specific actions are required when works may impact on remaining native vegetation, particularly in verge areas of road reserves. (a) Declared Rare Flora The Department of Environment and Conservation (DEC) should be contacted during the planning phases of the proposed works to ensure that no rare flora or threatened ecological communities will be affected by the works. Fines for illegally taking rare flora are significant. Further information is available from DEC (refer to Appendix A Section A12). (b) Clearing Native Vegetation If any clearing of native vegetation is anticipated, DEC must be contacted to determine if a clearing permit is required. It is recommended that this is done during early stages of planning the proposed works. Exemptions do not apply in environmentally sensitive areas.

1 8

U t i l i t y

(c) Dieback and Weeds Dieback, caused by Phytophthora cinnamomi (Pc), results in irreversible damage to natural environments and some tree crops. To prevent the spread of dieback caused by Pc, all machinery, equipment and vehicles must be cleaned on entry and exit from site. Diebackfree fill should be used and site activities should be planned for drier months. Further information is available from the Roadside Conservation Committee and DEC. Weeds displace native vegetation and once established are difficult to control. Good hygiene practices of clean on entry and clean on exit from the site and the use of weed-free fill will minimise the spread of weeds. It is recommended that utility service providers and local governments use the Environmental Checklist (or equivalent) provided in Appendix F.

P r o v i d e r s

C o d e

o f

P r a c t i c e

8 . 2 E n v i ro n m e n ta l C o n s i d e r at i o n s i n Ma i n Ro a d s WA Ro a d R e s e rv e s

8 . 5 A b o r i g i n a l H e r i ta g e S i t e s

Aboriginal sites are protected under the Aboriginal Heritage Act 1972 (WA). A check must be made with the Department of Indigenous Affairs for any registered sites and the potential for the existence of any unregistered sites must also be investigated.

Utility Providers and their Contractors/SubContractors are required to be aware of Main Roads WA environmental requirements when undertaking works in the road reserve. Refer to Section 4.3.1 (d).

8.6 Existing and Planned S t r e e t s c ap e A m e n i t y (Street Trees)

8 . 3 E n v i ro n m e n ta l C o n s i d e r at i o n s i n Ra i lway R e s e rv e s

Rail land can also include important native vegetation. The PTA (Rail) maintains a Land and Transport Information system database (LATIS) that includes the location of any rare flora in railway reserve that has been advised by DEC. This would need to be checked as part of the approval process for any works in railway reserves.

Whilst it is acknowledged there will/may be conflict with existing streetscape amenity, particularly street trees when installing or upgrading infrastructure in established areas, preservation of mature flora where possible is encouraged. Liaison and consultation with the relevant Local Government (policy and specification), other utility providers and the community is required.

Refer also to WestNet Rail for environmental information within their rail reserves (Appendix A Section A11).

Refer to the WA Planning Commission publication Liveable Neighbourhoods, particularly for green field developments (Refer to Appendix A Section A7).

8 . 4 I m pa c t Up o n H e r i ta g e N o m i n at e d a n d L i s t e d P l ac e s

8 . 7 I m pa c t s o f P o l l u ta n t s

Utility providers and their Contractors/SubContractors are responsible for the use, control and impact of potentially polluting substances and any associated spills. Use of any classified material should be in accordance with the relevant manufacture’s specification and Dangerous Goods Act and Regulations. Consideration should also be given to impact on and protection of the underlying water table.

References should be made to both the Heritage Council of WA (Heritage Register) and relevant Local Government (Municipal Heritage Inventory) to assess potential impacts upon heritage listed sites. This also includes the impact of machinery causing vibration when working in close proximity to heritage-listed sites. Penalties for damage to places listed under the Heritage of Western Australia Act 1990 are significant.

Responsibility for the impact of pollutants applies to any site remediation work required as a result of discharge from any existing infrastructure, i.e. leaking oil pipes or sewer pressure mains. Liaison with other utility providers will be necessary in most instances.

In pedestrian and heritage areas, particularly within the CBD, utility providers are to ensure that pit covers do not detract from the area and are level with the footpath surface.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



1 9

Co d e o f P rac t i c e

8 . 8 I m pa c t o n A d j o i n i n g La n d s a n d I m pa c t o f N o i s e

adjusted alignment. Refer to Reserve Allocations, Appendix B.

Consideration must be given to the impact on adjoining lands when working in the road reserve. This extends from discharging and dumping on adjoining land that may result in impact on drainage, watercourses, wetlands and water protection areas.

‘As constructed’ drawings and details shall be kept by the Utility Provider for all new plant that occupies a non-standard alignment.

Noise impacts may require restricted hours of work permitted under the Environmental Protection (Noise) Regulations 1997 and requirements of the Local Government. Refer also to the new WAPC Noise Policy which may also apply. Utility providers and their contractors are actively encouraged to pursue sustainable work practices through material reuse and recycling wherever practicable. 9. S P E C IAL N OTES 9.1

Utility providers agree to co-operate in providing details of buried services plant that may be affected by the operations of others proposing to do work in the vicinity of the plant. It is the responsibility of the organisation that proposes to do work in the vicinity of other plant to seek this information (refer to Section 4.1 Dial Before You Dig). 9.2

Utility providers agree to construct their new plant within the allocated corridor and under the conditions stipulated and will consult the other utility providers concerned when this is impractical. When plant is not located on allocated alignments, it is mandatory for records to be kept by the Utility Provider which provide details of plant alignment and includes the agreement of the other utility providers that may be affected by the

2 0

U t i l i t y

Junction pits, access chambers, poles, valve boxes, etc should be constructed within the allocated corridor if practical. These corridors shown in diagrams in Appendix B have been allocated with respect to distances from the property line on the cross-section of the road reserve. Should encroachment beyond allocated corridors be required, the agreement of the affected utility providers must be obtained prior to installation of the plant. It is not practical to specify the location of trees, poles and underground structures such as junction pits, boxes, etc, within the allocated corridor on a longitudinal basis. The utility providers concerned are expected to locate their plant in positions that avoid existing entrances to properties and other obstacles and to provide for future developments. Consultation regarding such issues with Main Roads WA, Local Government or Planning Authority is considered essential for the benefit and interest of all parties. 9.3

Underground crossings of roads and footpaths should be made at right angles and the position of consumer’s meter (if any) should be indicative of the service route (does not apply to electrical meters). 9.4

All attempts shall be made to minimise damage to the road pavement or railway formation. Alternatives to open trenching such as thrust boring and other trenchless technology should be considered in preference to open trenching. P r o v i d e r s

C o d e

o f

P r a c t i c e

9 . 7 P r i vat e I n s ta l l at i o n s

Consultation regarding the proposed method should occur with the Road Authority or PTA (Rail) and the method agreed by both parties prior to commencement of work. When trenching is necessary, service providers should liaise and try to co-locate cables/conduits and share trench space to minimise disruption to traffic and reinstatements.

Proponents who wish to install private installations in road or rail reserves shall seek approvals from the relevant road authority or PTA (Rail) and relevant utility providers if there is likely interference with existing services. Approvals shall be obtained for alignment and depth/cover of service, installation conditions (protection of existing services, traffic management, public safety, etc) and maintenance requirements. A record of the private installation shall be provided to Dial Before You Dig, during office hours.

9 . 5 F i r e H y d r a n t B ox e s

Fire hydrants must be clear to operate at all times. Particular care must be taken in carrying out work on the road reserve to prevent interference with the access to or operation of fire hydrants (Refer to Appendix A Section A12, Fire and Emergency Services Authority of WA for location of plant and reporting damage to plant). 9 . 6 Sa f e t y P r e c a u t i o n s – U t i l i t y S e rv i c e s S t r u c t u r e s i n Ro a d R e s e rv e s

All appropriate structures (except utility power supply structures) within the road reserve and subjected to traffic are to be designed for a loading in accordance with the appropriate Austroads Standards. Approval to erect such structures is to be obtained from the applicable road authority.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



2 1

a pp e n d i x A

a pp e n d i x A Directory of Information on Utility Service Providers, Road Authorities, PTA (Rail) and other applicable organisations regarding plant in road reserves and rail reserves

2 2

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

Dial Before You Dig should be the initial contact for service information. Note: Service plant that is not registered cannot be protected. This is a directory of information on Utility Service Providers and other applicable organisations regarding service plant in Road Reserves or Rail Reserves and where services cross dedicated easements for high pressure gas, petroleum and water pipelines. A 1. DIAL B EFORE YO U DIG

A 2. ELE C TRI C ITY N ET W OR K P ROVIDERS A 2.1 Western P ow e r

Responsible for the network, transmission and distribution of electricity in the South West interconnected system (Kalbarri – Kalgoorlie – Albany area). Written requests for information relating to the location of buried services should be addressed to: Fax: 1300 652 077 or ‘Dial Before You Dig’ Website. Telephone requests for location of plant (WA wide): 1100

Website: www.1100.com.au Tel: 1100 (8:0am – 5:0pm weekdays) Fax: 1300 652 077 (a standard form is available)

Reporting damage to plant (all hours): Tel: 13 13 51

Call no less than two working days before the job is due to commence.

Website: www.westernpower.com.au

To contact the WA Manager (for matters other than enquiries) : Tel: (08) 9424 8116 Fax: (08) 9424 8120

U t i l i t y

P r o v i d e r s

General and Business enquiries: Tel: 13 10 87

A 2.2 Horizon P ow e r

Responsible for generating or procuring, distributing and selling electricity in Regional WA. The business provides services in the Pilbara, Kimberley, Gascoyne and parts of the Mid West and southern Goldfields (eg Esperance/Hopetoun) including about 38 towns and isolated communities. C o d e

o f

P r a c t i c e

Regional Centres: Carnarvon, Karratha, Esperance, Port Hedland, Kununurra and Broome. Head Office: PO Box 817 Karratha WA 6714 Tel: (08) 9159 7250 Fax: (08) 9159 7288 Telephone requests for location of plant: 1100. Reporting damage to plant (all hours): Tel: 13 23 51 General enquiry: Tel: 1800 267 926 Website: www.horizonpower.com.au A 3. GAS N ET W OR K P ROVIDERS A 3.1 WestNet E n e r g y S e rv i c e s

Gas Distribution West (Gas distribution services in Perth and several country districts, including Kambalda to Esperance) Faults and Emergencies: Tel: 13 13 52 Enquiries: Asset Management Gate 1 81 Prinsep Rd Jandakot WA 6164 Tel: (08) 9499 5200 Fax: (08) 9486 3903



2 3

Co d e o f P rac t i c e

Dampier to Bunbury Natural Gas Pipeline – (WA) Transmission Faults and Emergencies: Tel: 1800 019 919 Enquiries: Asset Management Gate 2 81 Prinsep Rd Jandakot WA 6164 Tel: (08) 9223 4300 Fax: (08) 9223 4301 Website: www.dbp.net.au Warning: These pipelines should be treated with extreme caution. If fractured, gas will escape with an explosive force and will probably catch fire and destroy anything in the vicinity. A 3.2 Australian Pipeline Trust (APT)

Australian pipeline trust assets are managed by Agility Management Pty Ltd. APT and Agility own and operate several high pressure gas transmission pipelines. Contact details relating to each pipeline are listed separately below. Parmelia Pipeline (Dongara to Perth) Faults and Emergencies: Tel: 1800 019 966 or (08) 9353 7555

Enquiries: Agility Management Pty Ltd 8 Marchesi Street KEWDALE WA 6105 PO Box 203 CLOVERDALE WA 6985 Tel (08) 9353 7500 Fax (08) 9353 2452 Goldfields Gas Pipeline (Pilbara to Goldfields) Mid-West, Telfer and Cape Lambert Pipelines (Geraldton to Murchison; Port Hedland to Telfer; and Karratha to Cape Lambert) Faults and Emergencies: Tel: 1800 151 016 Enquiries: Agility Services Level 8 15-17 William Street PERTH WA 6000 Tel: (08) 9422 4100 Fax: (08) 9322 3703 Warning These pipelines should be treated with extreme caution. If fractured, gas will escape with an explosive force and will probably catch fire and destroy anything in the vicinity. A 3 . 3 Ep i c E n e r g y

Karratha to Port Hedland Pipeline Faults and Emergencies: Tel: 1800 625 665 Enquiries: Level 8 60 Collins Street Melbourne Vic 3000

2 4

U t i l i t y

P r o v i d e r s

Tel: (03) 8626 8440 or 1300 662 734 Fax: (03) 8626 8454 Website: www.epicenergy.com.au Warning: This pipeline should be treated with extreme caution. If fractured, gas will escape with an explosive force and will probably catch fire and destroy anything in the vicinity. A 3.4 W o r l e y Pa r s o n s Asset Ma n a g e m e n t G ro u p

Kambalda to Esperance Pipeline Faults and Emergencies: Tel: (08) 9072 1422 Fax: (08) 9072 1433 Mob: 0429 886 016 Enquiries: Operations Manager Suite 6, Esperance Business Centre 75 Dempster Street ESPERANCE WA 6450 Website: www.esperance-energy.com This pipeline should be treated with extreme caution. If fractured gas will escape with an explosive force and will probably catch fire and destroy anything in the vicinity.

