Commercial Building Subsidence Remediated - Mainmark
complex evenly without compromising the structure in any way, and so correcting the settlement and re- levelling the building. A particular consideration was the ...
Commercial Building Subsidence Remediated INDUSTRY
Commercial STRUCTURE
Office building PROBLEM
Earthquake remediation LOCATION
Christchurch New Zealand DURATION / YEAR
23 days / 2014 TECHNOLOGY
JOG ComputerControlled Grouting BUSINESS UNIT
Mainmark New Zealand
Summary A building in this commercial complex of ten units in Christchurch had suffered differential settlement of up to 178mm with the 2010-2011 earthquakes. It was rectified using JOG Computer-Controlled Grouting to raise the building up precisely to the required level.
Objectives The task was to raise one of the buildings in this complex evenly without compromising the structure in any way, and so correcting the settlement and relevelling the building. A particular consideration was the need to avoid moving the next door building that was less than a metre from the back of the affected building.
Solution The JOG Computer-Controlled Grouting levelling system was used to level the tilted, differential settlement of the structure. The fine degree of control offered by JOG allowed the substantial lift of the building to not affect the adjacent property.
Robotic survey stations were established above the other building of the complex to pick up level data from the many survey prisms set up on the building being lifted. 74 JOG injection ports were installed through the concrete foundations, where the high mobility grout was introduced. The maximum lift was 178mm and the average was 110mm. The structure was re-levelled successfully, returning the building to design levels, while leaving the neighbouring property unaffected.
The task was to raise one of the buildings in this complex evenly without compromising the structure in any way, and so correcting the settlement and re-.
Above, left: Typical JOG site control centre with computer controls, slurry tanks and pumping equipment. Above, right: Angular insertion of JOG injector.
It was rectified using Jet Grouting to strengthen the foundation ground and by ... www.mainmark.com ... columns and then remove the Jet-Crete equipment.
concrete track slab was laid, to which the rails had ... tracks to spring up and down as the trains travelled ... the tunnel on a high rail truck, and supplied with.
A large retail warehouse building constructed of precast tilt panels supported by pad footings and beam construction had experienced differential settlement of ...
and a significant void had formed under one side of the building. The body corporate arranged a geotechnical site investigation, which revealed that the.
via a fully automated Trimble monitoring system and manual assessment. The high degree of monitoring was a key contributor in achieving such an accurate.
This 2-storey structure of mostly tilt slab construction had suffered earthquake liquefaction and subsidence. Jet Grouting was used to strengthen the foundation.
Installed PowerPiles are geotextile shells, filled with an expanded Uretek resin that can have a compressive strength of 1000 kPa to 5000 kPa, and more, ...
Summary. The concrete slab ground floor slab of an occupied commercial building in Christchurch needed re-levelling after earthquake subsidence. Objectives.
commercial building in Christchurch needed re-levelling after earthquake subsidence. Objectives. The concrete slab-on-ground floor of this commercial building ...
Commercial Building Permits. April 2014. Applicant. Address. Permit Price Square Feet ... Offices at 33rd Street. 817 E. 33rd St. $250,000. 3,485. AT&T Mobility.
Aug 17, 2008 - building stock, across 16 locations (representing all U.S. climate zones) ... Renewable Energy Laboratory (NREL) has developed standardized ...
Figure 5: Annual Variation of Air Change Rates (BLAST Methodology) . ..... 1 Email exchange between David Winiarski and Peter Ellis, May 27, 2008. 10 .... EnergyPlus simulation software based on the linear wind velocity coefficient.
involves more than the best choice of products .... occupied, providing the best security to ensure the safety of people and protection ..... Video analytics software.
The central core of the structure rested on the central raft foundation with the external columns founding on a continuous strip foundation around the perimeter.
This two-storey commercial building with a footprint of 510m2 had walls built of precast tilt-panels and had suffered significant earthquake subsidence. In three ...
of applicable local and national Building Codes. Within New Zealand this warranty is for a period of 50 years. Who will carry out and be responsible for the work? The work will be carried out by Mainmark, using our own experienced technicians and Qua
Multi Story Building Re-levelled by JOG continued. Z14 Y435. All injectors were connected to the central computer control unit, where the operator individually controlled and manipulated the quantity of grout supplied and cure times to individual inj
Mainmark Equipment Pty Ltd is part of the Mainmark Corporation (previously ... 12 pallet, air con, p/steering, gates,. 7520L x 2340W. ⢠6 cyl 7.5L turbo auto.