FY 2015-2019 C - City of Atlanta, Watershed Management

0 downloads 217 Views 13MB Size Report
Apr 4, 2016 - Supply Program (former Bellwood Quarry, site of planned water storage facility, pictured below). .... (AWW
FY 2015-2019 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS FY 2015-2019 Capital improvement program ________________________________________________________ 1 Historical Perspective ___________________________________________________________________________ 2 Introduction___________________________________________________________________________________ 3 1.0

Water System___________________________________________________________________________ 4

1.1.

Water Supply _________________________________________________________________________ 5

1.2.

Water Facilities _______________________________________________________________________ 5

1.3.

Distribution System ____________________________________________________________________ 6

2.0

Wastewater System______________________________________________________________________ 7

2.1.

Wastewater Facilities __________________________________________________________________ 8

2.2.

Wastewater Collection ________________________________________________________________ 10

3.0

Water Quality Control Facilities ___________________________________________________________ 11

4.0

Watershed Protection ___________________________________________________________________ 11

5.0

General_______________________________________________________________________________ 13

5.1.

Facilities Management ________________________________________________________________ 13

5.2.

Support Services _____________________________________________________________________ 14

HISTORICAL PERSPECTIVE During the 10-year period between the entry of its Sanitary Sewer Overflow (SSO) Consent Decree in 1999 and completion of its Combined Sewer Overflow (CSO) Consent Decree requirements in 2008, the Department of Watershed Management implemented one of the nation’s most significant wastewater capital programs. By 2009, the Department’s compliance with its Consent Decree, as well as complementary capital projects had resulted in a 97 percent reduction in sewer spill volumes, and a 75 percent reduction in the incidence of spill events. During this time frame, capital program expenditures averaged more than $225 million per year and totaled in “The work's been done. It's been done excess of $2.0 billion. Financing this level of expenditure precipitated rate increases that placed the City’s service on time, I think pretty much done rates as the highest imposed by major North American within budget. And it really is a metropolitan systems.

remarkable accomplishment.”

With completion of its CSO Consent Decree obligations and U.S. District Court Judge Thomas Thrash, on the the extension of its SSO Consent Decree obligations until City’s Consent Decree progress 2020-2027, Watershed Management has had an opportunity to effect the balancing of its planned capital program expenditures (within its financial capabilities) called for in its schedule extension request. This balancing has been informed by the recent completion of a series of facility assessments and an integrated master planning effort. These efforts have identified or heightened the priority status of several major projects not highlighted in earlier capital improvement plans – most notably the Water Supply Program (former Bellwood Quarry, site of planned water storage facility, pictured below).

The Water Supply Program reflects Mayor Kasim Reed's emphasis on securing the reliability of Atlanta's water supply for the next 100 years. FY2015-FY2019 Capital Improvement Program Department of Watershed Management

INTRODUCTION The Capital Improvement Program (CIP) is a planning and budgeting tool that organizes system needs and prospective funding requirements over a specified time horizon. It identifies requirements for sustaining, restoring and modernizing the facilities and infrastructure that support the water system, wastewater system, combined sewer control facilities and general maintenance and repair priorities in the Atlanta service area. This report provides project priorities and implementation schedules for a fiveyear period, from FY 2015 through FY 2019.1,2 The proposed capital program includes net funding requirements of $1,055,710,000 and consists of the following project categories: Water System, Wastewater System, Watershed Protection and Water Quality Control Facilities, General Facilities Management, and General Support Services.

Water Quality Control Facilities and Watershed Protection 13%

Facilities Management 5%

Support Services 7%

2015-2019 CIP Water System 38%

Wastewater System 37%

1

Capital projects funded prior to this period, but not yet completed, are not included in this report. Additional funding requirements for some prior period projects have been identified as part of this five-year CIP. In such cases, only the incremental funding requirement (i.e. cost estimate) is included on the corresponding project summary sheets. 2

FY2015-FY2019 Capital Improvement Program Department of Watershed Management

1.0 WATER SYSTEM The original City of Atlanta water system was constructed in 1851 and consisted of five artesian wells. In 1891, the City’s Water Commission recommended withdrawing up to 10 million gallons per day (mgd) from the Chattahoochee River to address water shortages. The water would be treated at a plant named for Mayor William Hemphill, who was responsible for the purchase of the 200-acre plant site. In 1893, the City's first river intake, a 30inch pipeline located on the east bank of the Chattahoochee River just north of Peachtree Creek, was constructed to transfer water from the river to the Hemphill Water Treatment Plant (WTP) complex. A 36-inch main was added in 1910 and a 48-inch main was added in 1923. The Chattahoochee WTP was constructed and placed in service in 1960. The Atlanta-Fulton County WTP (jointly owned by the City of Atlanta and Fulton County, and operated by the Atlanta Fulton County Water Resources Commission) was constructed and placed in service in 1991. Additionally, the City constructed 60-inch and 72-inch pipelines to transfer water from the raw water pump station to the Chattahoochee and Hemphill WTPs. Today, these three treatment plants serve more than 1 million people in the metropolitan Atlanta region, providing approximately 100 million gallons a day (mgd) of water each day within a 650-square-mile service area. The City obtains its drinking water from the Chattahoochee River through two raw water intakes located downstream of Lake Lanier, a multi-purpose water reservoir owned and operated by the U.S. Army Corps of Engineers. The City is permitted to withdraw a combined total of approximately 225 mgd. The raw water is treated at the City’s three water treatment plants (WTPs), one of which (along with a raw water intake) is jointly owned with Fulton County. The WTPs have a combined treatment capacity of 246.4 mgd. The City’s distribution system includes more than 2,750 miles of water distribution pipelines, 4 finished water pump stations, 3 re-pump stations, 11 booster pump locations (8 of which are in reserve, 2 raw water pump stations, 1 reservoir emergency draw-down pump station, 4 surge tanks and 12 ground and elevated storage tanks. The City’s retail water system serves more than 150,000 active water accounts. The City’s retail water service area includes the City, unincorporated areas of Fulton County (South of the City), the areas located within the cities of Sandy Springs and Chattahoochee Hills and portions of incorporated areas located in South Fulton where the City’s customers were recently annexed into cities from formerly unincorporated Fulton County. The City’s wholesale water customers include three cities in Fulton County (Hapeville, Fairburn and Union City), and the counties of Coweta (Coweta County Water and Sewerage Authority), Clayton (Clayton County Water Authority) and Fayette. The City supplies all water needed by the wholesale customer cities and a limited portion of the total water needed by the wholesale customer counties. The cities of College Park, East Point and Palmetto are supplied with water independent of the City and Fulton County. FY2015-FY2019 Capital Improvement Program Department of Watershed Management

The City’s water treatment plants are operated and maintained by the Department’s Office of Water Treatment and Reclamation; water transmission and distribution system assets are operated and maintained by the Office of Linear Infrastructure Operations. Regulatory compliance is ensured through the oversight of the Office of Watershed Protection and management of the CIP is the responsibility of the Office of Engineering Services. The Water System’s capital projects represent ongoing and planned projects to ensure system reliability, meet specific facility needs, and ensure compliance with the Safe Drinking Water Act, proposed revisions to administrative consent orders, and operating permits.

1.1. WATER SUPPLY The Department’s near-term capital program is highlighted by implementation of the Water Supply Program – the most substantial water system investment since development of the Chattahoochee WTP. This program, as described below, will address acute weaknesses in the Department’s raw water supply infrastructure identified in recent facility assessments. Beyond its assurance of sound raw water conveyance and storage capacity for the foreseeable future, other water supply projects will help assure the reliability of the water system’s other raw water storage and conveyance facilities. Key water supply projects include: The Water Supply Program is a major undertaking identified through the water master planning process that will improve the reliability of raw water delivery to the Chattahoochee and Hemphill WTPs. A deep, five-mile tunnel with a diameter of 10-12 feet will connect the raw water intake on the Chattahoochee River to the Chattahoochee WTP, the Hemphill WTP, and the former Bellwood Quarry. Utilization of the quarry will add 2.4 billion gallons of raw water storage to the system, making raw water storage available at the Chattahoochee WTP for the first time. Water storage at the quarry will be equivalent to 30 days’ worth of backup water supply. Raw water will be pumped up from this tunnel to the Chattahoochee WTP and to the Hemphill raw water reservoirs. This conveyance and storage system will replace reliance on three cast-iron transmission lines built in 1893, 1907, and 1924 and one steel water main built in 1975 that deliver water from the intake to the Hemphill plant. A portion of the raw water transmission system will remain in place after completion of the program to provide redundancy and further enhance reliability. The Hemphill Reservoir #1 Embankment project will return this 180-million gallon reservoir to active service. Together with Hemphill Reservoir #2, a total of five days’ water supply will be provided for water treatment and distribution. The scope of the project includes minor repairs to the embankment and the construction of a permanent drainage system.

1.2. WATER FACILITIES Water Facilities projects are focused on the drinking water treatment system to improve the treatment and transmission facilities. These projects include control system upgrades, automation projects, equipment renovation or replacement, building maintenance projects, and other small FY2015-FY2019 Capital Improvement Program Department of Watershed Management

capital projects at the WTPs. The projects are intended to improve efficiency and reliability, replace/renew assets, and ensure a safe operating environment. Key projects include: The Downtown Storage Tanks project will add a total of 4 million gallons of finished drinking water storage. The two storage and pumping stations will be located on either side of the eastern continental divide that crosses downtown. This storage will improve reliability of drinking water pressure and fire flows in the event of a power outage or other interruption at the Hemphill plant. The Chattahoochee WTP Improvements project will address immediate needs identified in the Water Master Plan. Elements of this project include replacing sedimentation basin valves; modifications or replacement of the alum, fluoride, and powdered activated carbon feed systems; secondary containment for chemical storage; and replacement of filter underdrains. The Hemphill WTP Improvements project includes compliance upgrades that were also identified as immediate needs in the Water Master Plan. As with Chattahoochee upgrades, these projects, which are in design, will further ensure continued compliance with Safe Drinking Water Act rules, regulations, and permits. Included in the Hemphill scope is overhauling the activated carbon feed system, replacement of baffle walls and overflow weirs in the sedimentation basins, replacing filter media, and refurbishing one of the three filter galleys with new underdrains, air-scour blowers, and piping. The Hartsfield Pump Station Manifold project will provide professional services for a project already underway to repair piping and stop leakage in this manifold that serves the HartsfieldJackson airport area.

1.3. DISTRIBUTION SYSTEM The projects in this category are related to the transmission and distribution of finished water. The projects are intended to improve efficiency and reliability or replace/renew assets that have reached the end of their useful life. The following two categories of projects represent the planned system improvements: Distribution system maintenance and improvement projects include water main replacement projects, valve and hydrant testing, water tank maintenance and repair, and other miscellaneous projects. Other investments are for protective measures such as cathodic protection and telemetry system improvements. The Department has completed its Valve and Hydrant Assessment that provided an inventory and condition assessment of all water valves and hydrants. The Department’s Water Tank Maintenance and Repair project has renewed these assets with a number of structural repairs and surface conditioning of system water tanks. Annual contracts are for services such as small meter installations, repair or replacement of large meters, raising of valve covers, and repair and replacement of water pipe. These contracts are forecast at a consistent level of effort. Planned encumbrances also include a funding allowance for projects in which utility relocations are required as a part of municipal or state road widening, bridge replacements or other improvements. FY2015-FY2019 Capital Improvement Program Department of Watershed Management

Key projects include: Large Diameter and Small Diameter Distribution System Renewal and Rehabilitation is a general project for as-yet unidentified future water distribution line improvements. The distribution system is a large and diverse set of assets for which sustained funding is imperative to provide uninterrupted flow and pressure for health, business productivity, and fire protection. Replacing mains with a high break history or those with chronic leaks also reduces real water loss. In many instances, smaller mains may be replaced with larger pipe based on hydraulic modeling. Included within the scope of work for this project is cathodic protection of steel pipe and pressure zone realignment. Selection of individual projects will be based on age of assets, material of construction, history of leaks/repairs, and criticality. The Large Meter Installation, Testing & Replacement project includes the testing, repair, replacement, and installation of water meters with diameters greater than two inches. There are more than 3,000 large meters in the distribution system, through which approximately half the finished drinking water flows. Maintaining accuracy to American Water Works Association (AWWA) standards is important for sustaining revenues, equitable billing, and reduction of apparent water loss. This program is implemented via annual contracts. The Distribution System Telemetry Improvements project is to upgrade the Department’s existing system that signals real-time pressures at critical nodes in the distribution system, as well as water levels in remote finished water storage tanks, to a centralized water delivery control center at the Hemphill WTP. The project will add telemetry transmitters in the distribution network to fine-tune operations and improve the level of service.

2.0 WASTEWATER SYSTEM The City’s wastewater treatment and collection system encompasses more than 2,150 miles of sanitary and combined sewers, two permitted combined sewer overflow (CSO) Water Quality Control Facilities (WQCF), four permitted Combined Sewer Control Facilities (CSCF), three permitted water reclamation centers (WRCs) and 16 pump stations. The City’s wastewater system is operated and maintained by the Department’s Offices of Water Treatment and Reclamation and Linear Infrastructure Operations. The three WRCs have a combined hydraulic capacity of 220 mgd and are permitted to discharge up to 188 mgd under the existing combined permit (NPDES Permit No. GA0039012). The City’s wastewater treatment and collections system serves more than 88,000 active retail wastewater accounts in the City of Atlanta (and also bills for wastewater services provided by Fulton County for accounts that receive water service from the City of Atlanta). In addition, the City treats wastewater from wholesale customers including DeKalb and Fulton counties and the cities of College Park, East Point, and Hapeville. The wastewater system is operating pursuant to the requirements of judicial orders and environmental permits issued by the State of Georgia in accordance with the requirements of the federal Clean Water Act and the Georgia Water Quality Control Act. In 1998, the City entered into a federal Consent Decree (CSO Consent Decree), which required the City to achieve full compliance with environmental permits, the federal Clean Water Act and the Georgia Water Quality Control Act with regard to the City’s CSO FY2015-FY2019 Capital Improvement Program Department of Watershed Management

Control Facilities. The City completed the work required under the CSO Consent Decree in October 2008, including separation of three combined sewer areas and construction of storage and transmission tunnels. It then completed a two-year post-compliance evaluation period and successfully avoided substantial noncompliance during that timeframe.

Additionally, the City is subject to the requirements of the SSO Consent Decree as amended, which required the City to achieve, by 2020-2027, full compliance with the City’s environmental permits, the federal Clean Water Act and the Georgia Water Quality Control Act with regard to the City’s WRCs, collection system and pump stations, to eliminate all unpermitted discharges, and to eliminate all sanitary sewage overflows (SSOs). Numerous improvement projects designed to achieve these objectives have been completed. These improvement projects include upgrades to treatment facilities, system-wide inspection and rehabilitation of the collections system, and additional tunnel construction. The City’s CIP has been developed to meet these objectives as well as ensure the renewal and operational efficiency and reliability of the wastewater collection and treatment system. The wastewater capital program is designed to address a number of acute needs identified in recent assessments and to enhance system operational efficiency and reliability. The designated capital projects were also specified to ensure compliance with the Clean Water Act, Georgia Clean Waters Act, and National Pollutant Discharge Elimination System (NPDES) permits issued by the Georgia EPD. The following capital program categories are consistent with the Department’s new operational structure, support an asset management approach to system renewal and rehabilitation, and incorporate consent decree compliance work within the Wastewater Collection project category.

2.1. WASTEWATER FACILITIES The projects under this category are intended to improve efficiency and reliability, renew or replace assets, or address current or prospective regulatory requirements. The capital program will FY2015-FY2019 Capital Improvement Program Department of Watershed Management

transition into an asset management approach, thus providing a systematic way to identify and prioritize projects based on service levels, asset condition, criticality of asset, and other criteria. Key projects include: Numerous critical projects will be completed within the City’s largest water reclamation facility, RM Clayton WRF. The intent of the projects is to restore design capacity and improve reliability and efficiency, thus reducing permit non-compliance events. Key projects at RM Clayton consist of the following:  Replacement of the headworks facility to improve grit removal and reduce the damaging effects of grit on downstream treatment equipment;  Replace obsolete switch gears, have on hand two spare units for the centrifuges, and provide emergency generators for the blower building;  Provide a mobile belt filter press to be used at RM Clayton or the other WRCs to provide sludge handling in the event of an emergency and to provide treatment flexibility;  Modernize and improve the reliability of instrumentation and controls at the facility;  Provide supplemental blowers;  Refurbish the sand filter to improve efficiency; and  Provide an additional thickener waste activated sludge (TWAS) centrifuge. Decommissioning of the Intrenchment Creek WRC and consolidating treatment at the South River WRC is expected to result in operational cost savings and reduce the risk of permit noncompliance events. The project will include replacing the grit traps, providing new influent and effluent pump stations, and repairing force mains at Intrenchment Creek WRC. To consolidate treatment at South River WRC, upgrades will be made at the primary odor control building, replacement of the chemical feed building, and providing a new poly aluminum chloride (PAC) chemical feed facility. The South River WRC Various Projects Group 1 consist of upgrading the existing digester complex and control building, as well as modifying the dewatering building. The existing centrifuges will be replaced with new dewatering centrifuges and a new polymer feed system will added. The Flint River and Bolton Road Pump Stations will undergo major upgrades. The Flint River Pump Station will be replaced with a pump station with a capacity of 25 MGD. The Bolton Road Pump Station will be rehabilitated and upgraded to 40 MGD with modern equipment and variable frequency drive pumps. The RM Clayton Nutrient Harvesting project will produce fertilizer pellets, a marketable product, from the centrifuge operation and improve nitrogen and phosphorus removal, which results in lower nitrogen and phosphorus loads as required by the City’s NPDES permit. Utoy Creek WRC Compliance Upgrades includes improving stormwater drainage at the headworks facility, replacing influent pumps and updating pump controls, replacing the chemical feed system, replacing heat exchanger systems, replacing sludge digester rear elation pump boilers and replacing secondary clarifier equipment.

FY2015-FY2019 Capital Improvement Program Department of Watershed Management

Pump Stations Improvements include equipment replacement at the Philip Lee, Rebel Forest, Woodward Way 1 & 2, Cascade, Niskey Lake 1, Highlands, SR Industrial, Rivermeade, Bell South, Paul Avenue, and Hanover West pump stations. Watershed Management is evaluating potential opportunities to avoid capital expenditure for rehabilitation and replacement (R&R) of outmoded technology, gain efficiencies through outsourcing and facility consolidation, and move from disposal to beneficial reuse and resource recovery. While this new direction could reduce the net life-cycle cost of solids treatment, implementation of the beneficial reuse and resource recovery attributes of the program will be deferred beyond FY 2015-19 in light of financial constraints and the priority funding of the Water Supply Program.