C o d e

o f

P r a c t i c e

A 4. C OMM UNI CATIO NS N ET W OR K P ROVIDERS A 4.1 Telstra

Telstra: Installs and maintains major communications network in Western Australia and Australia. Planning, design and construction enquires should be addressed to: The Manager Network Integrity Services Telstra Centre Locked Bag 2522 PERTH 6001 Plant locations must be sought at the planning stage and prior to commencing construction by calling 1100, Dial Before You Dig. Emergencies: Refer to Section 7. All reporting of damage to Telstra assets: Tel: 13 22 03 Website: www.telstra.com A 4.2 Bright Telecom­ m u n i c at i o n s

All enquiries should be addressed to: Bright Telecommunications GPO Box L921 PERTH WA 6842 Tel: 1300 661 393 Website: www.brightonline.com.au

U t i l i t y

P r o v i d e r s

A 4.3 Telecom­ m u n i c at i o n s General Ca r r i e r s

Telstra, Vodafone, Bright Telecommunications, AAPT Telecommunications, SingTel Optus Pty Ltd, AMCOM Pty Ltd, Broadcast Engineering Services, Uecomm Operations Pty Ltd, Visionstream. AARNet Pty Ltd (Telecommunications Carrier owned by all 37 Australian [public] Universities and CSIRO) Contact: John Nicholls Tel: (02) 8779 6977 Other carriers will emerge – for details refer to Dial Before You Dig or Australian Communications Authority or Communications Alliance Ltd. A 5. WATER N ET W OR K P ROVIDERS A 5 . 1 Wat e r C o r p o r at i o n

The Water Corporation provides water, sewerage, drainage and irrigation services throughout the State. P e rth R e g i on

13 South Street CANNING VALE WA 6155 Tel: (08) 9424 8422 /13 13 95 Fax: (08) 9424 8166

C o d e

o f

P r a c t i c e

N orth W e st R e g i on

84 Welcome Road KARRATHA WA 6714 Tel: (08) 9186 8222 /13 13 95 Fax: (08) 9185 3818 M i d W e st R e g i on

45 Cathedral Avenue GERALDTON WA 6530 Tel: (08) 9923 4988 /13 13 95 Fax: (08) 9923 4966 S outh W e st R e g i on

61 Victoria Street BUNBURY WA 6230 Tel: (08) 9791 0400 /13 13 95 Fax: (08) 9791 4079 Agr i cu ltur a l R e g i on

263 Fitzgerald Street NORTHAM WA 6401 Tel: 13 13 95 Fax: (08) 9622 4866 G o l d f i e l d s R e g i on

Cnr. Hannan St and Throssell St KALGOORLIE WA 6430 Tel: 13 13 95 Fax: (08) 9080 1030 G r e at S outh e rn R e g i on

215 Lower Stirling Terrace ALBANY WA 6330 Tel: (08) 9842 4211 /13 13 95 Fax: (08) 9842 4255 Service Difficulties, Faults and Emergencies Tel: 13 13 75 (24 hours) Website: www. watercorporation.com.au

2 5

Co d e o f P rac t i c e

A 5 . 2 Ot h e r Wat e r P ro v i d e r s (a) AQWEST ( B unbury )

Tel: (08) 9780 9500 Fax: (08) 9780 9509 24 Hour Emergency Contact: Tel: (08) 9791 3272 ( b ) B uss e lton Wat e r Board

Tel: (08) 9754 1811 Fax: (08) 9754 1075 Mobile: 0407 522 388 A/H Emergency Contact: Tel: (08) 9754 1811 A 6. MAI N ROADS W ESTER N A U STRALIA

General When calling or writing on general business, Main Roads’ address is: Don Aitken Centre Waterloo Crescent EAST PERTH WA 6004 Tel: (General enquiries) 13 81 38 or (08) 9323 4111 Fax: (08) 9323 4430 Postal Address: PO Box 6202 EAST PERTH WA 6892 Web Site: www.mainroads.wa.gov.au Road Condition A Statewide Report is available on: 1800 013 314 2 6

Em e rg e ncy M a i nt e n a nc e

Main Roads WA Faultline (faults and hazards) A 24-hour service in the Metropolitan Area and South West Region is available on: 1800 800 009. For other Regions use the Regional Phone number (as shown in this Appendix A) or 13 81 38. All electrical enquiries regarding traffic lights, pedestrian lights, message signs, underground cables, etc refer to: Tel: 13 81 38. Enquiries and requests regarding works within road reserves contact appropriate Regional office. H e avy V e h i c l e O p e r at i ons

Extra Width or Heavy Load Permits: 70 Pilbara Street WELSHPOOL WA 6106 (PO Box 374 WELSHPOOL WA 6986) Tel: (08) 9311 8450 Fax your application to: Fax: (08) 9311 8455 Pay by Bankcard, Master Card or Visa Card. For emergencies after hours, contact the Heavy Vehicle Operations Manager on: Mob: 0417 096 944 Fax: Road Traffic Compliance Unit: (08) 9311 8458 U t i l i t y

P r o v i d e r s

M e d i a Enqu i r i e s

Manager Public Affairs Tel: (08) 9323 4638 A/Hours: (08) 9401 4779 Mobile: 0419 907 230 Fax: (08) 9221 0044 Email: [email protected] Pavement and Structures Engineering 5-9 Colin Jamieson Drive WELSHPOOL WA 6106 Tel: (08) 9350 1444 Fax: (08) 9451 1400 T r a ff i c O p e r at i ons C e ntr e

18 Newcastle Street EAST PERTH WA 6004 Tel: (08) 9428 2222 Fax: (08) 9428 2220 Postal Address: PO Box 6202 EAST PERTH WA 6892 A

6.1 Regional Offices

G a scoyn e R e g i on

470 Robinson Street (PO Box 480) CARNARVON WA 6701 Tel: (08) 9941 0777 Fax: (08) 9941 0701 GoldfieldsEsp e r a nc e R e g i on

83 Piesse Street BOULDER WA 6432 (PO Box 99 KALGOORLIE WA 6433) Tel: (08) 9080 1400 Fax: (08) 9080 1452

C o d e

o f

P r a c t i c e

G r e at S outh e rn R e g i on

Chester Pass Road (PO Box 503) ALBANY WA 6331 Tel: (08) 9892 0555 Fax: (08) 9841 8213 K i mb e r l e y R e g i on ( W e st )

Wodehouse Street (PMB 959) DERBY WA 6728 Tel: (08) 9158 4333 Fax: (08) 9158 4334 K i mb e r l e y R e g i on ( E a st )

Messmate Way (PO Box 138) KUNUNURRA WA 6743 Tel: (08) 9168 4777 Fax: (08) 9168 1995 M i d W e st R e g i on

Eastward Road (PO Box 165) GERALDTON WA 6531 Tel: (08) 9956 1200 Fax: (08) 9956 1240 P i l b a r a R e g i on

Maxine McGillvray Centre Brand Street (PO Box 2256) SOUTH HEDLAND WA 6722 Tel: (08) 9172 8877 Fax: (08) 9140 1076 M e tropo l i t a n R e g i on

EAST PERTH WA 6892 Tel: (08) 9323 4111 or 13 81 38 Fax: (08) 9323 4430 S outh W e st R e g i on

Robertson Drive (PO Box 5010) BUNBURY WA 6231 Tel: (08) 9725 5677 Fax: (08) 9725 5666

P r o v i d e r s

Term Network Contractor BGC Contracting Pty Ltd Tel: (08) 9140 2566 Fax: (08) 9140 1377 Lot 2450 Moorambine Street (PO Box 2582) Wedgefield, SOUTH HEDLAND WA 6722

W h e atb e lt N orth R e g i on

M i d W e st & W h e atb e lt N orth

Peel Terrace (PO Box 333) NORTHAM WA 6401 Tel: (08) 9622 4777 Fax: (08) 9622 3767

Term Network Contractor CSR Emoleum Road Services Project Manager Tel: (08) 9622 6905 Fax: (08) 9622 3990

W h e atb e lt S outh R e g i on

Lot 2 Chidlow Street (PO Box 640) NORTHAM WA 6401

Mokine Road (PO Box 194) NARROGIN WA 6312 Tel: (08) 9881 0566 Fax: (08) 9881 0503 A 6 . 2 Ma i n Ro a d s WA T e r m N e t wo r k C o n t r a c to r s K i mb e r l e y

Term Network Contractor BGC Contracting Pty Ltd Tel: (08) 9192 8700 Fax: (08) 9192 8704 13 Haynes.Street (PO Box 928) BROOME WA 6725

C o d e

o f

Goldfields – Esp e r a nc e

Term Network Contractor Macmahon Contractors Pty Ltd. Project Manager Tel: (08) 9091 5399 Fax: (08) 9091 5499 Carnegie Street KALGOORLIE WA 6430 (PO Box 2589) BOULDER WA 6432 G r e at S outh e rn , W h e atb e lt S outh & S outh W e st

Term Network Contractor RoadCare Project Manager Tel: (08) 9724 9724 Fax: (08) 9724 9725

Don Aitken Centre Waterloo Crescent (PO Box 6202) U t i l i t y

G a scoyn e & P i l b a r a

P r a c t i c e



2 7

Co d e o f P rac t i c e

McCombe Road (PO Box 5046) BUNBURY DC WA 6230 M e tro S outh

Term Network Contractor CSR Emoleum Road Services Project Manager Tel: (08) 9365 9918 Fax: (08) 9365 9960 5 Marion Road (PO Box 282) MADDINGTON WA 6101 M e tro N orth T e rm N e twork

Contractor Best Roads Group Contractor’s Representative Tel: (08) 9248 9095 Fax: (08) 9248 3476 54 Westchester Road (PO Box 3330) MALAGA DC WA 6945 E l e ctr i c a l C ontr a ctor

Downer Electrical Pty Ltd Tel: (08) 9351 3318 Fax: (08) 9351 9211 Mob: 0408 929 633 33 Kewdale Road, WELSHPOOL WA 6104 (PO Box 45) WELSHPOOL DC WA 6986 RoadCare is a joint venture of Pioneer Road Services Pty Ltd and Fulton Hogan Pty Ltd, supported by Opus International Consultants Ltd. Recently RoadCare formed an Alliance with Main Roads WA to operate under Southern Road 2 8

Services and provide road maintenance services in the affected Regions. Best Roads Group is a joint venture of Boral Resources (WA) Ltd, Egis Consulting Australia Pty Ltd and Highway Construction Pty Ltd. A 7. P LA N N I N G a n d LA N D MA N AGEME N T a

7 . 1 D e pa rt m e n t of Planning

– Statewide responsibility for the planning of communities and policies. – Associated with the WA Planning Commission (WAPC) and Subcommittees such as the Infrastructure Co-ordinating Committee (ICC), the Statutory Planning Committee and the Sustainability Committee. – Management of Liveable Neighbourhoods (which includes references and diagrams from the Utility Providers Code of Practice). Albert Facey House 469 Wellington Street PERTH WA 6000 Tel: 9264 7777 Fax: 9264 7566 Website: www.planning.wa.gov.au U t i l i t y

P r o v i d e r s

Regional Offices are located in Albany, Broome, Bunbury, Geraldton, Kalgoorlie and Mandurah (refer to Website for details). a

7 . 2 S tat e La n d S e rv i c e s ( D e pa rt m e n t of Regional Development a n d La n d s )

– SLS is responsible for the administration of Crown land and the Dampier to Bunbury Natural Gas Pipeline corridor. C rown L a n d

Notices of intended works should be addressed to: General Manager State Land Services Business Unit Department of Regional Development and Lands Midland Square MIDLAND WA 6056 (PO Box 1575 MIDLAND WA 6936) Tel: (08) 9347 5000 Fax: (08) 9347 5008 Website: www.lands.rdl.wa.gov.au E-mail: [email protected] D a mp i e r to B unbury N atur a l G a s P i p e l i n e (DBNGP)

All persons who seek to undertake activities and works in the DBNGP corridor, for C o d e

o f

P r a c t i c e

whatever reason, must obtain prior approval from the DBNGP Land Access Minister under Section 41 of the Dampier to Bunbury Pipeline Act 1997 (refer to details in Appendix E). All applications for activities and works are to be forwarded to: Manager Infrastructure Corridors State Land Services Business Unit

footpaths, local storm water drainage, telecommunications, electricity facilities and associated works, and for the care, control and management of local road reserves. Telephone requests for the location of plant and reporting of damage to plant should be made to the engineering or technical services sections if information cannot be obtained from Dial Before You Dig – dial 1100.

Department of Regional Development and Lands Midland Square MIDLAND WA 6056 (PO Box 1575 MIDLAND WA 6936)

General Email address for the WA Local Government Association is: [email protected] and Website: www.walga.asn.au.

Tel: (08) 9347 5130 Fax: (08) 9347 5007.

