Section 7.0 of the Management Plan Technical Report document provides a detailed description and ...... Regulating activ
T A B L E   O F   C O N T E N T S     1.1 

Background 



1.2  

Structure of the Management Plan 



1.3  

Purpose of the Management Plan 



1.4 

Goal and Objectives 

          4 

1.5 

Management Plan Development Process 

          5  

1.6 

Public Consultation  

          6  

1.7 

Site Inventory and Analysis 

          7  

1.7.1  Vegetation Communities 

          8  

1.7.2  Invasive Species 

          9  

1.7.3  Management of Tree Health 

          9  

1.7.4  Drainage Features ­ Seepage 

1.8 

              10  

1.7.5  Drainage Features – Ames Creek 

          11  

1.7.6  Steep Slopes 

          11  

1.7.7  Soil Erosion 

          12  

1.7.8  Structures – Timber Retaining Walls 

          13  

1.7.9  Structures – Stairs and Boardwalks 

          13  

1.7.10  Access and Use 

          14  

1.7.11  Interpretation 

          15  

Management Options  

          15  

1.8.1  Management Option ‘A’ 

          17  

1.8.2  Management Option ‘B’ 

          19  

1.8.3  Preferred Option 

          22 

     

Schollen & Company Inc. Landscape Architects ~ North­South Environmental Inc ~ Pterophylla   dmA Planning & Management Services ~ Arborvitae Environmental Services Ltd. ~ Unterman McPhail Associates  

1.9 

Glen Stewart Management Plan 

          22 

1.9.1  Trail Management Plan 

          23 

1.9.2  Ecological Management Plan 

          23 

1.10 

Management Prescriptions 

          27 

1.11 

Implementation Priorities 

          27 

1.11.1  Management Prescription Priority Tables 

          28  

1.11.2  Immediate Priorities, 0­2 years 

          29  

1.11.3  Short Term Priorities ­ Safety, 2­6 years 

          31  

1.11.4  Short Term Priorities – Slope Stability, 2­6 years      33  

1.12 

1.13 

1.11.5  Medium Term Priorities, 5­10 years 

          35  

1.11.6  Long Term Priorities, 10­20 years 

          37  

Maintenance and Monitoring 

          39  

1.12.1  Long­Term Maintenance Initiatives 

          39  

1.12.2  Monitoring Initiatives 

          41  

1.12.3  Tracking and Reporting 

          42  

Roles and Responsibilities 

          43  

1.13.1  City of Toronto 

          43  

1.13.2  TRCA 

          44  

1.13.3  Community/ Volunteer Involvement 

          45  

1.14 

Funding Opportunities 

          46  

1.15 

Conclusion 

          47  

       

Schollen & Company Inc. Landscape Architects ~ North­South Environmental Inc ~ Pterophylla   dmA Planning & Management Services ~ Arborvitae Environmental Services Ltd. ~ Unterman McPhail Associates  

   

  1..1 

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Ba ackgro oun nd   

Glen Stewart Ravine is located within the Beach community in the City of Toronto.  The  ravine  was designated in  1981  under  the  City  of  Toronto’s Ravine  Protection  Act.    The  study  area  encompasses  8.5  ha  of  ravine  landscape  and  is  bounded  on  three  sides by  single  family  dwellings.  The  ravine  is wholly  owned by  the  City  of  Toronto  and  regulated  by  the  City  and  the  Toronto  and  Region  Conservation  Authority (TRCA).     Glen  Stewart  Ravine  has been  designated as an  Environmentally  Significant  Area  (ESA)  by  the  TRCA.  It  is also  a  component  of  the  City’s Natural  Heritage  System  incorporating  important  ecological,  hydrological  and  geological  functions.  The  Toronto  Ravine  By­Law  promotes  the  environmentally  responsible  management,  protection and conservation of ravines and associated woodlands. The protection  of the ravine is important to safeguard public and private property, to maintain the  integrity of the forest and rare species of flora and fauna and their habitats.     Glen  Stewart  Ravine  contains  drainage  features  that  are  important  within  the  watershed to ensure that water quality and fish habitat are protected downstream  of  the  site.   The  vegetated slopes of  the  ravine  offer  habitat  for  birds and wildlife  and  enhance  slope  stabilization.  As  well,  a  healthy  and  intact  ravine  system  provides aesthetic, visual, and recreational amenities to the Beach community.    Increased  use  has  the  potential  to  undermine  ecological  sustainability  within  the  ravine.  To  protect  the  resource  from  becoming  further  compromised,  the  City  requires  strategic  direction  on  the  management  of  the  ravine’s  natural  heritage  resources  and  recreational  uses  and  this  constitutes  the  purpose  of  this  Management Plan.    1 .2  

Structure of the Manag gem gement Plan    

The  Glen  Stewart  Ravine  Management  Plan  is  comprised  of  three  main  components:  •

An Executive Summary



A Technical Report



A number of Technical Appendices   

1    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

    The Executive Summary pro provides::  •

An overview of the study process; 



A  summary  of  the  findings  of  the  inventory,  resultant  management  recommendations, and implementation strategy; and 



A  tool  to  direct  the  reader  to  specific  sections within  the  Technical  Report  and  Technical  Appendices  where  additional  detail  related  to  specific  components of the plan is provided. 

  The Technical Rep port pro prrovides:  •

A concise description of the study process; 



A  description  of  the  state  of  the  Glen  Stewart  Ravine  environment  and the  issues  that  need to  be  addressed through  the  future  management  of  the  ravine landscape; 



A  description  of  the  goal  and  objectives  for  the  management  of  Glen  Stewart Ravine; 



A discussion of alternative approaches to the management; 



A presentation of optional management concepts as well as the preferred  concept  that  was  selected  through  a  process  of  City  and  stakeholder  review and public consultation; 



Management  prescriptions  to  address  trail  related  issues  (Trail  Management  Plan)  and  environmental  issues  (Ecological  Management  Plan); 



A  strategy  to  direct  the  implementation  of  the  various prescriptions.   This  strategy  addresses  the  implementation  priorities  and  assigns  roles  and  responsibilities; and 



A  program  to  direct  the  long­term  monitoring  of  the  ravine  landscape,  including trails and natural heritage features and functions. 

  The Technical Appen dic pend dices  iinclude:  •

Detailed inventory  information  that  formed the  basis for  the  Management  Plan; 



The reports of the subconsultant experts on the study team;   

2    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   



Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Other  background information  that  informed the  development  of  the  Glen  Stewart Ravine Management Plan; and  



Detailed design guidelines and recommendations.   

1..3 

Purpose of the Mana agementt Pllan 

The  Management  Plan  has been  prepared for  the  purpose  of  providing strategic  direction to the City of Toronto to guide the management and use of Glen Stewart  Ravine. To achieve this the Management Plan is designed to:    •

Be  used  as  a  guide,  identifying  current  issues  of  concern  and  recommending strategies to address each; 



Remain consistent with the goals and objectives that serve as the basis for  the Natural Heritage policies in the City of Toronto’s Official Plan; 



Remain  dynamic  to  accommodate  change  over  time  in  the  ravine  landscape, patterns of use and as maintenance needs evolve; 



Set  out  recommendations  to  guide  the  protection  and  enhancement  of  the  ecological  functions  and  natural  characteristics  of  the  ravine  landscape over time; 



Respond to  recreational  activities that  have  been  identified as important  to  the  community  while  achieving  core  ecological  objectives  identified  through the inventory stage of the study process; 



Provide  direction  to  guide  the  management  of  direct  and indirect  impacts  associated with use on the ecology, stability and character of the ravine; 



Establish  guidelines  to  direct  the  management  and  maintenance  of  the  natural  system  while  providing  recommendations  to  guide  appropriate  human  interaction  within  the  ravine  landscape,  ultimately  strengthening  the  ecological  integrity  of  the  ravine  and  providing  a  healthier  and  safer  environment for public recreational and educational use; 



Include an implementation and monitoring strategy; and 



Identify  the  potential  roles  and  responsibilities  of  the  City,  its  partner  agencies,  and  the  potential  roles  of  the  various  user  groups  that  have  a  stake in the sustainable management and use of the ravine environment. 

       

3    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

1..4  

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Go oal and Obje   b ectives 

The Management Plan was generated to achieve the following goal: 

Develop an  integrated long­term  management  strategy  to  protect,  enhance  and  restore  the  ecological,  hydrological,  geological  and  recreational  functions  of  the  ravine in an environmentally sensitive and economically sound manner.    The  management  objectives  which  will  ensure  that  this  goal  is  achieved  and  upon which the management plan is founded include 4 trail­related initiatives and  12 ecological­related initiatives described below.    Trail Related M b bjectives   Management Obje A.

Mitigate risks to users and provide a safer ravine environment. 

B.

Manage  informal  trails  (see  fig  9:  Technical  Report)  by  deterring  public  access  to  sensitive  areas  within  the  ravine  to  facilitate  restoration  of  degraded slopes and impacted vegetation communities. 

C.

Improve  condition  of  primary  trail  (see  fig  9:  Technical  Report)  to  provide  safe access through the ravine and mitigate impact on soils, vegetation and  surface and groundwater resources. 