2.2. WASTEWATER COLLECTION The Wastewater Collection projects represent the combination of SSO Consent Decree projects to be implemented in the forecast period and other collection system improvements specified to assure appropriate renewal and rehabilitation of wastewater system linear infrastructure. Key projects include: The Sewer Capacity Relief Projects will increase wastewater collection capacity in accordance with SSO Consent Decree requirements. Several key projects add sewer capacity to reduce spills and overflows during storm events. For other key projects, additional capacity is being added in anticipation of new residential and industrial development within the City. Within the current five-year CIP, the capacity relief projects for Sewer Group 3 will be completed, as well as acceleration of Sewer Group 4 projects where needed to resolve issues. The small diameter Sewer Group Pipe Rehabilitation Projects are the continuation of the SSO Consent Decree mandated Sewer System Evaluation Survey projects to identify and repair structural defects in the pipe. During the five-year CIP, the pipe rehabilitation work for Sewer Groups 3 and 4 will be competed. There are several deep tunnels that convey sewage to WRCs and to combined sewer facilities. Over time, these tunnels accumulate grit and debris. The Nancy Creek Tunnel Assessment project will provide for removal of this debris through drop shafts and allow the Department to upgrade odor control technology at the tops of these drop shafts. The Sewer Cleaning and Pipeline Assessment annual contract will allow the DWM to plan systematic cleaning and assessment of the sewer system. Regular cleaning helps minimize blockages in pipes and thereby reduces sewer spills and overflows. Through rehabilitation and repairs identified during the inspection, it can help preserve the structural integrity and service life of sewer pipes. The Department will implement sewer rehabilitation and relief projects required under the SSO Consent Decree to ensure completion within the revised July 2027 completion date.

FY2015-FY2019 Capital Improvement Program Department of Watershed Management

3.0 WATER QUALITY CONTROL FACILITIES As a consequence of completion of the CSO Consent Decree program, relatively limited additional work is required on the Department’s water quality control facilities themselves. However, in part due to changes in the Department’s permits, projects under this category also include not only selected facility repairs and projects to improve operational performance, but also projects in the combined sewer system basins to limit wet weather flows to the water quality control facilities. Key projects include: The West Area Water Quality Control Facility Improvements project will replace equipment at the sludge thickening and dewatering facilities, modify the filter compression plate, improve the control system, replace electrical equipment, replace chemical system equipment, and install new control system software. The West Area Water Quality Control Facility Outfall Repair entails reconstruction of the energy dissipation system at the bottom of the concrete apron of the emergency outfall for the West Area Tunnel. The project also includes the repair and reinforcement of the Peachtree Creek streambank where the West Area Tunnel discharges. The East Area Water Quality Control Facility Improvements project will rehabilitate the sludge thickening and dewatering facilities, repair the tunnel pump station outfall, repair the sedimentation basin, provide electrical improvements, replace submersible sludge pumps, upgrade chemical system equipment, and upgrade the control system software.

4.0 WATERSHED PROTECTION The Department’s Office of Watershed Protection delivers services in collaboration with the City’s Department of Public Works. As described below, these services include a variety of activities required under the Department’s NPDES wastewater discharge permits, MS4 NPDES permit, and other waterquality related regulatory requirements. The two Departments also continue to work collaboratively to perform a number of stormwater management and drainage functions. The City’s watershed protection assets serve the 132.4 square miles of area within the City of Atlanta jurisdictional boundaries. Assets include the combined sewer system (approximately 11 square miles) as discussed earlier in Section 3.6, and approximately 122 miles of separate storm sewer management infrastructure. These systems are comprised of a broad array of stormwater management/drainage assets (e.g., culverts, inlets, outfalls) constructed primarily in conjunction with land and road development.

FY2015-FY2019 Capital Improvement Program Department of Watershed Management

As defined in the City’s Stormwater Management Plan, approved by the Georgia Environmental Protection Division (EPD), stormwater management and control infrastructure is specifically limited to that which:  Is located within the City of Atlanta’s right-of-way along municipal roadways; or  Discharges directly through a municipally-owned stormwater outfall; or  Has been formally deeded to the City of Atlanta; or  Was constructed by the City of Atlanta; or  Is located on private property and for which a written easement has been recorded. Further, the City of Atlanta has jurisdiction only over stormwater infrastructure that is municipally owned, and excludes systems installed to facilitate travel along state and federal roads and highways. As such, City-responsible stormwater infrastructure is comprised of systems, facilities, and features that transfer, control, convey, infiltrate, or otherwise influence either the movement of stormwater runoff or water quality, which: (1) Are either owned by the City or for which the City has accepted an offer of dedication of an easement or other legally binding permanent right of use for stormwater drainage as defined in Part 15-07.004 of the City’s Land Subdivision Ordinance or for public use and maintenance under Title 44 of the Official Code of Georgia or as otherwise determined by Georgia law; or (2) Are structures or features that drain water from the City right-of-way and are located within the City right-of-way of the municipal street system that the City is responsible for maintaining in a condition reasonably safe for travel under Title 32 of the Official Code of Georgia. Consequently, about 35 percent of the stormwater infrastructure within the City of Atlanta is the responsibility of municipal government. As of 2009, the City had responsibility for over 41,500 known structures and their associated transmission pipelines. The Department’s restructuring and creation of the Office of Watershed Protection places heightened emphasis on these aspects of the Department’s responsibilities in response to emerging regulatory trends and infrastructure development opportunities. These regulatory changes, aspects of which have been incorporated into wastewater treatment plant permit requirements, reflect a focus on water quality improvement that requires effective management of both point source and non-point discharges to receiving waters.

Key projects include: The Southeast Atlanta Green Infrastructure Initiative addresses combined sewer system capacity limits within the Custer Avenue sub-basin. Long-term solutions will require the installation of green and gray infrastructure features to intercept, hold, and slowly release stormwater into the downstream collection system. As part of this program, permeable pavers will be installed in the Peoplestown, Mechanicsville, and Summerhill communities. In addition, capacity relief ponds and a bioretention area will be constructed to add approximately two million gallons of capacity relief. The features are being designed to serve as a recreational and community amenity.

FY2015-FY2019 Capital Improvement Program Department of Watershed Management

The Proctor Creek Watershed encompasses downtown Atlanta and many residential neighborhoods, including some economically depressed areas of the City. In 2013, as part of the Urban Waters Federal Partnership, the DWM took on a leadership role for the revitalization of Upper Proctor Creek, where remedial actions would provide the greatest benefit to the overall watershed. A combination of innovative treatment technology, green infrastructure, and capacity relief are being planned. The Upper Proctor Creek Mitchell Street Sewer and Mims Park Pond Projects will provide capacity relief to the Mineral Springs and Beckwith combined trunk sewers. The Mims Park Pond is being designed to serve as a recreational and community amenity. In addition, the Upper Proctor Creek Water Quality Facility project will provide direct enhanced treatment of Proctor Creek water to reduce the concentrations of bacteria, sediment, and other pollutants. The Green Infrastructure Maintenance projects to be constructed within the five-year CIP will provide 13 million gallons of stormwater capacity and lead to an additional 10 million gallons of capacity in subsequent phases. The DWM has become a leader in the effective use of green infrastructure to reduce storm runoff into the combined sewer system and creeks. The purpose of the project is to maintain the green infrastructure. The projects will be implemented via an annual contract.

5.0 GENERAL General projects are those that are not specific to the wastewater, water or watershed protection categories defined above but are required to support all department capital project initiatives. General projects are divided into two sub-categories: Facilities Management and Support services.

5.1. FACILITIES MANAGEMENT Facilities Management projects include new facilities such as the Linear Operations Warehouse and Training Center (Peyton Center) that will consolidate operations and maintenance for wastewater collection and water distribution under the Department’s Office of Linear Infrastructure Operations (OLIO). Facilities Management projects also include structural and site improvements at various Department properties (including road repairs at plant sites) and utility relocation projects required in conjunction with Georgia Department of Transportation (GDOT) or municipal road projects. Key projects include: The Peyton Center will consolidate operations and maintenance for wastewater collection and water distribution. The Department plans to co-locate a training academy at the proposed central warehouse at property owned on Peyton Road. This training center is anticipated to include full-scale simulators and training grounds for equipment operation. The Facility Structural and Site Improvements project is comprised of general plant and building maintenance, repair or replacement of roofs, elevators, HVAC, security fencing, pavement, replacement of emergency generators (required by NPDES permits), and the demolition of abandoned structures.

FY2015-FY2019 Capital Improvement Program Department of Watershed Management

Plant Capital Maintenance – Small Capital Projects is a multi-faceted capital program that includes replacing plumbing fixtures in municipal buildings with water-efficient fixtures, evaluation and upgrade of telemetry and supervisory control and data acquisition (SCADA) controls at treatment plants and remote water and sewage pump stations, electrical switchgear and circuitry (especially for three-phase power), and incidental demolition or removal of defunct equipment and small structures. GDOT/IntraGovernmental Agreements Utility Relocation Project result from situations where road, bridge, and drainage improvements conflict with existing water and sewer lines. The responsibility and cost of relocating these lines is generally assigned to the utility owner, who is required to move them to maintain uninterrupted service. Transportation-driven water and sewer line relocations are recurring projects in the Department’s capital program. Plant repair and maintenance is managed through a computerized maintenance management system (CMMS). The CMMS Assessment project will upgrade the work order system for vertical assets (plants and pump stations) with a consistent hierarchy of asset nomenclature on a common and uniform CMMS software system.

5.2. SUPPORT SERVICES Support services projects include upgrades to the Department’s technology infrastructure including Geographical Information Systems (GIS), computerized maintenance management systems (CMMS), permit documentation, and other software tools. This sub-category also includes continuing program management support services; geotechnical investigations; raising valves and manholes; asphalt paving, milling, and resurfacing; small meter testing and repair; and departmental conservation and special projects. Key projects include: The Fleet Replacement project is to replace vehicles and rolling equipment on a defined schedule based on age, miles, or hours of service. The Department operates approximately 800 items of rolling stock, including construction equipment, trucks, sedans, and mowers. Replacement of fleet vehicles and other rolling stock is a capitalized expenditure. The Geotechnical Testing (not otherwise specified) project will fund a series of contracts to sample and evaluate soil and rock borings. This testing is generally used at the concept and alignment phases of capital projects and facilitates development of improved designs, especially with deep excavation or tunneling projects. Reducing the uncertainty of below-grade conditions controls the Department’s construction project costs. The Program Management Services project will fund professional services related to capital project delivery including planning, tracking, scheduling, and cost estimating as well as ancillary services related to the CIP.

FY2015-FY2019 Capital Improvement Program Department of Watershed Management

#

Program Name

Category Name

Project Name

Start Date

End Date

1

Water

Water Supply

Water Supply Program - Quarry/Chattahoochee

05/01/2014

05/08/2018

$298,073,432 *

3

Wastewater

Water Reclamation Centers & Facilities

RM Clayton WRC - Two Scroll Bowl Kits, Switch Gears, Emergency Generators

12/21/2015

11/13/2018

4

Water

Water Supply

Hemphill/Chattahoochee WTP - Instrumentation & Controls System

03/04/2013

5

Watershed Protection

Watershed Protection

Southeast Atlanta Green Infrastructure Initiative(SAGII) - Permeable Pavers

6

Watershed Protection

Watershed Protection

7

WQCF

8

Cost Estimate

Funded Amount Funding Remaining

Impacted Council District(s)

$173,073,432

$125,000,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

$4,950,000

$0

$4,950,000

2, 3, 4, 5, 6, 7, 8, 9

03/16/2018

$1,091,859

$0

$1,091,859

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

01/02/2013

05/31/2016

$10,000,000 *

$10,000,000

$0

1, 2, 4, 5

Southeast Atlanta Green Infrastructure Initiative(SAGII) - Capacity Relief Ponds

07/17/2013

08/27/2018

$16,000,000 *

$16,000,000

$0

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Water Quality Control Facilities

Custer Avenue Water Quality Control Facility - Additional Screens

06/25/2015

09/14/2018

$10,000,000 *

$1,468,731

$8,531,269

1

Wastewater

Wastewater Collection

Peachtree Creek Trunk Sewer Stabilization

06/26/2015

08/03/2018

$3,170,000 *

$0

$3,170,000

6,7

9

Watershed Protection

Watershed Protection

Upper Proctor Creek Sewer Capacity Relief - Mitchell Street Sewer

12/12/2014

06/08/2016

$9,759,746

$9,759,746

$0

10

Watershed Protection

Watershed Protection

Upper Proctor Creek Sewer Capacity Relief - Mims Park Pond

11/26/2014

07/31/2017

$14,620,000

$2,964,069

$11,655,931

11

Wastewater

Wastewater Collection

SG3 Contract B Small Diameter Rehabilitation

03/01/2015

07/30/2018

$15,000,000

$15,000,000

$0

2, 6, 7

12

Wastewater

Wastewater Collection

SG3 Contract C Small Diameter Rehabilitation

01/06/2016

03/06/2019

$14,200,000

$0

$14,200,000

2, 6, 7

13

Wastewater

Wastewater Collection

SG3 Capacity Relief Projects - Ashby-Jett, Lower Proctor Trunk & Terrell Creek Trunk (Phase 2)

10/26/2015

11/07/2019

$8,440,000

$1,181,587

$7,258,413

3, 4, 9, 10, 11

14

Wastewater

Wastewater Collection

SG4 Advanced Sewer Capacity Relief - Collier Road Outfall

11/16/2015

08/14/2018

$4,427,482

$4,427,482

$0

15

Wastewater

Wastewater Collection

SG3 Contract D Small Diameter Rehabilitation

10/18/2016

12/16/2019

$14,200,000

$0

$14,200,000

2, 6, 7

16

Wastewater

Wastewater Collection

SG4 Pipe Rehabilitation

10/02/2017

02/11/2021

$17,000,000

$0

$17,000,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

17

Wastewater

Water Reclamation Centers & Facilities

RM Clayton WRC - Headworks

01/27/2014

05/04/2018

$56,980,000

$56,980,000

$0

18

Wastewater

Water Reclamation Centers & Facilities

Utoy Creek WRC - Aeration Tanks/Slide Gates

12/28/2015

05/22/2017

$1,420,000

$1,342,729

$77,271

10, 11

19

Wastewater

Water Reclamation Centers & Facilities

RM Clayton WRC - Instrumentation & Controls Reliability Restoration

07/01/2014

12/28/2017

$4,469,000

$3,959,255

$509,745

2, 3, 4, 5, 6, 7, 8, 9

20

General

Facilities Management

Peyton Center

03/01/2015

05/14/2019

$28,000,000

$4,320,000

$23,680,000

21

Water

Distribution System

Hartsfield Jackson Manifold Improvements

06/01/2015

09/18/2017

$2,718,333 *

$2,036,900

$681,433

22

Wastewater

Water Reclamation Centers & Facilities

RM Clayton Nutrient Recovery

09/21/2015

09/08/2017

$9,894,928

$9,894,928

$0

23

Water

Water Facilities

Chattahoochee WTP Compliance Improvements

04/04/2016

05/11/2018

$5,099,710

$0

$5,099,710

8, 9, 10

24

WQCF

Water Quality Control Facilities

West Area Water Quality Control Facility Improvements

07/01/2015

04/25/2018

$25,382,507

$25,382,507

$0

3, 6, 8, 9

25

Wastewater

Wastewater Collection

Nancy Creek Tunnel Shafts Odor Control

04/25/2014

11/30/2021

$3,000,000

$3,000,000

$0

7, 8, 9

9 3, 9

3,6, 8, 9

2, 3, 4, 5, 6, 7, 8, 9

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12 11,12 2, 3, 4, 5, 6, 7, 8, 9

Note: Cost sharing projects are not included in this listing and account for approximately $7.6M; also not included is the $84M encumbered during the previous bond period. * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 1

#

Program Name

Category Name

Project Name

Start Date

End Date

26

WQCF

Water Quality Control Facilities

West Area Water Quality Control Facility - Outfall

01/26/2015

01/04/2018

$2,300,200

$2,300,200

$0

27

Water

Distribution System

Large Diameter Water System Rehabilitation & Replacement

11/03/2015

09/09/2020

$12,000,000

$11,700,000

$300,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

28

General

Support Services

Asset Management Implementation & Planning

06/01/2014

12/06/2016

$5,000,000

$1,630,671

$3,369,329

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

29

General

Support Services

Geotechnical Testing & Investigation

01/01/2015

02/16/2021

$3,000,000

$2,000,000

$1,000,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

30

General

Support Services

GDOT/IntraGovernment Agreements Utility Relocation

07/01/2015

06/30/2019

$6,000,000

$1,625,362

$4,374,638

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

31

Wastewater

Wastewater Collection

Sanitary Sewer Repairs - Annual Contract

07/01/2015

01/22/2021

$9,000,000

$3,247,971

$5,752,029

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

32

Wastewater

Wastewater Collection

Sewer Cleaning & Pipeline Assessment

11/01/2015

01/14/2026

$9,000,000

$3,000,000

$6,000,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

33

General

Support Services

Asphaltic Concrete Pavement Milling & Resurfacing

07/08/2013

09/11/2020

$6,000,000

$2,000,000

$4,000,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

34

General

Facilities Management

Facility Structural and Site Improvements

07/01/2015

06/30/2019

$5,000,000

$5,000,000

$0

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

35

Water

Distribution System

Large Meter - Testing, Replacement & Installation

12/14/2015

07/30/2020

$5,100,000

$1,879,547

$3,220,453

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

36

Wastewater

Wastewater Collection

Raising Valve and Manhole Covers

02/24/2016

09/03/2020

$7,500,000

$7,500,000

$0

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

37

Water

Distribution System

Small Meters - Testing, Replacement & Installation

03/01/2015

06/26/2019

$6,000,000

$3,636,056

$2,363,944

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

38

Water

Distribution System

Distribution System Appurtenances

11/09/2015

04/20/2021

$15,000,000

$0

$15,000,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

39

Wastewater

Wastewater Collection

Emergency Sewer Repairs

11/09/2015

04/20/2021

$6,000,000

$1,839,918

$4,160,082

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

40

Watershed Protection

Watershed Protection

Green Infrastructure Maintenance

11/16/2015

06/17/2021

$3,179,250

$0

$3,179,250

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

43

Wastewater

Water Reclamation Centers & Facilities

Plant Capital Maintenance - Small Capital

11/16/2015

02/10/2022

$17,000,000

$9,000,000

$8,000,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

44

General

Support Services

Small Business Development Program

10/26/2015

05/27/2021

$750,000

$750,000

$0

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

45

General

Support Services

Fleet Replacement

07/01/2015

06/30/2019

$15,000,000

$3,500,000

$11,500,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

46

General

Support Services

Program Management

04/06/2015

05/20/2016

$52,130,000

$33,509,135

$18,620,865

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

47

Water

Distribution System

Small Diameter Distribution System Rehabilitation & Replacement

03/01/2015

04/13/2022

$43,000,000

$3,420,000

$39,580,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

48

Watershed Protection

Watershed Protection

Clear Creek West Sewer Improvements - Civic Center

11/18/2013

04/12/2019

$16,316,548

$16,316,548

$0

2, 3, 5, 6, 7, 8, 9

49

WQCF

Water Quality Control Facilities

Clear Creek Combined Sewage Control Facility (Package 1, Chemical System Improvements and Flow Monitoring)