(PO Box 1544) WEST PERTH WA 6872

L a n d g at e

Tel: (08) 9213 2061 (Transport & Roads) Fax: (08) 9322 2611

Telephone advice of imminent danger or damage to survey marks: Survey Integration Services Tel: (08) 9273 7111. Website: www.landgate.wa.gov.au A 8. LO C AL GOVER N ME N T ROAD MA N AGEME N T A U THORITIES

Notices should be addressed to the Chief Executive Officer. Responsible for the management of local roads, U t i l i t y

P r o v i d e r s

15 Altona Street WEST PERTH WA 6005

A . 8 . 1 M e t ro p o l i ta n Local G ov e r n m e n t s C i ty of Arm a d a l e

7 Orchard Avenue (Locked Bag No 2) ARMADALE WA 6112 Tel: (08) 9399 0111 Fax: (08) 9399 0184 Email: [email protected] Website: www.armadale.wa.gov.au  33

C o d e

o f

P r a c t i c e

T own of B a ss e n d e a n

48 Old Perth Road (PO Box 87) BASSENDEAN WA 6054 Tel: (08) 9377 8000 Fax: (08) 9279 4257 Email: [email protected] Website: www.bassendean.wa.gov.au C i ty of B ayswat e r

61 Broun Avenue (PO Box 467) MORLEY WA 6943 Tel: (08) 9272 0622 Fax: (08) 9272 0665 Email: [email protected] Website: www.bayswater.wa.gov.au C i ty of B e l mont

215 Wright Street (Locked Bag 379) CLOVERDALE WA 6105 Tel: (08) 9477 7222 Fax: (08) 9478 1473 Email: [email protected] Website: www.belmont.wa.gov.au T own of C a mbr i d g e

1 Bold Park Drive (PO Box 15) FLOREAT WA 6014 Tel: (08) 9347 6000 Fax: (08) 9347 6060



2 9

Co d e o f P rac t i c e

Email: [email protected] Website: www.cambridge.wa.gov.au C i ty of C a nn i ng

1317 Albany Highway (Locked Bag 80) WELSHPOOL WA 6986 Tel: (08) 9231 0606 Fax: (08) 9458 2353 Email: [email protected] Website: www.canning.wa.gov.au T own of C l a r e mont

308 Stirling Highway CLAREMONT WA 6010 Tel: (08) 9285 4300 Fax: (08) 9285 4301 Email: [email protected] Website: www.claremont.wa.gov.au C i ty of C ockburn

Cnr Rockingham Road and Coleville Crescent SPEARWOOD WA 6163 (PO Box 1215) BIBRA LAKE WA 6965 Tel: (08) 9411 3444 Fax: (08) 9411 3416 Email: [email protected] Website: www.cockburn.wa.gov.au

T own of C ott e s l o e

109 Broome Street COTTESLOE WA 6011 Tel: (08) 9285 5000 Fax: (08) 9285 5001 Email: [email protected] Website: www.cottesloe.wa.gov.au T own of E a st F r e m a nt l e

135 Canning Highway (PO Box 1097) EAST FREMANTLE WA 6959 Tel: (08) 9339 9339 Fax: (08) 9339 3399 Email: [email protected] Website: www.eastfremantle.wa.gov.au C i ty of F r e m a nt l e

8 William Street (PO Box 807) FREMANTLE WA 6959 Tel: (08) 9432 9999 Fax: (08) 9430 4634 Email: [email protected] Website: www.fremantle.wa.gov.au C i ty of G osn e l l s

2120 Albany Highway GOSNELLS WA 6110 (PO Box 662) GOSNELLS WA 6990

Email: [email protected] Website: www.gosnells.wa.gov.au C i ty of J oon d a l up

Boas Avenue (PO Box 21) JOONDALUP WA 6919 Tel: (08) 9400 4000 Fax: (08) 9300 1383 Email: [email protected] Website: www.joondalup.wa.gov.au S h i r e of K a l a mun d a

2 Railway Road (PO Box 42) KALAMUNDA WA 6076 Tel: (08) 9257 9999 Fax: (08) 9293 2715 Email: kala.shire@kalamunda. wa.gov.au Website: www.kalamunda.wa.gov.au T own of K w i n a n a

Cnr Gilmore Avenue & Sulphur Road (PO Box 21) KWINANA WA 6167 Tel: (08) 9439 0200 Fax: (08) 9439 0222 Email: [email protected] Website: www.kwinana.wa.gov.au

Tel: (08) 9391 3222 Fax: (08) 9398 2922 3 0

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

10 Almondbury Road (Locked Bag 1) BOORAGOON WA 6954

Email: [email protected] Website: www.nedlands.wa.gov.au

Tel: (08) 9364 0666 Fax: (08) 9364 0285

S h i r e of P e pp e rm i nt G rov e

C i ty of M e lv i l l e

S h i r e of S e rp e nt i n e J a rr a h d a l e

6 Paterson Street MUNDIJONG WA 6123 Tel: (08) 9525 5255 or (08) 9526 1111 Fax: (08) 9525 5441

Email: [email protected] Website: www.melville.wa.gov.au

1 Leake Street PEPPERMINT GROVE WA 6011

T own of M osm a n P a rk

Email: [email protected] Website: www.peppermintgrove.wa.gov.au

Civic Centre Cnr Sandgate Street and South Terrace SOUTH PERTH WA 6151

C i ty of P e rth

Tel: (08) 9474 0777 Fax: (08) 9474 2425

‘Memorial Park’ Bayview Terrace (PO Box 3) MOSMAN PARK WA 6012 Tel: (08) 9384 1633 Fax: (08) 9384 3694 Email: ceo@ townofmosmanpark.wa.gov.au Website: www. townofmosmanpark.wa.gov.au S h i r e of M un d a r i ng

7000 Great Eastern Hwy MUNDARING WA 6073 Tel: (08) 9290 6666 Fax: (08) 9295 3288 Email: [email protected] Website: www.mundaring.wa.gov.au C i ty of N e d l a n d s

71 Stirling Highway (PO Box 9) NEDLANDS WA 6009

Tel: (08) 9384 0099 Fax: (08) 9384 2796

Council House 27 St Georges Terrace (GPO Box C120) PERTH WA 6839 Tel: (08) 9461 3333 Fax: (08) 9461 3083 Email: [email protected] Website: www.perth.wa.gov.au C i ty of R ock i ngh a m

Civic Boulevard ROCKINGHAM WA 6168 (PO Box 2142) ROCKINGHAM DC WA 6967) Tel: (08) 9528 0333 Fax: (08) 9592 1705 Email: [email protected] Website: www.rockingham.wa.gov.au

Tel: (08) 9386 6900 Fax: (08) 9386 3670

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

Email: [email protected] Website: www.sjshire.wa.gov.au C i ty of S outh P e rth

Email: [email protected] Website: www.southperth.wa.gov.au C i ty of S t i r l i ng

Civic Place STIRLING WA 6021 Tel: (08) 9345 8555 Fax: (08) 9345 8822 Email: [email protected] Website: www.stirling.wa.gov.au C i ty of S ub i a co

241 Rokeby Road (PO Box 270) SUBIACO WA 6008 Tel: (08) 9237 9222 Fax: (08) 9237 9200 Email: [email protected] Website: www.subiaco.wa.gov.au

3 1

Co d e o f Prac t i c e

C i ty of S wa n

Midland Square (PO Box 196) MIDLAND WA 6056 Tel: (08) 9267 9000 Fax: (08) 9267 9444 Email: [email protected] Website: www.swan.wa.gov.au T own of V i ctor i a P a rk

99 Shepperton Road (Locked Bag 437) VICTORIA PARK WA 6100 Tel: (08) 9311 8111 Fax: (08) 9311 8181 Email: [email protected] Website: www.vicpark.wa.gov.au T own of V i nc e nt

244 Vincent Street (PO Box 82) LEEDERVILLE WA 6902 Tel: (08) 9273 6000 Fax: (08) 9273 6099 Email: [email protected] Website: www.vincent.wa.gov.au C i ty of Wa nn e roo

23 Dundebar Road (Locked Bag 1) Wanneroo WA 6946 Tel: (08) 9405 5000 Fax: (08) 9405 5499 Email: [email protected] Website: www.wanneroo.wa.gov.au 3 2

A . 8 . 2 R e g i o n a l Local G ov e r n m e n t s C i ty of A l b a ny

221 York Street ALBANY WA 6330 (PO Box 484) ALBANY WA 6331 Tel: (08) 9841 9333 Fax: (08) 9841 9222 or (08) 9841 4099 Email: [email protected] Website: www.albany.wa.gov.au C i ty of B unbury

4 Stephen Street (PO Box 21) BUNBURY WA 6230 Tel: (08) 9780 8222 Fax: (08) 9721 7509 Email: [email protected] Website: www.bunbury.wa.gov.au S h i r e of C a rn a rvon

Francis Street (PO Box 459) CARNARVON WA 6701 Tel: (08) 9941 0000 Fax: (08) 9941 0099 Email: [email protected] Website: www.carnarvon.wa.gov.au S h i r e of D e rby – W e st K i mb e r l e y

Loch Street (PO Box 94) DERBY WA 6728 U t i l i t y

P r o v i d e r s

Tel: (08) 9191 0999 Fax: (08) 9191 1221 Email: [email protected] Website: www.sdwk.wa.gov.au C i ty of G e r a l d ton

Cathedral Avenue (PO Box 101) GERALDTON WA 6530 Tel: (08) 9956 6600 Fax: (08) 9956 6674 Email: [email protected] Website: www.geraldton.wa.gov.au C i ty of K a l goor l i e – B ou l d e r

577 Hannan Street KALGOORLIE WA 6430 (PO Box 2042) BOULDER WA 6430 Tel: (08) 9021 9600 Fax: (08) 9021 6113 Email: [email protected] Website: www.kalbould.wa.gov.au C i ty of M a n d ur a h

3 Peel Street (PO Box 210) MANDURAH WA 6210 Tel: (08) 9550 3777 Fax: (08) 9550 3888 Email: [email protected] Website: www.mandurah.wa.gov.au

C o d e

o f

P r a c t i c e

T own of N a rrog i n

89 Earl Street (PO Box 188) NARROGIN WA 6312 Tel: (08) 9881 1944 Fax: (08) 9881 3092 Email: [email protected] Website: www.narrogin.wa.gov.au T own of N orth a m

298 Fitzgerald Street (PO Box 269) NORTHAM WA 6401 Tel: (08) 9622 1466 Fax: (08) 9622 1910 Email: [email protected] Website: www.northamtown.wa.gov.au T own of P ort Hedland

Civic Centre McGregor Street (PO Box 41) PORT HEDLAND WA 6721 Tel: (08) 9158 9300 Fax: (08) 9173 1766 Email: [email protected] Website: www.porthedland.wa.gov.au O th e r R ur a l / R e g i on a l Loc a l G ov e rnm e nts

Please refer to Telephone Directories.

U t i l i t y

P r o v i d e r s

A 9. RAIL A U THORITIES a

9.1 Public T r a n s p o rt Authority ( Ra i l )

All persons who seek to enter upon the rail reserve, for whatever reason, must first obtain permission from a duly authorised PTA (RAIL) officer or Infrastructure Manager for the area concerned (refer to Appendix D). For people intending to carry out work within 3.0 m of nearest rail or live overhead traction equipment, including Utility Providers, they must have appropriate Track Access Accreditation or be under the control of a suitably accredited safe working supervisor. Persons working outside these limits must still request permission to enter the reserve, notify the train Controller when entering or leaving, wear appropriate high visibility clothing (not red in colour) and safety footwear. Persons entering onto the Rail Reserves will be subject to PTA (RAIL): • Occupational Safety and Health Policy; • Drug and Alcohol Policy; and • Environmental Policy.

C o d e

o f

P r a c t i c e

Contacts for Information: • PTA (RAIL) Manager Track and Civil (suburban electrified and passenger railways) Tel: (08) 9326 2851 or (08) 9326 2281 (office hours) • Safeworking Compliance Manager, PTA (RAIL) Tel: (08) 9326 2927 (office hours) • Train Controller: – Narngulu Tel: (08) 9964 0327 – Northam Tel: (08) 9622 4627 – Merredin Tel: (08) 9041 0627 – Picton Tel: (08) 9725 5527 – Metro (Freight) Tel: (08) 9326 2215 or (08) 9326 2067 – Metro (Passenger) Tel: (08) 9326 2214 • For Emergencies only: Tel: (08) 9220 9999. Website: www.pta.wa.gov.au a

9 . 2 W e s t N e t Ra i l

Head Office 2-10 Adams Drive WELSHPOOL WA 6106 (GPO Box S1411) PERTH WA 6845 Tel: (08) 9212 2501 or Tel: (08) 9212 2814 Fax: (08) 9212 2922

3 3

Co d e o f Prac t i c e

For Faults and Emergencies Only Faults Tel: 1800 150 107 Midland Control Tel: 1300 987 246 Avon Control Tel: 1300 087 246 A10. E N VIRO N ME N TAL AGE N C IES A

1 0 . 1 Nat i v e V e g e tat i o n a n d Ra r e F l o r a

Department of Environment and Conservation (DEC) Locked Bag 104 Bentley Delivery Centre WA 6983 Tel: (08) 9219 8000 Fax: (08) 9334 0466 Website: www.dec.wa.gov.au A

1 0 . 2 Ro a d s i d e C o n s e rvat i o n Committee

17 Dick Perry Avenue KENSINGTON WA 6983 (Locked Bag 104 Bentley Delivery Centre WA 6983) Tel: (08) 9334 0423 Fax: (08) 9334 0199 Website: www.dec.wa.gov.au/rcc

DEC R e g i o n a l Offices K i mb e r l e y R e g i on a l O ff i c e

Lot 248 Ivanhoe Road (PO Box 942) KUNUNURRA WA 6743 Tel: (08) 9168 4200 Fax: (08) 9168 2179 P i l b a r a R e g i on a l O ff i c e

Lot 3 Anderson Road Karratha Industrial Estate (PO Box 835) KARRATHA WA 6714 Tel: (08) 9182 2000 Tel: (08) 9144 1118

W h e atb e lt R e g i on a l O ff i c e

7 Wald Street (PO Box 100) NARROGIN WA 6312 Tel: (08) 9881 9222 Fax: (08) 9881 3297 S outh W e st R e g i on a l O ff i c e

South West Highway (PO Box 1693) BUNBURY WA 6230 Tel: (08) 9725 4300 Fax: (08) 9725 4351

