invitation to tender appel d'offres amendment ... - Buyandsell.gc.ca

1 downloads 165 Views 337KB Size Report
Mar 22, 2016 - Name of person authorized to sign on behalf of the Vendor/Firm ... Items of concern are the slope repair
RETURN BIDS TO: RETOURNER LES SOUMISSIONS Á:

Title-Sujet

Highway 6 Road Rehabilitation Waterton Lakes National Park

Parks Canada Agency 1300 - 635 8 Ave SW Calgary, AB T2P3M3 Bid Fax: (403) 292-4475

Solicitation No. - No. de l’invitation

Date:

5P420-16-5009/A

March 22, 2016

GETS Reference No. – No de reference de SEAG

Amendment No. - N° de la modif.

INVITATION TO TENDER

Solicitation Closes:

APPEL D’OFFRES

at – á 02:00 PM

AMENDMENT / MODIFICATION

F.O.B. - F.A.B.

002

PW-16-00725701

on – le March 30, 2016

Plant-Usine: 

002

Time Zone - Fuseau horaire MDT - HAR

Destination: 

Other-Autre: 

Address Inquiries to: - Adresser toute demande de renseignements à :

Tender To: Parks Canada Agency We hereby offer to sell to Her Majesty the Queen in right of Canada, in accordance with the terms and conditions set out herein, referred to herein or attached hereto, the goods, services, and construction listed herein and on any attached sheets at the price(s) set out therefor.

Nathaniel Harrison - [email protected]

Soumission aux: l’Agence Parcs Canada Nous offrons par la présente de vendre à Sa Majesté la Reine du Chef du Canada, aux conditions énoncées ou incluses par référence dans la présente at aux annexes ci-jointes, les biens, services et construction énumérés ici et sur toute feuille ci-annexée, au(x) prix indiqué(s).

See Herein – Voir ici

Telephone No. - No de téléphone

(403) 292-4572

Fax No. – No de FAX:

(403) 292-4475

Destination of Goods, Services, and Construction: Destinations des biens, services et construction:

TO BE COMPLETED BY THE BIDDER (type or print)

Vendor/Firm Name

Comments - Commentaries Address - Adresse

Name of person authorized to sign on behalf of the Vendor/Firm Nom de la personne autorisée a signer au nom du fournisseur/ de l’entrepreneur

Issuing Office - Bureau de distribution

Parks Canada Agency Suite 1300 635 – 8 Ave SW Calgary, AB T2P3M3

Titale - Titre Telephone No. - N° de telephone: Facsimile No. - N° de télécopieur:

Signature

Date

Solicitation No. - N° de l'invitation 5P420-16-5009/A

Amd. No. - N° de la modif. 002

Buyer - l'acheteur Nathaniel Harrison

Client Ref. No. - N° de réf. du client 201545

File Name - Nom du dossier Highway 6 Road Rehabilitation – Waterton Lakes National Park

Amendment 2 This amendment is issued to answer questions and make changes to the specifications. 1.

Questions & Answers Q5. A5. Q6.

A6. Q7. A7.

2.

The drawings do not show the top of road width. This would help in determining the location of embankment Refer to Amendment 1, Tender Questions and Responses - A2. We would like to look at the site to enable us to make an accurate assessment of the scope of work. Items of concern are the slope repair areas, the total reconstruction areas and the pulverizing areas. We would be considerably more comfortable giving aggressive pricing after we saw what we were getting into. Refer to Amendment 001, Tender Questions and Responses - A1. Contractor can only pulverize the amount of roadway that can be bottom lift paved the same day. No pulverized area can be unpaved at end of day. Refer to changes below.

Tender Document Changes In: Delete: Replace with:

BID AND ACCEPTANCE FORM (BA) BA06 CONSTRUCTION TIME

BA06 CONSTRUCTION TIME The Contractor shall perform and complete all Work by July 15, 2016.

3.

Specifications

The specifications have been amended as follows. Section 01 11 00 – Summary of Work Remove: Article 1.9.3.1 - Commence paving no sooner than July 6, 2016. Replace with: Article 1.9.3.1 - Commence paving no sooner than May 02, 2016. Remove: Article 1.9.3.2 - Complete all Work by October 14, 2016. (Contract Completion Date). Replace with: Article 1.9.3.2 - Complete all Work by July 15, 2016. (Contract Completion Date).

Section 01 32 16.07 – CONSTRUCTION PROGRESS SCHEDULES BAR (GANTT) CHART Remove: Replace with:

Article 1.8.1.1 - Commence paving no sooner than July 6, 2016. Article 1.8.1.1 - Commence paving no sooner than May 02, 2016.

Remove:

Article 1.8.1.2 - Complete all Work by October 14, 2016. (Contract Completion Date). Article 1.8.1.2 - Complete all Work by July 15, 2016. (Contract Completion Date).

Replace with:

Page 2 of 3

Solicitation No. - N° de l'invitation 5P420-16-5009/A

Amd. No. - N° de la modif. 002

Buyer - l'acheteur Nathaniel Harrison

Client Ref. No. - N° de réf. du client 201545

File Name - Nom du dossier Highway 6 Road Rehabilitation – Waterton Lakes National Park

Section 32 01 16.8 - FULL DEPTH RECLAMATION Remove:

Replace with:

Article 3.3.7 - The Contractor shall complete the reclamation procedures in continuous segments. The Contractor shall complete each segment, compact, and pave bottom course asphalt by end of each day and open to traffic. The Contractor shall not be permitted to leave reclaimed sections of highway unpaved (bottom lift only required) at end of work day. Article 3.3.7 - The Contractor shall complete the reclamation procedures in continuous segments. The Contractor shall complete each segment, grade and compact the reclaimed granular surface by the end of each day before opening the working lane to traffic. The Contractor shall complete bottom lift paving for reclaimed surfaces accepted by the Departmental Representative as soon as reasonably possible. Any re-grading, additional compaction and dust control required for the reclaimed granular surface prior to bottom course paving as a result of vehicle traffic running on the reclaimed granular surface will not be measured for payment and will be considered incidental to the Works.

All other terms and conditions remain unchanged.

Page 3 of 3