02/01/2016

01/05/2018

$7,458,465

$7,458,465

$0

2, 3, 5, 6, 7, 8, 9

50

Water

Distribution System

Downtown Water Storage Tanks

10/26/2015

10/06/2017

$12,000,000

$12,000,000

$0

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

51

Wastewater

Water Reclamation Centers & Facilities

Intrenchment Creek WRC Decommissioning/South River WRC Primary Clarifiers Replacement

03/01/2014

01/13/2020

$56,069,193

$21,964,372

$34,104,821

Cost Estimate

Funded Amount Funding Remaining

Impacted Council District(s) 8, 9

1, 2, 3, 4, 5

Note: Cost sharing projects are not included in this listing and account for approximately $7.6M; also not included is the $84M encumbered during the previous bond period. * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 2

#

Program Name

Category Name

Project Name

Start Date

End Date

52

Wastewater

Water Reclamation Centers & Facilities

RM Clayton Supplemental Blowers

06/13/2015

05/02/2016

$5,600,000

53

Wastewater

Water Reclamation Centers & Facilities

South River WRC Various Projects Group 1

09/01/2014

02/04/2022

54

Wastewater

Wastewater Collection

Randall Hall Sewer Improvements

01/02/2013

55

Wastewater

Wastewater Collection

Intrenchment Creek Viaduct Rehabilitation

56

Wastewater

Water Reclamation Centers & Facilities

57

Wastewater

58

Cost Estimate

Funded Amount Funding Remaining

Impacted Council District(s)

$5,600,000

$0

2, 3, 4, 5, 6, 7, 8, 9

$53,221,917 *

$0

$53,221,917

1, 2, 3, 4, 5, 6, 12

11/10/2016

$1,386,904

$0

$1,386,904

9

11/09/2015

11/28/2018

$950,000

$0

$950,000

Pump Stations Improvement: Philip Lee, Rebel Forest, Woodward Way 1 and 2, Cascade, Niskey Lake #1, Highlands , SR Industrial, Rivermeade, Bell South, Paul Avenue and Hanover West

08/28/2013

10/29/2018

$8,640,000

$0

$8,640,000

1, 2, 8, 9, 11, 12

Water Reclamation Centers & Facilities

Bolton Road Sewage Pump Station Rehabilitation

01/11/2016

08/18/2020

$10,700,000

$1,128,349

$9,571,651

9

WQCF

Water Quality Control Facilities

East Area Water Quality Control Facility Improvements

12/08/2015

02/23/2018

$8,050,200

$7,642,040

$408,160

59

Water

Distribution System

Distribution System Telemetry Improvements

11/02/2015

05/15/2019

$1,750,000

$0

$1,750,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

60

WQCF

Water Quality Control Facilities

Combined Sewer System Repair & Rehabilitation

12/27/2016

07/28/2021

$5,700,000

$0

$5,700,000

1, 2, 3, 4, 5, 6, 7, 8, 9, 10

61

Watershed Protection

Watershed Protection

Clear Creek West Green Infrastructure

12/21/2015

03/14/2019

$1,121,760

$0

$1,121,760

2, 3, 5, 6, 7, 8, 9, 10

62

Wastewater

Water Reclamation Centers & Facilities

RM Clayton WRC Sand Filter Refurbishment

04/06/2016

08/22/2019

$5,300,000

$5,300,000

$0

2, 3, 4, 5, 6, 7, 8, 9

63

Watershed Protection

Watershed Protection

Upper Proctor Creek - Boone Boulevard Green Infrastructure

11/30/2015

08/15/2017

$2,000,000

$2,000,000

$0

3

64

Wastewater

Water Reclamation Centers & Facilities

Utoy Creek WRC Improvements - Group 1

10/26/2015

04/03/2019

$3,435,000

$0

$3,435,000

65

Wastewater

Water Reclamation Centers & Facilities

RM Clayton WRC Thickener Waste Activated Sludge Centrifuge

12/28/2015

09/01/2020

$2,800,000

$2,800,000

$0

2, 3, 4, 5, 6, 7, 8, 9

66

Wastewater

Water Reclamation Centers & Facilities

Flint River Sewage Pump Station Replacement

11/02/2015

09/24/2021

$14,000,000

$1,140,655

$12,859,345

1, 2, 3, 4, 5, 6, 12

67

Wastewater

Water Reclamation Centers & Facilities

Treatment Plant Facilities - Various projects - Bid Pkg 2 of 6 (Utoy Creek WRC headhouse MCC's and I&C Improvements and Phillip Lee PS bar screens)

04/15/2014

03/19/2018

$5,890,000

$0

$5,890,000

1, 2, 3, 4, 5

68

Water

Water Facilities

Hemphill WTP Compliance Improvements

05/31/2016

06/20/2018

$4,165,645

$0

$4,165,645

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

69

Watershed Protection

Watershed Protection

Upper Proctor Creek Water Quality Facility

02/26/2016

06/12/2019

$8,428,200

$0

$8,428,200

3, 9

70

Watershed Protection

Watershed Protection

Peachtree Creek - South Fork Green Infrastructure - Cheshire Bridge Road

10/22/2015

05/31/2018

$500,000

$0

$500,000

6, 7

71

WQCF

Water Quality Control Facilities

Water Quality Control Facilities Improvements Design

04/15/2015

03/19/2018

$3,000,000

$3,000,000

$0

1, 2, 3, 4, 5, 6, 7, 8, 9, 10

72

Wastewater

Water Reclamation Centers & Facilities

RM Clayton Plant Entrance

10/02/2014

01/29/2016

$504,667

$0

2, 3, 4, 5, 6, 7, 8, 9

73

Wastewater

Water Reclamation Centers & Facilities

RM Clayton Belt Filter Presses

01/04/2016

05/08/2019

$1,750,000

$1,750,000

$0

2, 3, 4, 5, 6, 7, 8, 9

74

Wastewater

Water Reclamation Centers & Facilities

RM Clayton Emergency Dewatering and Hauling

01/19/2016

03/14/2018

$2,000,000

$2,000,000

$0

2, 3, 4, 5, 6, 7, 8, 9

76

Water

Water Supply

Hemphill Reservoir Embankment #1

05/04/2015

01/27/2017

$200,000

$0

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

$504,667 *

$200,000 *

1, 2, 3, 4, 5

1, 12

1, 2, 3, 4, 5

Note: Cost sharing projects are not included in this listing and account for approximately $7.6M; also not included is the $84M encumbered during the previous bond period. * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 3

#

Program Name

Category Name

Project Name

Start Date

End Date

77

Wastewater

Water Reclamation Centers & Facilities

South River WRC Filter Refurbishment

02/08/2016

03/11/2019 Grand Total:

Cost Estimate

Funded Amount Funding Remaining

$1,500,000

$1,500,000

$1,050,294,947

$530,635,323

$0

Impacted Council District(s) 1, 2, 3, 4, 5, 6, 12

Note: Cost sharing projects are not included in this listing and account for approximately $7.6M; also not included is the $84M encumbered during the previous bond period. * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 4

Map ID

1 57 56 1 2,4,23,68 48,49,61 7 66 56 21 1,2,4,68, 76 1,2,4,68, 76 51,55 8,70 56 56 10 20 67 56 56 3,17,19,22,52,62,65,72,73,74 51,53,77 18,64,67, 24,26

DWM CIP Facilities

2

Name

Bellwood Quarry Bolton Road PS Cascade PS Chattahoochee River Intake Chattahoochee WTP Clear Creek CSO Overflow Facility Custer CSO Overflow Facility Flint River PS Hanover West PS Hartsfield Repump Station Hemphill Raw Water Reservoirs Hemphill WTP Intrenchment WRC & CSO Treatment Facility Liddell Drive Facility Niskey Lake PS No. 1 Niskey Lake PS No. 2 North Ave CSO Overflow Facility Peyton Rd Pipeyard Facility Philip Lee PS Rebel Forrest PS Rivermeade PS RM Clayton WRC / RMC-BYPASS South River WRC Utoy Creek WRC West Area CSO Facility

Yolanda Adrean 8

56 3,17,19,22,52,62,65,72,73,74 1

24,26

Howard Shook 7

56

2,4,23,68

h tr P eac

20 57

Sa

nd

67

yC

Felicia A. Moore 9

r ee

k

r eek

Alex Wan 6

1,2,4,68, 76

8,70

48,49,61

1

C.T. Martin, Jr. 10

18,64,67

ee C

Ivory Lee Young, Jr. 3

10 Kwanza Hall 2 Natalyn Mosby Archibong 5

Intrenchment Cr

Cleta Winslow 4 56

U t oy

k

56

7 Carla Smith 1

eek

56

Cre e

51,55

Keisha Bottoms 11 56 51,53,77

Joyce Sheperd 12

South River

Legend

Hydrology

DWM Facilities

Administrative/Maintenance Drinking Water Wastewater

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, EsriBoundary Japan, METI, Atlanta Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and Council Districts 21 the GIS User Community

THIS MAP IS PROVIDED AS A PUBLIC SERVICE

The City of Atlanta has made known that these data contain known errors and inconsistencies. The City of Atlanta in no way ensures, represents, or warrants the accuracy and/or reliability of the data and/or map products being developed. The user of the data and or map products assumes all risks and liabilities which may arise from the information produced by maps or data furnished to the user by the City of Atlanta.

City of Atlanta

Department of Watershed Management

Fi l e L o c a ti o n : Y: \ G I S D i v i s i o n\ M a p P r o du c t i on a n d A na l y s i s \ C I P _ M a p s \ Ma r c h 12 0 1 6 \ M X D \ D W M _F a c i l i t i e s . m x d

COORDINATE SYSTEM

MAP UNITS DATE

AUTHOR TICKET # MAP SCALE

NAD 1983 STATE PLANE GEORGIA WEST U.S. SURVEY FEET 3/2/2016

DWM GIS Presentation

1:104,400 1 in = 8,700 ft

COMMENTS:

µ

Water System - Water Supply

Water Supply Program - Quarry/Chattahoochee

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

The City of Atlanta’s raw water system infrastructure forms the foundation and starting point for delivering clean and reliable drinking water as well as fire protection service for more than 1 million system users including the world's busiest passenger airport. In the 1890’s, when Atlanta faced major public health issues with water quality and water availability, the investment in raw water conveyance and storage was the first step in securing a sound future for the City. Since then, that investment has been integral to the success of Atlanta’s economy and the health of its citizens. The original raw water supply pipelines are still in service. Cast iron mains of 30”, 36”, and 48” in diameter were installed in 1893, 1908, and 1924 respectively. Although these water mains were renewed with a cement liner in the 1950s, they have far exceeded their design life. A fourth line, a 72” steel main, was built in 1975; however, metallurgical weaknesses restrict its operation to warm weather months. The Chattahoochee River is the source of raw water for the entire metro Atlanta. The path of the new raw water conveyance system will follow closely the path of the current cast iron and steel lines. The new five-mile conveyance line will connect to a quarry site that will be transformed into a new water storage facility at the quarry. The new storage facility will be designed to meet the current withdrawal permit limits and store any excess water not used for daily drinking water. Once filled, this facility will hold 2.4 billion gallons of water to provide the City at least 30 days of reserved water supply. Water treatment will be provided by the Hemphill Water Treatment Plant (WTP). The scope of this project includes: • Constructing a deep, five-mile long tunnel with a 10-foot diameter • Connecting Chattahoochee River raw water intake to the Hemphill WTP and quarry • Creating storage capacity within the quarry Justification: • Increases the City's reserve water supply to 30 days • Reduces corrective and emergency maintenance of existing raw water delivery pipelines • Enhances operational reliability with improved automation and system redundancy Consent Decree:

No

Start Date:

05/01/2014

End Date:

05/08/2018

$ 298,073,432

Funding Status:

Partially Funded

Funded:

$ 173,073,432

Not Funded:

$ 125,000,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

1

Water System - Water Supply Water Supply Program - Quarry/Chattahoochee

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

1

Water System - Water Supply

Hemphill/Chattahoochee WTP - Instrumentation & Controls System

Description: The implementation of the Water Supply Program is the most substantial water system investment since development of the Chattahoochee Water Treatment Plant (WTP). This program will address acute weaknesses in the raw water supply infrastructure identified in recent facility assessments.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

This project is as crucial to the Water Supply Program as it is to the future efficient operation of Chattahoochee and Hemphill WTPs. The existing instrumentation and control systems at these facilities are old and obsolete. The new instrumentation and control system will be used to automate the operation of both plants and the tunnel system from the Chattahoochee River to the Quarry. The scope of this project includes: • Replacing three (3) programmable logic controllers at Chattahoochee WTP • Replacing three (3) variable frequency drives of the distribution pumps at Hemphill WTP • Replacing one (1) programmable logic controller at Hemphill WTP Also included in the scope of this project is the tying of the Division 1 and Division 2 areas of Hemphill WTP into the plant’s supervisory control and data acquisition (SCADA) system.

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Improves reliability of the water distribution system • Enhances system operational efficiency and reliability

Andre Dickens Consent Decree:

No

Start Date:

03/04/2013

End Date:

03/16/2018

Cost Estimate:

$ 1,091,859

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 1,091,859

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

Water System - Water Supply Hemphill/Chattahoochee WTP - Instrumentation & Controls System

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

Water System - Water Supply

Hemphill Reservoir Embankment #1

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith

The water system includes two raw water reservoirs located in northwest Atlanta with a combined storage capacity of approximately 525 million gallons, providing about five days of storage for water treatment and distribution. The reservoir east of Howell Mill Road, Hemphill Reservoir #1, provides approximately one-third of the reservoirs’ total storage capacity but is currently not in service. In order to provide sufficient storage capacity to the constituency and reduce the threat of water deficiency, the goal of this project is to return the Hemphill Reservoir #1 to active service. The scope of this project includes: • Constructing a permanent drainage system • Repairing minor embankment erosion and revetment repairs to both reservoirs • Implementing corrective action required by the Georgia Department of Natural Resources

Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Supports economic development Increases storage for water treatment and distribution Enhances system operational reliability to include system redundancy Reduces corrective and emergency maintenance of existing raw water delivery

Consent Decree:

No

Start Date:

05/04/2015

End Date:

01/27/2017

$ 200,000

Funding Status:

Fully Funded

Funded:

$ 200,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

3

Water System - Water Supply Hemphill Reservoir Embankment #1

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

3

Water System - Water Facilities

Chattahoochee WTP Compliance Improvements

Description: Constructed in 1961-1962, the Chattahoochee Water Treatment Plant (WTP), located on Bolton Road Northwest, is a manually operated treatment plant and is staffed 24 hours a day, seven days per week and has a maximum capacity of 64.9 mgd. The Chattahoochee WTP is one of three water treatment plants in the City's water treatment system and provides approximately 35% of drinking water for the City and parts of Fulton County. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

Chattahoochee WTP upgrades were identified as immediate needs in the Water Master Plan. These projects, which are in the design phase, will further ensure continued compliance with the Safe Drinking Water Act rules, regulations and permits as well as improve system reliability and efficiency. The scope of this project includes: • • • •

Replacing sedimentation basin valves Modifying or replacing alum, fluoride, and powdered activated carbon feed systems Modifying or replacing secondary containment for chemical storage Replacing filter underdrains

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Enhances system operational reliability Improves safety and reduces operating costs Reduces cost and effort for corrective and emergency maintenance Ensures continued compliance with state and federal rules and regulations

Consent Decree:

No

Start Date:

04/04/2016

End Date:

05/11/2018

Cost Estimate:

$ 5,099,710

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 5,099,710

Council District:

8, 9, 10

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Water System - Water Facilities Chattahoochee WTP Compliance Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Water System - Water Facilities

Hemphill WTP Compliance Improvements

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

The Hemphill Water Treatment Plant (WTP), located on Bishop Street NW, is a manually operated water treatment plant that is staffed 24 hours a day, 7 days per week and has a maximum capacity of 136.5 mgd. Operating since 1893, the Hemphill WTP is one of three water treatment plants in the City’s water treatment system that provides potable water for the City and parts of Fulton County. The Hemphill WTP supplies water to retail, residential, commercial, and industrial customers within the City and portions of Fulton County south of the Chattahoochee River and in South Fulton County. The plant also supplies water to fire hydrants throughout the City. It has been identified in the Water Master Plan that immediate upgrades are required at Hemphill WTP. These upgrades will further ensure continued compliance with the Safe Drinking Water Act rules, regulations and permits as well as improve system reliability and efficiency. The scope of this project includes: • • • •

Modifying or replacing alum, fluoride, and powdered activated carbon feed systems Replacing baffle walls, overflow weirs and effluent valves in the sedimentation basins Retrofitting and replacing media in filters Installing new sample lines

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Reduces cost and effort for corrective and emergency maintenance • Enhances system operational reliability and economic development • Ensures continued compliance with state and federal rules and regulations Consent Decree:

No

Start Date:

05/31/2016

End Date:

06/20/2018

Cost Estimate:

$ 4,165,645

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 4,165,645

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Water System - Water Facilities Hemphill WTP Compliance Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Water System - Distribution System

Hartsfield Jackson Manifold Improvements

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan

Constructed in 1981, the Hartsfield-Jackson water distribution facility includes two below ground storage tanks and a re-pump station. The east and west concrete tanks are rectangular underground reservoirs and provide an estimated storage capacity of 5 million gallons each. These tanks receive water from the Hemphill Water Treatment Plant (WTP) and supply water to the Hartsfield-Jackson pump station within the Hemphill service zone. The tanks serve the Hartfield-Jackson International Airport and Coweta County and can direct flow to South Fulton County during peak hours. The Hartsfield-Jackson re-pump station contains four pumps used to maintain pressure in the southern areas of the Hemphill service zone and in the Stonewall tank. The scope of this project includes: • • • •

Demolishing existing ductile iron pipe, fittings, and valves Installing new above and below-grade ductile iron pipe, fittings, and valves Installing new flow meters Constructing reinforced concrete foundation slabs

Also included within the scope of this project are structural and architectural modifications to the existing pump station building to facilitate the new above grade piping, landscaping, temporary bypass piping, dewatering, electrical and controls, storm drainage, erosion and sediment control along with all incidentals and appurtenances required for construction.

Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Enhances service reliability and efficiency • Provides a permanent cost-effective and sustainable solution • Ensures reliable water distribution to Hartsfield–Jackson International Airport Consent Decree:

No

Start Date:

06/01/2015

End Date:

09/18/2017

$ 2,718,333

Funding Status:

Partially Funded

Funded:

$ 2,036,900

Not Funded:

$ 681,433

Council District:

11,12

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

6

Water System - Distribution System Hartsfield Jackson Manifold Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

6

Water System - Distribution System

Large Diameter Water System Rehabilitation & Replacement

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin

The City owns approximately 320 miles of 16-inch to 48-inch large diameter water mains ranging from new installations to assets more than 75 years old. As of 2009, approximately 95 percent of the City’s water system infrastructure is ductile or cast iron pipe. There is limited information about the actual condition of the large water mains, except where sections have been repaired or replaced. In order to determine the remaining service life of the water mains, the Department plans to assess the condition of its critical lines. The results will be used to develop a rehabilitation, repair and replacement program for large water mains. A planning phase will assess the condition of the large water mains. DWM has a calibrated hydraulic model of the water transmission and distribution system and a Criticality Assessment model. These models will be used in conjunction with a database of water main maintenance work orders to develop a priority list of large water mains to be assessed. The Department will then perform an assessment to determine the wall thickness, location of leaks and other water main problems. Approximately 30 miles per year of the large water mains will be assessed. Subsequent phases will include design and construction. The results of the condition assessment will be used to prepare detailed designs for the rehabilitation, repair and replacement of large water mains. The scope of this project includes: • • • • •

Updating DWM Criticality Analysis model including fire flow analysis Developing a priority list of large water mains requiring a condition assessment Performing condition assessment of large diameter water mains Preparing a priority list of critical projects Reviewing and updating standard design details and specifications for large water mains

Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Reduces cost and effort for corrective and emergency maintenance • Enhances operational reliability and efficiency of the water distribution network • Ensures continued compliance with state and federal rules and regulations Consent Decree:

No

Start Date:

11/03/2015

End Date:

09/09/2020

Cost Estimate:

$ 12,000,000

Funding Status:

Partially Funded

Funded:

$ 11,700,000

Not Funded:

$ 300,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Water System - Distribution System Large Diameter Water System Rehabilitation & Replacement

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Water System - Distribution System

Large Meter - Testing, Replacement & Installation

Description: There are more than 3,000 large water meters in the City of Atlanta’s water distribution system, through which flows approximately half of the city’s drinking water. Accurate meter readings and adherence to American Water Works Association (AWWA) standards is important for sustaining revenues, performing equitable billing, and determining, assessing, and addressing apparent water loss. Kasim Reed Mayor Ceasar C. Mitchell Council President

This work is performed continually, and is implemented via annual contracts. The scope of this project includes testing, repairing, replacing, and installing water meters with diameters greater than two inches.

Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Contributes to more stable revenue projections Reduces the number of inaccurate and/or estimated bills Enhances customer satisfaction through more accurate billing Reduces cost and effort for corrective and emergency maintenance

Consent Decree:

No

Start Date:

12/14/2015

End Date:

07/30/2020

Cost Estimate:

$ 5,100,000

Funding Status:

Partially Funded

Funded:

$ 1,879,547

Not Funded:

$ 3,220,453

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

Water System - Distribution System Large Meter - Testing, Replacement & Installation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

Water System - Distribution System

Small Meters - Testing, Replacement & Installation

Description: The City of Atlanta maintains more than 150,000 small water meters (2-inch or smaller) across its water distribution system. Maintaining meter reading accuracy is essential to revenue collection and equitable billing. It also aids in identifying, assessing, and addressing apparent water loss in the distribution system. This work is performed continually and is implemented via annual contracts. Kasim Reed Mayor

The scope of this project includes testing, repairing, replacing, and installing water meters with diameters of 2-inches or smaller.

Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Contributes to more stable revenue projections Reduces the number of inaccurate and/or estimated bills Enhances customer satisfaction through more accurate billing Reduces cost and effort for corrective and emergency maintenance

Consent Decree:

No

Start Date:

03/01/2015

End Date:

06/26/2019

Cost Estimate:

$ 6,000,000

Funding Status:

Partially Funded

Funded:

$ 3,636,056

Not Funded:

$ 2,363,944

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9

Water System - Distribution System Small Meters - Testing, Replacement & Installation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9

Water System - Distribution System

Small Diameter Distribution System Rehabilitation & Replacement

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan

The Department provides water to customers within a 379-square-mile area through more than 2,600 miles of distribution piping. Most of these pipes are located underground and many are approaching the end of their design lives. This project is to identify and rehabilitate the small diameter piping (less than 16 inches in diameter) that poses the highest risk of water leaks and low pressure events. The risk management approach to be used will assess the likelihood of failure due to aging, pressure, flow, and weathering impacts and also the consequence of failure. Funding will be used to proactively reduce the higher-risk areas. The failure of distribution piping is a rare event, but the consequences can be significant. The overall objective of this project is to align maintenance and investment of physical assets with asset criticality, to reduce unplanned maintenance, and to utilize asset condition and criticality information to develop a pipe repair and rehabilitation program. The scope of this project includes: • • • • • •

Reviewing main break work order data dating back to 2000 Reviewing computer model of the water system Improving existing criticality model developed in 2013 Reviewing and prioritizing existing pipeline projects Developing rehabilitation and repair program for small diameter pipes (< 16 inch in diameter) Developing a maintenance data analysis and pipe material failure analysis

Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Reduces risk posed to customers of unplanned water outages Reduces water leakage and unplanned maintenance activities Reduces cost and effort for corrective and emergency maintenance Enhances operational system reliability and efficiency

Consent Decree:

No

Start Date:

03/01/2015

End Date:

04/13/2022

Cost Estimate:

$ 43,000,000

Funding Status:

Partially Funded

Funded:

$ 3,420,000

Not Funded:

$ 39,580,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

10

Water System - Distribution System Small Diameter Distribution System Rehabilitation & Replacement

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

10

Water System - Distribution System

Downtown Water Storage Tanks

Description: This project involves the design and construction of two elevated water storage tank facilities which will provide finished water storage for downtown Atlanta and surrounding areas. Each tank will provide a short-term backup water supply to feed the water distribution network in the event of a major disruption at the Hemphill Pump Station or a major break in one of the key distribution lines. The tanks will provide reliable pressure in the system, thus protecting the system against contaminants and providing pressure for firefighting activities. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

The scope of this project includes: • Installing above ground water storage tanks with a total storage volume of 4 million gallons • Installing piping for connecting the pump stations to the distribution system • Installing SCADA controls for automated operation • Installing water quality equipment • Installing backup generators for uninterrupted electrical supply • Providing architectural treatment to blend into the neighborhood

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves reliability of drinking water pressure and fire flows • Adds redundancy to maintain water pressure and reduce potential boil water advisories • Increases the volume of water available for fire flows Consent Decree:

No

Start Date:

10/26/2015

End Date:

10/06/2017

Cost Estimate:

$ 12,000,000

Funding Status:

Fully Funded

Funded:

$ 12,000,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

11

Water System - Distribution System Downtown Water Storage Tanks

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

11

Water System - Distribution System

Distribution System Telemetry Improvements

Description: The water distribution system is operated with a telemetry system that signals real-time pressure readings at critical nodes in the water distribution system as well as water levels in remote water storage tanks to allow for effective operation, assessment, and control of the system. These signals are relayed to the centralized water delivery control center at the Hemphill Water Treatment Plant. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith

The City regularly reviews and updates the telemetry network as required to ensure optimal water distribution system coverage. The scope of this project includes: • Installing telemetry transmitters at various locations throughout the water distribution network

Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Ensures adequate monitoring and assessment of the water distribution system • Optimizes distribution system operations and minimizes system issues • Improves the telemetry network for operational optimization and more timely maintenance • Reduces corrective and emergency maintenance expenditures Consent Decree:

No

Start Date:

11/02/2015

End Date:

05/15/2019

Cost Estimate:

$ 1,750,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 1,750,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

12

Water System - Distribution System Distribution System Telemetry Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

12

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton WRC - Two Scroll Bowl Kits, Switch Gears, Emergency Generators

Description: Constructed in 1965, the R. M. Clayton Water Reclamation Center (WRC) located in northwest Atlanta along the Chattahoochee River provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

The treatment process removes biological and chemical impurities from the wastewater in three phases: primary treatment, secondary treatment, and tertiary treatment. The primary treatment process begins with the removal of floatable and settleable solids. Next, biological treatment during the secondary treatment phase reduces the concentration of organic and chemical pollutants. Finally, tertiary treatment removes the remaining suspended solids, disinfects the treated water using ultraviolet radiation and increases dissolved oxygen concentrations before discharging to the Chattahoochee River. The biological solids that are removed during the wastewater treatment process are reduced in the digestion process before being dewatered and incinerated or hauled to a landfill. The biological solids handling systems are in need of additional capacity in order to handle excessive grit and debris loading. The centrifuges at R.M. Clayton WRC are of the scroll bowl type. These centrifuges use a high rotational speed to separate solids from liquids. A helical screw conveyor continuously discharges the separated solids from the bowl. The scroll conveys the solids from the stationary zone where the wastewater enters to the dewatering beach where the solids are discharged. The scope of this project includes: • Installing two spare scroll bowl kits for the sludge thickener centrifuges • Replacing obsolete switch gears • Providing emergency generators for the Blower Building Justification: • Spare scroll bowl kits minimize downtime and allow the facility to continuously remove biosolids • Replaces obsolete switch gear equipment • Provides emergency generators for the Blower Building to meet permit requirements Consent Decree:

No

Start Date:

12/21/2015

End Date:

11/13/2018

Cost Estimate:

$ 4,950,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 4,950,000

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

1

Wastewater System - Water Reclamation Centers & Facilities RM Clayton WRC - Two Scroll Bowl Kits, Switch Gears, Emergency Generators

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

1

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton WRC - Headworks

Description: Constructed in 1935, the RM Clayton Water Reclamation Center (WRC), located in northwest Atlanta along the Chattahoochee River, provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore

RM Clayton WRC receives influent flows from the combined stormwater and sanitary sewer collection systems. Sanitary sewer flows are also stored and conveyed to the RM Clayton WRC through a deep rock tunnel system, which is pumped to the WRC influent collection box by the Nancy Creek pumping station located at the RM Clayton WRC. These various sources of influent flow result in wide fluctuations in the WRC’s influent flow rates and fluctuations in the solids loadings at the headworks facility. Constructed in 2000, the headworks facility provides raw wastewater screening and grit removal, critical functions to the wastewater treatment process. Inadequate performance of the headworks facility can promote adverse impacts to downstream treatment processes. As a result of age and performance, the existing mechanical screens, screening handling equipment and grit removal units of the headworks facilty are in need of repair and/or replacement. The scope of this project includes: • Replacing the existing coarse screening and grit removal systems • Installing influent monitoring equipment for accurate monitoring of flows

C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Enhances system operational efficiency and reliability • Facilitates compliance with National Pollution Discharge Elimination System (NPDES) permit

Andre Dickens Consent Decree:

No

Start Date:

01/27/2014

End Date:

05/04/2018

Cost Estimate:

$ 56,980,000

Funding Status:

Fully Funded

Funded:

$ 56,980,000

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

Wastewater System - Water Reclamation Centers & Facilities RM Clayton WRC - Headworks

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

Wastewater System - Water Reclamation Centers & Facilities

Utoy Creek WRC - Aeration Tanks/Slide Gates

Description: The Utoy Creek Water Reclamation Center (WRC), constructed in 1936 and expanded in 2000, provides wastewater treatment for the service area that encompasses portions of Southwest Atlanta, Northwest Atlanta, East Point and a portion of Fulton County. The Utoy Creek WRC is designed to treat 44 million gallons per day (mgd) of wastewater for discharge into the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

The aeration basins at the Utoy Creek WRC have significant accumulations of sediment. Removing this sediment will improve process efficiency. The aluminum slide gates, which control the flow between the aerobic and anoxic sections have corroded and need to be replaced. The scope of this project includes: • Cleaning out the aeration basin tanks of sedimentation • Replacing aluminum slide gates • Repairing and replacing any damaged air diffusers and piping

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves efficiency and reliability of the Utoy Creek WRC • Facilitates compliance with NPDES Permit • Reduces annual operating costs Consent Decree:

No

Start Date:

12/28/2015

End Date:

05/22/2017

Cost Estimate:

$ 1,420,000

Funding Status:

Partially Funded

Funded:

$ 1,342,729

Not Funded:

$ 77,271

Council District:

10, 11

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

Wastewater System - Water Reclamation Centers & Facilities Utoy Creek WRC - Aeration Tanks/Slide Gates

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton WRC - Instrumentation & Controls Reliability Restoration

Description: This project will upgrade various outdated Distributive Control Systems (DCS) and Process Logic Controller (PLC) systems as well as add optical fibers and duct banks at the RM Clayton Water Reclamation Center (WRC). These systems monitor and control various process equipment and provide the interconnectivity required to treat wastewater to meet regulatory compliance permits. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall

The scope of this project includes: • • • • • •

Installing additional duct banks and fiber optic cables Replacing input and output modules in various buildings Upgrading and consolidating DCS control processors Translating old databases for new control modules Replacing PLCs at Incinerator Building and Blower Building Installing new fiber network for Administration Building and various other buildings

Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Removes and replace obsolete instrumentation and control equipment Reduces corrective and emergency maintenance Enhances system operational reliability Facilitates compliance with regulatory requirements

Consent Decree:

No

Start Date:

07/01/2014

End Date:

12/28/2017

Cost Estimate:

$ 4,469,000

Funding Status:

Partially Funded

Funded:

$ 3,959,255

Not Funded:

$ 509,745

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Wastewater System - Water Reclamation Centers & Facilities RM Clayton WRC - Instrumentation & Controls Reliability Restoration

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton Nutrient Recovery

Description: Constructed in 1935, the RM Clayton Water Reclamation Center (WRC), located in northwest Atlanta along the Chattahoochee River, provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean

The purpose of this project is to improve nutrient (phosphorus and nitrogen) removal within the RM Clayton WRC. Enhanced nutrient removal will improve permit compliance, reduce chemical and operating costs, and provide a reusable byproduct. The WRC discharge permit requires the effluent to meet a total phosphorus limit. The plant employs a combination of chemical and biological phosphorus removal to meet this limit. The RM Clayton WRC dewatering centrate has a high concentration of dissolved nutrients, specifically phosphorus and ammonia. The presence of these nutrients at high concentration causes unintentional struvite scale to form. The formation of struvite is currently providing a benefit to the plant, as phosphorus that would normally be recycled to the head of the plant is currently being removed with the plant’s dewatered sludge or via removal by adherence to the pipes in the form of struvite crystals. However, that same benefit results in underground and aboveground piping to be abandoned or removed and replaced on a regular basis increasing costs and introducing operational and compliance risk. The scope of this project includes: • Designing and installing a Nutrient Recovery and Treatment System

Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Provides a reusable by-product rather than full reliance on incineration and landfilling Reduces chemical and operating costs Improves plant reliability and certainty in meeting NPDES permit limits Reduces the need for periodic replacement of underground and aboveground piping

Consent Decree:

Yes

Start Date:

09/21/2015

End Date:

09/08/2017

Cost Estimate:

$ 9,894,928

Funding Status:

Partially Funded

Funded:

$ 9,894,928

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Wastewater System - Water Reclamation Centers & Facilities RM Clayton Nutrient Recovery

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton WRC Thickener Waste Activated Sludge Centrifuge

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

The RM Clayton Water Reclamation Center (WRC) is located on Bolton Road in northwest Atlanta along the Chattahoochee River. The facility provides wastewater treatment for a service area that encompasses the City of Atlanta primarily north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. This project will provide a new Thickener Waste Activated Sludge (TWAS) centrifuge to provide back-up equipment for the dewatering process. This helps minimize build-up of biosolids in the system. The scope of this project includes: • Installing a new TWAS centrifuge

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves the facility's biosolids handling systems • Provides an additional thickening facility for biosolids • Improves the reliability and performance of the facility Consent Decree:

No

Start Date:

12/28/2015

End Date:

09/01/2020

Cost Estimate:

$ 2,800,000

Funding Status:

Fully Funded

Funded:

$ 2,800,000

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

Wastewater System - Water Reclamation Centers & Facilities RM Clayton WRC Thickener Waste Activated Sludge Centrifuge

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton Belt Filter Presses

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

The RM Clayton Water Reclamation Center (WRC) is located in northwest Atlanta along the Chattahoochee River. The facility provides wastewater treatment for a service area that encompasses the City of Atlanta primarily north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. Primary sludge and biological solids that are removed during the wastewater treatment process at RM Clayton WRC are reduced in the digestion process before being dewatered and incinerated or hauled to a landfill. This project provides a belt filter press to dewater the biological solids and wastewater treatment sludge and thereby reduce the volume of sludge to be hauled offsite. The scope of this project includes: • Procuring a mobile, trailer-mounted belt filter press system

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Provides emergency service when a centrifuge is out of service • Enables facility usage during small corrections • Provides redundant and reliable operating systems as required in the NPDES permit Consent Decree:

No

Start Date:

01/04/2016

End Date:

05/08/2019

Cost Estimate:

$ 1,750,000

Funding Status:

Fully Funded

Funded:

$ 1,750,000

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Wastewater System - Water Reclamation Centers & Facilities RM Clayton Belt Filter Presses

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Wastewater System - Water Reclamation Centers & Facilities

Plant Capital Maintenance - Small Capital

Description: The Department is responsible for the management, operation and maintenance of the City’s two drinking water treatment plants (WTPs) and storage facilities, three wastewater reclamation centers (WRCs), seven water quality control facilities (WQCFs), and 16 sewage pump stations. The maintenance of all these facilities is essential to advancing DWM’s goal of providing safe and sustainable drinking water, wastewater, and watershed protection services to the community. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore

This project provides funding to help address critical maintenance needs at the numerous facilities which are operated and maintained by the Department. Plant managers have identified a comprehensive list of critical needs for each facility. Various existing and new services type contracts will be used to provide servicing and repairs to key mechanical, and electrical civil assets. The project will also include critical structural repairs. Rehabilitation, repair, and replacement of these assets will help maintain the operability and efficiency of DWM facilities. The scope of this project includes implementing various service contracts for the following: • • • • • • • • •

Process controls service and repairs Pump systems service and repairs Chemical systems service and repairs Sediment basin cleaning Electrical testing and inspection Electrical repairs Mechanical repairs Dewatering, hauling and disposal services Structural repairs

C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Improves safety Improves operability of facilities Reduces operation and maintenance costs Improves efficiencies in plant operations

Consent Decree:

No

Start Date:

11/16/2015

End Date:

02/10/2022

Cost Estimate:

$ 17,000,000

Funding Status:

Partially Funded

Funded:

$ 9,000,000

Not Funded:

$ 8,000,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

Wastewater System - Water Reclamation Centers & Facilities Plant Capital Maintenance - Small Capital

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

Wastewater System - Water Reclamation Centers & Facilities

Intrenchment Creek WRC Decommissioning/South River WRC Primary Clarifiers Replacement

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook

Originally constructed in 1910 and upgraded in 1936, the Intrenchment Creek Water Reclamation Center (WRC) provides wastewater treatment for the northern half of the South River sewer service area, which encompasses portions of Atlanta and a small portion of DeKalb County. Because Intrenchment Creek WRC is no longer capable of meeting modern effluent limits, treated wastewater will be conveyed to the South River WRC for further treatment before being discharged to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) permit. The scope of the South River WRC project includes: • • • •

Providing primary clarifiers, head house and odor control ductwork Replacing chemical feed building and prefabricated warehouse building for new clarifiers Providing new poly aluminum chloride (PAC) chemical feed facility Rehabilitating the force main from Intrenchment Creek WRC to South River WRC headworks

The scope of the Intrenchment Creek WRC includes: • • • • •

Providing new grit traps for the Intrenchment Creek Sewer and the Sugar Creek Sewer Providing new effluent and influent pump stations and influent primary storage tank Providing odor control facility for bar screens and new primary storage tank Repairing Intrenchment Creek WRC force main Decommissioning primary and secondary treatment facilities

Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Allows wastewater to be sent directly to South River WRC for secondary treatment Leverages existing wastewater treatment assets while maintaining permit compliance Enhances system operational efficiency and reliability Reduces corrective and emergency maintenance

Consent Decree:

No

Start Date:

03/01/2014

End Date:

01/13/2020

Cost Estimate:

$ 56,069,193

Funding Status:

Partially Funded

Funded:

$ 21,964,372

Not Funded:

$ 34,104,821

Council District:

1, 2, 3, 4, 5

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9

Wastewater System - Water Reclamation Centers & Facilities Intrenchment Creek WRC Decommissioning/South River WRC Primary Clarifiers Replacement

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton Supplemental Blowers

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

The R.M. Clayton Water Reclamation Center (WRC) is located in northwest Atlanta along the Chattahoochee River. Constructed in 1935, the facility provides wastewater treatment for a service area that encompasses the City of Atlanta primarily north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. Currently, the facility is operating two of the three Turblex Blowers used to supply the fine bubbler system (aeration system) associated with biological treatment. One blower went down in September 2013 and its repair was completed in 2015. Due to limited air supply, a capital project was initiated to repair the fine bubbler system. The scope of the project includes: • Supplying and installing four new Turblex blower system packages • Repairing the fine bubbler system

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves facility efficiency and reliability • Restores aeration to full capacity • Facilitates regulatory compliance Consent Decree:

Yes

Start Date:

06/13/2015

End Date:

05/02/2016

Cost Estimate:

$ 5,600,000

Funding Status:

Fully Funded

Funded:

$ 5,600,000

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

10

Wastewater System - Water Reclamation Centers & Facilities RM Clayton Supplemental Blowers

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

10

Wastewater System - Water Reclamation Centers & Facilities

South River WRC Various Projects Group 1

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall

Constructed in 1936, the South River Water Reclamation Center (WRC) provides wastewater treatment for the service area that encompasses portions of Atlanta, East Point, College Park, Hapeville, Forest Park, Dekalb County and Clayton County. South River WRC also treats partially treated wastewater from the Intrenchment Creek WRC. This facility is designed to treat 54 million gallons per day (mgd) of wastewater for discharge into the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. The purpose of this project is to upgrade and/or replace the digesters and dewatering system controls at the South River WRC. The scope of this project includes: • • • •

Upgrading the existing digester complex and control building Modifying the dewatering building Replacing the centrifuges with three new dewatering centrifuges and Providing a new polymer feed system

Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Allows South River WRC to process additional solids from the Intrenchment Creek WRC Reduces energy, chemical, and labor cost Leverages existing treatment assets to maintain system capacity Enhances system operational efficiency and reliability

Consent Decree:

No

Start Date:

09/01/2014

End Date:

02/04/2022

$ 53,221,917

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 53,221,917

Council District:

1, 2, 3, 4, 5, 6, 12

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

11

Wastewater System - Water Reclamation Centers & Facilities South River WRC Various Projects Group 1

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

11

Wastewater System - Water Reclamation Centers & Facilities

Pump Stations Improvement: Philip Lee, Rebel Forest, Woodward Way 1 and 2, Cascade, Niskey Lake #1, Highlands , SR Industrial, Rivermeade, Bell South, Paul Avenue and Hanover West

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall

The City operates and maintains 20 unmanned remote pumping stations that convey sewage flows to the Water Reclamation Centers in areas not accessible by gravity sewers. The Department remotely monitors the pump stations seven days a week. These pump stations have safety components and telemetry equipment that must operate continuously to ensure that there will be no loss of power resulting in unsafe working conditions or sewage overflows. During inclement weather the power source to the pumping stations may be interrupted and require immediate attention from operators that must have emergency generators delivered to the site. The scope of this project includes: • • • •

Installing permanent generators to ensure reliable power source Replacing gas alarm system Replacing force main pressure sensor and transmitter Replacing pump control panel and input/output (I/O) panels

Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Improves pump station system reliability and efficiency Improves operational capability during extreme weather Replaces outdated and obsolete equipment Meets code requirements and improves safety for operating staff

Consent Decree:

No

Start Date:

08/28/2013

End Date:

10/29/2018

Cost Estimate:

$ 8,640,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 8,640,000

Council District:

1, 2, 8, 9, 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

12

Wastewater System - Water Reclamation Centers & Facilities Pump Stations Improvement: Philip Lee, Rebel Forest, Woodward Way 1 and 2, Cascade, Niskey Lake #1, Highlands , SR Industrial, Rivermeade, Bell South, Paul Avenue and Hanover West

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

12

Wastewater System - Water Reclamation Centers & Facilities

Bolton Road Sewage Pump Station Rehabilitation

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

Constructed in 1972, the existing 40 million gallons per day (mgd) Bolton Road Sewage Pumping Station is more than 40 years old and is approaching the end of its useful life. The pump station has high pump failure rates, obsolete controls, and other issues associated with an older facility asset. Numerous equipment failures at the facility over the last two years have resulted in several sewage spills, despite timely corrective and emergency maintenance measures. Additionally, the pump station configuration presents numerous maintenance challenges, including a deep wet well that is difficult to access and maintain. The scope of this project includes: • • • • • •

Replacing existing pumps with new higher capacity pumps Providing new variable frequency drive units Reconfiguring pump station to facilitate safe access and maintenance Upgrading Instrumentation and control system Incorporating odor control technology Refurbishing concrete in the wet well

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Replaces a stressed, inefficient critical asset with a refurbished pump station Improves operational reliability and performance of a critical asset Reduces sanitary sewer overflow discharges to area receiving streams Provides cost savings associated with reduced maintenance

Consent Decree:

No

Start Date:

01/11/2016

End Date:

08/18/2020

Cost Estimate:

$ 10,700,000

Funding Status:

Partially Funded

Funded:

$ 1,128,349

Not Funded:

$ 9,571,651

Council District:

9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

13

Wastewater System - Water Reclamation Centers & Facilities Bolton Road Sewage Pump Station Rehabilitation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

13

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton WRC Sand Filter Refurbishment

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

The R. M. Clayton Water Reclamation Center (WRC) is located in northwest Atlanta along the Chattahoochee River. Constructed in 1935, the facility provides wastewater treatment for a service area that encompasses the City of Atlanta primarily north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. The R.M. Clayton WRC treatment process removes biological and chemical impurities from the wastewater in three phases: primary treatment, secondary treatment, and tertiary treatment. The primary treatment process involves the removal of floatable and settleable solids. Next, during the secondary treatment phase, biological treatment reduces the concentration of organic and chemical pollutants in the wastewater. Finally, tertiary treatment removes the remaining suspended solids, disinfects the treated water using ultraviolet radiation, and increases dissolved oxygen concentrations before discharging to the Chattahoochee River. Primary sludge and biological solids that are removed during the wastewater treatment process are reduced in the digestion process before being dewatered and incinerated or hauled to a landfill. The purpose of this project is to restore design operation and reliability of the deep bed filters at the R.M. Clayton WRC. In addition, the underdrain system is in need of comprehensive service and in some portions repair or replacement. The scope of this project includes: • • • •

Changing the media of the deep bed filter Refurbishing the underdrain system Repairing equipment associated with the automatic operation of tertiary filtration Repairing equipment on 22 deep bed filter cells

Justification: • Restores the effectiveness of the filtration process • Reduces filter backwash frequency and duration, reducing maintenance costs • Improves overall plant reliability in meeting permit limits Consent Decree:

Yes

Start Date:

04/06/2016

End Date:

08/22/2019

Cost Estimate:

$ 5,300,000

Funding Status:

Fully Funded

Funded:

$ 5,300,000

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

14

Wastewater System - Water Reclamation Centers & Facilities RM Clayton WRC Sand Filter Refurbishment

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

14

Wastewater System - Water Reclamation Centers & Facilities

Utoy Creek WRC Improvements - Group 1

Description: Constructed in 1936 and expanded in 2000, the Utoy Creek Water Reclamation Center (WRC) provides wastewater treatment for a service area that encompasses portions of southwest Atlanta, northwest Atlanta, East Point and a portion of Fulton County. Utoy Creek WRC is designed to treat 44 million gallons per day of wastewater for discharge into the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) permit. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

The U.S. Environmental Protection Agency (EPA) and the Georgia Environmental Protection Division (EPD) are considering new permit requirements that will necessitate plant upgrades at Utoy Creek WRC. The facility will potentially need equipment/process upgrades and/or replacement due to the age of the facility and its inability to reliably meet new permit limits. The scope of this project includes: • • • • • •

Improving stormwater drainage at headworks Replacing influent pumps and updating pump controls Replacing chemical feed system Replacing heat exchanger systems Replacement of digester sludge recirculation pumps and boilers Replacing secondary clarifier equipment

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Helps meet new permit requirements • Provides for effective, reliable, and more cost-efficient operation of the facility • Reduces operating and maintenance costs at the facility Consent Decree:

No

Start Date:

10/26/2015

End Date:

04/03/2019

Cost Estimate:

$ 3,435,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 3,435,000

Council District:

1, 2, 3, 4, 5

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

15

Wastewater System - Water Reclamation Centers & Facilities Utoy Creek WRC Improvements - Group 1

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

15

Wastewater System - Water Reclamation Centers & Facilities

Flint River Sewage Pump Station Replacement

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith

The existing 15 million gallons per day (mgd) pump station at Flint River is nearly 40 years old and is approaching the end of its useful life. The pump station has high pump failure rates, obsolete controls, and other issues associated with an older facility asset. The pump station has been previously retrofitted to provide additional capacity as needed, but its current configuration is inefficient and unable to provide for sustainable operations associated with current and future system flows. This could contribute to additional sewage spills and overflows in the sanitary sewer system. The scope of this project includes: • Upgrading existing pump station or construct new pump station • Increasing pumping capacity from 15 to 25 mgd • Providing facility upgrades to protect the assets

Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Improves operational reliability and performance of a critical asset Reduces risk of sanitary sewer overflow discharges to area receiving streams Provides cost savings associated with reduced maintenance Resolves electrical code issues associated with the old pump station

Consent Decree:

No

Start Date:

11/02/2015

End Date:

09/24/2021

Cost Estimate:

$ 14,000,000

Funding Status:

Partially Funded

Funded:

$ 1,140,655

Not Funded:

$ 12,859,345

Council District:

1, 2, 3, 4, 5, 6, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

16

Wastewater System - Water Reclamation Centers & Facilities Flint River Sewage Pump Station Replacement

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

16

Wastewater System - Water Reclamation Centers & Facilities

Treatment Plant Facilities - Various projects - Bid Pkg 2 of 6 (Utoy Creek WRC headhouse MCC's and I&C Improvements and Phillip Lee PS bar screens)

Description: The Primary Headhouse electrical and instrumentation systems at the Utoy Creek Water Reclamation Center (WRC) monitor and control the process equipment to treat wastewater. It has been determined that the equipment is outdated and no longer supported by the manufacturer. The goal of this project is to reduce the risk of failure due to a sewage spill or a safety hazard by replacing the equipment and providing the level of redundancy required to ensure that Utoy Creek WRC maintains its regulatory compliance. Kasim Reed Mayor Ceasar C. Mitchell Council President

The scope of this project includes: • Replacing and upgrading electrical switchgear and power distribution equipment • Replacing telemetry and process control system components

Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Replaces outdated and obsolete electrical and instrumentation and controls • Reduces the risk of failure due to a sewage spill or a safety hazard

Andre Dickens Consent Decree:

No

Start Date:

04/15/2014

End Date:

03/19/2018

Cost Estimate:

$ 5,890,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 5,890,000

Council District:

1, 2, 3, 4, 5

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

17

Wastewater System - Water Reclamation Centers & Facilities Treatment Plant Facilities - Various projects - Bid Pkg 2 of 6 (Utoy Creek WRC headhouse MCC's and I&C Improvements and Phillip Lee PS bar screens)

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

17

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton Plant Entrance

Description: The entrance to the Chattahoochee Water Treatment Plant (WTP) and RM Clayton Water Reclamation Facility (WRF) sits at the intersection of Marietta Boulevard, Bolton Road, and Adams Drive. The goal of this project is to provide additional traffic safety and simplify the intersection. The scope of this project includes: Kasim Reed Mayor Ceasar C. Mitchell Council President

• Closing the RM Clayton WRC/Chattahoochee WTP Road entrance • Installing an upgraded security entrance at existing Coronet Way off of Moore’s Mill • Performing a study to evaluate utility conflicts, security concerns, and site restrictions

Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Improves public safety and traffic problems in the area • Provides safer access for employees, contractors, and suppliers who access the facilities

Andre Dickens Consent Decree:

Yes

Start Date:

10/02/2014

End Date:

01/29/2016

$ 504,667

Funding Status:

Fully Funded

Funded:

$ 504,667

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

18

Wastewater System - Water Reclamation Centers & Facilities RM Clayton Plant Entrance

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

18

Wastewater System - Water Reclamation Centers & Facilities

South River WRC Filter Refurbishment

Description: Constructed in 1936, the South River Water Reclamation Center (WRC) provides wastewater treatment for the service area that encompasses portions of Atlanta, East Point, College Park, Hapeville, Forest Park, DeKalb County, and Clayton County. South River WRC also treats partially treated wastewater from the Intrenchment Creek WRC. This facility is designed to treat 54 million gallons per day (mgd) of wastewater for discharge into the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) permit. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

Sand filtration at South River WRC is essential to permit compliance for total suspended solids and it has been identified that both the sand filter media and ancillary equipment need replacement. The scope of the project includes: • Replacing filter media for 12 filters • Repairing filter underdrains • Repairing/replacing three air scour blowers

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Improves plant reliability and performance • Reduces emergency and corrective maintenance

Andre Dickens Consent Decree:

Yes

Start Date:

02/08/2016

End Date:

03/11/2019

Cost Estimate:

$ 1,500,000

Funding Status:

Fully Funded

Funded:

$ 1,500,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

19

Wastewater System - Water Reclamation Centers & Facilities South River WRC Filter Refurbishment

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

19

Wastewater System - Water Reclamation Centers & Facilities

RM Clayton Emergency Dewatering and Hauling

Description: Constructed in 1965, the R.M. Clayton Water Reclamation Center (WRC), located in northwest Atlanta along the Chattahoochee River, provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook

The treatment process removes biological and chemical impurities from the wastewater in three phases: primary treatment, secondary treatment, and tertiary treatment. The primary treatment process begins with the removal of floatable and settleable solids. Next, biological treatment during the secondary treatment phase reduces the concentration of organic and chemical pollutants. Finally, tertiary treatment removes the remaining suspended solids, disinfects the treated water using ultraviolet radiation and increases dissolved oxygen concentrations before discharging to the Chattahoochee River. Biological solids removed during the wastewater treatment process are reduced in the digestion process before being dewatered and incinerated or hauled to a landfill. The biological solids handling systems are in need of additional capacity in order to handle excessive grit and debris loading. Other WRCs may also be included. The scope of this project includes: • Emergency dewatering and hauling of biosolids

Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Improves efficiency of biosolids handling

Andre Dickens Consent Decree:

No

Start Date:

01/19/2016

End Date:

03/14/2018

Cost Estimate:

$ 2,000,000

Funding Status:

Fully Funded

Funded:

$ 2,000,000

Not Funded:

$0

Council District:

2, 3, 4, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

20

Wastewater System - Water Reclamation Centers & Facilities RM Clayton Emergency Dewatering and Hauling

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

20

Wastewater System - Wastewater Collection

Peachtree Creek Trunk Sewer Stabilization

Description: The Sewer System Evaluation Survey (SSES), required by the First Amended Decree (FACD), was designed to evaluate the condition of the City’s sanitary sewer collection and transmission system and carried out over eight years across six sewer groups. Peachtree Trunk, a 90- to 96-inch concrete line, was constructed in the late 1930s. This project is to stabilize the many longitudinal and circumferential cracks identified in the Peachtree Trunk to ensure structural integrity is retained under varying conditions while conveying sewage. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith

The scope of this project includes: • • • •

Inspecting approximately 13,900 feet of large diameter sewer using closed circuit TV Cleaning approximately 3,600 feet of large diameter sewer Removing large debris accumulation using special cleaning techniques Installing approximately 11,000 feet of structural liner in a large diameter sewer

Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Increases asset life by around 50 years Restores pipe integrity through trenchless technology Reduces pipe Infiltration/Inflow Addresses Consent Decree requirements

Consent Decree:

Yes

Start Date:

06/26/2015

End Date:

08/03/2018

$ 3,170,000

Funding Status:

Partially Funded

Funded:

$0

Not Funded:

$ 3,170,000

Council District:

6,7

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

21

Wastewater System - Wastewater Collection Peachtree Creek Trunk Sewer Stabilization

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

21

Wastewater System - Wastewater Collection

SG3 Contract B Small Diameter Rehabilitation

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook

The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows (SSOs) and capacity limitations. The project proposes to rehabilitate the sanitary sewers in Sewer Group Three (SG3), which have been identified under the Sewer System Evaluation Survey (SSES) and as required by the First Amended Consent Decree. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in both the Proctor Creek and Sandy Creek Sewer Basins. Rehabilitation will extend the life of sewer assets. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order to promote extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work under this project is July 1, 2020. The scope of this project includes: • • • • • •

Pre-cleaning sewers Lining more than 25,000 feet of sewers using Cured-in-Place pipe (CIPP) liner Replacing more than 5,000 feet of sewer through pipe bursting Replacing more than 4,000 feet of sewers through open-cut Addressing defects in approximately 30 sewer pipe sections by point repair Rehabilitating manholes

Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Addresses Consent Decree requirements Enhances flow capacity of small diameter sewers Reduces inflow and infiltration or extraneous flows into the sewer system Increases protection of our receiving waters and reduced threat to public health and safety

Consent Decree:

Yes

Start Date:

03/01/2015

End Date:

07/30/2018

Cost Estimate:

$ 15,000,000

Funding Status:

Fully Funded

Funded:

$ 15,000,000

Not Funded:

$0

Council District:

2, 6, 7

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

22

Wastewater System - Wastewater Collection SG3 Contract B Small Diameter Rehabilitation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

22

Wastewater System - Wastewater Collection

SG3 Contract C Small Diameter Rehabilitation

Description: The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in both the Camp Creek and Utoy Creek Sewer Basins and will be located in approximately eleven sewersheds. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean

This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work under this project is July 1, 2020. The scope of this project includes: • • • • • • •

Pre-cleaning sewers Lining of sewers using Cured-in-Place pipe (CIPP) liner Replacing sewers through pipe bursting Installing new sewer sections using horizontal directional drilling methods Replacing sewer through open-cut method Addressing defects in short pipe sections through internal and external point repairs Rehabilitating manholes

Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Addresses Consent Decree requirements Enhances flow capacity of small diameter sewers Reduces inflow and infiltration or extraneous flows into the sewer system Increases protection of our receiving waters and reduces threat to public health and safety

Consent Decree:

Yes

Start Date:

01/06/2016

End Date:

03/06/2019

Cost Estimate:

$ 14,200,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 14,200,000

Council District:

2, 6, 7

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

23

Wastewater System - Wastewater Collection SG3 Contract C Small Diameter Rehabilitation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

23

Wastewater System - Wastewater Collection

SG3 Capacity Relief Projects - Ashby-Jett, Lower Proctor Trunk & Terrell Creek Trunk (Phase 2)

Description: The Department is continuing the implementation of the Sewer Capacity Relief Program to upgrade its existing large diameter system to eliminate sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for three trunk sewers located in the Proctor Creek Basin. These projects will consist of improvements to the Ashby-Jett Trunk, Lower Proctor Creek Trunk, and Terrell Creek Trunk (Phase 2) sewers. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean

These projects are necessary to meet the requirements of the Second Amendment to the First Amended Consent Decree (FACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded Water Reclamation Centers. The current milestone completion date for the work under these projects is July 1, 2020. The scope of the Lower Proctor Creek project includes: • Rehabilitating approximately 1,500 feet of the 54-inch sewer The scope of the Terrell Creek Trunk Sewer includes: • Replacing of approximately 10,000 feet of two parallel trunk sewers The scope of the Ashby-Jett Trunk project includes: • Replacing about 1,300 feet of the existing 18-inch sewer with a 24-inch sewer

Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Enhances flow capacity of the trunk and outfall sewers Reduces Infiltration/Inflow (I/I), or extraneous flows into the sewer system Increases protection of our receiving waters and reduces threat to public health and safety Addresses Consent Decree requirements

Consent Decree:

Yes

Start Date:

10/26/2015

End Date:

11/07/2019

Cost Estimate:

$ 8,440,000

Funding Status:

Partially Funded

Funded:

$ 1,181,587

Not Funded:

$ 7,258,413

Council District:

3, 4, 9, 10, 11

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

24

Wastewater System - Wastewater Collection SG3 Capacity Relief Projects - Ashby-Jett, Lower Proctor Trunk & Terrell Creek Trunk (Phase 2)

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

24

Wastewater System - Wastewater Collection

SG4 Advanced Sewer Capacity Relief - Collier Road Outfall

Description: The Department is continuing the implementation of the Sewer Capacity Relief Program to upgrade its existing large diameter system to eliminate sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for the existing Collier Road Outfall sewer.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith

Collier Road Outfall sewer is located in the Peachtree Creek sewer basin. The outfall sewer services the Howell Mill & Collier Road area, East of I-75 North to Brookview Park. Based on hydraulic analysis, the sewer currently has capacity limitations. The scope of this project includes: • Replacing of approximately 4,400 linear feet of an existing outfall • Realigning of a portion of the sewer to Brookview Road

Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Provides adequate capacity to reduce sanitary sewer spills • Extends service life and improve flow conveyance • Addresses Consent Decree requirements Consent Decree:

Yes

Start Date:

11/16/2015

End Date:

08/14/2018

Cost Estimate:

$ 4,427,482

Funding Status:

Fully Funded

Funded:

$ 4,427,482

Not Funded:

$0

Council District:

3,6, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

25

Wastewater System - Wastewater Collection SG4 Advanced Sewer Capacity Relief - Collier Road Outfall

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

25

Wastewater System - Wastewater Collection

SG3 Contract D Small Diameter Rehabilitation

Description: The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City proposes system improvements for small diameter sewers situated in the Sugar Creek Sewer Basin and located in approximately 10 sewersheds. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean

This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work under this project is July 1, 2020. The scope of the project includes: • • • • • • •

Pre-cleaning of sewers Lining of sewers using Cured-in-Place pipe (CIPP) liner Replacing sewers through pipe bursting Installing new sewer using horizontal directional drilling methods Replacing sewers using open-cut methods Addressing defects in short pipe sections through Internal and external point repairs Rehabilitating manholes

Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Addresses Consent Decree requirements Enhances flow capacity of small diameter sewers Reduces inflow and infiltration or extraneous flows into the sewer system Increases protection of our receiving waters and reduced threat to public health and safety

Consent Decree:

Yes

Start Date:

10/18/2016

End Date:

12/16/2019

Cost Estimate:

$ 14,200,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 14,200,000

Council District:

2, 6, 7

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

26

Wastewater System - Wastewater Collection SG3 Contract D Small Diameter Rehabilitation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

26

Wastewater System - Wastewater Collection

SG4 Pipe Rehabilitation

Description: The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in the Nancy Creek, Proctor Creek, and Peachtree Creek Sewer Basins. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook

This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work is July 1, 2025. The scope of the project includes: • • • • • •

Pre-cleaning of sewers Lining of sewers using Cured-in-Place pipe (CIPP) liner Replacement of sewers through pipe bursting Replacing sewers using open cut methods Addressing defects in short pipe sections using Internal and external point repairs Rehabilitating manholes

Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Addresses Consent Decree requirements Enhances flow capacity of small diameter sewers Reduces inflow and infiltration or extraneous flows into the sewer system Increases protection of our receiving waters and reduced threat to public health and safety

Consent Decree:

Yes

Start Date:

10/02/2017

End Date:

02/11/2021

Cost Estimate:

$ 17,000,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 17,000,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

27

Wastewater System - Wastewater Collection SG4 Pipe Rehabilitation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

27

Wastewater System - Wastewater Collection

Nancy Creek Tunnel Shafts Odor Control

Description: The Department aims to restore full design capacity of the Nancy Creek Tunnel, providing sustainable relief from sanitary sewer overflows for the Nancy Creek basin community. Three construction shafts were constructed as part of the Nancy Creek Tunnel project. R.M. Clayton and Johnson Ferry Road tunnel shafts anchor the tunnel line, with an intermediate shaft located at Roswell Road. One intake is located at each of the construction shaft sites. The tunnel lift station is located at the end of the tunnel, inside the R.M. Clayton facility. Kasim Reed Mayor Ceasar C. Mitchell Council President

The scope of the project includes: • Modifying existing odor equipment located at two tunnel drop shafts • Reconditioning odor control equipment (scrubbers) to original factory specifications

Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Reduces odors in area surrounding drop shafts • Extends service life of odor control assets

Andre Dickens Consent Decree:

No

Start Date:

04/25/2014

End Date:

11/30/2021

Cost Estimate:

$ 3,000,000

Funding Status:

Fully Funded

Funded:

$ 3,000,000

Not Funded:

$0

Council District:

7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

28

Wastewater System - Wastewater Collection Nancy Creek Tunnel Shafts Odor Control

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

28

Wastewater System - Wastewater Collection

Sanitary Sewer Repairs - Annual Contract

Description: The intent of this annual contract is to serve as an undefined scope contracting mechanism to complete necessary linear sanitary sewer repairs on an as-needed basis to supplement and support DWM Linear Operations.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

The project will facilitate the long-term sustainability and structural integrity of a critical linear asset, ensuring continued operation as intended and mitigating environmental risks. The project will allow for adequate conveyance capacity for existing and new Customers, and lead to improved treatment capacity at the area Water Reclamation Center. The scope of this project includes: • Repairing linear sewer assets utilizing methods such as: o Cured-in-Place Pipe (CIPP) o Pipe-bursting o Internal and external point repairs o Open-cut replacement o Jack and bore installations

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Reduces Infiltration/Inflow or extraneous flows into the sewer system Contributes to reductions in Sanitary Sewer Overflows Increases protection of receiving waters and reduces threat to public health and safety Enhances responsiveness to complete emergency repairs

Consent Decree:

No

Start Date:

07/01/2015

End Date:

01/22/2021

Cost Estimate:

$ 9,000,000

Funding Status:

Partially Funded

Funded:

$ 3,247,971

Not Funded:

$ 5,752,029

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

29

Wastewater System - Wastewater Collection Sanitary Sewer Repairs - Annual Contract

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

29

Wastewater System - Wastewater Collection

Sewer Cleaning & Pipeline Assessment

Description: This contract serves as a contracting mechanism to complete necessary cleaning and assessment of linear sanitary sewers on an as-needed basis to supplement and support DWM Linear Operations. The continued survey and assessment of the wastewater system is necessary to remain in compliance with the First Amended Consent Decree and to prescribe upgrades and improvement measures for the elimination of sanitary sewer overflows. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

The contract will allow for adequate conveyance capacity for existing and new customers, and leads to improved treatment capacity at the water reclamation facilities. Planned, systematic cleaning and assessment of the sewer system minimizes blockages in pipes, which preserves the structural integrity and service life of the pipe. The project will provide a balanced preventive maintenance program that allows leveling of operational demands and resources. The scope of the project includes: • • • • •

Inspecting pipes using closed-circuit television (CCTV) Heavy cleaning Chemical root treatment Smoke and dye testing Installing sewer cleanouts

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Reduces Infiltration/Inflow or extraneous flows into the sewer system Addresses Consent Decree requirements Increases protection of our receiving waters and reduced threat to public health and safety Provides needed capacity in some parts of the system by removing silt and debris from sewers

Consent Decree:

No

Start Date:

11/01/2015

End Date:

01/14/2026

Cost Estimate:

$ 9,000,000

Funding Status:

Partially Funded

Funded:

$ 3,000,000

Not Funded:

$ 6,000,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

30

Wastewater System - Wastewater Collection Sewer Cleaning & Pipeline Assessment

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

30

Wastewater System - Wastewater Collection

Raising Valve and Manhole Covers

Description: The City’s water, wastewater, and stormwater system includes over 50,000 water system valves and wastewater and stormwater system manholes. Access to and positioning of these assets is critical for water and wastewater system maintenance and reliability, as well as vehicle operation on city streets.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

In conjunction with Department of Public Works' street and sidewalk improvements, and as a routine matter of uncovering access to linear assets, water line valves (and lids) and manhole covers must periodically be raised for continued operations and maintenance access to the distribution and collection systems. The scope of this project includes: • Repairing and replacing infrastructure associated with 6-inch, 8-inch and 12-inch valves • Raising manhole and valve covers and associated asphalt and pavement • Coordinating with Department of Public Works

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Provides continuous access to critical water and wastewater infrastructure components • Improves system reliability • Provides cost savings associated with inter-departmental coordination on improvements Consent Decree:

No

Start Date:

02/24/2016

End Date:

09/03/2020

Cost Estimate:

$ 7,500,000

Funding Status:

Fully Funded

Funded:

$ 7,500,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

31

Wastewater System - Wastewater Collection Raising Valve and Manhole Covers

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

31

Wastewater System - Wastewater Collection

Emergency Sewer Repairs

Description: The Department’s Office of Linear Infrastructure Operations (OLIO) oversees all aspects of the sanitary and combined sewer collection system, drinking water distribution system, including raw water supply.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore

The Department is responsible for responding promptly to all linear sewer, storm, and water related service requests that are received through ATL311. Such requests consist of a variety of emergency conditions that pose a threat to public health and safety such as: broken sewers lines, sewer cave-in/sinkholes, missing manhole lids, sewer spills (public and private), sewer main back-ups, catch-basin back-up, as well as storm sewer back-ups. The Department is able to handle most of the requests received. However, there is a small percentage of requests that require more specialized equipment and repair methods that DWM personnel are unable to perform and the quantity that require immediate attention has accrued over the past months. The intent of this contract is to serve as an undefined scope contracting mechanism to complete emergency sanitary sewer repairs on an as-needed basis to supplement and support the Department. The scope of this project includes: • • • • • •

Inspecting sewers using closed circuit TV (CCTV) Sewer cleaning including debris removal Replacing sewers through open-cut replacement methods or pipe bursting Addressing defects in short pipe sections by internal and external point repairs Rehabilitating service laterals Rehabilitating manholes

C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Provides enhanced response to emergency repairs and unexpected maintenance demand Enhances flow capacity of repaired sewers Reduces Infiltration/Inflow or extraneous flows into the sewer system Contributes to reductions in Sanitary Sewer Overflows

Consent Decree:

No

Start Date:

11/09/2015

End Date:

04/20/2021

Cost Estimate:

$ 6,000,000

Funding Status:

Partially Funded

Funded:

$ 1,839,918

Not Funded:

$ 4,160,082

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

32

Wastewater System - Wastewater Collection Emergency Sewer Repairs

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

32

Wastewater System - Wastewater Collection

Randall Hall Sewer Improvements

Description: Homes along Randall Hall were originally connected to a dry sewer. To address this issue, a storage tank was installed to collect the raw sewage and is being pumped out frequently to prevent further spills. A sewer extension is required to connect homes to the sewer system. The scope of this project includes: Kasim Reed Mayor

• Installing a sewer extension to the dry sewer located along Randall Hall

Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Provides connectivity for existing and future homes within the project area • Alleviates the need for the storage tank that was placed on Randall Hall • Improves service to the residents within the project area Consent Decree:

No

Start Date:

01/02/2013

End Date:

11/10/2016

Cost Estimate:

$ 1,386,904

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 1,386,904

Council District:

9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

33

Wastewater System - Wastewater Collection Randall Hall Sewer Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

33

Wastewater System - Wastewater Collection

Intrenchment Creek Viaduct Rehabilitation

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook

Over 100 years old, the Intrenchment Creek Viaduct is a 48-inch pipeline that conveys sanitary sewer flows to the Intrenchment Creek Water Reclamation Center. The pipeline was constructed as a cast-in-place, reinforced concrete viaduct structure to create an elevated creek crossing. The aerial portion of the structure span is approximately 300 feet and is 40 feet above Parker Creek. Over time, the viaduct has developed structural deficiencies and currently has evidence of severe cracks in its wall foundation that warrant repair/rehabilitation to restore the structural integrity of the pipeline. The scope of this project includes: Phase 1: Conducting a structural evaluation, surveying, and non-destructive testing of the viaduct: • Determining the size, strength and reinforcement of supporting structure • Completing as-built survey of the viaduct and the retaining walls • Determining the remaining strength of the concrete cover around the pipe and rebar • Determining the size of the foundations supporting the structure Phase 2: Rehabilitating the viaduct as needed: • Installing either a Cured-in-Place pipe (CIPP) or PVC Spiral Wound Liner • Inserting a fiber glass pipe into the existing sewer • Grouting the annular space between the existing structure and the new pipe

Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Enhances flow capacity of the viaduct Reduces Infiltration/Inflow or extraneous flows into the sewer system Contributes to reductions in sanitary sewer overflows Provides adequate conveyance capacity for existing and new customers

Consent Decree:

No

Start Date:

11/09/2015

End Date:

11/28/2018

Cost Estimate:

$ 950,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 950,000

Council District:

1, 2, 3, 4, 5

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

34

Wastewater System - Wastewater Collection Intrenchment Creek Viaduct Rehabilitation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

34

Water Quality Control Facilities - Water Quality Control Facilities

Custer Avenue Water Quality Control Facility Additional Screens

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

Constructed in the mid-1980s, the Custer Avenue Water Quality Control Facility (WQCF) receives disinfected wet weather flows from the Boulevard CSO Regulator. Flows up to 500 million gallons per day (mgd) enter the Custer WQCF, receiving both coarse and fine screening, followed by de-chlorination. The screened flow is then routed to the East Area WQCF via a tunnel. When the Custer Avenue WQCF screening capacity or the tunnel storage capacity is reached, excess flows are diverted around the Custer Avenue WQCF to Intrenchment Creek via tipping weirs and concrete channel. The Custer Avenue WQCF requires an upgrade to provide additional screening prior to watershed discharges of these excess flows. The screening facilities will remove floatables that are discharged over the tipping weirs. The scope of this project includes: • Installing additional screens upstream and/or downstream of the tilting weirs • Installing a concrete channel • Providing for the collection, conveyance and disposal of screenings.