M i d w e st R e g i on a l O ff i c e

Wa rr e n R e g i on a l O ff i c e

1st Floor, The Foreshore Centre 201 Foreshore Drive (PO Box 72) GERALDTON WA 6531 Tel: (08) 9921 5955 Fax: (08) 9921 5713

Brain Street (Locked Bag 2) MANJIMUP WA 6258 Tel: (08) 9771 7988 Fax: (08) 9777 1363

G o l d f i e l d s R e g i on a l O ff i c e

32 Brookman Street (PO Box 10173) KALGOORLIE WA 6430 Tel: (08) 9080 5555 Fax: (08) 9021 7831 S wa n R e g i on a l O ff i c e

7 Turner Avenue (PO Box 1167 Bentley Delivery Centre WA 6983) 3 4

BENTLEY WA 6106 Tel: (08) 9423 2900 Fax: (08) 9423 2901

U t i l i t y

P r o v i d e r s

S outh C o a st R e g i on a l O ff i c e

120 Albany Highway ALBANY WA 6330 Tel: (08) 9842 4500 Fax: (08) 9841 3329 A

1 0 . 3 D i e b ac k

D i e b a ck C ontro l

DEC, Swan Region 7 Turner Avenue (PO Box 1167 Bentley Delivery Centre WA 6983) C o d e

o f

P r a c t i c e

BENTLEY WA 6106 Tel: (08) 9423 2900 Fax: (08) 9423 2901 D i e b a ck W ork i ng G roup

C/ – Perth Region NRM 80 Great Northern Highway MIDDLE SWAN WA 6056 PO Box 2206 MIDLAND WA 6936) Tel: (08) 9374 3333 Fax: (08) 9374 0685 A

1 0 . 4 H e r i ta g e C o u n c i l o f WA

108 Adelaide Terrace EAST PERTH WA 6004 Tel: (08) 9221 4177 or 1800 644 177 Fax: (08) 9221 4151 Website: www.heritage.wa.gov.au A11. W OR K SAFE WA a n d E N ERGY SAFETY WA A

1 1 . 1 W o r k Sa f e WA

5th Floor ‘Westcentre’ 1260 Hay Street WEST PERTH WA 6005 PO Box 294 WEST PERTH WA 6872 Tel: (08) 9327 8777 Duty Phone: 1300 307 877 Tel: 1800 305 791 (Accident Reporting 24 hours) Fax: (08) 9321 8973 U t i l i t y

P r o v i d e r s

E-mail: [email protected] Website: www.safetyline.wa.gov.au

from Kwinana to Fremantle and Kewdale. Requests for the location of plant and reporting damage to plant:

Regional Offices

Tel: (08) 9419 0222 (all hours) or

B unbury

Fax: (08) 9439 2003.

8th Floor, 61 Victoria Street BUNBURY WA 6230 Tel: (08) 9722 2888 Fax: (08) 9791 8047

Notices should be addressed to: Assets Manager Offsites BP Refinery (Kwinana) Pty Ltd Mason Road KWINANA WA 6167

K a rr ath a

Unit 9, Karratha Village Shopping Centre KARRATHA WA 6714 Tel: (08) 9185 1911 Fax: (08) 9185 1234 A 11.2 Energy Sa f e t y WA

303 Sevenoaks Street CANNINGTON WA 6107 PO Box 135 CANNINGTON WA 6987 Tel: (08) 9422 5200 Tel: 1800 678 198 (Accident Reporting 24 hours) Fax: (08) 9422 5222 E-mail: energysafety@ commerce.wa.gov.au A 12. B P REFI N ERY ( K W I N A N A ) P TY LTD

Responsible for the production and supply of oil by pipeline C o d e

o f

P r a c t i c e

A 13. P RIVATE SERVI C ES i n KWINANA I N D U STRIAL AREA

There are also a number of private services which have pipelines in the Kwinana Industrial Area. Enquiries should be directed to the relevant Local Government or contact listed organisations below by phone . Air Liquide WA (08) 9439 1593 Alcoa World Alumina Australia (08) 9410 3111 Australian Fused Materials (08) 9439 2236 Bayer CropScience (08) 9355 3906 BOC Gases (08) 9456 6700 BP Oil Refinery (08) 9419 9500 CBI Constructors (08) 9419 1999 Chemeq (08) 9528 0200

3 5

Co d e o f Prac t i c e

CIBA Specialty Chemicals (08) 9437 8888 Cockburn Cement (08) 9411 1000 Cockburn Power Station (08) 9326 4911 Coogee Chemicals (08) 9439 8200 Cooperative Bulk Handling (08) 9237 9600 CSBP (08) 9411 8777 Doral Specialty Chemicals (08) 9439 9000 ELI Ecologic (08) 9439 2362 Fremantle Ports (08) 9430 3555 Freo Machinery (08) 9419 5444 HIsmelt Corporation (08) 9437 0600 Nalco Australia (08) 9419 1811 Nufarm Australia (08) 9411 4000 Nufarm Coogee (08) 9439 2166 OneSteel Market Mills (08) 9410 1933 Shinagawa Thermal Ceramics (08) 9410 8710 Summit Fertilisers (08) 9439 1844 Terminals West (08) 9411 4999 Tiwest Joint Venture (08) 9411 1444 Tyco Water (08) 9437 8200 United KG (08) 9499 0499 United Farmers Cooperative (08) 9419 7111 Water Corporation (08) 9420 2420 Wesfarmers Kleenheat Gas (08) 9333 0333

3 6

Wesfarmers LPG (08) 9439 1222 Western Power (08) 9326 4911 WMC Resources (08) 9479 0500 A 14. OTHER SERVI C ES A 1 4 . 1 WA P o l i c e S e rv i c e

State Traffic Co-ordination Tel: (08) 9222 1469 or Police Assistance (non emergency) 131 444 Fax: (08) 9222 1766 A 14.2 Fire and Emergency S e rv i c e s Authority of WA ( FES A )

Fire and Rescue Service WA, Fire Hydrants Notices should be addressed to: Water Resources Manager Fire and Rescue Service WA PO Box P1174 PERTH WA 6844 Tel: (08) 9323 9405 Fax: (08) 9323 9495 Planning and Evaluation Reporting Branch Tel: (08) 9323 9364 Tel: (08) 9323 9300 (Emergency Management Services, Fire Services) Fax: (08) 9323 9354.

U t i l i t y

P r o v i d e r s

A 1 4 . 3 S tat e Emergency S e rv i c e , Emergency A s s i s ta n c e

Tel: (08) 9277 0555 or 1300 130 039 (all hours) Fax: (08) 9479 4890 (Emergency Assistance) Fax: (08) 9277 8320 (Administration and General Enquiries) Website: www.fesa.wa.gov.au A 14.4 St John Ambulance A s s o c i at i o n

WA Ambulance Service – Communications Branch Tel: (08) 9334 1320 or (08) 9334 1323 Fax: (08) 9334 1207 Contact: Johnathan Wright Tel: (08) 9334 1432 A 1 4 . 5 T r a n s p e rt h

Service Difficulties, Faults and Feedback Tel: 13 16 08 Tel : (08) 9326 2111 (Emergency) Tel: (08) 9326 2277 (Administration) A 1 4 . 6 Ta x i I n d u s t ry

Taxi Council of WA Tel: (08) 9473 1588 Fax: (08) 9473 1577 Email: [email protected] C o d e

o f

P r a c t i c e

A

14.7 Civil C o n t r a c to r s F e d e r at i o n ( WA B r a n c h )

Level 1, 70 Malaga Drive MALAGA WA 6090 (PO Box 688) MIRRABOOKA WA 6941 Tel: (08) 9249 8944 Fax: (08) 9209 2669 Website: www.civilcontractors.com A

1 4 . 8 P o rt Authorities

F r e m a nt l e P orts

Contact for any excavation work within the Port Authority boundaries with respect to Policies, Excavation and Reinstatements. Tel: (08) 9430 3555 Fax: (08) 9336 1391 G e r a l d ton P ort Author i ty

Contact: Greg Hood Tel: (08) 9964 0520

U t i l i t y

P r o v i d e r s

A 14.9 D e pa rt m e n t of Defence

Defence Infrastructure Division, Property Management Section contact for any excavation work undertaken on Defence owned land. P rop e rty O ff i c e r

Corporate Services and Infrastructure Tel: (08) 9311 2685, or (08) 9311 2680 Fax: (08) 9311 2670 Defence Materials Contact Andrew Schmidt Tel: (02) 6265 4974 A

1 4 . 1 0 BH P – S u pp ly Authority

Contact for issues relating to power supply in Newman. Tel: 1800 677 639 or (08) 9175 3303 (Supply Authority Inspector) Fax: (08) 9175 3919

C o d e

o f

P r a c t i c e

A 14.11 Pilbara I ro n U t i l i t i e s

Contact for issues relating to power and water supply in Dampier, Paraburdoo and Tom Price. Tel: (08) 9143 3271 (Tom Price) Fax: (08) 9143 3452 Tel: (08) 9143 4432 (Paraburdoo) Fax: (08) 9143 4796 Tel: 08) 9143 5662 (Dampier) Fax: (08) 9143 5670 A 1 4 . 1 2 EDL G ro u p Op e r at i o n s P t y Lt d

Contact: Marc Beckx Tel: (07) 3275 5678 A

14.13 Pa r l i a m e n ta ry S e rv i c e s D e pa rt m e n t

Contact: Graham McDonald Tel: (08) 9222 7444



3 7

a pp e n d i x B

a pp e n d i x B Road Reserve Allocations for Utility Service Providers: Figures showing Standard Alignment; Green Field Development; Narrow Road Reserves; and Paved Laneways

3 8

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

R o a d R e s e rv e A l l o c at i o n f o r U t i l i t y S e rv i c e P r ov i d e r s w h e n u s i n g S ta n d a r d A l i g n m e n t s

(Applicable prior to June 2001 and not applicable to new ‘Green Field’ Developments) Figure B1

Notes: 1. All measurements relate to distance from the boundary line on each side of the road reserve unless otherwise specified.

Telecommunications cable alignments following negotiation and approval from other affected utility providers.

2. Junction pits and access chambers may extend into the 2.4 – 3.0 metre corridor.

6. In general, no underground utility service shall exceed a nominal 300mm diameter in the 0 – 3.0 metre alignment. Larger utility services may be located within this alignment following negotiation and approval from other utility providers.

3. These allocations may be interchanged with approval from all affected utility providers. 4. Traffic light installation cables for synchronising systems to be located in verge by arrangement.

7. Local Government reticulation or rising irrigation main to be located beyond the 3.0 metre alignment by arrangement.

5. Under established footpaths some variations may be necessary to Western Power and U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



3 9

C ode of P rac t i c e

SERVICE a n d P I P E COLOUR

Gas – Yellow pipe or Yellow Striped pipe Electrical – Orange pipe or Orange Striped pipe or Orange electrical tape for directly buried black cable or plain black cable MRWA Traffic Signals – Orange pipe Roadside Lighting – Orange pipe ITS – Orange pipe (power) and White pipe (comms) Telecommunications – White pipe or black pipe with White Stripe Water – Blue pipe or Blue Striped pipe Sewerage – Cream pipe or Grey pipe or Cream/Grey Striped pipe ‘Third Pipe’/Effluent Reuse – Purple pipe (refer to Section 5.1.4)

Note: Colours of pipe relate only to PVC and polyethylene pipe and other materials could be used, particularly in older established areas unless otherwise stated. Some services can be buried directly in the ground and not in conduits.

CAUTION: It is possible that pipe and conduits in existence may not conform to these standards.

widths, particularly if trees are to be planted in the verge. Also consult appropriate Local Government.

8. The planting of street trees should be of a type and variety to have a minimal interference to utility services. (Refer to the applicable Local Government for policy and specification).

12. Access points may extend partly into adjacent allocations, particularly in Common Trenching.

9. Utility services may, in special circumstances, be located beneath the carriageway where verge space is insufficient. Approval must be sought from all utility providers and road authority. 10. In established localities where overhead power cables have been located underground, power cables may exist in the 2.4 – 3.0 metre corridor. Beware that in many instances power cable ‘tape’ has not been installed. 11. Verge widths may vary. Refer to current version of the Liveable Neighbourhood Community Design Code produced by the WA Planning Commission for acceptable verge 4 0

U t i l i t y

Refer Special Notes 8.2. 13. In established areas Western Power’s (Bright Telecommunications) pit and pipe installation is on the 2.7 metre alignment. 14. Where overhead power is being undergrounded or where there are problems with the 0 to 0.6 metre alignment, power may be installed on the 2.7 metre alignment, subject to approval by Western Power or Horizon Power.

15. For stormwater pipes, minimum cover may be reduced to 600 mm. P r o v i d e r s

C o d e

o f

P r a c t i c e

R o a d R e s e rv e a l l o c at i o n f o r U t i l i t y S e rv i c e P r ov i d e r s i n n e w ‘ G r e e n F i e l d ’ d e v e l o p m e n t s

(Applicable after May 2001) and supersedes ALL allocations shown in previous codes Figure B2

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



4 1

Co d e o f Prac t i c e

Notes: 1. All measurements relate to distance from the Property Line on each side of the road reserve unless otherwise specified.

footpaths some variations may be necessary following negotiation and approval from other affected utility providers and the road authority.

2. Although the diagrams show a single utility service within each corridor, these may be multiple services of similar utilities.

7. In general, no underground utility service shall exceed a nominal 300mm diameter within the 0 – 3.0 metre corridor. Larger utility services may be located within this corridor following negotiation and approval of other Utility Providers.

3. Junction pits and access chambers may extend into the 2.4 – 3.0 metre corridor by agreement with the electricity network provider. 4. Alignments in the 4.2 – 5.0 metre corridor may be used by arrangement between Utility Providers. 5. Traffic light installation cables for synchronising systems to be located in the verge by arrangement with utility providers. Similarly under established footpaths some variations may be necessary to electrical and telecommunication cable alignments following negotiation and approval from other affected utility providers. 6. In new developments Power and Communications distribution cables are to be laid in locations shown. Under established

4 2

U t i l i t y

8. Local Government reticulation or rising irrigation mains are to be located beyond the 3.0 metre alignment by arrangement. 9. The planting of street trees should be of a type and variety to cause minimal interference to utility services. (Refer to the applicable Local Government for policy and specification). 10. Utility services may be located beneath the carriageway where verge space is insufficient. Consultation must be made and agreements obtained with all relevant Utility Providers and Road Authorities.

P r o v i d e r s

C o d e

o f

P r a c t i c e

SERVICE a n d P I P E COLOUR

Gas – Yellow pipe or Yellow Striped pipe Electrical – Orange pipe or Orange Striped pipe or Orange electrical tape for directly buried black cable or plain black cable MRWA Traffic Signals – Orange pipe Roadside Lighting – Orange pipe ITS – Orange pipe (power) and White pipe (comms) Telecommunications – White pipe or black pipe with White Stripe Water – Blue pipe or Blue Striped pipe Sewerage – Cream pipe or Grey pipe or Cream/Grey Striped pipe ‘Third Pipe’/Effluent Reuse – Purple pipe (refer to Section 5.1.4)

Note: Colours of pipe relate only to PVC and polyethylene pipe and other materials could be used, particularly in older established areas unless otherwise stated. Some services can be buried directly in the ground and not in conduits.

CAUTION: It is possible that pipe and conduits in existence may not conform to these standards.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



4 3

C ode of P rac t i c e

11. Verge widths may vary. Refer to the current version of the Liveable Neighbourhood Community Design Code produced by the Western Australian Planning Commission for acceptable verge widths, particularly if trees are to be planted in the verge. Also consult appropriate Local Government. 12. Electricity to pass under Gas and Water at Reticulation crossings. 13. Gas to pass above Water at Reticulation crossings. 14. A minimum clearance of 300mm is required between gas and other utility services. If 300mm clearance cannot be achieved, approval of the gas provider shall be obtained. 15. A minimum clearance of 150mm is required between sewer main and other utility services and between water main and other utility services (note clearance of reticulation services may vary from this value). Refer also to Table B1, Clearance Zones Guide regarding minimum clearances between utility services when undertaking works within the road reserve.

17. All reticulation to be laid within +/-100mm wherever practicable of the indicated centre line and secured against movement with initial backfill. Some utility practices may vary from this requirement particularly for multiple utility services. 18. Low voltage cables used by non-network provider for street lighting may be installed in the 2.4 – 3.0 metre corridor. All electricity network provider cabling must be installed at a minimum depth of 850mm. Cable joints shall have a minimum cover of 750mm. All other low voltage cabling shall be installed at a minimum depth of 600mm. Refer also to Section 5.1.2 of this Code. 19. Different alignment corridors may apply to green field developments in Narrow Road Reserves with widths of 14.0 – 16.0 metres. Refer to Figure B3. 21. Where there are problems with the 0 to 0.5 metre alignment, power may be installed on the 2.7 metre alignment subject to approval by Western Power or Horizon Power.

16. Cover, bedding and backfill are to be in accordance with utility provider’s requirements (eg water reticulation in accordance with Water Corporation’s Drawing BD62-1-1) and road authority’s reinstatement specification agreement.

4 4

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

R o a d R e s e rv e a l l o c at i o n f o r U t i l i t y S e rv i c e P r ov i d e r s i n N a r r o w R o a d R e s e rv e s ( n o m i n a l ly 1 4 . 0 – 1 6 . 0 m e t r e s )

These allocated alignments apply to all new developments after October 2002 and supersedes all allocations shown in previous Codes of Practice, including Standard and Common Trenching. All affected utility service providers must agree to proposed variations to these allocations. All previous utility services allocation notes apply except where varied below Figure B3

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



4 5

Co d e o f Prac t i c e

Notes: 1. The designers of narrow road reserves are obliged to consider the relationship of all utility services, pavements and furniture with each other. The corridors shown in this diagram can only be varied with approval from all affected utility service providers. 2. All measurements generally relate to the distance from the property line on each side of the road reserve unless otherwise specified.

9. Cover, bedding and backfill requirements to be in accordance with appropriate authority requirements.

3. Access chambers may extend into the trees and lights corridor. 4. In general, no underground utility service shall exceed a nominal 300 mm diameter within the 0 – 3.0 m corridor. Larger utility services may be located within this corridor only after negotiation with all utility providers. 5. Local Government reticulation or irrigation pressure mains are to be located beyond the 3.15 m alignment by arrangement. 6. For narrow reserves with a wide road pavement, the verge space available may be insufficient for trees while maintaining minimum clearances from other utility services. (Refer to current version of the WA Planning Commission Liveable Neighbourhoods and applicable Local Government for Policy and Specification). 7. Provision of an alignment for water distribution mains and other ‘trunk’ services can be negotiated on the verge adjacent to the sewer in 16m reserves.

4 6

U t i l i t y

8. Verge widths may vary. Refer to the current version of the Liveable Neighbourhood Community Design Code produced by the Western Australian Planning Commission for acceptable verge widths, particularly if trees are to be planted in the verge. Also consult appropriate Local Government.

10. For sewers in curved streets: Access chambers and maintenance shafts should be positioned in the sewer corridor. Alternatively they may need to be positioned in the pavement. The minimum distance from the sewer to the property boundary shall be 1.0 metres. Access chambers and maintenance shafts should be clear of the kerb. The minimum cover to the sewer shall be 0.9 m. A similar approach shall apply to stormwater pipe work. 11. All pits shall be totally contained within the utility service corridor except where approved by the utility service provider whose alignment is encroached upon. This may require staggering of pits as shown in the following Supplementary Diagram to Figure B3. 12. Underground power cables may be installed on the 2.7m alignment, where there are installation and maintenance issues adjacent to retaining walls in the 0-0.5m corridor provided it is acceptable to other Utility Service Providers and doesn’t interfere with street trees.

P r o v i d e r s

C o d e

o f

P r a c t i c e

SERVICE a n d P I P E COLOUR

Gas – Yellow pipe or Yellow Striped pipe Electrical – Orange pipe or Orange Striped pipe or Orange electrical tape for directly buried black cable or plain black cable MRWA Traffic Signals – Orange pipe Roadside Lighting – Orange pipe ITS – Orange pipe (power) and White pipe (comms) Telecommunications – White pipe or black pipe with White Stripe Water – Blue pipe or Blue Striped pipe Sewerage – Cream pipe or Grey pipe or Cream/Grey Striped pipe ‘Third Pipe’/Effluent Reuse – Purple pipe (refer to Section 5.1.4)

Note: Colours of pipe relate only to PVC and polyethylene pipe and other materials could be used, particularly in older established areas unless otherwise stated. Some services can be buried directly in the ground and not in conduits.

CAUTION: It is possible that pipe and conduits in existence may not conform to these standards.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



4 7

C ode of P rac t i c e

‘ G r e e n F i e l d ’ D e v e l o p m e n t s i n N a r r o w R o a d R e s e rv e s ( n o m i n a l ly 1 4 . 0 – 1 6 . 0 m e t r e s ) Supp l e m e n ta ry D i ag r a m t o F i g u r e B 3

4 8

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

R o a d R e s e rv e A l l o c at i o n f o r U t i l i t y S e rv i c e s i n L a n e ways ( a s d e f i n e d i n t h e P l a nn i n g a n d D e v e l o p m e n t Ac t )

Figure B4

Notes: 1. Cover to utility services to be the same as for roadways.

4. Utility Services are to be placed on the side of the laneway servicing the greatest number of lots, unless there are topographical constraints.

2. Where a laneway lot fronts a primary street the location of utility services shall be in the primary street, except where building setbacks and/or topography constrains the provision of utility services in the primary street, ie. natural or altered land environment, including retaining walls.

5. Street lights to be positioned to suit Local Government requirements and to minimise the effect on the other utility services. 6. For all laneway widths, utility services are to remain in their relative positions. 7. Proposed variations to these allocations must be agreed by all affected utility service providers.

3. Where a laneway lot fronts POS, consideration should be given to relocating some of the utility services to the POS; eg sewer.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



4 9

Co d e o f Prac t i c e

TA B LE B 1 C l e a r a n c e Z o n e s G u i d e – C l e a r a n c e L i m i t s to U n d e r g ro u n d U t i l i t y S e rv i c e s w h e n U n d e rta k i n g W o r k s i n Ro a d R e s e rv e s

This Clearance Zone Table provides the minimum approach distance that powered excavating machines may operate before the Controls are applied. Use of this Table provides protection of the utility service and ensures the safety of the excavator and operator. Adoption of this Table will improve site safety and demonstrate Duty of Care by both the utility service provider and excavator operator. Types of Underground Utility Services Note: The owners of utility services registered with the Dial Before You Dig service are covered by this Guide and require an enquiry through this free service and the compliance with any directive issued with information regarding the utility service

Clearances The minimum approach distance for individuals carrying out work near underground utility services.

Clearance Zone for Powered Excavation Distance B is the minimum approach distance for powered excavating machines.

Typical Depths

Controls If the risk assessment identifies a potential risk of making contact with both underground and overhead utility services, two safety observers would be required. One observer to ensure that the machinery maintains a safe distance from underground utility services, the other observer to ensure a safe distance from the overhead utility services eg powerlines.

Below natural ground level or top of road pavement.

B = the distance from the underground utility service to the break of the surface created by an excavating machine digging away from the underground utility service. In the case of The machine will be on the other side of the cut away from gas or electricity the underground utility service. utility services, an appropriate fire For directional boring across extinguishing system the line of a utility service, a must be accessible to minimum clearance of 300 meet the identified mm from the utility service fire risk. will be maintained. If the width and /or For directional boring parallel depth of the excavation to the utility service and at will expose the utility the level of the utility service, service, the utility a clearance of 500mm shall service provider must be maintained from the edge be contacted prior to of the nearest utility service. It commencing work. may be necessary to dig trial holes to prove the location of the nearest utility service at points along the route.

5 0

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

Types of Underground Utility Clearances Services Low and Medium N/A Pressure Gas Services

Clearance Zone for Powered Excavation 300mm.

Pot hole to confirm location of utility service.

Low pressure gas mains

Medium pressure gas N/A mains

Controls

Typical Depths 300 – 450 mm.

The position of the utility service may not appear on the plans.

300mm.

Pot hole to confirm location of utility service.

450 – 750mm.

The Code of Practice for shafts, tunnels and trenches, and the Guideline to dangers of poorly ventilated workplaces. Only one individual at a time should be excavating if hand excavation is being undertaken in a confined space. Another should act as an observer and be able to operate any breathing, escape or fire equipment if required. The elimination of an ignition source in the event of an escape. Excavation below underground utility services should not be undertaken within a distance of 300mm below the utility service located at the lowest level. Note: All transmission pipelines involving gas (also oil and petrochemical) have separate requirements and the utility service provider should be contacted.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



5 1

C ode of P rac t i c e

Types of Clearance Zone for Underground Utility Clearances Powered Excavation Services High Pressure gas 1000mm. 300mm with services, mains and hand tools and pipelines supervision from the utility service provider.

Low Voltage Electricity cables – voltages less than or equal to 1000V (1kV)

High Voltage Electricity cables – voltages from 1000V (1kV) up to 33000 (33kV)

Refer to utility service provider requirements.

Refer to utility service provider requirements.

Typical Depths

Controls Powered excavation within 300 – 1000mm is only permitted under supervision and with a Permit to Work from the Utility Service Provider. Refer also to Controls for medium pressure mains above. Must contact the utility service provider for specific conditions prior to excavating.

750 – 1200mm.

500mm minimum.

Western Power conditions:

Refer to utility service provider requirement.

Refer to utility service provider requirement.

http://www. westernpower.com. au/mainContent/ workingWithPower/ WorkingAround PowerLines/Excavating NearPowerlines%20. html Must contact the utility 500mm minimum. service provider for specific conditions prior to excavating. Western Power conditions: http://www. westernpower.com. au/mainContent/ workingWithPower/ WorkingAround PowerLines/Excavating NearPowerlines%20. html

5 2

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

Types of Underground Utility Clearances Services Underground subRefer to utility transmission cables service provider 33000V (33kV) up to requirement. 132000V (132kV)

Telecommunications cables

Water pipelines

Contact utility service provider for specific requirement. N/A

Sewer pipelines

N/A

U t i l i t y

P r o v i d e r s

Clearance Zone for Powered Excavation Refer to utility service provider requirement.

Controls Must contact utility service provider for specific conditions.

Typical Depths 750mm minimum.

Western Power conditions:

Contact utility service provider for specific conditions prior to excavating. 300mm (if pipeline is 200mm or greater in diameter). 300mm (if pipeline is 200mm or greater in diameter).

C o d e

o f

http://www. westernpower.com. au/mainContent/ workingWithPower/ WorkingAround PowerLines/Excavating NearPowerlines%20. html Must contact utility service provider for specific conditions prior to excavating. Pot hole to confirm location of utility service. Pot hole to confirm location of utility service.

P r a c t i c e



Typically 450 – 600mm, other assets to 1200mm. 450mm minimum. 600mm to 10 (ten) metres.

