Oct 19, 2009 - Railway construction is scheduled for the CP Railway crossing on. Mississauga Road between Erin Centre Bo
DETOUR - SERVICE ADVISORY
.com MISSISSAUGA RD RAILWAY CONSTRUCTION Routes: 9 Rathburn-Miller’s Grove | 44 Mississauga Road 305 Streetsville Secondary-Falconer 306 Streetsville Secondary-Square One Monday October 19 to Friday October 23, 2009 Railway construction is scheduled for the CP Railway crossing on Mississauga Road between Erin Centre Boulevard and Reid Drive. Construction begins at 9:00 am Monday October 19 to 4:00 pm Friday October 23, 2009, affecting routes 9, 44, 305 and 306.
VIST AB
L
. VD
TANNERY ST
N
ROUTE 9
REID DR
ROUTE 44 SCHOOL ROUTES 305 (PM), 306
LV NTRE B ERIN CE
D.
MISSISSAUGA RD\ QUEEN ST
ERIN MILLS PKY
THOMAS ST
JOYMAR DR
For more information, please call 905-615-INFO (4636).