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Enhances system operational reliability • Ensures compliance with the WQCF permit requirements

Andre Dickens Consent Decree:

No

Start Date:

06/25/2015

End Date:

09/14/2018

$ 10,000,000

Funding Status:

Partially Funded

Funded:

$ 1,468,731

Not Funded:

$ 8,531,269

Council District:

1

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

1

Water Quality Control Facilities - Water Quality Control Facilities Custer Avenue Water Quality Control Facility - Additional Screens

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

1

Water Quality Control Facilities - Water Quality Control Facilities

West Area Water Quality Control Facility Improvements

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan

The West Area Water Quality Control Facility (WQCF) treats excess combined sewer overflows (CSO) from Clear Creek, Tanyard Creek and North Avenue Combined Sewer Control Facilities (CSCF). Flows from these CSCFs are transported to R.M. Clayton Water Reclamation Center during dry weather conditions, and most storm events for treatment. The capacity of the West Area WQCF is 85 mgd. The treatment consists of fine screening through rotary drum screens, grit removal in four vortex separators with grit classifiers, high rate compressed media filtration, disinfection with sodium hypochlorite, and dechlorination with sodium bisulfite. The West Area WQCF is relatively new, and in fair condition, and these upgrades will ensure filters operate efficiently. The scope of this project includes: • • • • • • • •

Upgrading equipment in the sludge thickening and dewatering facilities Modifying filter compression plate to prevent loss of media from the filter cells Improving Pakscan Control system used to control filter actuators Making improvements to the sedimentation basin Repairing, replacing and improving various electrical equipment, performing arc flash study Repairing or replacing chemical system equipment Installing powered permanent samplers for upstream and downstream sample points Installing Foxboro software updates

Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves overall plant reliability and efficiency • Replaces old and obsolete equipment • Facilitates compliance with permit effluent discharge limits Consent Decree:

No

Start Date:

07/01/2015

End Date:

04/25/2018

Cost Estimate:

$ 25,382,507

Funding Status:

Fully Funded

Funded:

$ 25,382,507

Not Funded:

$0

Council District:

3, 6, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

Water Quality Control Facilities - Water Quality Control Facilities West Area Water Quality Control Facility Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

Water Quality Control Facilities - Water Quality Control Facilities

West Area Water Quality Control Facility - Outfall

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall

The outfall to the West Area Water Quality Control Facility (WQCF) overflow tunnel is located at the R.M. Clayton WRC at northwest Bolton Road, adjacent to the Nancy Creek Pump station. It serves the West Area WQCF tunnel and pump station which takes flows from the North Avenue, Clear Creek and Tanyard Creek WQCFs. It is designed to release flow to Peachtree Creek when the tunnel is full to protect the pump station if the upstream tunnel influent gates fail to close at any of the WQCF facilities. While these events are very rare, the outfall to the West Area WQCF overflow tunnel is necessary to prevent excessive damage to the WQCF and/or RM Clayton WRC. The scope of this project includes: • • • •

Removing grout and sediment in Peachtree Creek Grouting the outfall foundation Installing a concrete plunge pool to dampen velocities in the concrete channel Lining the remainder of the channel to Peachtree Creek

Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Reduces erosion potential during overflow events • Reduces operational and maintenance costs • Facilitates regulatory compliance Consent Decree:

No

Start Date:

01/26/2015

End Date:

01/04/2018

Cost Estimate:

$ 2,300,200

Funding Status:

Partially Funded

Funded:

$ 2,300,200

Not Funded:

$0

Council District:

8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

Water Quality Control Facilities - Water Quality Control Facilities West Area Water Quality Control Facility - Outfall

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

Water Quality Control Facilities - Water Quality Control Facilities

Clear Creek Combined Sewage Control Facility (Package 1, Chemical System Improvements and Flow Monitoring)

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

Clear Creek Combined Sewage Control Facility (CSCF), one of the combined sewer control systems owned and operated by the City, is located in the west service area. During large storm events, when the capacity of the tunnels and the West Area WQCF is exceeded, the combined flows enter the Clear Creek CSCF and the combined wastewater is treated through coarse bar screening and fine drum screening, disinfected with sodium hypochlorite (NaOCl) and dechlorinated with sodium bisulfite. The purpose of this project is to upgrade the NaOCl storage tanks, pump and piping system to improve system reliability. Various improvements to other WQCFs are included in the project. The scope of this project includes: • • • • • •

Replacing four 16,000 gallon fiberglass reinforced plastic NaOCl storage tanks Replacing all PVC and metallic chemical feed piping and valves Replacing chemical feed pumps Repairing concrete and special coatings within Chemical Room and Dosing Vault Providing system flow monitoring improvements at various facilities Rebuilding and/or rehabilitating drum screens at Custer Avenue WQCF facility

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves system reliability and reduces compliance risks • Improves general operational efficiency and maintenance • Improves process performance to meet permit requirements Consent Decree:

No

Start Date:

02/01/2016

End Date:

01/05/2018

Cost Estimate:

$ 7,458,465

Funding Status:

Fully Funded

Funded:

$ 7,458,465

Not Funded:

$0

Council District:

2, 3, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Water Quality Control Facilities - Water Quality Control Facilities Clear Creek Combined Sewage Control Facility (Package 1, Chemical System Improvements and Flow Monitoring)

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Water Quality Control Facilities - Water Quality Control Facilities

East Area Water Quality Control Facility Improvements

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

The East Area Water Quality Control Facility (WQCF) treats combined sewer overflows from the Boulevard Regulator and Custer Avenue WQCF. Flows from these facilities are then transported through the Intrenchment Creek Storage Tunnel for treatment at East Area WQCF. The capacity of the East Area WQCF is 20 mgd but can treat flows up to 34 mgd. The East Area WQCF needs upgrades and repairs to restore efficiency and reliability; in particular, the solid thickening and dewatering and vortex grit removal units require rehabilitation. In addition, the facility has significant corrosion and the filter building and residual handing units need replacement. The scope of this project includes: • • • • • • • •

Rehabilitating the sludge thickening and dewatering facilities Repairing the tunnel pump station outfall Repairing the East Area WQCF sedimentation basin Providing electrical improvements Replacing six sedimentation basin submersible sludge pumps Upgrading chemical system equipment Rehabilitating the East Area WQCF solids processing pump station Providing an update to the Foxboro control system software

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves system reliability helps the City meet new permit requirements • Provides safer working conditions for operating personnel • Reduces imminent, short term, and long term compliance risks Consent Decree:

No

Start Date:

12/08/2015

End Date:

02/23/2018

Cost Estimate:

$ 8,050,200

Funding Status:

Partially Funded

Funded:

$ 7,642,040

Not Funded:

$ 408,160

Council District:

1, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Water Quality Control Facilities - Water Quality Control Facilities East Area Water Quality Control Facility Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Water Quality Control Facilities - Water Quality Control Facilities

Combined Sewer System Repair & Rehabilitation

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

The National Pollutant Discharge Elimination System (NPDES) discharge permit conditions require the City of Atlanta to improve the water quality in degraded urban streams within its sewer service area. In the near term, DWM will focus on improving drainage issues in two areas - along Carroll Street in southeast Atlanta and on Ralph David Abernathy Boulevard in southwest Atlanta. The purpose of this project is to repair deteriorated infrastructure to better control stormwater flow and reduce sediment load into these two areas of the City’s combined sewer system, thereby reducing flooding and enhancing local water quality. Other areas with critical drainage issues will be considered. The scope of the Carroll Street project includes: • Upsizing the formerly combined pipes and constructing a relief pipe • Providing additional manholes, catch basins and a rain garden The scope of the Ralph David Abernathy Boulevard project includes: • Upsizing about 1,100 linear feet of pipe • Installing additional manholes and catch basins

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Reduces localized flooding thereby improving public health and safety • Reduces sediment loading into the combined sewer • Reduces maintenance costs associated with sewer cleaning Consent Decree:

No

Start Date:

12/27/2016

End Date:

07/28/2021

Cost Estimate:

$ 5,700,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 5,700,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

Water Quality Control Facilities - Water Quality Control Facilities Combined Sewer System Repair & Rehabilitation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

Water Quality Control Facilities - Water Quality Control Facilities

Water Quality Control Facilities Improvements Design

Description: The combined sewer system is located in a 15-square-mile area of the City, which is centered in downtown Atlanta. The combined sewer area includes the North Avenue, Tanyard Creek, Clear Creek and Custer Avenue sub-basins. During most storm events, the flows from the combined sewer areas are transported to the area Water Reclamation Center (WRC) for treatment. If WRC treatment capacities are exceeded, a portion of the flow is directed to a Water Quality Control Facility (WQCF) for treatment prior to discharge to a stream. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean

The City owns and operates seven WQCFs, which operate under two separate National Pollutant Elimination System (NPDES) permits. One permit covers the East Area Facilities which discharge into the South River basin; a separate permit covers the West Area Facilities which discharge into the Chattahoochee River basin. In 2014, a task order was awarded to an Architectural/Engineering Joint Venture to prepare designs for renewal and replacement of aging, outdated or nonfunctioning equipment at each WQCF. The scope of this project includes: • • • • •

Evaluating renewal and replacement requirements at WQCFs Preparing preliminary and detailed designs Preparing opinions of probable construction costs Grouping projects into short-term and long-term priorities Preparing bid documents for most critical equipment at WQCFs

Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Replaces aging, outdated or nonfunctioning equipment at WQCFs Design improvements facilitate compliance with permit requirements Improves efficiency and reliability Improves safety at facilities

Consent Decree:

No

Start Date:

04/15/2015

End Date:

03/19/2018

Cost Estimate:

$ 3,000,000

Funding Status:

Fully Funded

Funded:

$ 3,000,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Water Quality Control Facilities - Water Quality Control Facilities Water Quality Control Facilities Improvements Design

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Watershed Protection - Watershed Protection

Southeast Atlanta Green Infrastructure Initiative(SAGII) - Permeable Pavers

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook

In July 2012, southeast Atlanta residents living immediately east of Turner Field experienced several days of intense rainfall resulting in localized ponding. DWM responded immediately to perform on-site inspections and performed a review of the combined sewer collection and conveyance system. To better address flooding in the area, DWM created the Southeast Atlanta Green Infrastructure Initiative (SAGII) that focuses on the Peoplestown, Mechanicsville, and Summerhill communities of Atlanta. SAGII is an integrated water resources management approach that incorporates both green and grey structural stormwater management best management practices (BMPS) inclusive of short-term and long-term projects to impact the performance of the East Area Water Quality Control Facility during periods of intense rainfall as experienced in July 2012. The Southeast Atlanta Green Infrastructure Initiative will provide much needed capacity relief to residents in the Custer Avenue CSO service area impacted by flooding in 2012. Eight short-term projects were completed to provide immediate relief to residents including the construction of bioswales. Long-term solutions to mitigate the flooding in the affected areas including the construction of the Media Lot Vault (completed in 2014), Connally Vault, the Capacity Relief Ponds and the Permeable Pavers. The Permeable Pavers Project will provide up to 7.1 million gallons of capacity relief. The scope of this project includes installing permeable pavers in the following areas: • Peoplestown, Summerhill and Mechanicsville totaling approximately 6 miles

Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Captures stormwater to reduce runoff and overflows in the community Increases groundwater recharge Reduces runoff and urban heat island effect from surface pavement Adds aesthetic enhancements for the corridor and community

Consent Decree:

No

Start Date:

01/02/2013

End Date:

05/31/2016

$ 10,000,000

Funding Status:

Fully Funded

Funded:

$ 10,000,000

Not Funded:

$0

Council District:

1, 2, 4, 5

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

1

Watershed Protection - Watershed Protection Southeast Atlanta Green Infrastructure Initiative(SAGII) - Permeable Pavers

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

1

Watershed Protection - Watershed Protection

Southeast Atlanta Green Infrastructure Initiative(SAGII) - Capacity Relief Ponds

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

In July 2012, southeast Atlanta residents living immediately east of Turner Field experienced several days of intense rainfall resulting in localized ponding that affected homes located along Atlanta, Connally, and Ormond Avenues. DWM responded immediately to perform on-site inspections and performed a review of the combined sewer collection and conveyance system. To better address flooding in the area, DWM created the Southeast Atlanta Green Infrastructure Initiative (SAGII) that focuses on the Peoplestown, Mechanicsville, and Summerhill communities of Atlanta. SAGII is an integrated water resources management approach that incorporates both green and grey structural stormwater management best management practices (BMPS) inclusive of short-term and long-term projects to impact the performance of the East Area Water Quality Control Facility during periods of intense rainfall as experienced in July 2012. The scope of this project includes designing and constructing of around 2 million gallons of capacity relief ponds comprising: • Three ponds • Bio-retention areas • Containment area for potential spills from the Peoplestown Junction Box

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Reduces flooding potential Protects public health and safety Provides a recreational and community amenity Provides ecological habitat

Consent Decree:

No

Start Date:

07/17/2013

End Date:

08/27/2018

$ 16,000,000

Funding Status:

Fully Funded

Funded:

$ 16,000,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

* Cost Estimate:

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

2

Watershed Protection - Watershed Protection Southeast Atlanta Green Infrastructure Initiative(SAGII) - Capacity Relief Ponds

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019 * The cost estimate for this project represents the incremental funding requirement during the FY2015 - 2019 CIP and does not reflect the projects overall costs. Similarly, the funding status and not funded categories pertain to the status of the incremental funding requirement and not the overall project cost.

2

Watershed Protection - Watershed Protection

Upper Proctor Creek Sewer Capacity Relief - Mitchell Street Sewer

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall

The area of the City located between Northside Drive, Phillips Arena, 72 Marietta, Five Points Marta Station and the Russell Federal Building is often referred to as “The Gulch." Approximately 75-85 percent of the area is considered impervious, consisting of parking decks, buildings, concrete slabs, drives, roads and asphalt surface parking. Stormwater collected by all city assets located in The Gulch routes into the combined sewer system, eventually becoming a portion of the flow in the Mineral Springs Sewer Trunk. The proposed Upper Proctor Creek Sewer Capacity Relief Project (UPCRP) is a multi-phase program intended to provide a means of intercepting surface water runoff and redirecting the flow away from the combined sewer. The scope of this project includes: • Installing 1,400 (+/-) feet of 60-inch sewer • Concurrent time line with New Stadium Project (NSP) activities • Completing project in advance of NSP walkway, street, and plaza improvements

Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Provides essential capacity relief to the Mineral Springs and Beckwith combined sewer trunks Enhances system operational efficiency and reliability Reduces frequency and cost of corrective and emergency maintenance Decreases frequency and magnitude of flooding potential

Consent Decree:

Yes

Start Date:

12/12/2014

End Date:

06/08/2016

Cost Estimate:

$ 9,759,746

Funding Status:

Fully Funded

Funded:

$ 9,759,746

Not Funded:

$0

Council District:

9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

Watershed Protection - Watershed Protection Upper Proctor Creek Sewer Capacity Relief - Mitchell Street Sewer

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

Watershed Protection - Watershed Protection

Upper Proctor Creek Sewer Capacity Relief - Mims Park Pond

Description: Pipeline modeling in the Vine City/Mims Park vicinity demonstrates that the existing combined sewer trunk lines in the area have capacity limitations that can result in localized street flooding. By redirecting surface water away from the combined sewer trunk lines, essential capacity relief will be provided for the Beckwith combined trunk sewer. The scope of the project includes: Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith

• • • • • •

Installing a new capacity relief storage facility in Mims Park Installing 2,200 linear feet (LF) of 60-inch capacity relief trunk line Re-routing 1,100 LF of 96-inch combined trunk sewer Extending 1,400 LF of 48" storm water drain to the Georgia World Congress Center Installing pipeline in the right-of-way along streets in the Vine City area Relocating Georgia Power transmission lines, remediating soils and relocating sewers

Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Enhances system operational efficiency and reliability Reduces frequency and cost of corrective and emergency maintenance Provides essential capacity relief to the Beckwith combined sewer trunk Decreases frequency and magnitude of flooding in the vicinity of Mims Park

Consent Decree:

Yes

Start Date:

11/26/2014

End Date:

07/31/2017

Cost Estimate:

$ 14,620,000

Funding Status:

Partially Funded

Funded:

$ 2,964,069

Not Funded:

$ 11,655,931

Council District:

3, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Watershed Protection - Watershed Protection Upper Proctor Creek Sewer Capacity Relief - Mims Park Pond

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

Watershed Protection - Watershed Protection

Green Infrastructure Maintenance

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

Maintaining green infrastructure assets, including permeable paver roadways, bio-retention, bio-swales, wet ponds, etc., is necessary for their continued function. As part of the Southeast Atlanta Green Infrastructure Initiative, the City is utilizing green infrastructure to manage 13 million gallons (MG) of stormwater runoff in the initial phase and an additional 10 MG in future phases. This includes up to six miles of permeable paver roadways in the Peoplestown, Summerhill, and Mechanicsville neighborhoods. The City has become a national leader with regard to using green infrastructure to manage stormwater runoff. The scope of this project includes: • • • • • • • •

Inspecting City-owned green infrastructure assets Inspecting green infrastructure underdrains and adjacent pipe networks semi-annually Sweeping and vacuuming permeable pavers and maintaining clogged areas Removing weeds and controlling noxious plant to maintain aesthetics and functionality Replacing dead or dying vegetation Replacing mulch, controlling erosion, and removing trash and sediment Conducting restoration and repairing structures as necessary Locating green infrastructure assets using Global Positioning Systems (GPS)

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Helps ensure proper function of green infrastructure during heavy rain events • Helps prevent localized flooding to adjacent property owners • Reduces need for emergency repairs Consent Decree:

No

Start Date:

11/16/2015

End Date:

06/17/2021

Cost Estimate:

$ 3,179,250

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 3,179,250

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Watershed Protection - Watershed Protection Green Infrastructure Maintenance

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

Watershed Protection - Watershed Protection

Clear Creek West Sewer Improvements - Civic Center

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr.

