Massena Central School District Potential Capital Project Scope MARCH No. 1613

Jefferson Elementary School No.

Item

Construction Cost

Category

Generated Priority By

Replace roof Replace exterior doors with mag locks (1 pair) Replace non-rated classroom doors Provide intruder function locksets at remaining doors (10) Replace carpeting Refinish gym floor Replace 1x1 (non-accessible) ceilings Replace pavement/walks at front of building Replace upper grade level playscape Provide ADA compliant walks to playscapes Provide storm water management at playscapes Masonry repointing

BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS

1 1 1 1 3 3 2 1 1 1 1 2

Improve HVAC in 5/6 wing Replace cafeteria lighting Replace gym lighting Upgrade dish room & ventillation Make-up air for boilers/boiler feed/rebuild boilers Improve loading dock Replace roof leader in boiler room Upgrade public toilet rooms Copier room ventilation ADA toilet room in music room Convert remaining pneumatic controls to DDC Replace steam & condensate lines in 100 wing Replace clock, PA, & fire alarm systems Provide shades at all windows

FAC FAC FAC FAC FAC FAC FAC FAC FAC FAC FAC FAC FAC FAC

1 2 2 1 1 2 1 1 1 3 1 1 1 1

Comments

may not be complete roof code issue Fire code issue security issue possibly library could be a priority Refinished in 2009 Safety issue; trip hazards 16 years old Muddy areas

Already done-in house

1988 boilers would connect with site work Roof drain is leaking no ventialtion impacts equipment Have existing bathroom energy efficiency original construction

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Massena Central School District Potential Capital Project Scope MARCH No. 1613

Jefferson Elementary School No.

Item Create building storage (chairs, supplies, equip, etc.) Provide larger lockers/cubbies for students Improve exterior lighting Improve visibility at main entrance/approach Expand security camera coverage Reconfigure & expand parking/dumpsters/deliveries Inspect plumbing systems (supply & waste) Expand faculty room, add range/stove Create a copy room for each wing Create multi-purpose room to be shared Provide carpet in all classrooms (pre-k - 2) Improve classroom lighting (dimming) Provide additional tack boards in corridors & classrooms Provide more outlets spaced throughout rooms Provide more storage in classrooms Improve HVAC. Rooms are hot/cold Create a central dismissal room Provide air conditioning at all rooms Provide new tables, chairs, & desks throughout Provide a shower in the nurses office Separate the faculty parking from the parent parking (events) Expand gym to accommodate indoor recess Create a dedicated OT room with sensory equipment Address musty smell from crawlspace Mount the smartboards on the wall Improve technology/wireless throughout Create a SE classroom for each teacher (5 total) w/ A/C Create rooms for 2 speech pathologists Room divider system

Construction Cost

Category

Generated Priority By P P P P P P P P P P P P P P P P P P P P P P P P P P P P P

1 2 2 3 1 1 3 3 3 3 3 2 2 2 3 1 3 3 1 3 1 3 3 1 1 1 3 2 3

Comments very little storage

Done in 2009

Not necessary large instruction carpet--not full coverage energy efficiency

Some work in last project not necessary

Just improve parking and expand a bit

dirt floor

this already exists one room exists not sure what purpose this serves

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Massena Central School District Potential Capital Project Scope MARCH No. 1613

Jefferson Elementary School No.

Item Create a series of small rooms for behavior management, social skills, time out, test accomodation, etc. ADA Compliant adapted playground Expand the life skills classroom Provide door to exterior at life skills room(s) Create life skills suite with some shared services Create a sensory room like Harrisville with padded floor, hook for swing, climbing wallfor SE equipment/materials Create proper storage Provide large sink in music room Improve sound system in music room Provide sufficient space for instrument storage Provide storage cabinets in music room Create separate storage for parent group & music Build an auditorium for performances/gatherings Improve heat/insulation at gym storage Provide cabinets/storage for counselor Create an intervention room to check out & store materials Create storage for students in need clothing Provide smart board in library Create a reading area for the 4-6 students Provide tack/display surfaces in library Conference room for 12-15 people Kitchen upgrades Add air conditioning in 5/6 wing Expand wireless technology for 1:1 computers Replace countertops with storage in 5/6 wing Improve heat in the 3/4 wing (windows open in winter) Provide 2 way communication to playground Phones need access to the 518 area code

Construction Cost

Category

Generated Priority By P 3 P P P P

2 2 3 3

P P P P P P P P P P P P P P P P P P P P P P P

3 2 3 2 1 1 1 3 3 2 3 3 1 3 2 3 1 3 1 2 1 1 3

Comments

can be done within existing space Storage is the issue

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Massena Central School District Potential Capital Project Scope MARCH No. 1613

Jefferson Elementary School No.

Item Roll out "Singlewire InformaCast" system Establish dedicated network closets Mount Smart Boards in classrooms Add outlets to support charging stations Add 2 SMART Tables at Library Add 44 wireless access points & wiring Replace 10 existing wireless access points Rewire all classrooms w/ 5 CAT6

Construction Cost

Address kitchen code issues Replace aging food service equipment Upgrade kitchen area services (HVAC/Plumbing)

Generated Priority By T 2 T 1 T 2 T 3 T 3 T 2 T 2 T 1

FS FS FS

PRIORITY 1 TOTAL

$0.00

PRIORITY 2 TOTAL

$0.00

PRIORITY 3 TOTAL

$0.00

Jefferson Elementary Subtotal

Category

1 1 1

$0.00

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments