Compliance to Specification Page 1 of 1 Essential Returnable to be ...

0 downloads 130 Views 312KB Size Report
THE SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF. FOUR (4) NEW LIEBHERR RTG ENGINES (Volvo, Penta TAD1352GE Diese
THE SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF FOUR (4) NEW LIEBHERR RTG ENGINES (Volvo, Penta TAD1352GE Diesel Engines) FOR TRANSNET SOC LTD (1990/000900/30) OPERATING AS TRANSNET PORT TERMINALS (HEREINAFTER REFERRED TO AS “TPT”) AT THE NGQURA CONTAINER TERMINAL AS A ONCE OFF PURCHASE.

Essential Returnable to be used for scoring iCLM PE

Manuals

Returnable Schedule: No. 3

The Respondent is required to submit a letter confirming that Engines will delivered together with manuals. Respondent must attach a letter to this returnable schedule.

Signed Name

___________________________ ___________________________

Date Position

_______________________________ _______________________________

Respondent_________________________________________________________________________

Compliance to Specification

Page 1 of 1