D.

Protect  and enhance  native  shrub layer  and native  ground plane  vegetation  communities adjacent existing trails.   

Ecollogica al Rellated Mana agem ment Obje b ectives    A. Maintain  the  long­term  health  of  native  trees  within  Glen  Stewart  Ravine  and  promote optimum conditions for regeneration.  B. Mitigate  erosion  and  soil  compaction  around  tree  roots.  Protect  root  zones  and  restore  compacted  and  eroded  soils  around  tree  roots  where  these  conditions are affecting tree health and stability.  C. Promote  diversity  of  vegetation,  as  diversity  of  vegetation  will  give  rise  to  diversity of other life.  D. Promote  species  diversity.  Enrich  diversity  of  plant  species  within  the  ravine  as a means to enhance overall biodiversity.   E. Manage  habitat.  Enhance  the  diversity  of  wildlife  species  through  habitat  protection, enhancement and/or creation.  F. Increase  security  for  wildlife.  Sustain  sensitive  species  and  ground  nesting  species to enrich species diversity.   

4    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

G. Protect Ames Creek and restore seepage areas impacted by human traffic to  enhance habitat and sustain moisture­loving plant communities.  H. Restore  and  enhance  floodplain  vegetation  community.  Enhance  stability  of  floodplain and establish a diverse vegetation community within floodplain.  I. Improve  vegetation  community  along  adjacent  roads  and.  Improve  functionally  protective  effect  of  vegetation  that  is  located  along  roads  and  private  properties  that  abut  Glen  Stewart  Ravine  (as  dense  edges  protect  forest from drying winds, dust and excess light).  J. Stabilize steep and unstable slopes utilizing aggressive rooting vegetation.  K. Enhance  overall  diversity,  function  and  ecological  integrity  of  the  degraded  area located at the north end of the ravine.  L. Manage  invasive  species.  Promote  biological  diversity  and  enhance  opportunities to establish robust native plant communities.    The  16  objectives provide  the  basis upon  which  management  plan  prescriptions  have  been  developed.  The  prescriptions  essentially  describe  the  actions  recommended  to  be  implemented  to  address  concerns  within  the  ravine.  The  concerns  are  identified  in  section  1.7  of  the  Executive  Summary.  Tables  1­5  in  section  1.14  of  this  document  relate  the  prescriptions  to  the  objectives  above.  Prescriptions are arranged in priority order (for immediate and short term actions)  and are  referenced  with  a  code  to  various Management  Plan  maps  provided in  section 1.14.    1..5

Manageme ent Pla an Deve elopmen nt Proce ess s 

The  following process was completed by  the  multi­disciplinary  study  team  in  the  course of preparing the Management Plan:  •

Review of background information 



Inventory and assessment of site features and functions 



Identification of issues, opportunities and constraints 



Review of progress and findings with City of Toronto 



Presentation of findings and issues to stakeholders 



Receipt of feedback from stakeholders 



Definition of general direction for Management Plan (draft) 



Development of Management Options and Selection of a Preferred Option 



Development of Site­Specific Rehabilitation Plans   

5    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   



Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Development of final Management Plan and Implementation Strategy 

  1 .6   

Publi b blic Consultation    

A  key  component  of  the  Management  Plan  study  process  included  community  consultation and education which included:  •

Installation of temporary signs at various locations throughout the ravine to  identify  important  aspects  of  the  ravine  landscape  and  existing  issues  of  concern; 



Preparation  of  a  brochure  by  the  study  team  which  had a  similar  intent  to  that  of  the  signs  and  which  was  mailed  out  to  nearly  4000  residents  (a  copy of each sign and brochure are included in Appendix D); and 



Two public meetings that were held at strategic stages of the process with  the intent of:   •

Introducing the project and planning process to stakeholders; 



Confirming  current  use  patterns  and  preferences  within  the  ravine; 



Identifying  key  issues  and  opportunities  that  should  be  addressed; 



Presenting  the  findings  of  the  preliminary  inventory  and  assessment; 



Seeking  community  feedback  on  the  goal  and  objectives  for  the Management Plan; 



Presenting  and  discussing  conceptual  management  options  and  the  priorities,  benefits  and  constraints  for  each.  Options  addressed issues of concern related to:  •

Restoration  and  management  of  existing  vegetation  communities and habitat; 





Trail delineation and recreational use; and 



Erosion and slope stabilization. 

Providing  an  opportunity  for  public  review  of  the  conceptual  management  options  and  assist  in  the  process  of  selecting  a  preferred option;  



Present  a  preferred  approach  to  the  community  and  stakeholders for review; and   

6    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   



Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Including  children  in  the  education  process  by  providing  in­ class sessions and a site walk; 

  The  community  provided  verbal  and  written  responses  which  the  study  team  ultimately  used to  refine  the  Management  Plan.  Responses from  the  participants  who attended the two meetings are documented in Appendix C.    1..7

Sitte Inve enttory and Anal lysis     

Section  7.0  of  the  Management  Plan  Technical  Report  document  provides  a  detailed  description  and  mapping  of  existing  conditions  within  the  ravine  based  on  the  inventory  and  assessment  work  completed  by  the  study  team.  It  summarizes  issues  of  concern  and  recommends  some  general  approaches  to  resolve  these  issues.  Detailed  prescriptions  for  management  actions  are  provided  later  in  the  document  in  Section  10.3.  The  inventory  and  analysis  section  is  accompanied  by  a  photographic  inventory  found  in  Appendix  F:  Technical  Report  and  includes maps to  illustrate  where  the  areas of  concern  are  located within the ravine.     The  inventory  and  analysis  of  the  ravine  landscape  is  described  based  on  the  following categories:  1. Vegetation communities  2. Invasive species  3. Management of tree health   4. Drainage features  5. Steep slopes  6. Soil erosion  7. Structures  8. Access and use  9. Interpretation    The  following  sections  summarize  the  findings  of  the  review  and  assessment  stage of the project. The findings were used as a basis from  which management  options were derived.        

7    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

1..7.1 1  Vegetation n Comm muniities s  Glen  Stewart  Ravine  is  classified  as  an  Environmentally  Sensitive  Area  and  is   comprised  of  three  vegetation  communities.  Dry­Fresh  Red  Oak­Maple  Forest  predominates  with  a  small  pocket  of  Dry­Fresh  Hemlock­Sugar  Maple  Mixed  Forest  occurring  in  the  south  east  and  a  narrow  swathe  of  cultural  meadow  following  the  streamcourse.  This  data  is  important  to  the  Management  Plan  because  it  provides  an  indication  that  the  vegetation  has  arisen  because  of  environmental factors that were present before the advent of human interference.  The  communities  are  mapped  in  Figure  2:  Technical  Report  and  additional  mapping illustrating this inventory information is provided in Appendices A and B:  Technical Report.    Much  of  the  canopy  and  subcanopy  layers  of  vegetation  within  the  ravine  were  found to  be  in  fairly  good condition.  Some  concerns  that  were  identified through  the inventory stage of the work program include the following:  •

A lack of awareness by community of ecological sensitivity within ravine; 



Impacts  on  forest  habitat  by  urban  pets  specifically  unleashed  dogs  and  cats 



Presence  of  invasive  non­native  plants  (Norway  maple,  garlic  mustard,  black swallow­wort); 





Presence of discarded food that presents the potential to:  -

Affect behaviour of wildlife 

-

Make animals sick 

-

Attract parasites and urban predators like skunks and raccoons 

Signs  that  the  herbaceous  layer  is  being  threatened  by  invasive  species  (that  are  out­competing  and shading out  native  species)  and trampling  as  a  consequence  of  foot  traffic.  This  latter  condition  is  more  significant  on  steep slopes where soil erosion is evident.   

Recommendations:  Given  the  current  impacts  from  trampling  and  if  left  unmanaged,  the  quality  of  habitat  will  diminish  along  with  the  diversity  of  flora  and  fauna.  Therefore,  it  is  recommended  that  a  restoration  strategy  be  developed  to  enhance  biodiversity  and control  invasive  species.  One  option  is to  encourage  light  penetration  to  the  forest  floor  by  creating  small  openings  in  the  tree  canopy  to  encourage  new   

8    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

growth  that  will  contribute  to  the  sustainability  of  the  ecology  of  the  ravine  and  protect  it  from  further  decline.  This  option  requires  monitoring  and  intensive  management  of  invasive  species  as  these  opportunistic  species  will  also  take  advantage of the additional light.     1..7.2 2  Inva asive i  Speciies  North­South  Environmental  Inc  carried  out  an  assessment  of  native  and  non­ native  species  within  the  ravine  in  Spring,  2007  and  found  there  to  be  concentrations  of  Japanese  knotweed,  Garlic  mustard,  Manitoba  maple  and  Norway  maple.  Clusters  of  non­native  trees  including  Norway  and  Manitoba  maple,  inhabit  the  edge  of  Glen  Manor  Drive.  These  species  have  the  ability  to  suppress  the  native  understorey  species  by  outcompeting  native  plants  for  moisture,  nutrients  and  available  light.  If  uncontrolled,  these  species  can  dominate  the  ravine  landscape,  decreasing biodiversity  and suppressing natural  successionary  processes.  Concentrations  of  invasive  species  are  illustrated  on  Figure 3: Technical Report.    Recommendations:   A  strategy  to  progressively  remove  species  from  the  ravine  environment  is  provided.  Over  time  it  is  recommended  that  the  preparation  of  a  more  detailed  and up­to­date  map of  the  location  of  invasive  plant  species  within  the  ravine  be  undertaken  as  the  Management  Plan  is  implemented.  Specifically,  invasive  species management will need to be addressed at ravine edges and clearings in  the  canopy  to  ensure  the  long­term  sustainability  of  a  diverse  native  forest  community within Glen Stewart Ravine. 