5 3

a pp e n d i x C

a pp e n d i x C Traffic Control and Safety

5 4

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

1. TRAFFI C MA N AGEME N T f o r ROADW OR K S

Practice training course can erect temporary traffic management signs. Amendments to the Code of Practice may be made from time to time. Users of this document shall ensure that they are using the current document, which is available from the Main Roads WA Website: www.mainroads.wa.gov.au (‘Using Roads’ > ‘Traffic Management’ > ’Roadworks’ > ‘Traffic Management for Works on Roads – Code of Practice’).

The Utility Providers Code of Practice for Western Australia has adopted the following documents (unless otherwise agreed between the utility service provider and Main Roads WA) to be used for all traffic control and safety purposes: Main Roads Western Australia, Traffic Management for Works on Roads Code of Practice (April 2009) – defined as ‘Code of Practice’ in the following text.

Note: The Code of Practice is to be used in conjunction with Australian Standards AS 1742.3 – 2002 and Field Guides HB 81.1 – 81.9.

The Code of Practice is issued by Main Roads WA to establish and maintain a standardised system of road works traffic management procedures and practices on all works undertaken within the road reserve by direct labour (eg utility service provider) and contract. The Code of Practice is supported by the Australian Standard AS 1742.3 – 2002 and Australian Standard Field Guides HB 81.1 – 81.9 (refer to titles of standards listed below). It is also supported by the Main Roads Act 1930, Occupational Safety and Health Act 1984, Road Traffic Act 1984, Road Traffic Code 2000 and Disability Services Act 1993.

T I T LE S O F S T A N DA R D S

AS 1742.3 (2002) Traffic control devices for works on roads HB 81.1 (1996) Short-term urban works, daytime only HB 81.2 (1996) Short-term rural works, daytime only HB 81.3 (1997) Mobile works

The Code of Practice has been authorised by the Commissioner of Main Roads for use by Local Government and Main Roads (including authorised contractors) personnel. It is expected that State instrumentalities and other organisations such as utility service providers and their contractors will adopt the Code of Practice for all works on roads that are under the control of Main Roads WA or Local Government to ensure a safer road network environment for both the road works and road users.

HB 81.4 (1998) Short-term night works HB 81.5 (1998) Works on unsealed roads HB 81.6 (1998) Bituminous surfacing works HB 81.7 (2000) Short-term works on freeways

The enforcement of safe worksite practices to ensure the safety of employees and public is undertaken by Worksafe WA.

HB 81.8 (2000) Long-term partial closures and detours on urban roads

It is essential that only accredited personnel who have completed modules of the Code of

HB 81.9 (2000) Long-term partial closures and detours on rural roads.

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



5 5

C ode of P rac t i c e

2. ERE C TIO N o f TEM P ORARY REG U LATORY TRAFFI C SIG N S a n d D U TY o f C ARE w h e n U N DERTA K I N G W OR K S i n ROAD RESERVES

Part 20 Regulation 297 of the WA Road Traffic Code 2000 provides that where work or a survey is being carried out upon a road by an authorised body, that authorised body may erect, establish, display alter or take down any particular road sign or traffic control signal approved by the Commissioner of Main Roads so as to only apply to one lane, or one dissection of the carriageway to which the work or survey relates. Motorists must not exceed speed limits displayed on a speed restriction sign operating over any portion of road that lies between this sign and a de-restriction sign. It is implicit that such signs will be of a temporary nature for the purpose of warning motorists and for the prevention of injury and loss of life to the persons carrying out the works or survey in question and possibly also to a lesser extent to the motorist and their vehicle.

5 6

U t i l i t y

A duty of care would arise on the part of anybody, whether government or private, who is carrying out operations on a road which is otherwise open to traffic, to take all reasonable measures to prevent accident or injury to persons carrying out those operations and also to members of the public lawfully using the road. Part of this duty of care would consist of the erection of warning signs, which would be of a temporary nature, to alert motorists to the impending danger for as long as the operations are being carried out within the road reserve. This duty of care is the responsibility of those carrying out the works or surveys within the public road reserve and not upon the Commissioner of Main Roads or the relevant Local Government. These temporary signs would have to be removed from the road or vicinity of the road as soon as the works or survey have been completed.

P r o v i d e r s

C o d e

o f

P r a c t i c e

a pp e n d i x D

a pp e n d i x D Utilities Located in Rail Reserves – Process and Information

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



5 7

Co d e o f Prac t i c e

1. U TILITIES LO C ATED I N THE RAIL RESERVE 1 . 1 I n t ro d u c t i o n

Railways accredited in WA under the Rail Safety Act 1998 are required to manage the interfaces with service providers using railway reserves and infrastructure. AS 4292.1 – 2006 is the Standard for compliance with this Act, and service providers will need to perform risk assessments, develop safety management plans and interface co-ordination plans with track managers for the design, installation and ongoing inspection and maintenance of their services in rail corridors. Requirements specific to Utilities are in Section D4 of AS4292.1 – 2006. Service Providers should consult with the rail organization on these matters. Since the freight business of Westrail was sold in December 2000 the land on which railways are built falls into two categories, which determine the processes to apply for and obtain approval of other parties’ services entering and using railway land. Correct categorisation of the land to be entered or traversed is critical to the approval process: – PTA (Rail) Reserves which are maintained by the Public Transport Authority (Rail) in the Perth Metropolitan area on behalf of the State Government; and Rail Corridor Land that is leased by other private freight rail operators, predominantly outside the Perth Metropolitan Area. Refer to Section 2.2 of this Appendix D regarding role of WestNet Rail. The Rail Corridor Minister administers the use of Corridor Land under the Rail Freight System Act 2000 and a lease with private freight rail operators. The process for external parties to access such land is described in the document ‘Information For Applications to Access Rail Corridor Land’, incorporated in Section 2 of this Appendix D.

5 8

U t i l i t y

1 . 2 A pp ly i n g f o r U t i l i t y S e rv i c e s i n P TA ( Ra i l ) Ra i lway R e s e rv e s

The process of applying for access to rail reserves managed and maintained by PTA (Rail) on behalf of the Government is simplified because no other private freight operators are involved. The Manager Track & Civil is responsible for the management of these PTA (Rail) Rail Reserves. The definitive reference document for underground services in rail reserves is AS 4799-2000, ”Installation of underground utility services and pipelines within railway boundaries”. It is essential that applicants in all cases are familiar with the requirements of this Standard. The information below is in the Western Australian context and is a supplement to AS4799-2000. 1 . 3 C e s s at i o n o f u s e o f t h e Na m e ‘ W e s t r a i l’

The use by the Western Australian Government Railways Commission of the trading name ‘Westrail’ ceased in December 2000. Utility service providers and applicants must not include this in documentation and correspondence. 1 . 4 I n i t i a l P o i n t s o f C o n ta c t

These are determined by the section of railway affected and the location of the crossing: 1.4.1

PTA (Rail) Lines in the Perth Metropolitan Area (All electrified lines carrying urban passenger traffic) The Corridor and Land Manager PTA (Rail) PO Box 8125 PERTH BUSINESS CENTRE WA 6849 Tel: (08) 9326 2530 Fax: (08) 9326 2382

P r o v i d e r s

C o d e

o f

P r a c t i c e

Non-Electrified lines between Armadale and Mundijong, and Robbs Jetty to Fremantle:

less than 1.0 metre depth and be not less than 2.0 metres below rail level under the tracks. The minimum depth recommended in AS4799-2000 is 1.2m from the top of rail to top of cover pipe. Utility service providers must be aware that the presence of 25KV overhead traction equipment raises issues regarding earthing and bonding of equipment, electrical interference and special safety precautions unique to the electrified railway environment.

Address and contacts as above. Non-Electrified Freight Lines between Woodbridge and Forrestfield, Forrestfield and Kwinana, Mundijong and Kwinana, Cockburn and Robbs Jetty, and Freight Lines outside the Perth Metropolitan Area: Refer to the document ‘Information for Applications to Access Rail Corridor Land’ (Section 2 of this Appendix D).

1 . 7 I d e n t i f i c at i o n o f t h e C ro s s i n g P o i n t i n T e r m s o f Ra i l K i l o m e t r e s

1 . 5 T h e R e l at i o n s h i p b e t w e e n P TA ( Ra i l ) , t h e U t i l i t y S e rv i c e P ro v i d e r a n d I n s ta l l e r o f a U t i l i t y S e rv i c e

On the Perth Electrified Network, the masts supporting overhead electric traction equipment are identified by letters and numerals painted on the side of the mast inside a yellow rectangle. The location of the crossing point can be defined by measurement from the nearest masts each side of the crossing point and noting their identification details.

PTA (Rail) is ultimately required to enter into an agreement with the Utility Service Provider (or Principal Agency) of a utility service regarding its long-term use and possible removal should this be required in future. There is a trend for utility service providers to engage consultants to plan and manage installation, who in turn engage contractors and sub-contractors as installers. PTA (Rail) must be assured by written advice from the Utility Service Provider that they take full responsibility for any decisions, representations, commitments or actions by their agents, contractors and sub-contractors, including on-site negotiations during installation.

In non-electrified territory the following reference points can be used: • Railway kilometre posts • Centrelines of road level crossings • Signals and location cases. • Centrelines of station platforms, culverts (state type and size of openings) and bridge abutments. 1 . 8 Ca b l e L o c at i o n i n t h e Ra i l R e s e rv e

1.6 Depth requirements in the P e rt h M e t ro p o l i ta n A r e a

Every application for a utility service to cross or enter the PTA (Rail) rail reserve will incur an ‘initial fee’ of $200.00 to cover detailed location of PTA (Rail) services in the vicinity. Existing PTA (Rail) customers, Government Departments and Local Governments may cover this by a Purchase Order. Other parties should pay by cheque made out to ‘The Public Transport Authority (Rail)’, NOT ‘WAGR’. As indicated above, the cost of a PTA (Rail)

PTA (Rail) policy is that wherever possible other parties’ services, including utilities, shall maintain a separation of at least 1.0 metre from PTA (Rail) cables. Due to considerable PTA (Rail) cable routes in the Reserves at depths between 0.6 and 1.2 metres, it is highly desirable that a utility service is designed to enter and leave the reserve at not

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



5 9

C ode of P rac t i c e

presence during installation of a utility service to ensure that correct separation is maintained may also be charged to the utility service provider. The utility service provider must therefore ensure that processes are in place for payment of such fees that may not necessarily devolve on to the installer.

Slinging above ground cables and suspending crane loads above overhead traction equipment automatically requires isolations. To avoid such costs and disruption to services it is therefore desirable that underground crossings of the Railway reserve start and end at pits situated outside the reserve boundary fences.

Note: PTA (Rail) does not supply personnel for safe working protection of the site. 1 . 9 Ra i l Sa f e t y Ma n a g e m e n t

Under the Rail Safety Act 1998 PTA (Rail) is required to ensure that safety of rail infrastructure and operations is adequately addressed by preparation of Safety Management Plans covering Railway Safe working, Occupational Health and Safety, environmental issues and if necessary a formal Risk Assessment of the installer’s activities. These plans must be submitted and approved by PTA (Rail) prior to installation. Guidance on the content and format of such Safety Management Plans can be obtained from the contacts provided in Section 1.4 of this Appendix D. 1.10 T r a c k C l o s u r e s a n d I s o l at i o n s o n E l e c t r i f i e d Lines

Contractors’ activities that will result in plant, personnel or materials coming within 3.0 metres of the nearest rail or any live overhead traction equipment may require the track to be closed, the electricity switched off and the site earthed (isolated). This requires the work to be conducted after suburban trains cease running in the early morning, from about 0100 to 0430 depending on location. The indicative cost of an isolation is $1 000.00, regardless of location in the Perth Metropolitan Area. This cost may be reviewed from time to time.

6 0

U t i l i t y

Programming of isolations depends on the availability of PTA (Rail) personnel, train operations and other maintenance of railway infrastructure. Note: Approval for an isolation on a particular date is not guaranteed. 1 . 1 1 ‘ A s C o n s t r u c t e d ’ D e ta i l s

In addition to the requirements of Clause 2.3.2.1 of AS4799 (2000), on completion of installation of a utility service, PTA (Rail) will require ‘as constructed’ drawings showing the surface alignment of the utility service, as well as records of depths such as bore logs. 2. I N FORMATIO N FOR A P P LI C ATIO N S TO AC C ESS RAIL C ORRIDOR LA N D 2 . 1 I n t ro d u c t i o n

The following information provides guidelines for people and organisations in Western Australia seeking access to Rail Corridor Land. The guidelines have been developed based upon the requirements of the Rail Freight System Act 2000 (the Act). The Act states that approval must be sought from the Rail Corridor Minister (the Minister) for the following: • to carry out any work in the Corridor, including installation of structures and utility services;

P r o v i d e r s

C o d e

o f

P r a c t i c e

A person or company cannot construct anything on Corridor Land unless the Minister has agreed in writing or the regulations state that the Minister’s agreement is not required (section 47 of the Act). No such regulations currently exist. The exception to this is that WestNet Rail (defined in Section 2.2.2 of this Appendix D) can approve uses for the Land for railway purposes.

• to lease Corridor Land to a company; and • to excise the land from the Corridor for sale, in order to realise commercial gain to the State. That is, the Minister’s approval is required for almost all applications to access the Rail Corridor. 2 . 2 R e l e va n t D e ta i l s f ro m t h e Ac t a n d t h e L e a s e

The Rail Corridor Minister is restricted by the Act as to the uses that can be approved on Corridor Land. The Land cannot be used in a way that is inconsistent with existing or future uses of the Land. Any application can be refused on any grounds at the discretion of the Minister.