The combined sewage system (CSS) encompasses the urban core of the City. The Clear Creek CSS services the eastern portion of the downtown area north of Interstate 20. In conjunction with future development opportunities at the Civic Center, there is an opportunity to address issues relating to the combined sewers and stormwater system at the Civic Center and surrounding area with green infrastructure combined with more traditional storage solutions. The Civic Center is located in the Clear Creek basin and Peachtree Creek sewershed. The Civic Center property is about 20 acres in size and consists of 90 percent impervious land cover. This project is the first phase of an overall initiative that provides management of peak flows in the City’s two combined sewers, and enhances system reliability and efficiency by addressing areas of the system that have become inefficient in their operation. The scope of this project includes: • Designing and constructing an underground storage vault at the Civic Center location

Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Addresses stormwater capacity issues in the Clear Creek West combined sewer basin Improves customer service by providing additional storm capacity Improves the efficiency of the combined sewer system and reduces the risk of flooding Provides additional drainage for the right of way, which improves public health and safety

Consent Decree:

No

Start Date:

11/18/2013

End Date:

04/12/2019

Cost Estimate:

$ 16,316,548

Funding Status:

Fully Funded

Funded:

$ 16,316,548

Not Funded:

$0

Council District:

2, 3, 5, 6, 7, 8, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

Watershed Protection - Watershed Protection Clear Creek West Sewer Improvements - Civic Center

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

Watershed Protection - Watershed Protection

Clear Creek West Green Infrastructure

Description: The combined sewer system (CSS) services the urban core of the City. The Clear Creek CSS is located in the eastern portion of the downtown area north of Interstate 20.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

In conjunction with the future development opportunities at the Civic Center, there is an opportunity to address issues relating to the combined sewers and stormwater system at the Civic Center and surrounding area with green infrastructure. Examples of green infrastructure solutions include porous pavers in public parking lots (locations to be determined), green street concepts where determined to be viable, and cisterns on parcels owned by the City of Atlanta, or where private owners agree to allow access for this purpose. The Civic Center is located within the Clear Creek basin and Peachtree Creek sewershed. The Civic Center property is about 20 acres and consists of 90 percent impervious land cover. The stormwater infrastructure in the area consists of a Butler Street combined sewer and a parallel Butler Street combined sewer relief trunk, and several stormwater lines (diameters ranging from 12-inch to 24-inch) connecting to the combined sewer system. The Butler Street Combined Sewer Trunk and Butler Street Combined Sewer Relief Trunk cross through the Civic Center site. The scope of this project includes: • Evaluating, selecting, designing, and constructing green infrastructure

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Improves reliability of combined sewer system Reduces up to one million gallons of stormwater runoff Enhances aesthetic appearance in neighborhoods Reduces flooding potential

Consent Decree:

Yes

Start Date:

12/21/2015

End Date:

03/14/2019

Cost Estimate:

$ 1,121,760

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 1,121,760

Council District:

2, 3, 5, 6, 7, 8, 9, 10

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Watershed Protection - Watershed Protection Clear Creek West Green Infrastructure

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

Watershed Protection - Watershed Protection

Upper Proctor Creek - Boone Boulevard Green Infrastructure

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall

Boone Boulevard is located in the Proctor Creek watershed in the northwest quadrant of Atlanta. It passes through several neighborhoods and crosses the future path of the Atlanta Beltline. The green infrastructure proposed for this project includes parks, stormwater management greenways, community gardens and other vegetative areas, as well as constructed streams, rain gardens and bio-retention ponds. In addition to the series of connected green spaces, the vision calls for the introduction of green streets, a design approach that uses natural systems to reduce stormwater runoff, improve water quality, enhance pedestrian safety, and beautify neighborhoods. The scope of this project includes: • Constructing bio-retention areas on the edge of the road • Removing impervious surfaces • Installing pervious paving in parking and turn lanes

Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Provides capacity relief to the North Avenue combined sewer system Increases ground water recharge and reduces heat island effect from surface pavement Adds aesthetic enhancements including bicycle lanes and pedestrian improvements Reduces stormwater runoff and enhances water quality

Consent Decree:

No

Start Date:

11/30/2015

End Date:

08/15/2017

Cost Estimate:

$ 2,000,000

Funding Status:

Fully Funded

Funded:

$ 2,000,000

Not Funded:

$0

Council District:

3

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

Watershed Protection - Watershed Protection Upper Proctor Creek - Boone Boulevard Green Infrastructure

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

Watershed Protection - Watershed Protection

Upper Proctor Creek Water Quality Facility

Description: Proctor Creek flows through downtown Atlanta and discharges into the Chattahoochee River. The water quality within Proctor Creek is monitored regularly, and elevated levels of suspended solids and bacteria have been measured that are likely due to runoff, erosion, and sanitary sewer overflows.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

In 2013, the Urban Waters Federal Partnership designated Proctor Creek to be a priority Urban Waters location. The Partnership works to improve coordination among federal and local agencies to improve the watershed, with particular focus on actions that lead economic, social, and ecological revitalization. DWM has taken on the leadership role for the revitalization of Upper Proctor Creek, where remedial actions would provide the greatest overall benefit. The purpose of this project is to improve water quality in Proctor Creek and downstream surface waters. The scope of this project includes: • Providing off-line enhanced treatment consisting of a wet pond and treatment equipment • Reducing concentrations of contaminants

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Provides aesthetic and amenity benefits to the local community • Improves water quality in Proctor Creek • Provides an amenity that will support local economic development Consent Decree:

No

Start Date:

02/26/2016

End Date:

06/12/2019

Cost Estimate:

$ 8,428,200

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 8,428,200

Council District:

3, 9

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9

Watershed Protection - Watershed Protection Upper Proctor Creek Water Quality Facility

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9

Watershed Protection - Watershed Protection

Peachtree Creek - South Fork Green Infrastructure Cheshire Bridge Road

Description: The City has planned various projects in the Peachtree Creek sewer basin to provide sewer capacity relief and reduce stormwater runoff. Completed in 2014, the Peachtree Creek South Fork Relief Storage and Pumping Stations includes a 10 million gallon equalization tank at Liddell Drive. Since construction of the project, significant reductions in sewage spills have occurred. Other projects will be constructed in order to provide not only additional sewer capacity relief but help reduce stormwater runoff and improve water quality. Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith

The focus of the Cheshire Bridge Road Green Infrastructure Project is to help reduce stormwater runoff in one of the sewersheds of Peachtree Creek. The scope of this project includes: • Constructing pervious sidewalks and street tree wells • Constructing infiltration galleries and bioretention areas

Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Provides water quality treatment for surface runoff • Increases groundwater recharge • Reduces runoff and the urban heat island effect from nearby pavement • Supports economic development through aesthetic enhancements to the corridor Consent Decree:

No

Start Date:

10/22/2015

End Date:

05/31/2018

Cost Estimate:

$ 500,000

Funding Status:

Not Funded

Funded:

$0

Not Funded:

$ 500,000

Council District:

6, 7

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

10

Watershed Protection - Watershed Protection Peachtree Creek - South Fork Green Infrastructure - Cheshire Bridge Road

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

10

General - Support Services

Asset Management Implementation & Planning

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow

The Department is updating its Computerized Maintenance Management System (CMMS) at DWM-owned water/wastewater facilities. The goal is to develop an effective system to manage assets. This involves developing an Asset Management Program for water and wastewater systems, including water treatment and reclamation facilities and linear infrastructure. As part of the recommendation from an inventory audit, this project will implement a single version of the CMMS (Maximo version 7.1.1.13) across all facilities including warehouses. Periodic upgrades of the CMMS will be implemented at all treatment plants, warehouse vertical inventory assets, and Fleet Services. Subsequent phases of the project will involve developing an Asset Management Implementation Plan and CMMS for the water distribution and sanitary sewer collection system. The scope of this project includes: • • • • •

Developing and implementing an Asset Management Program for vertical and linear assets Implementing one version of the CMMS with periodic upgrades to be used by all staff Providing initial and ongoing CMMS training for all applicable DWM personnel Providing ongoing management of all warehouse inventory using CMMS Developing preventive maintenance programs for vertical and horizontal facilities

Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Establishes a centralized CMMS to manage assets Establishes preventative maintenance programs to schedule maintenance Enhances operational reliability to include improved automation Reduces cost and effort for corrective and emergency maintenance

Consent Decree:

No

Start Date:

06/01/2014

End Date:

12/06/2016

Cost Estimate:

$ 5,000,000

Funding Status:

Partially Funded

Funded:

$ 1,630,671

Not Funded:

$ 3,369,329

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

1

General - Support Services Asset Management Implementation & Planning

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

1

General - Support Services

Geotechnical Testing & Investigation

Description: From project conception through construction and throughout the operation and maintenance phase, geotechnical investigations are designed to provide the level of information appropriate to the particular project development stage.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan

Geotechnical investigations are performed to evaluate those geologic, seismologic, and soil conditions that affect the safety, cost effectiveness, design, and execution of a proposed engineering project. Insufficient geotechnical investigations, faulty interpretation of results, or failure to portray results in a clearly understandable manner may contribute to undesirable results. These may include inappropriate designs, delays in construction schedules, costly construction changes, and post-construction remedial work. An annual contract will be used for these services. The scope of this project includes: • • • • • •

Collecting and analyzing data Site conditions and soil sampling Testing of rocks and soils to determine strength, compaction, moisture content, etc. Pressure tests Drilling, boring and rock coring Other geotechnical services as needed

Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Reduces costs by identifying problematic soils prior to construction • Determines project site soil characteristics used for designing foundations

Andre Dickens Consent Decree:

No

Start Date:

01/01/2015

End Date:

02/16/2021

Cost Estimate:

$ 3,000,000

Funding Status:

Partially Funded

Funded:

$ 2,000,000

Not Funded:

$ 1,000,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

General - Support Services Geotechnical Testing & Investigation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

2

General - Support Services

GDOT/IntraGovernment Agreements Utility Relocation

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook

GDOT and other local municipal governments may require the relocation or adjustment of utility facilities to facilitate transportation projects. These projects result from situations where road, bridge, and drainage improvements conflict with existing water and sewer lines. The responsibility and cost of relocating these lines is generally assigned to the utility owner, who is required to move them to maintain uninterrupted service. DWM anticipates 50 or more projects over the next five years, including projects to be undertaken under the Renew Atlanta Infrastructure Bond. These projects will be located across all City Council Districts, as well as sites where the water or wastewater service area extends beyond City limits. The GDOT projects will be identified by expected bid let date. Typical projects will include bridge replacements, road widening, other roadway improvements, sidewalks and streetscape improvements, or milling and resurfacing. Services will be provided by an Architectural/Engineering Joint Venture. The scope of this project includes: • • • • • • • •

Estimating and validating of bid costs and change order proposals Construction management and administration services Environmental assessment services Land acquisition, title research and appraisals, legal descriptions and plats Public information, data collection and site investigations Site visits, meetings, surveying services Subsurface utility engineering services Modeling, design, geotechnical and permitting services

Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Enhances coordination with GDOT and municipalities for sustaining its linear assets • Improves public health, operational reliability, and ensure serviceability • Addresses customer service and other priorities when utilities are impacted in right-of-way Consent Decree:

No

Start Date:

07/01/2015

End Date:

06/30/2019

Cost Estimate:

$ 6,000,000

Funding Status:

Partially Funded

Funded:

$ 1,625,362

Not Funded:

$ 4,374,638

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

General - Support Services GDOT/IntraGovernment Agreements Utility Relocation

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

3

General - Support Services

Asphaltic Concrete Pavement Milling & Resurfacing

Description: The intent of this annual contract is to have a contracting mechanism to complete repairs at locations where water main or sewer rehabilitation work has disturbed the existing pavement.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall

Milling is widely used for pavement recycling whereby the pavement is removed and ground up to be used as the aggregate in new pavement. For asphalt surfaces the product of milling is reclaimed asphalt pavement, which can be recycled in the asphalt hot mix pavement by combining with new aggregate and asphalt binder or a recycling agent. This reduces the impact that resurfacing has on the environment. Milling can also remove distresses from the surface, providing a better driving experience and/or longer roadway life. It can be also be used to control or change the height of part or the entire road. The scope of this project includes: • Concrete paving, milling, and resurfacing

Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood

Justification: • Rehabilitate road surfaces in order to maintain structural integrity in disturbed areas

Andre Dickens Consent Decree:

No

Start Date:

07/08/2013

End Date:

09/11/2020

Cost Estimate:

$ 6,000,000

Funding Status:

Partially Funded

Funded:

$ 2,000,000

Not Funded:

$ 4,000,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

General - Support Services Asphaltic Concrete Pavement Milling & Resurfacing

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

4

General - Support Services

Small Business Development Program

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan

The Small Business Development Program (SBDP) is an intensive program to train small, minority and/or female contractors and consultants in sewer rehabilitation techniques and construction management. Successful completion of this program prepares them for subcontracting and prime contracting opportunities with the City of Atlanta's $1.2 billion Capital Improvement Program to rebuild our water and sewer infrastructure. The budget includes funding for a series of SBDP sessions, and associated technical services for small businesses in a declining cost contract. As the City assumes increased responsibilities for direct administration of the program, services provided by the Consultant will decrease. The scope of this project includes the following training modules: • • • • • • • • •

Sewer Cleaning, Rehabilitation (Pipe-bursting), and Point Repairs Manhole Rehabilitation and Construction Right-of- Way Clearing New Sewer Construction (Open Trench) Estimating and Bidding Street Repairs and Paving Traffic Management and Safety Training Work Support Services (for all above public involvement) Scheduling and Project Management

Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Participants will become familiar with the City’s requirements and procedures Participants will gain a better understanding of the Procurement bid requirements Risk Management (bonding and insurance requirements) EBO Certification of minority, female and small business

Consent Decree:

No

Start Date:

10/26/2015

End Date:

05/27/2021

Cost Estimate:

$ 750,000

Funding Status:

Fully Funded

Funded:

$ 750,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

General - Support Services Small Business Development Program

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

5

General - Support Services

Fleet Replacement

Description: The Department of Watershed Management (DWM) operates approximately 1,400 items of rolling stock, including construction equipment, trucks, sedans, and mowers. Replacement of fleet vehicles and other rolling stock is a capitalized expenditure. The scope of this project includes vehicle replacement based on condition, hours, duty cycles and manufacturer recommendation to include: Kasim Reed Mayor Ceasar C. Mitchell Council President

• Cars - 80,000 miles or 7 years • Trucks - 120,000 miles or 10 years • Heavy equipment and other equipment

Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Improves productivity and operations efficiency • Reduces fleet operating expenses • Reduces fleet down time • Improves safety by replacing old and obsolete vehicles Consent Decree:

No

Start Date:

07/01/2015

End Date:

06/30/2019

Cost Estimate:

$ 15,000,000

Funding Status:

Partially Funded

Funded:

$ 3,500,000

Not Funded:

$ 11,500,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

General - Support Services Fleet Replacement

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

6

General - Support Services

Program Management

Description: Since 2001, a Program Management Services (PMS) firm has supported DWM to deliver projects in compliance with two Consent Decrees as well as to provide other specialized technical and industry knowledge and best practices to support DWM in achieving its strategic initiatives.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

The DWM will continue using a PMS firm to provide professional program and construction management services to support DWM on the implementation of the Capital Improvement Plan (CIP), Departmental support and other strategic initiatives. Services will be provided by the PMS on an as-needed basis. The scope of this project includes providing support in the following areas: • CIP program management and administration • Asset management and risk-based planning support • Consent Decree program support • Financial and investment analysis and support • Project management and departmental support • Technical support and technology development • Workforce development and support • Publicity and communications support

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • • • •

Ensures consistency, provide industry expertise, verify cost effectiveness and validate projects Incorporates lessons learned from other utilities Provides financing and budgeting expertise across multiple projects and programs Assists the City in meeting federal and state consent decree requirements

Consent Decree:

No

Start Date:

04/06/2015

End Date:

05/20/2016

Cost Estimate:

$ 52,130,000

Funding Status:

Partially Funded

Funded:

$ 33,509,135

Not Funded:

$ 18,620,865

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

General - Support Services Program Management

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

7

General - Facilities Management

Peyton Center

Description: The Peyton Center facility will be located on Peyton Road at the former Peyton Pipe Yard. A new facility will be constructed that consolidates the following functions: Linear Infrastructure Operations Center, Training Center and Warehouse Storage Facility.

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

The Peyton Center will consolidate executive and administrative staff responsible for Linear Infrastructure operations and maintenance for wastewater collection. The facility will include management offices, lockers, break rooms and meeting rooms. Storage facilities will be provided for crews and associated equipment and vehicles used by the crews. The Training Center will include a 300-seat auditorium, classrooms with advanced training systems, full-scale simulators and training grounds. The new Warehouse Storage Facility will provide adequate access to allow storage and removal of large equipment, pipe and other materials and office space for warehouse staff. The scope of this project includes: • Constructing a LEED-certified Training Center, Linear Operations Center and Warehouse • Paving areas for Commercial Drivers License and other operations-oriented training • Establishing a secure central warehouse for operations

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Establishes a centralized Linear Infrastructure Operations Center for wastewater collection • Enhances efficiency with asset control from consolidation of the warehouse facilities • Enhances efficiency with operational space and enhanced training capabilities Consent Decree:

No

Start Date:

03/01/2015

End Date:

05/14/2019

Cost Estimate:

$ 28,000,000

Funding Status:

Partially Funded

Funded:

$ 4,320,000

Not Funded:

$ 23,680,000

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

General - Facilities Management Peyton Center

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

8

General - Facilities Management

Facility Structural and Site Improvements

Description:

Kasim Reed Mayor Ceasar C. Mitchell Council President Carla Smith Kwanza Hall Ivory Lee Young, Jr. Cleta Winslow Natalyn M. Archibong

General plant and capitalized maintenance is necessary for several DWM properties. Some buildings have leaking roofs that damage interiors and threaten to damage equipment. For several of these roofs, repair is not as cost-effective as replacement. Additional roof appurtenances could include flashing, roof drains, gutter systems, parapet and scupper repair/replacement, etc., as would be necessary to create a complete watertight roofing system. HVAC systems, elevators, pavement, fences, and gates at numerous locations are in need of complete rehabilitation or replacement. The scope of this project includes replacement of building infrastructure where maintenance is not cost-effective. Some of the locations included in this effort are: • • • • • • • •

R.M. Clayton Water Reclamation Center Administration building Drinking Water Facilities Chattahoochee Water Treatment Plant Hemphill Water Treatment Plant Chattahoochee Raw Water Intake Building South River Water Reclamation Center Office Trailers Roofs, various Intrenchment Creek Water Reclamation Center Guard Shack Roof 14th Street Administrative & CMD Buildings

Alex Wan Howard Shook Yolanda Adrean Felicia Moore C.T. Martin Keisha Bottoms Joyce Sheperd Michael Julian Bond Mary Norwood Andre Dickens

Justification: • Reduces building operation and maintenance costs • Enhances operational reliability at DWM-owned facilities • Ensures workplace safety Consent Decree:

No

Start Date:

07/01/2015

End Date:

06/30/2019

Cost Estimate:

$ 5,000,000

Funding Status:

Fully Funded

Funded:

$ 5,000,000

Not Funded:

$0

Council District:

1, 2, 3, 4, 5, 6, 7, 8, 9, 10 , 11, 12

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9

General - Facilities Management Facility Structural and Site Improvements

Department of Watershed Management, Capital Improvement Program (CIP) 2015 - 2019

9