  1.7.3  Management of Tree Health  The  City  of  Toronto  currently  manages  risks  associated  with  trees.  A  bi­annual  review of the ravine is conducted to identify potential trees that pose a risk for trail  users  and  potential  impacts  on  private  property  related  to  tree  structure  and  health.    The  assessment  helps  determine  the  need  to  implement  subsequent  actions such  as topping,  dieback  removal,  pruning,  removal  of  broken  branches  and  debris.  Through  this,  the  City  recognizes  that  a  total  elimination  of  all  risk  related  to  trees  is  unrealistic,  however,  appropriate  management  and  risk  reduction  are  attainable.  Through  an  independent  review  conducted  by  Urban   

9    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Forest  Innovations  Inc  in  January,  2007  it  was  determined  that  risks  stemming  from:  structural  weakening or  destabilization,  presence  of  dead branches,  rot  or  disease,  soil  compaction  and root  exposure  occurring as a  result  of  erosion,  had  been  well  managed by  the  City  along primary  trails and over  stairways  within  the  ravine. The extent of internal decay, however, is a risk that is not easily detectable  and in  the  cases of  large  mature  trees can  continue  to  pose  a  safety  concern  for  users  of  ad­hoc  trails  as  in  these  circumstances  soil  tends  to  be  compacted  or  eroded  near  the  tree  and roots  exposed,  potentially  weakening the  tree.  In  fact,  the  findings  of  the  assessment  determined  that  many  ad­hoc  secondary  trails  coincided  with  locations  where  individuals  and  groups  of  trees  are  showing  evidence  of  declining  health,  dead  branches  and/or  structural  problems  and  hence  pose  potential  safety  concerns.  Tree  management  issues  are  illustrated  on Figure 4: Technical Report.    Recommendations:  Recommendations  address  ad­hoc  trail  use  and  soil  compaction  issues  are  provided  within  the  Management  Plan.  Recommendations  for  improvements  to  the  design  of  the  primary  trail  are  also  provided  to  mitigate  potential  future  impacts on trees. Restoration of the vegetation community to promote the natural  regeneration  of  native  trees  and  protect  and  enhance  biodiversity  is  also  an  important way to ensure a healthy and thriving forest.     1..7.4 4  Draiinag ge Feattures  ­ See epage a   Parts of the lowlying areas of the ravine are located within the flood plain of Ames  Creek.    Where  the  edges  of  the  floodplain  meet  the  steep  slopes  of  the  ravine,   seepage  is  present.  Seepage  originates  on  the  surface  of  slopes,  pools  in  low­ lying areas and supports moisture­loving plants and wildlife, and enhances water  quality.  Areas  prone  to  seepage  were  mapped  in  the  Spring  of  2007  by  North­ South Environmental Inc (refer Figure 5: Technical Report).    In  some  cases,  where  trails traverse  seepage  areas,  muddy  conditions and trail  widening  have  occurred  as  users  attempt  to  avoid  the  wet  areas  of  the  trail.  In  winter,  when  the  water  freezes  over  the  trail  surface,  ice  poses  a  hazard.  Trampling  of  seepage  areas  impacts  sensitive  wetland  plant  communities  and  contributes to a loss in diversity of the vegetation community.    

10    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

  Recommendations:  In  response,  the  Management  Plan  sets  out  alternative  solutions  to  address  conflicts  between  trails  and  seepage  areas  as  well  as  trail  design  recommendations  to  avoid  muddy  and  icy  trail  conditions  caused  by  the  discharge  of  water  from  seepage  zones.  Design  alternatives  can  be  found  in  Appendix E: Technical Report.    1..7.5 5  Draiinag ge Feattures –    Ames Cre   eek k  Ames  Creek  winds  through  the  ravine’s  north  section  originating  from  a  natural  spring  at  the  north  end  of  the  site.    This  watercourse  continues  to  be  fed  throughout the length of the ravine by discharge along the base of the slopes and  from  within  the  floodplain.  The  natural  source  of  flows  to  this  creek  is  a  unique  feature  of  ravines  in  Toronto  and  should  be  protected.  However,  the  following  issues of concern were identified as a product of the inventory process:    •

A  lack  of  riparian  woody  cover  combined  with  erosion  from  trail  use  and  trail  widening  near  the  creek  appears  to  be  affecting  the  integrity  of  the  streambanks; 



In  locations  where  the  stream  adjoins  steeper  slopes,  weakening  of  the  toes of the slopes has occurred; and 



Some  slopes  have  been  undercut;  this  is  a  concern  when  the  condition  occurs next to a trail. 

  Recommendations:  The  Management  Plan  provides  recommendations  to  mitigate  potential  erosion  at the interface between the trail network and the creek through improvements to  trail  design  and  the  implementation  of  biotechnical  stabilization  solutions  that  employ  vegetation  as  the  primary  stabilization  mechanism  where  avoidance  of  conflicts through  the  realignment  of  the  trail  is not  an  option.   This approach  will  also assist in establishing woody riparian cover.     1.7.6  Steep Slopes  There  are  a  number  of  steep  slopes  within  the  ravine  (refer  Figure  6:  Technical  Report),  some  with  a  gradient  of  1V:2H  or  greater.  In  some  cases,  slopes of  this   

11    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

magnitude  have  been  impacted  by  erosion  and  exhibit  a  lack  of  vegetation  cover. The following concerns need to be addressed in these cases:    •

Trampling is impacting the health of the vegetation upon  which the slopes  depend on for stability; 



Soil  compaction  and root  exposure  (refer  photos 12,  35,  38:  Appendix  F:  Technical  Report)  has  the  potential  to  destabilize  trees  and  further  undermine  the  stability  of  slopes over  the  long­term  creating the  potential  for  risks  to  trail  users  and  adjacent  private  properties  that  are  located  beyond the top of slope.   

  Recommendations:  The  Management  Plan  recommends  that  the  slopes  be  monitored  in  the  short­ term  (over  the  next  5  years)  and  that  appropriate  long­term  slope  stabilization  methods  be  developed  (refer  Appendix  B).  The  process  of  establishing  future  capital  budgets must  consider  slope  assessment  and   stabilization  requirements  in  order  to  address  potential  public  safety  considerations and to  ensure  that  the  ravine slopes remain stable over the long­term. Slopes in the order of  1V:2H and  steeper  should  be  assessed  on  a  site­by­site  basis  to  determine  the  extent  to  which  potential  retrogression  might  affect  adjacent  properties and the  propensity  of the slopes to fail should nothing be done to stabilize them in both the short and  long terms.     1..7.7 7  Soil Erosio o n  There  are  areas  within  the  ravine  where  ground  flora  has  been  impacted  by  trampling and soil  compaction.  Soil  loss has occurred as a  result  of  sheet  runoff  and erosion.  These  conditions have  the  potential  to  contribute  to  slope  instability  over  the  long  term  if  left  unmitigated.  Gully  erosion  is  also  occurring  in  the  crevices  between  the  ravine  slopes  and  is  caused  by  soil  migrating  through  groundwater  discharge  areas.  This condition  could weaken  the  toes of  slopes,  a  condition  that  may  in­turn  result  in  the  future  slumping  of  slopes  (refer  to  the  geotechnical report in Appendix B: Technical Report for a detailed assessment of  soil erosion and slope conditions. Also refer mapping Figure 7: Technical Report).       

12    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Recommendations:  Efforts should be  made  to  restore  a  robust  native  vegetation  community  in  areas  experiencing acute  erosion.  Where  undisturbed forest  areas exist  within  the  Glen  Stewart  ravine,  these  areas should be  left  in  a  natural  state  as much  as possible  with  the  objective  of  protecting  and  promoting  the  regeneration  of  naturally  occurring ground flora.    1..7.8 8  Struc ctures – ber Retain ning g  Wa alls s     Tiimb Retaining  structures  that  were  built  to  control  the  surface  flow  of  water  and  prevent  slope  erosion  continue  to  function.  However,  an  assessment  of  these  structures  carried  out  by  a  qualified  structural  engineer  on  the  study  team,  has  determined  that  the  structures  are  approaching  the  end  of  their  serviceable  life  (refer Figure 8: Technical Report).    Recommendations:  Slope  stabilization  measures  should  be  implemented  to  replace  these  existing  retaining  structures  in  order  to  enhance  long­term  slope  stability.  Soft  biotechnical  solutions,  reliant  on  planting  should  form  the  primary  stabilization  element  where  possible.  Existing  timber  retaining  structures  should  be  phased  out as replanting strategies on slopes takes effect over time. 