2.2.1

The Act The Rail Freight System Act 2000 (the Act) enabled the sale of the WA Government Railways Commission’s Freight Business. The Act also provided for Government railway land to be designated as Corridor Land, and established the Rail Corridor Minister as a State agency to manage the Corridor Land. A large proportion of the land that was owned by the State as Rail Reserve was designated as Corridor Land on December 17, 2000 and control of the land was vested in the Rail Corridor Minister.

2.2.2

The Lease The sale of the State’s rail freight business to the Australian Railroad Group (ARG) included the sale of all contracts and rolling stock, the lease of the freight rail network for 49 years, and a non-exclusive right to use corridor land for railway purposes for 49 years. The Rail Freight Corridor Land Use Agreement covers the use of the corridor land and freight rail network and Railway Infrastructure Lease (the Lease). WestNet Narrow Gauge Pty Ltd and WestNet Standard Gauge Pty Ltd, both of which are subsidiaries of the Australian Railroad Group (ARG), are the Lessees under this agreement. WestNet Rail, a subsidiary of Queensland Rail, undertakes the management of the rail infrastructure and corridor land on behalf of the Lessees.

The extent of the former Railway Reserve that is now designated Corridor Land is described in the Rail Freight System (Corridor Land) Order 2000 and defined by plans held at the Public Transport Authority (Rail). They are available for viewing by appointment by contacting the Corridor and Land Manager at PTA (Rail). There are several portions of land that have been specifically excluded from the Corridor, either because they were subject to existing leases or uses, or it was deemed that the land was not required for the purposes of the Rail Freight Business. Therefore, not all railway land is Corridor Land.

The Rail Corridor Minister is obliged to work within the contractual details of the lease when assessing applications to carry out work in the Corridor, in order to minimise any liability to the State as a result of the proposed works. The relevant details of the lease are generally based upon the requirements of the Act. Like the Act, the Lease allows use of the Land if it will not unreasonably interfere with the existing or future uses of the Land.

The Act designates the Minister as having control of access to, and use of, the Corridor. Disposal of interests in corridor land by the Minister is restricted to interests that are no greater than leasehold interest for a term of not more than 50 years. That is, Corridor Land may not be sold. U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



6 1

Co d e o f Prac t i c e

However, the Minister is required to give 60 days notice to the Lessee before granting anyone a right to use corridor land, not involving construction, and must consult with the Lessee regarding the impact on the Lessee’s use of the corridor or any other usage right the Minister proposes to grant.

• fines of $20 000.00; and • removal of the works, at the cost of the proponent. 2 . 3 T h e A pp ro va l P ro c e s s

Note that the following process applies only to proposals for construction on or use of corridor land designated under the Rail Freight System Act. Proposals for construction on or use of Rail Reserves, require approval from the PTA (Rail) and any other interested parties, and are subject to the requirements of the Government Railways Act 1904. The procedure for approvals for construction on or use of Government Rail Reserves is unchanged from that applying prior to the sale of the freight business.

Most importantly for proponents of construction projects on corridor land, the Lease requires that the Lessee be given six months notice of any construction work, and that the Minister consult with the Lessee regarding the impact of any works on the Lessee’s use of the corridor land or railway infrastructure. Projects that involve the relocation of the leased railway line are covered by specific provisions of the lease. The Lease also specifically sets out procedures to be followed if the construction of works will interfere with existing or future uses. This includes the right of the Lessee to claim compensation for loss suffered by the Lessee by reason of the construction.

The process documented below applies for all applications associated with access to, or use of, Corridor Land. All Applications should be addressed to:

The Lease specifically prohibits the Minister from granting any other party the right to use the corridor for a ‘Permitted Use’, which broadly covers use for railway purposes and use by Local Governments for civic purposes.

The Rail Corridor Minister c/ – The Public Transport Authority (Rail) PO Box 8125 PERTH BUSINESS CENTRE WA 6849 Attention: The Corridor and Land Manager

2.2.3

Regulations Persons wishing to construct on or use corridor land should also be familiar with the Rail Freight System (Corridor Land) Regulations 2000, which covers specific matters such as erection of gates, transport of heavy vehicles across the railway track and drainage. 2.2.4

Penalties The Rail Freight System Act 2000 and the Rail Safety Act 1998 contain provisions for the following penalties to possibly be incurred if written approval is not sought from the Minister or WestNet Rail, or if the conditions of approval are breached: 6 2

U t i l i t y

PTA (Rail) will assess the application and determine the appropriate Approving Authority and process according to the details provided. If the approval of the Minister is not required for the works, the application will be referred to the appropriate Approving Authority: • PTA (Rail) (eg if the application is located in Rail Reserve or Corridor Land); or • WestNet Rail (eg if the application relates to the operation of the railway, or maintenance of existing utility services or structures); for assessment in accordance with the relevant statutory requirements.

P r o v i d e r s

C o d e

o f

P r a c t i c e

2.3.2

Applications should be submitted in time to allow required assessment to be undertaken. The process of obtaining Ministerial Approval can take up to twelve weeks depending on the nature of the application and the effect of the application on the existing users of the Rail Corridor. Additional two to four weeks may be required to arrange all necessary approvals with WestNet Rail regarding the design and construction of the works. If the application involves leasing of Corridor Land or removal of land from the Rail Corridor, the process may take substantially longer.

Final Application The process for application for approval from the Minister, as required by the Act, is detailed below: Step 1. Application to the Minister c/ – PTA (Rail) as detailed in Section 2.3 of this Appendix D. Information that should be provided is as follows: • Description of proposed works (including physical description and use, maintenance requirements etc); • Location (including identification in terms of rail kilometres to the nearest metre);

All Proponents should build into their lead – time for projects sufficient time to obtain approval to use Corridor Land. Such approval should be sought as early as possible in the project development process.

• Time frame for the works; • Any conditions or constraints associated with the installation, maintenance or presence of the utility service which may impact on the operation, construction or maintenance activities of the rail operator;

2.3.1

• Diagrams (in plan and in cross-section), if applicable;

Approval in Principle ‘Approval in Principle’ can be sought from the Minister to enable concept planning of proposals. Design advice and conditions likely to be imposed on applications can be provided as part of this process by WestNet Rail and other affected parties identified at the time. Information that should be provided to obtain ‘Approval in Principle’ (four full sets of information are required) is as follows: • Description of the works (proposed use and construction details, if applicable);

• Proposed construction methods, if applicable; and • Details of the person or company responsible for the proposal. Four full sets of documentation, including drawings are required. Applications for construction of services should include additional information as required.

• Location of the proposal (including identification in terms of rail kilometres to the nearest metre); and

Step 2. PTA (Rail) will consult with WestNet Rail and any other interested parties, regarding the likely impact of the works on the operation of the existing users. This may involve obtaining further information from the proponent regarding the proposal.

• Any conditions or constraints associated with the proposal, which may impact on the operation, construction or maintenance activities of the rail operator.

U t i l i t y

P r o v i d e r s

C o d e

Step 3. Should they approve ‘In Principle’, WestNet Rail and any other interested parties will document conditions, which are considered important to their safe and effective operations. o f

P r a c t i c e



6 3

C ode of P rac t i c e

Step 4. PTA (Rail) will liaise with the proponent regarding the conditions. Step 5. A Land Use Agreement will be prepared to reflect the conditions to be imposed on the application. The preparation and execution of this document will require the payment of legal fees by the proponent. The Land Use Agreement will be forwarded to the Minister for execution, if the Minister deems the terms and conditions acceptable. Step 6. If the application involves construction works, the Proponent will be required to liaise with WestNet Rail and any other interested parties to determine the specific technical and safety requirements to ensure the railway is not adversely affected by the installation. WestNet Rail and any other interested parties will approve the design drawings and monitor the construction works to ensure their safety and operational requirements are met. 2.3.3

Documentation Requirements for Utility Services on Rail Corridor Land (a) Description of the works (including identification of site location in terms of rail kilometres to the nearest metre and proposed date of installation). (b) Complete details of utility service, for example: • Natural Gas Pipe (high pressure); • Optic Fibre Cable; and • Water Main (low pressure). (c) Complete details of utility service pipe or conduit, for example: • 100mm outer diameter steel pipe (high pressure); • 200mm outer diameter precast concrete pipe (Z class); and • 75mm outer diameter PVC pipe. (d) Complete details of sleeve/encasing pipe, for example:

6 4

U t i l i t y

• 250mm outer diameter steel pipe; • 300mm outer diameter precast concrete pipe (Z class); and • 100mm outer diameter PVC pipe. (e) Site Plan (to scale), showing: • cadastral boundaries; • alignment of railway tracks; • significant features; and • proposed and existing utility services. (f) Cross Section Plan (to scale) showing: • proposed and existing utility services and features; • cover from top of rail to top of sleeve under each track affected, and cover over the remainder, particularly at drains and low points; and • locations of proposed utility service marker signs. (g) Any conditions or constraints associated with the installation, maintenance or presence of the utility service that may impact on the operation, construction or maintenance activities of the rail operator. (h) Utility Codes of Practice under which the utility service will be installed and proposed methods of installation. • Details of cathodic protection (locations, fault voltages and currents, impressed voltages and currents), if applicable. • Contact details for relevant parties, including consultants, utility provider and contractors. Please note: Certification that the design meets the requirements of AS 47992000 will be required prior to the commencement of construction. 3. OTHER RAIL O W N ERS A N D C O N TAC TS

Refer to the following Table. P r o v i d e r s

C o d e

o f

P r a c t i c e

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



6 5

Kalgoorlie – Boulder Pinjarra – Dwellingup – Etmilyn Reserve between Kojonup & Farrar Rottnest Island

Babbage Island Heritage Precinct Bassendean Private Sidings

RAILWAY UNDER CONTROL – LOCATION Trans Australian Railway East of Parkeston Busselton Foreshore PO Box 10343 Gouger St ADELAIDE SA 5000 Locked Bag 1 BUSSELTON WA 6280 PO Box 779 CARNARVON WA 6701 Locked Bag 2 BASSENDEAN WA 6934

POSTAL ADDRESS

GPO Box 2506 PERTH WA 6001 PO Box 163 KOJONUP WA 6839 GPO Box 693 FREMANTLE WA 6959 Pemberton Tram Co Pty Ltd Lyall – Pemberton – Pemberton Railway Station Northcliffe PEMBERTON WA 6260 Perth Electric Tramway Society Whiteman Park 131 Albert Street Inc OSBORNE PARK WA 6017 Toll SPD Fremantle North Quay Rail PO Box 84 Terminal BENTLEY WA 6982 Western Australian Light Whiteman Park PO Box 3160 Railway Preservation MALAGA WA 6945 Association Inc Public Transport Authority Perth Urban Rail Network PO Box 8125, PBC (defined in Appendix D) PERTH WA 6849

Golden Mile Loopline Hotham Valley Tourist Railway (WA) Inc Kojonup Shire – Kojonup Tourist Railway Rottnest Island Authority

United Group Rail Service Ltd

Carnarvon Heritage Group Inc

Shire of Busselton

Australian Rail Track Corp Ltd

COMPANY NAME

08 9326 2382

08 9249 3510

08 9381 9648

08 9326 2530

08 9431 0698

08 9431 0600

[email protected]

[email protected]

[email protected]

[email protected]

08 9443 1945

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

E-mail

[email protected]

08 9432 9301

08 9831 1556

08 9093 3556 08 9221 3065

08 9442 5801

08 9752 4958

Facsimile

08 9776 1322

08 9432 9332

08 9831 1066

08 9093 3055 08 9221 4444

08 9442 5852

08 9941 4309

08 9781 0397

08 8217 4234

Phone

6 6

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

COMPANY NAME

RAILWAY UNDER CONTROL – LOCATION WestNet Rail WA Freight Rail Network (defined in Appendix D) Pilbara Iron Pty Ltd (formerly Rio Tinto Rail Network in Pilbara Rail Company Pty Ltd) the Pilbara The Pilbara Infrastructure Future Cloud Break – Port Hedland Railway [email protected]

[email protected]

08 6218 8888

08 9212 2922

E-mail

[email protected]

08 9212 2814

PO Box S1411 PERTH WA 6845 PO Box 21 DAMPIER WA 6713 PO Box 6915 EAST PERTH WA 6892

Facsimile

08 9143 6330

Phone

POSTAL ADDRESS

Co d e o f Prac t i c e

Utility Services Located in the Dampier to Bunbury Natural Gas Pipeline (DBNGP) Corridor – Process and Information

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



6 7

a pp e n d i x E

a pp e n d i x E

C ode of P rac t i c e

1. THE DAM P IER TO B U N B U RY N AT U RAL GAS P I P ELI N E ( D B N G P ) C ORRIDOR

Management of the DBNGP corridor is an integral part of ensuring transportation of natural gas supplies from the North West Shelf to the South West of Western Australia. The gas is used for heavy and light industry, power generation and homes.

1 . 1 I n t ro d u c t i o n

The Minister acting with the advice of the Minister for Energy has control over the DBNGP corridor to assist with the gas needs of the State.