  1..7.9 9  Struc ctures –      Sttairs and Boardwalks     Wooden  stairs  and  boardwalks  (refer  photos  11,  29,  31,  33:  Appendix  F:  Technical  Report)  installed in  the  early  1990’s are  becoming unstable  as a  result  of  soil  erosion  and  material  degradation.  The  areas  around  the  stairways  are  being  impacted  by  foot  traffic,  contributing to  soil  erosion  which  in­turn  results in  the  undermining of  the  integrity  of  the  existing  footings.  Two  existing footbridges  (refer  photo  17:  Appendix  F)  do  not  meet  the  requirements of  the  Ontario  Bridge  Code and are not suitable to provide access for City of Toronto maintenance and  emergency vehicles.    Recommendations:  To  improve  safety,  the  Management  Plan  recommends  that  stairways  be  replaced/upgraded  as  soon  as  possible  to  mitigate  erosion  and  address  potential  public  safety  concerns  and  that  a  more  robust  and  sustainable  design   

13    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

be  employed  using  either  concrete  or  steel  footings  and  substructure.    It  is  recommended  that  the  implementation  of  replacement  staircases be  completed  over  the  next  2  to  6  years.  Slopes  adjacent  the  stairways  will  require  barriers  to  prevent users from short cutting up/down the slopes (refer photo 12: Appendix F).  In  these  areas,  restoration  plantings  are  recommended  to  enhance  slope  stability.  The  two  bridges should be  replaced within  the  short­term  (over  the  next  5 years) with more robust structures that achieve the above noted requirements.    Further  geotechnical  investigations  should  be  carried  out  to  determine  if  more  substantial  slope  stabilization  measures  are  required  to  ensure  the  long­term  integrity  and  protection  from  risk  of  properties  up­slope.  Options  related  to  the  design of replacement structures within the ravine are provided in Appendix E.      1..7.1 10  Acces ss an     nd Use   The  ravine  is  highly  valued  by  the  community  as  a  recreational  asset,  however,  intensive  use  over  the  past  decade  has  placed  increasing  pressure  on  the  ecology  of  Glen  Stewart  Ravine.  People  have  been  accessing  the  slopes  of  the  ravine  in  an  uncontrolled  manner  resulting  in  the  creation  of  ad­hoc  trails.  The  trails  are  illustrated  on  Figure  9:  Technical  Report).  This  has  contributed  to  soil  compaction,  erosion  and undercutting of  the  surface  soil  layer  which  in­turn  can  result in the exposure of tree roots and potential destabilization of trees.      In  addition,  although  Glen  Stewart  Ravine  is designated as an  area  where  dogs  must  remain  on  a  leash,  roaming  off­leash  dogs  are  of  particular  concern  and  this  situation  occurs  frequently.  Uncontrolled  access  to  the  ravine  slopes  has  enabled  unleashed  dogs  to  trample  over  delicate  plants  on  the  forest  floor.  Repeatedly,  this  can  affect  the  ability  of  the  herbaceous  layer,  which  helps  to  retain soil through fibrous root systems and moisture, to survive.   Other  activities  are  impacting  the  character  and  health  of  the  ravine  landscape  including  dumped  garbage,  vandalism  and  invasive  species  planted  in  private  gardens adjoining the ravine.         

14    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Recommendations:  The  Management  Plan  sets  out  the  recommendations  that  these  activities  be  curbed  through  the  provision  of  education,  fencing,  interpretive  programming,  enforcement  and  signage.  The  Management  Plan  addresses  access  requirements  throughout  the  ravine,  defines  appropriate  uses  and  provides  recommendations  to  mitigate  uncontrolled  uses  within  the  ravine  through  the  closure  of  ad­hoc  trails  and  incorporation  of  deterrents  to  restrict  access  to  sensitive areas.      1..7.1 11  Interrpretattion  There  is  an  opportunity  to  enhance  the  trail  system  within  the  ravine  by  incorporating signage  and artwork  that  celebrates the  unique  environmental  and  cultural  significance  of  the  ravine  and local  area.  Themes could be  based on  the  following:  •

The  fact  that  archaeologists  have  found  artifacts  near  the  Glen  Stewart  Ravine that date back to about 4000 years ago; 



The ravine’s geologic history which dates back to the last Ice Age and is a  remnant of the Iroquois Shoreline; and/or 



The fact that in the  early 1900’s the ravine encompassed a  pond that  was  approximately  a  half  an  acre  in  size,  created by  a  dam.  The  dam  existed  until a drowning resulted in a public protest that forced its removal. 

  1..8 

Manageme ent Option ns   

Based  on  the  findings  of  the  inventory  and  analysis,  alternative  management  options  were  prepared.  The  strategies  synthesized  the  findings  of  the  inventory  and  assessment  and  incorporated  input  from  stakeholders  and  City  staff  to  define  preliminary  approaches for  the  management  of  Glen  Stewart  Ravine.  The  benefits  and  constraints  of  each  alternative  approach  were  compared  and  evaluated based on their respsective performance, practicality of implementation  and anticipated cost  implications.  This process  ensured that  the  best  alternative  was  chosen  to  satisfy  ecological  objectives  and  address  the  needs  of  the  City  and the community.   •

Each alternative management option was evaluated based on its potential  to achieve the following objectives: 



Improvement of public safety addressing:   

15    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

-

Vandalized structures and signs   

-

Existing remnant posts and infrastructure  

-

Exposed metal and reinforcement bars  

-

Dumped household waste  

-

Missing handrails and treads on stairs  

-

Instability of existing structures  

-

Trip and fall hazards 



Trees that potentially pose a risk to primary trail users 



Replacement of degraded structures 



Protection and enhancement of the natural ravine environment; 



Enhancement of safe public access within and through the ravine; 



Improvement  of  the  primary  valley  trail  focusing  on  remediating  trail  specific issues; 



Regeneration of the forest ecology; 



Remediation of steep slope sites and erosion; 



Mitigation of impacts resulting from the establishment of secondary trails; 



Mitigation of access to sensitive sites within the ravine; 



Provision  of  opportunities  to  engage  users  with  the  natural  environment  and educate users about the sensitivity of the ravine’s microenvironments,  natural drainage features and the interrelated natural cycles; and 



Management  of  the  potential  impacts  of  increased  use  on  the  natural  environment and is reliant on varying degrees of economic resources and  staff  commitment  to  implement  its  recommended  management  directives effectively and efficiently. 

  The  alternative  management  concepts  emphasized  one  of  three  basic  management  approaches  each  of  which  has  a  direct  correlation  to  funding  implications over the short and long terms:    ess 1. Approa p ach  1::  Managing   Public l   Acce s  ­  Restricts  public  access  to  areas  that  are  least  resilient  to  human  activities and  impact  as well  as those  that  are  targeted  for  intensive  restoration.  This  option  is  most  cost  effective  long­term.  2. Approa p ach  2:  Physic s cal  Improvementts  –  Promotes  physical  improvements  to  accommodate  expected  levels  of  use  within  sensitive  areas  of  the   

16    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

ravine  over  the  long­term.  Requires robust  infrastructure  and highest  one­ time up­front costs but reduced investment in long­term maintenance.  3. Appr gem p oach  3:  Active  Manag gement  –  Promotes  on­going

active 

management  activities  to  mitigate  the  anticipated  impacts  of  use  on  the  natural  environment.  Up­front  costs are  reduced but  requires  a  long term  funding commitment for maintenance and monitoring.    1..8.1 1  Manageme ent Option n ‘A’   Option  A  emphasizes  the  “physical  improvement”  approach  to  address  public   access and use  of  the  ravine  and protect  eroded slopes and sensitive  sites.  The   management option is comprised of the following components:    1. Creation  of  a  narrower  looped  nature  trail  within  the  ravine,  providing  the  opportunity  for  short  and longer  exercise  circuits through  different  parts of  the ravine.   2. A wider trail along the valley floor with granular surface.  3. The  installation  of  a  post  and wire  mesh  fence  on  both  sides  of  the  nature  trail for the entire length of the trail is proposed to limit public access to the  sensitive sandy slopes of the ravine and sensitive vegetation community.     Bene efits  1. Provides  choice  of  trail  experiences  and  enables  access  through  interesting sections of the ravine, enhancing educational opportunities;  2. Creates  a  looped  recreational  trail  through  the  ravine  that  will  afford  recreational opportunity for users;  3. Closes  segments  of  secondary  trails  which  are  impacting  the  ecology  of  the  ravine  the  most  and  facilitates  restoration  of  these  areas  with  native  plantings; and  4. Facilitates the  upgrading of  the  less impactful  segments of  secondary  trail  to  enable  users  to  observe  regenerating  forest  areas,  creating  a  further  opportunity to achieve educational and interpretive objectives.             