The DBNGP is Australia’s longest high pressure gas pipeline and one of Western Australia’s most critical pieces of energy infrastructure. The DBNGP covers more than 1,530km starting from the Burrup Peninsula in the State’s North West and finishing near Bunbury in the State’s South West. The DBNGP also includes numerous lateral pipelines at various locations along its length. Built by the State Energy Commission of Western Australia (SECWA), the Dampier to Kwinana section of the DBNGP was commissioned in 1984 with the extension south to Bunbury commissioned in 1985. In 1995, under the Government’s energy reform program, SECWA was split into gas (AlintaGas) and electricity (Western Power). As a result, the pipeline assets were vested in AlintaGas. In 1996, Cabinet approved the sale of the DBNGP and subsequently the Dampier to Bunbury Pipeline Act 1997 (the Act) provided for the sale of the DBNGP (Pipeline) to Epic Energy in March 1998. Under the Act, the land within the DBNGP corridor was vested in the DBNGP Land Access Minister (the Minister) and managed on behalf of the Minister by the Western Australian State Government. In October 2004 the Pipeline was sold to the Dampier Bunbury Pipeline (DBP) group, who are the current owner and manager of the Pipeline.

1 . 2 T h e D a m p i e r t o B u n b u ry P i p e l i n e Ac t 1 9 9 7 ( t h e Ac t )

In considering this information potential applicants should be mindful of the central requirements of the Act. Utility providers, land owners, pipeline operators and other third parties cannot use land in the DBNGP corridor in a way that is inconsistent with anything that is on, or is being done on the land in accordance with rights granted to access right holders under section 34 of the Act. Utility providers, land owners, pipeline operators and other third parties must seek written approval from RDL, who administers the DBNGP corridor on behalf of the Minister, to carry out any work within the DBNGP corridor. Such approval can be sought only by written application to RDL. Penalties are provided under section 41 of the Act and Regulation 4A of the Dampier to Bunbury Pipeline (Corridor) Regulations 1998 for unauthorised use of the DBNGP corridor. A successful criminal prosecution under these provisions can result in a fine of up to $10 000.

The DBNGP corridor is currently managed by the Infrastructure Corridors Branch, within the Department of Regional Development and Lands (RDL) on behalf of the Minister.

6 8

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

2. I N FORMATIO N FOR A P P LI C ATIO N S TO U N DERTA K E AC TIVITIES A N D W OR K S I N THE D B N G P C ORRIDOR

or future pipelines require emergency repair or maintenance, a 600mm separation distance is recommended). • The same clearance applies to underground services situated above the pipeline (providing there is sufficient soil cover). • Special protection such as concrete casing, steel casing or concrete culvert and lid may be required to be installed at the expense of the party installing the services.

2 . 1 I n t ro d u c t i o n

The following information provides details for all proponents and organisations seeking to undertake activities and works in the DBNGP corridor.

• All crossings shall be at right angles. Services running parallel or at oblique angles to the pipelines are not encouraged.

Detailed information regarding the DBNGP corridor, appropriate land use, activities and works, and the section 41 application process can be found in the Land Use Guidelines. Copies can be downloaded from the RDL Website: www.lands.rdl.wa.gov.au

• There is provision for corrosion protection test points (including interference test points), bonding and location of ground beds as necessary.

or contact the Infrastructure Corridors Branch (contact details below).

• A qualified body at the proponent’s cost will assess the impact of induced voltages and interference.

2 . 2 L o c at i o n o f P i p e l i n e ( s )

Where a pipeline is constructed in the DBNGP corridor, the area is marked by warning signs. Warning signs do not indicate the exact location of a pipeline and should only be used as an indication that a high pressure gas pipeline exists in the DBNGP corridor.

2 . 4 A pp l i c at i o n P ro c e s s

Before undertaking any works within the DBNGP corridor, contact Dial Before You Dig – Dial 1100. Prior to commencement of intended works within the DBNGP corridor, all parties must submit a written application for approval from the DBNGP Land Access Manager through RDL. This is a requirement under section 41 of the Act.

The greatest risk to high pressure gas pipelines and to people in the vicinity is damage by persons unfamiliar with the requirements for the safe work around high pressure gas pipelines. 2 . 3 U t i l i t y S e rv i c e s i n t h e DBNG P C o r r i d o r

All applicants are advised to submit an application at the earliest possible stage to allow sufficient time for assessment from a technical, social, environmental and safety-hazard perspective. 

Approval for underground utlities may be granted provided there is compliance with the following matters: • There must be a minimum vertical clearance of 300mm below any gas pipeline for the full width of the DBNGP corridor (however as the integrity of services may be affected if existing

U t i l i t y

P r o v i d e r s

C o d e

Submissions should include the following information: • Land description and map identifying location of the proposed works. • Type of works to be carried out. o f

P r a c t i c e



6 9

Co d e o f Prac t i c e

• Intended future use of the land.

2 . 5 P e r m i s s i o n to A c c e s s La n d

• Type and weight of machinery that will be used.

Please note that any such conditional approval granted under section 41 of the Act does not of itself provide any further approval required from any underlying land owner or other interest holder to access the land concerned.

• Timeframe of the works. • Any plans or diagrams of the works. Approval will only be granted to the party responsible for the works.  The approval process should take approximately 3 weeks and includes referral to all relevant section 34 access right holders (gas pipeline owners and/ or operators) for comment and technical and safety conditions regarding works in the vicinity of high pressure gas pipelines. Indemnification will be sought from the proponent for all proposed works within the DBNGP corridor and will need to be completed by the proponent and returned to RDL prior to commencement of processing the section 41 application. The section 41 application form can be downloaded from the RDL website: (refer to Section 2.1) or contact the Infrastructure Corridors Branch (contact details below). When completed, the application form and relevant information to support the application should be forwarded by either email, facsimile or post to: The Manager Infrastructure Corridors Department of Regional Development and Lands PO Box 1575 MIDLAND WA 6936 Ph: +61 8 9347 5132 Fax: +61 8 9347 5007  E-mail: [email protected]

For example,a third party holding conditional approval under section 41 of the Act should not access the land without appropriate permission from the land owner. 2 . 6 T e l e c o m m u n i c at i o n Ca r r i e r s

Telecommunication Carriers are defined in and subject to Commonwealth legislation under the Telecommunications Act 1997 (Cth) and the Telecommunications Code of Practice 1997 (Cth), including subsequent amendments. Licensed Telecommunications Carriers are exempt from some State or Territory laws. Where these laws are not consistent with the Telecommunications Act, the Commonwealth legislation will apply. To ensure compliance with all safety and technical requirements for working in the vicinity of high pressure gas pipelines it is essential to contact RDL and provide a Notice, pursuant to Schedule 3 Part 1 Division 5 Section 17 of the Telecommunications Act 1997 (Cth), of intended works to enable referral to relevant section 34 access right holders before undertaking any activities or works in the DBNGP corridor. The approval process should take approximately 3 weeks.

If you have any questions that are not covered on the website or in the Land Use Guidelines, please contact the Infrastructure Corridors Branch at RDL. The section 41 application process is free of charge. 7 0

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

a pp e n d i x F

a pp e n d i x F Environmental Checklist

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e



7 1

C ode of P rac t i c e

En v i r o n m e n ta l C h e ck l i s t

The following Environmental Checklist is a minimum requirement to be completed by Utility Service Providers for proposed works in road reserves managed by Main Roads WA and Local Governments. Approvals to undertake works may be required from the Department of Environment and Conservation, Department of Indigenous Affairs, etc. Refer to Section 8.1 regarding clearing of native vegetation and possible requirement for a clearing permit which could take several months to complete. Item No. 1

2

3

4

5

6

7

8 9

7 2

Yes /No / Not Applic.

Item Protection of rare flora, fauna or other significant vegetation 1(a) Identified significant vegetation or habitat. 1(b) Alternatives routes and methods considered. 1(c) Obtained approval to disturb this vegetation/habitat.

………….. ………….. …………..

Clearing of native vegetation 2(a) Routes and methods that do not require clearing considered. 2(b) Obtained all necessary approvals to clear. 2(c) Revegetation/rehabilitation plan prepared.

………….. ………….. …………..

Phytophthora cinnamomi Dieback 3(a) Work in area with rainfall greater than 600mm per year. 3(b) Hygiene practices will be in place. 3(c) Work to take place during dry periods.

………….. ………….. …………..

Water protection and Conservation Areas 4(a) Identified wetlands, sensitive water courses, drinking water areas, Swan River Trust management areas, Bush Forever areas, etc. 4(b) Alternatives routes and methods considered. 4(c) Obtained approval to work near sensitive water or conservation areas. 4(d) Obtained approval to undertake dewatering.

………….. ………….. ………….. ………….. …………..

Aboriginal heritage 5(a) Identified existing and potential for Aboriginal heritage sites. 5(b) Alternatives routes and methods considered. 5(c) Obtained approval to disturb sites.

………….. ………….. …………..

Cultural heritage 6(a) Identified existing heritage sites. 6(b) Alternatives routes and methods considered. 6(c) Obtained approval to disturb sites.

………….. ………….. …………..

Adjoining residential and other sensitive properties 7(a) Identified need to control dust, vibration and noise. 7(b) Obtained approval to do work outside normal hours.

………….. …………..

Waste 8(a) Identified appropriate area for disposal of waste.

…………..

Acid Sulphate Soils (ASS) 9(a) Identified requirement for ASS management. 9(b) Obtained approval for ASS management plan.

………….. …………..

U t i l i t y

P r o v i d e r s

C o d e

o f

P r a c t i c e

EMERGE N C Y P RO C ED U RES a n d C O N TAC TS In the event of damage to Utility Provider’s asset, Main Roads WA asset, Local Government asset or PTA (Rail) asset, the person/Agency responsible for causing the damage shall immediately advise all asset owners affected. Refer to emergency numbers as follows to be used in Emergency (Hazardous Situations) only: Fire (Fire, Rescue, Hazardous Material), Police and Ambulance (life threatening) Dial 000. N on L i f e T hr e at e n i ng

Fire and Emergency Services.....(08) 9323 9300 Police .................................................. 131 444 St John Ambulance . .................(08) 9334 1234 G a s P rov i d e rs

WestNet Energy Services ......................13 13 52 Agility ......................................... 1800 151 016 .................... 1800 019 966 (Parmelia Pipeline) Epic Energy ................................ 1800 625 665 Land Fill Gas and Power (office) . ..................................(08) 9475 0144 (Managing Director) . ................. 0412 314 002 DBNGP (WA) Transmission ......... 1800 019 919 or ............................................(08) 9223 4300 WorleyParsons Asset Mgt Group .. (08) 9072 1422 or ............................................... 0429 886 016 P ow e r P rov i d e rs

Western Power . ..................................13 13 51 Horizon Power . ..................................13 23 51 Wat e r P rov i d e rs

AQWEST Bunbury Water Corporation .............................(08) 9791 3272 Busselton Water .......................... 0408 933 589 Water Corporation ..............................13 13 75 S a f e ty Author i t i e s

Worksafe WA . ..........................(08) 9327 8777 (24hr Accident Reporting) . ........ 1800 305 791 Energy Safety WA ......................(08) 9422 5200 (24hr Accident Reporting) . ........ 1800 678 198 T e l e com P rov i d e rs

AAPT Telecommunications ..................13 88 86 AMCOM PtyLtd ............................ 1800 262 663 Bright Communications................ 1300 661 393 Broadcast Engineering Services.(08) 9248 5200 Cable and Optus . ........................ 1800 505 777 Telstra Office hours . ...........................(08) 9491 6389 Outside office hours . ..........................13 22 03 Uecomm Operations Pty Ltd......... 1800 707 447 Visionstream ............................... 1800 336 886 Vodaphone . .............................(08) 9322 6444 L a n d Author i ty

Crown Land State Land Services (RDL).......................................(08) 9347 5000 Dampier – Bunbury Natural Gas Pipeline Corridor only: State Land Services – Infrastructure Corridors (RDL) . . 0407 988 550

R o a d Author i t i e s

Local Governments (Refer to Appendix A for contact number details) Main Roads WA (Faultline) ......... 1800 800 009 or ........................................................ 138 138 (Refer to Appendix A for Regional Numbers) R a i l Author i t i e s

Public Transport Authority MetroRail (24hr Emergency) ...................(08) 9220 9999 WestNet Rail Level Crossing Faults .1800 150 107 Midland Train Control . ............... 1300 987 246 Avon Train Control ...................... 1300 087 246 M i sc e l l a n e ous

Agility Management Pty Ltd........(08) 9422 4100 BHP Supply Authority .................. 1800 677 639 or ............................................(08) 9175 3303 BP Refinery . ............................(08) 9419 9500 Coogee Chemicals ....................... 1800 800 655 Co-operative Bulk Handling...... (08) 9237 9600 Curtin University ......................(08) 9266 9266 or (24hr Security) (08) 9266 4444 Defence, communications cables etc 0427 196 000 Defence, Property Management .(08) 9311 2685 or ............................................(08) 9311 2680 Fax: .........................................(08) 9311 2670 (24 hour emergency) ................. 1300 139 788 Department of Industry and Technology C/ – Zernike Australia Pty Ltd . .... 0408 877 215 Ensite Claude .............................. 0414 225 826 Fremantle Ports .......................(08) 9430 3442 or ............................................(08) 9335 1300 Pilbara Iron Utilities (Tom Price) . ...........................(08) 9143 3271 (Paraburdoo) ..........................(08) 9143 4647 (Dampier) . .............................(08) 9143 5650 Adshel .....................................(08) 9387 7444 or ............................................... 0438 253 557 People Telecom .......................(08) 9318 6555 (24 hour emergency) ................. 1300 736 877 University of WA .......................(08) 6488 2025 For further information contact Dial Before You Dig – dial 1100 during office hours. Safety of the public as well as employees shall be paramount.