17    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

      Legend d 

 

Primary trail 

 

Seepage area 

   

Closed secondary  trails 

 

Retaining structures 

 

Steep slopes 

                                          Figure 1: Management Option ‘A’            

18    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Constra aintts   1. Requires significant initial investment to construct improvements to  primary and secondary trails. This work would include extensive slope  stabilization and the implementation of structures to mitigate erosion  where segments of the secondary trail cross seepage areas and  steep slopes;  2. The secondary trail crosses steep slopes requiring extensive  stabilization works.  3. The existing log crib slope structure is failing. Slope remediation is  required. Erosion at the top of the slope requires mitigation.  4. Potential future slope stabilization concern at these locations.  5. Trail crossing of drainage features requires improvement.  6. Multiple tree hazards exist within the area of the secondary trail.  7. Will result in an increase in the length of trail requiring maintenance  and the need for additional effort to manage risks related to slope  stability and tree health/stability; 

8. Primary and secondary trails will require fencing both sides for their full  length to prevent access to steep slopes and/or areas where safety  concerns related to tree health may exist. 9. Due to higher initial capital costs, potentially less funding could be  made available in the short term for the replacement of bridges and  stairways.    Antic cipated a d C  Capitall Cost      The estimated capital cost of the implementation of Option ‘A’ is $ $849, 500.     1..8.2 2  Manageme ent Option n ‘B’’   Management Option B is focused on promoting ‘active  management’ to stabilize   heavily  eroded  and  restore  sensitive  areas.  This  management  option  is 

comprised of the following components:     1. Closure of all secondary trails that traverse slopes within the ravine.   2. The  primary  trail  would  be  ‘flood  proofed’  and  specially  designed  to  deal  with  cross­surface  flow,  seepage  areas,  and the  steeper  grades  that occur along sections and the trail.     

19    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

3. Stabilization  and  restoration  of  the  most  heavily  eroded  sites  utilizing  bioremediation techniques.   4. Securing of  the  slopes utilizing post  and  wire  fencing along  segments  of the trail to prevent access to the most sensitive areas of the ravine.   5. To  further  address  safety  concerns  and  environmental  impacts,  access  from  Glen  Manor  Dr  down  the  west  valley  slope  would  be  restricted  using  discreet  fencing  set  back  from  the  boulevard  and  installed slightly below the elevation of the top of bank.     Bene efits  1. Provides  an  effective  and  efficient  means  to  manage  risk  to  trail  users  arising  from  impacted/structurally  weakened  trees  and  potential  slope  failure through the closure of all secondary trails;  3. Enhances  biodiversity  within  the  ravine  through  the  replanting  of  closed  trail alignments with native trees and herbaceous plants;  4. Achieves  reduction  in  long­term  management  effort  associated  with  impacts generated by user creation of/access to secondary trails; 

5. Results in  a  reduction  in  the  amount  of  trails requiring maintenance  and a  reduced  requirement  for  slope  stabilization  work  that  makes  overall  implementation more viable for the City; and  6. Provides  a  more  practical  means  to  stage  the  implementation  of  restoration  efforts.  Since  larger  areas  of  the  ravine  will  be  closed  to  the  public,  it  would  be  easier  to  address  a  multitude  of  issues  in  any  one  given  area  such  as  invasive  species  management,  soil  compaction,  tree  root exposure etc.                       

20    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

     

Legend   

 

Primary trail   

 

Seepage area   

Existing secondary  trails to be closed  Retaining structures 

   

 

 

Steep slopes 

 

Erosion areas

 

                                              Figure  2: Management Option ‘B’         

21    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Constra aintts  1. Limits the availability of funds to carry out restoration works until structures  are replaced and slopes are stabilized;  2. Limits  trail  choices  and  recreational  opportunities  as  well  as  limiting  user  experience and interpretative potential; and  3. The  reduced  extent  of  fencing  may  not  fully  discourage  public  access  to  sensitive slopes and additional fencing may be required in the long run.    Antic cipated  Capitall Cost       a d C The estimated capital cost of the implementation of Option ‘B’ is $1,099,500.     1.8.3  Preferred O Opti ption  Developed  from  the  alternative  approaches,  a  Preferred  Option  was  generated  and  endorsed  by  the  community  and  City  staff.  The  Preferred  Option  is  most  consistent  with  Management  Option  ‘B’  and  provided  the  direction  upon  which  the  Glen  Stewart  Management  Plan  was based.  Refinements were  made  to  the  Preferred  Option  in  order  to  address  community,  agency  and  City  staff  comments  and  a  catalogue  of  recommendations  was  generated  to  address  structural 

improvements 

and 

management 

initiatives. 

The 

structural 

improvements  and management  initiatives met  the  objectives established  in  the  early  stages  of  the  study  process  and  address  the  specific  issues  identified  through  the  completion  of  the  background  review,  site  assessment  and  public  consultation processes (refer section 1.7 of the Executive Summary).    1 .9

Glen Stewart Ravine Manage ement Plan 

The  recommended  Management  Plan  is  comprised  of  two  integrated  components  –  a  Trail  Management  Plan  and  an  Ecological  Management  Plan.  Both plans are fully integrated and offer the following benefits:     •

Mitigation of risks to public safety; 



Minimization of requirement for further capital improvements; 



Minimization of long­term maintenance requirements; 



Encouragement of passive recreational use of trails; 



Provision of a linkage between residential neighbourhoods across the ravine;  



Mitigation of further impacts to trees and sensitive understorey plants; and   

22    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   



Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Maximization of the potential to restore degraded vegetation/ eroded slopes.  

  Each  component  of  the  Management  Plan  is guided by  the  objectives  set  out  in  Section  1.4  of  the  Executive  Summary  and  identifies  a  set  of  actions  (prescriptions) to be implemented to achieve those objectives.     1..9.1 1  Trrail Mana agementt Pllan     The  Management  Plan  recommends  the  following  actions  be  implemented  to  assist  in  achieving  the  safety  and  access  objectives  identified  for  Glen  Stewart  Ravine:  1. Close secondary trails and implement closure barriers;  2. Monitor  and  manage  tree  hazards  to  reduce  risks  to  trail  users  and  adjacent properties;  3. Deter  further  creation  of  additional  secondary  trails through  the  installation  of new plantings;  4. Mitigate  impacts  by  foot  traffic  to  sensitive  slopes,  vegetation  and  drainage  features  through  the  installation  of  barriers,  brush  bundles  and  plantings;  5. Mitigate  compacted  soil  surfaces  and  restore  these  areas  with  native  vegetation;  6. Improve  the  primary  valley  trail  focusing  on  remediating  trail  specific  issues;  7. Provide  interesting  and  educational  trail  amenities  such  as  signage  and  artwork along trails;  8. Focus  on  improving  existing  surfaced  trail  locations  where  appropriate  rather than disturb other areas of the valley;   9. Maintain and enhance primary public access points into the ravine; and  10. Monitor and maintain the condition of trails, fencing and structures.                 

23    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

1..9.2 2  Ecollogica al Managementt Pllan     The  Management  Plan  recommends the  implementation  of  the  following actions  to assist in achieving the ecological objectives identified for Glen Stewart Ravine:    1. Provide  optimum  conditions  for  regeneration  of  native  tree  species  through  the  removal  of  non­native  species,  canopy  clearing  or  remediation; 2. Implement  solutions to  deal  with  erosion  and compaction  of  soils around  tree roots where it has the potential to threaten tree health; 3. Promote structural diversity in the canopy, sub­canopy and ground layers.  Restore  ecological  sustainability  through  natural  regeneration  and  enhanced biological diversity; 4. Promote species diversity; 5. Improve diversity of vegetation for wildlife use; 6. Provide increased diversity of microhabitats; 7. Provide increased security for wildlife; 8. Promote germination of native plants on seepage slopes; 9. Restore and enhance vegetation assemblage on floodplain; 10. Improve buffering function of vegetation adjacent to Glen Stewart Ravine; 11. Promote  structural  diversity  in  canopy,  sub­canopy  and  ground  layer  on  steepest slopes; 12. Improve vegetation cover on steepest slopes to help reduce erosion; 13. Reduce populations of invasive species;  14. Allow   for  natural  fluvial  processes  of  the  stream  course  and  ground  seepage to occur; and  15. Monitor   the  status  of  the  vegetation  communities,  restoration  plantings  and habitats.                   

24    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

      1..10   Manageme ent Prescriptions      s Specific  management  prescriptions  are  listed  in  Tables  1­5.    They  achieve  the  various short­term  and  long­term  management  objectives identified through  the  study  process  (refer  section  1.4).  The  prescriptions  have  been  organized  into  trail­based  improvements  and  ecological­based  initiatives  to  meet  the  following  three objectives:    1. The  prescriptions  direct  improvements  to  the  trail  network  within  Glen  Stewart Ravine. These improvements are aimed at enhancing appropriate  public  access through  the  ravine  while  ensuring that  important  ecological  features  and  functions  and  sensitive  sites  within  the  ravine  are  appropriately protected.  2. The  ecological  management  prescriptions  are  also  aimed  at  protecting  and  restoring  existing  ecological  features  and  functions  that  have  been  impacted/ degraded over time from use to enhance the ravine ecosystem  through management over the long term to ensure its sustainability.  3. The prescriptions are aimed at enhancing public safety.    The  prescriptions  are  identified  in  Tables  1­5:  Section  1.12  which  outline  the  timing  associated  with  the  implementation  of  each  trail­based  and  ecological­ based  management  prescription.  Detailed  design  guidelines  for  various  prescriptions are provided in Appendix E.     1..11

Implementattion Priioritie es 

Setting implementation  priorities for  the  various prescriptions will  assist  the  City  in  the  process  of  making  choices  based  on  the  anticipated  benefits  and  cost  considerations  associated  with  the  implementation  and  maintenance  of  each  recommended  management  prescription.  Short,  medium  and  long­term  implementation  priorities  have  been  defined  in  relation  to  cost  implications  and  user  needs  and  the  actual  staging  of  their  implementation  is  incumbent  on  funding  and  the  potential  to  mobilize  volunteer  assistance.  Tables  1­5  below  describe  the  various  management  prescriptions  in  relation  to  their  priority  for   

27    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

Glen Stewart Ravine  Management Plan 

   

OCTOBER 2008 

implementation  and  provide  information  regarding  the  sequencing,  timing  and  cost of implementation.     It  should be  noted that  the  process of  implementing  prescriptions requires some  flexibility.  For  example,  there  are  a  multitude  of  high  priority  prescriptions  that  need to  be  addressed  all  at  once  in  either  the  immediate  or  short  term.  As well  the  process  needs  to  consider  the  practical  implications  of  construction  with  respect  to  site  access  limitations,  the  fact  that  there  is  only  one  at­grade  level  entry  in  the  southern  end  of  the  ravine,  and  the  need  to  transport  materials  equipment  within  the  ravine.  Works are  therefore,  required to  be  implemented in  the most remote areas of the ravine before those that are proposed in  the vicinity  of  the  access  point  to  ensure  that  completed  works  are  not  impacted  by  the  movement 

of 

equipment 

later 

in 

the 

implementation 

process. 

The 

implementation of the various priority prescriptions, once funding is confirmed for  each implementation cycle, should be made with regard for this consideration.    Implementation  priorities  have  been  set  out  to  address  short  term  risk  management  as  well  as  some  predominant  objectives  that  are  important  to  achieve  within  both  the  short  and  longer  terms  to  benefit  the  overall  ecological  sustainability  of  Glen  Stewart  Ravine.    These  initiatives  include  the  stabilization  and restoration  of  slopes and the  on­going monitoring and management  of  tree  health.     1..11.1  Manageme ent Prescription s    Prioriity Tables s The  following  sections  describe  the  actions  (prescriptions)  recommended  to  be  implemented to  address concerns within  the  ravine.  The  concerns are  identified  in section 1.7 of the Executive Summary.  The prescriptions have been organized  into  groups  according to  when  they  are  to  be  implemented  ­  immediately,  in  the  short­term,  medium­term or long­term. To help locate the action items  within the  ravine,  they  are  illustrated on  maps (Figures 5­9).  The  prrescrip ptions  on  the  maps s 

rela ate  the  acttions s  to  16  objec ctive es  which  the  actio ons s  are  sett  out  to  achieve  (managem ment obj e liistted in sectio on 1.4).  Prescriptions on the maps are  b ectives are referenced with a code, where in the example TMP­A­5::  TMP  = Trail Management Plan  A 

= Objective A   

28    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

Glen Stewart Ravine  Management Plan 

   



OCTOBER 2008 

= Prescription 5 

  Detailed design  recommendations are  provided in  Appendix  E:  Technical  Report  and guide the implementation of prescriptions.    1..11.2  Immediate Prioriities s ­ ears   ­ 0­2 ye There  are  a  number  of  actions  that  can  be  immediately  implemented  without  substantial  investment,  both  in  terms  of  financial  resources  and  staff  effort  to  improve  public  safety  and  enhance  the  ecological  health  of  the  ravine.    The  immediate priorities are identified in Figure 5.        

 

  

                                           

29    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

1..11.3  Short Te erm Prioriities s ­ nagem men nt and Public c Safety – 2­­6 Years s   ­ Risk Man   A  primary  objective  of  the  Management  Plan  is  to  reduce  risk  of  injury  to  trail  users.  Initiatives  that  address  risk  reduction  and  public  safety  should  be  addressed  in  the  short­term  as  determined  by  financial  implications.   Consequently,  initiatives that  address immediate  or  potential  future  risks to  public  safety have been assigned the highest priority. High priority initiatives include:   

• Management of trees that pose a risk to trail users;   •

Closure  of  poorly  defined  or  informal  trail  alignments  which  traverse  potentially dangerous site conditions ie. steep slopes; 



Addressing situations or  structures that  present  potentially  unsafe  conditions;  and 



Repair of the trail where there is potential of slipping or tripping. 

  The  short­term  priorities  recommended  to  be  implemented  to  mitigate  risk  and  enhance public safety are identified in Figure 6.   

                               

31    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

    1.11.4    Short Term Priorities –  – Slope Stabilization – 2­6 Years  Initiatives  which  address  slope  instability  and  which  are  aimed  at  mitigating  potential  future  slope  failure  have  been  assigned a  high  priority.  Implementation  actions to address the priority include:   •

Undertaking  geotechnical  investigations  with  the  objective  of  determining  potential risks and recommending long term solutions. 



Reinforcement  of  the  steepest  slopes  within  the  ravine  nearest  residential  properties, primary trails and slopes that show signs of slumping; 



Mitigation  of  further  impacts of  surfacial  soil  erosion  on  slope  stability  through  the implementation of improvements; and 



Prevention  of  erosion  of  trail  surfaces  by  limiting  access  to  sensitive  slopes  and groundwater discharge areas.  

  This 

management 

priority 

requires 

both 

short 

term 

and 

long­term 

implementation  efforts.  The  capital  budget  to  address  all  the  stabilization  and  slope  restoration  works  required  within  the  ravine  will  likely  not  be  accommodated within  one  funding cycle.  Therefore,  the  stabilization  of  the  most  heavily  eroded slopes adjacent  to  properties or  trails within  the  ravine  should be  addressed  first.  The  implementation  of  associated  drainage  works  should  also  be addressed at this stage. A number of design recommendations are proposed  to  address stabilization  and can  be  found in  the  detailed design  guidelines of  the  Technical Appendices (Appendix E: Technical Report).    The  short­term  priorities  recommended  to  be  implemented  to  enhance  slope  stabilization are identified in Figure 7.                   

33    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

    1.11.5  Mediu  – 5­10 years  dii um Term Priorities – Impro p provements tto Existi sting Trails – Medium  term  priorities  include  improvements  to  the  existing  primary  trail  to  provide  enhanced  recreational  opportunities,  improved  serviceability  and  all­ season  accessibility  ensuring the  long­term  enjoyment  and usability  of  the  ravine  by  the  community.    Future  environmental  impacts  will  be  mitigated  through  the  implementation  of  a  sensitively  designed,  functional  trail  that  accommodates  demands  for  recreational  use  within  Glen  Steward  Ravine.  In  addition,  improvements  to  the  primary  trail  system  will  help compensate  for  the  closure  of  numerous trails on the east side of the ravine.    To  encourage  use  of  the  primary  trails,  several  improvements  will  be  required.  These should include:  •

Replacement  of  two  footbridges  and  the  construction  of  one  additional  footbridge  designed  to  accommodate  City  maintenance  and  emergency  services and should be  constructed in  accordance  with  current  standards  and codes.  



A  trail  design  that  addresses trail  widening and the  sensitivity  of  drainage  features/  seepages  by  providing  a  well  demarcated  path,  all­weather  surfacing and a proper base course and additional drainage layer.  



A  drainage  swale  or  drainage  pipes  and  culverts  should  be  utilized  to  convey water beneath/ across trails without undermining.  



Improved  linkage  between  neighbourhoods  across  the  ravine  as  requested  by  the  community,  by  way  of  a  formalized  access  from  the  west off Glen Manor Rd (south west corner of ravine) across the creek and  linking to the primary trail.   

  In  addition,  the  four  main  access  points  that  access  the  primary  trail,  should  be  upgraded  with  garbage  bins,  benches,  improved  signage  and  hard  surface  paths  that  connect  stairways  to  sidewalks.    Benches  and  interpretive  signs  should be  installed at  strategic  locations along the  primary  trail  to  educate  users  as  to  the  geologic,  hydrological  and  ecological  significance  of  the  ravine  in  the  context of a larger natural heritage system in Toronto.      

35    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

1..11.6    Lon ng Term m Priorritties  onm men ntal Sustai 0­ 20 ye earrs     ­ Enviiro s inability – 10 Protection  of  the  long­term  ecological  integrity  of  the  ravine  is a  key  objective  in  addition  to  the  protection  and  restoration  of  ravine  slopes  and  floodplain  seepage.  The  implementation  of  specific  vegetation  and  habitat  enhancement  initiatives is required to ensure the long­term ecological sustainability of the ravine  landscape.  Specific implementation actions include:  •

Mitigation  of  existing  impacts  to  discharge  zones  and  degraded  natural  drainage features; 



Mitigation of compaction and erosion and forging of multiple trails on slopes; 



Mitigation of understorey loss & decline in significant vegetation communities; 



Prevention  of  further  impacts  to  trees  and  consequent  decline  in  tree  health  and resultant tree loss;  



Removal of invasive species from canopy and subcanopy vegetation layers;  



Restoration of native vegetation communities 

  Invasive species management and restoration planting works should  commence  on  slopes  exhibit  degraded  conditions  such  as  presence  of  invasive  species.  These  areas  may  include  sites  which  were  impacted  by  secondary  trail  use.  These  activities  should  also  occur  in  floodplain  areas  which  may  include  creek  banks  and  groundwater  discharge  areas.  The  following  procedure  should  be  considered when implementing this priority:  •

Inspect  trail  closure  barriers and  fencing and  supplement  with  more  barriers/  fencing as required to ensure the prevention of access to restoration sites.  



Compacted  soils  should  first  be  loosened  using  manual  techniques  to  mitigate further compaction impact on the roots.  



A  native  seed  mix  should  then  be  applied  to  areas  with  slopes  of  less  than  5%. A combination of native stoloniferous shrubs, live stakes and herbaceous  plugs should be planted on slopes exceeding a 5% gradient.  



Restoration  plantings  on  dry,  steep  slopes  should  include  a  temporary  irrigation  system  or  regular  watering  in  the  first  two  growing seasons of  plant  establishment (refer section 13.3.1 of the Technical Report).  



A  layer  of  decomposed  wood  mulch  or  locally  collected leaf  litter  should be  applied in an effort to retain soil moisture and reduce weed competition. 

The long­term priorities recommended to be implemented to enhance ecological  sustainability within the ravine are identified in Figure 9.   

37    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

1..12

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Mainte enance and Moni itoring   

An  essential  component  of  the  Glen  Stewart  Ravine  Management  Plan  is  the  commitment  to  ongoing,  long  term  maintenance  and  monitoring  to  ensure  that  management  objectives  are  achieved  over  the  long  term.  The  following  recommendations  should  become  part  of  the  ongoing  maintenance  and  monitoring program for the ravine.    1..12.1 Lo ong­Ter rm Mainte enan nce Initiative es  g The  following  list  can  be  used  to  secure  further  funding  for  maintenance  and  operations procedures that will be required to improve safety and access, ensure  slope stability, improve  ecological integrity in the ravine and enhance access and  passive  recreational  use.  The  maintenance  program  outlined  here  corresponds  to the implementation priorities in Section 1.13 

   Safety an nd Lia   abilitty      1. Maintain  handrails,  decking,  posts  and  connections.  Promptly  secure  and/or  replace degraded elements.   2. Maintain guard rails and ensure in good repair.  3. Maintain the condition of boardwalks for same elements as above.  4. Maintain the condition of footbridges for same elements as above.  5. Monitor  the  condition  or  existing  retaining  structures  until  all  are  removed  or  replaced with improved structures.   6. Maintain  trail  surfaces and eliminate  trip hazards.  Resolve  sightline  issues  by  pruning back encroaching vegetation.   7. Remove garbage regularly and promptly repair vandalized structures.  8. Provide  routine  inspection  of  trees  overhanging  trails  once  annually.  Inspect  for  root  exposure,  frost  cracks  or  any  other  structural  damage,  disease,  rot  and dieback.     Slo ope Stabiliiza ation  1. Inspect  bioengineered  slopes  twice  yearly  for  the  first  2  years  then  yearly  thereafter.  Inspect  for  differential  settlement,  slumping,  integrity  of  rock  revetments and toe armouring.  

 

39    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

2. Routinely  inspect  restoration  plantings on  slopes for  the  presence  of  invasive  species,  damage  by  browsing  animals,  pets  or  human  impact.  This  activity  should be carried out bi­weekly until plant establishment (first 6 months).   3. Inspect  restoration  plantings  for  water  requirements  and  mulch.  Water  regularly  as  required  during  plant  establishment  period  (usually  first  two  growing seasons). Top up mulch as required.   4. Inspect  integrity  of  fencing  that  prohibit  access  to  steep  and  sensitive  sites  and associated signage and replace if damaged.   5. Where  drainage  pipes and culverts have  been  installed,  regular  maintenance  and inspection  of  the  pipes is required.    Blocked conduits should be  cleared  of debris in such a way as to avoid the flushing of sediments into the creek.     Trrail Improv ments   p vem 1. Inspect  trail  surface  annually  in  spring  for  ruts  that  may  pose  a  trip  hazard.  Patch and grade trails accordingly.   2. Avoid use  of  salt  as a  deicing agent  on  trails during the  winter  months  as this  can  be  harmful  to  the  ravine  ecology.  To  promote  all­season  access on  trails  a sand­based agent should be used.   3. Install  and  secure  recycling  containers  at  entry  points  to  the  trail  system  to  encourage waste reduction.   4.   Locate and secure trash receptacles at trail access points.  5.   Maintain signage to ensure legibility.  6. Update community message board to ensure information is current.   7. Ensure  trails  and  amenities  are  kept  clean,  litter  is  removed  on  an  ongoing  basis, and trash receptacles frequently emptied to avoid spill over.   8. Remove graffiti and tags promptly.    Ecollogica al Sustain nability/ Restorat tion       1. Inspect  fences  seasonally  to  ensure  wire  mesh  remains  properly  affixed  to  posts. Repair/replace posts and mesh that have been degraded.  2. Temporary  fencing  used  to  secure  restoration  sites  should  be  left  intact  and  maintained  until  plantings  have  become  established  and  non­native  species  are eradicated from the recovering understorey. 

 

40    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

3. Inspect  trail  closure  barriers  seasonally  to  ensure  that  they  remain  intact.  If  deterrents are not working, install additional barriers or reinforcements.  4. Store  mulch  and  other  bulk  supplies  away  from  stream  course.  If  a  staging  area  is  required  for  material  handling,  the  adjacent  roads  or  open  grassed  ravine area south of Glen Manor Drive should be used.   5. Install  sediment  control  barriers  between  stockpiles  of  materials  and  the  stream course or other drainage features.  6. Avoid the  use  of  pesticides and herbicides in  the  maintenance  of  restoration  plantings where possible.   7. Harvest leaf litter from open space areas to augment soils and mulch planting  areas.  If  supplemented,  do  not  use  leaf  compost  sourced  from  outside  the  ravine  unless  it  is  tested  and  confirmed  to  be  free  of  contaminants  and  has  been completely processed.    8. Erect  temporary  or  permanent  barrier  fencing to  limit  use  of  areas which  are  exhibiting  degradation  from  over  use.  Promptly  repair  fencing  and  trail  barriers to protect regeneration areas from trampling.  9. Actively enforce code of conduct with respect to:  i.

Encroachment on restoration plantings 

ii. Requirements for permits for school activities and recreational events  iii. Littering/ dumping  iv. Vandalism  v. Excrement deposits   vi. Dogs on­leash by­law  10. Temporarily   cordon  off  areas  to  be  revegetated  with  snow  fencing  and  maintain the fencing until plant establishment.  11.Remove   undesirable  species  from  restoration  planting  areas  to  mitigate  colonization and reduce competition.  

  1..12.2 Monitorrin ng In es    nitiative Monitoring  activities  should  be  initiated  at  the  same  time  as  management  prescriptions  are  being  implemented.    The  Management  Plan  sets  out  recommendations to monitor the following:  •

The stability of slopes and erosion prone areas; 



The integrity and stability of structures;   

41    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 



Access and trail use/ further ad hoc trail creation; 



The condition of amenities; 



The effectiveness of trail closure barriers and signage provided; 



The successful establishment of restoration plantings; 



The recovery of restored drainage features and stabilized creek­banks;  and 



The  health  of  vegetation  communities in  general  and  specifically,  existing  mature trees.  

  The  following  recommendations  are  provided  to  guide  the  implementation  of  a  monitoring program for Glen Stewart Ravine.    1. Monitoring  sites  should  be  identified  at  strategic  locations  which  should  include  known  problem  areas such  as seepage  sites or  eroded areas.  These  sites should be visible, and if possible, easily accessible in order to extend the  program  to  school/user  groups.  Monitoring  sites  should  coincide  with  educational signage to  help illustrate the  natural processes and interventionist  principles applied to restore the site.  2. Monitoring sites should  be  located on  a  map  visible  at  each  access  point  to  the ravine.   3. The  monitoring program  requires a  commitment  of  funding and participation  over several years to ensure the sustainability of the program in the long­term   4. Findings  of  the  monitoring  program  should  be  reviewed  and  trends  in  the  evolution  of  the  ecosystem  noted.  This  information  should  then  be  used  to  direct the implementation of management initiatives over time.  5.   The  following  areas  should  be  monitored  on  an  annual  basis  to  note  any  changes  in  conditions.  A  report  should  be  made  on  these  changes  to  help  track  the  progress  of  recovering  sites  and  overall  health  of  the  forest  and  seepage/wetland  ecosystems.  Tracking  these  changes  will  help  ensure  the  strategies employed are  succeeding,  and that  objectives are  being achieved  in the short­term and long­term     1..12.3 Trracking a rtin ng       and Repor   A  sample  checklist  is  provided  in  the  Management  Plan  Technical  Report  (section 11.3.2.7) to guide the implementation of actions (prescriptions) and allow   

42    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

Glen Stewart Ravine  Management Plan 

   

OCTOBER 2008 

for  the  tracking  of  the  progress  made  toward  implementing  the  recommended  prescriptions.  Short,  medium  and  long  term  management  prescriptions  should  be  incorporated  into  this  chart  and  identified  by  reference  numbers  that  correspond to those listed in Tables 1­5.     1..13

Role es and Respon     p nsibilitties 

The implementation of the Management Plan will require the coordinated effort of  a  number  of  partners  as  well  as  commitment  to  long  term  participation.  The  Management Plan identifies the roles and responsibilities of the following:    •

Toronto and Region Conservation Authority 



City of Toronto Parks, Forestry and Recreation   -

Parks  

-

Urban Forestry  

-

Ravine and Natural Feature Protection  

-

Natural Resources  

-

Natural Environment and Community Programs  



Community Involvement 



Dog Walking Groups 



Wildlife Groups 

  1..13.1  Citty off Toronto  The  following  provides  a  summary  of  the  specific  responsibilities  of  the  City  in  implementing the Management Plan.    •

Providing adequate  funding to  facilitate  the  implementation  of  recommended  trail  and  ecological  management  plan  prescriptions,  management  recommendations, and monitoring programs, 



Coordinating  and  overseeing  the  implementation  of  capital  improvements  and management and monitoring initiatives, 



Ensuring initiatives are implemented with in conformity with the Ravine By­law  and exerting influence over the By­law to ensure initiatives are met, 



Integrating  with  park  management  on  City  lands  in  the  south  part  of  the  ravine, 

 

43    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   



Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

Regulating activities within  the  ravine,  including  organized community/ school  events  and  activities  which  require  a  permit  to  ensure  that  the  levels  and  frequency of use does not impede restoration efforts; 



Enforcing  municipal  by­laws  including  off­leash  regulations,  encroachment  by­laws, and legislation related to the regulation of activities within the par; 



Overseeing  the  coordination  of  trail  construction  and  improvements,  in  concert with the management initiatives and priorities, 



Ensuring  that  maintenance  practices  are  undertaken  in  accordance  with  the  recommendations of the Management Plan, 



Coordinating  the  design  and  installation  of  signage  recommendations  and  park amenities, ensuring City design standards are met, and 

• Identifying  and  capitalizing  on  opportunities  to  draw  funding  from  the  private  sector and local businesses through funding raising and partnerships.      Citty Forestry De epartme ent      a Forestry staff will be responsible for:   •

Monitoring tree health; 



Identifying and managing tree related issues; and  



Assisting  in  the  implementation,  maintenance  and  monitoring  of  restoration  plantings.   

  Na aturall Environmen nt and Communi ity Program g ms Depart     p tment  This  department  within  the  City  is  well  positioned  to  address  the  following  activities:  •

Coordinating  planting  and  clean  up  events  with  groups  from  neighbouring  schools such as Glen Ames School; 



Ensuring  that  activities  initiated  by  community  groups  within  the  ravine  are  appreciated and consistent with the objectives of the Management Plan; 



Coordinating and focusing the activities of community interest groups; and 

• Enhancing  awareness  of  the  community  of  the  sensitivity  of  Glen  Stewart  Ravine in an effort to encourage stewardship of the natural environment.    1..13.2  TR RCA   •

Monitoring the aquatic stability and water quality of Ames Creek   

44    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 



Regulation/permits and approvals 



Technical review 



Potential to assist City staff in constructing some trail, habitat and interpretive  initiatives within the ravine 

  1.13.3  Community/  Vo Volunteer Involvement  The  potential  volunteerism  and energy  from  school  students,  interest  groups and  the  wider  community  can  be  capitalized  upon  to  assist  in  implementing  the  recommendations  of  the  Plan.  However,  it  is  important  that  the  activities  of  volunteer  groups  be  conducted  under  the  direction  of  the  City  and/or  TRCA  to  ensure  that  activities  are  complementary  and  that  efforts  are  not  duplicated.  As  well,  it  is  also  essential  that  activities  undertaken  by  volunteer  organizations  are  consistent  with  the  goals,  objectives,  recommendations  and  priorities  set  out  in  the Management Plan.     Initiatives appropriate for implementation by volunteer forces, could include:   •

The  implementation  of  restoration  plantings,  particularly  shrub and wildflower  plantings in dry areas where gradients are not steep; 



The  implementation  of  initiatives  aimed  at  enhancing  habitat  including  the  construction  and  installation  of  birdhouses,  denning  structures,  bat  boxes,  brush piles etc; 



Assisting  in  ensuring  trail  barriers are  maintained  intact  and that  closed trails  are respected; 



Maintenance  in  terms  of  the  collection  of  litter  throughout  the  park  and  reporting on damaged amenities and vandalism; and 



Maintenance of restoration plantings including weeding and watering. 

  Dog Walki ing Gr     roups 

     Dog  walkers  should  assist  in  regulating  leashed  dog  walking  in  the  ravine,   encouraging others who do not abide by the by­law to do so.     Willdlife s     l  Groups Groups that have a common interest in nature such as bird watching  groups can   be  a  valuable  resource  and should be  encouraged to  become  involved with  the    

45    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

monitoring of  wildlife  in  the  ravine  and education  of  other  ravine  users related to  the value of the ravine environment.    1..14

Fundin nitie e s  d ng Op   pporrtun

The  implementation  of  the  Management  Plan  will  require  additional  funding over  the  long­term  and the  commitment  of  private  donors and  community  groups to  help  realize  these  funds.  There  is  the  potential  that  the  costs  of  implementing  initiatives could be partially offset by:  •

Corporate contributions; 



Forming partnerships with private sector groups; 



Approaching  foundations  that  provide  funds  for  environmental  projects  including TD  Canada Trust’s – Friends of the  Environment Foundation and  the Shell Canada Foundation. Environment Canada; and  



The  Ministry  of  Natural  Resources  Community  Wildlife  Improvement  Program 

  Particular avenues of fundraising may include:  •

Local  landscape  suppliers  or  nurseries  for  voluntary  donations  of  construction materials and/or plant stock in  exchange for the promotion of  their name and image in association with the Glen Stewart Ravine project; 



Private  sector  companies  looking  to  improve  their  image  by  associating  themselves  with  environmental  values  and/or  education  in  exchange  for  free ad campaigns on signage or amenities; 



Seeking  other  generous  benefactors  to  strengthen  ownership  and  stewardship within the corporate community; 



Fundraising  for  trails  achieved  through  donor  recognition  programs.  This  model  could  be  successfully  adopted  to  fund  components  of  the  Glen  Stewart  Ravine  trail  system,  the  installation  of  benches  and  furnishings  and the construction of new park amenities; 



City  of  Toronto  Tree  Advocacy  Program  could  be  relied  upon  to  assist  in  implementing the planting strategies set out in the Management Plan; and 



The  City  could  also  investigate  the  potential  to  organize  a  Trees  Across  Toronto city­wide planting event to be held at Glen Stewart Ravine. 

 

 

46    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre

   

Glen Stewart Ravine  Management Plan 

OCTOBER 2008 

The  implementation  of  the  Glen  Stewart  Management  Plan  is  likely  to  take  a  number  of  years requiring that  funding and partnership programs will  need to  be  conceived  with  a  commitment  to  achieving  sustained  funding  levels  over  the  long­term.    1..15

Conclu usion i  

The  Glen  Stewart  Management  Plan  is  a  comprehensive  document  which  is  comprised  of  an  Executive  Summary,  Technical  Report  and  Appendices.  Together the Management Plan documents will be used by the City of Toronto as  a  guide  in  allocating  funds  and  implementing  priority  prescriptions  each  implementation 

cycle. 

The 

Management 

Plan 

provides 

management 

prescriptions in  response  to  issues that  were  identified through  the  inventory  and  assessment  phase  of  the  process  and  relies  on  the  development  of  a  maintenance  and  monitoring  program  to  ensure  the  successful  implementation  of  prescriptions  and  the  ecological  sustainability  of  the  natural  heritage  system.  The Management Plan has been designed to provide guidance to the City for the  next  20  years  to  manage  the  natural  heritage  resources  of  and  use  within  the  ravine  in  a  responsible  and  adaptive  manner.  In  this  way  the  recommendations  will  remain  relevant  over  time  as  the  ravine  landscape  evolves  and  the  maintenance needs evolve.       

 

47    Schollen & Company Inc. ~ North South Environmental ~  LURA Consulting     Urban Forest Innovations. ~ Brown and Co. Engineers ~  Geoterre