JW Leary Junior High School - NorthCountryNow

4 downloads 140 Views 283KB Size Report
Provide 5 computers per classroom. P. 1. Smart Schools Bond? Storage for Special Education program. P. 2. (A) ADA Access
Massena Central School District Potential Capital Project Scope MARCH No. 1613

J.W. Leary Junior High School No.

Generated By

Priority

Replace classroom door knobs with intruder function levers Replace non-rated classroom doors Replace aluminum entrances Replace exterior hollow metal doors with FRP doors Replace smoke doors throughout building Address HVAC issues at main office Address roof leaks in select areas Replace carpeting throughout Replace non-accessible ceilings in 1980 wing Replace corridor glazing in 1980 wing Address pavements and sidewalks including drainage Replace exterior stairs to parking lot Reset/Repoint marble panels at west side of gym Refinish gym floor Upgrade electrical distribution Upgrade lighting Upgrade HVAC

BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS

1 1 1 1 1 3 1 3 2 2 1 1 1 3 1 2 2

High priority; all schools Fire safety issue

Replace clock, PA, & fire alarm systems Complete VAT removal Investigate concealed asbestos (above ceilings) Replace shower controls in locker rooms Rework entrance/Create secure vestibule Replace sinks in boys locker rooms Replace corridor ceilings Upgrade water service Replace HVAC in tech shop area Improve HVAC in cafeteria and main office

FAC FAC FAC FAC FAC FAC FAC FAC FAC FAC

1 1 1 1 1 1 1 1 1 1

PA in gym is lousy; safety issue asbestos flooring

Item

Construction Cost

Category

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments

Fire rated doors; 1980 vintage or before Meet fire code Might do in-house Whole roof?

Very poor shape; trip hazards; Traffic safety Moisture coming in; could cause mold original construction energy efficiency where?

hot water control; not major cost

Tagged with asbestos in ceilings original construction undersized; cold area no ventilation; SED requirement

Massena Central School District Potential Capital Project Scope MARCH No. 1613

J.W. Leary Junior High School No.

Item Replace original cooler & freezer in kitchen Replace window shades throughout

Create a faculty restroom at the south end of the building Upgrade science labs to include demo tables, better exhaust, larger rooms, more practical lab stations, drains at safety showers Create a large group instruction room Consumer science lab is too small, designed for 16 but serving 24. combine with adjacent classroom to create larger lab Replace faucets at sinks in consumer science Provide more power in consumer science Replace faucets at sinks in consumer science Remove upper cabinets to allow better supervision (CS) Provide under counter lighting (CS) Provide room for ironing boards in consumer science Need more storage in consumer science Need for a 15:1:1 room to accept current Elem. Students Add a bathroom to the life skills room Provide more key fob access to building Mount the smart boards on the wall Improve HVAC control Provide desks/chairs for fidgety students Install blinds in the weight room for privacy Create a reading room/library for staff use Provide A/C in computer labs Disperse lockers throughout building Provide dome mirrors in corridors for better supervision Provide 5 computers per classroom Storage for Special Education program

Construction Cost

Category

Generated By FAC FAC

Priority 1 1

P

2

supervision issue; constant complaint

P P

3 1

common request

P P P P P P P P P P P P P P P P P P P P P

2 3 2 3 3 3 3 2 2 2 1 2 1 3 3 3 1 3 3 1 2

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments costly repairs constant complaints; low cost

Could be an issue as done in 2009 project flexibility for outlets Done in 2009

Burt will double check not major cost; ease of access Library has several heating/cooling problems several requests

preserves equipment Could do in-house Smart Schools Bond?

Massena Central School District Potential Capital Project Scope MARCH No. 1613

J.W. Leary Junior High School No.

Item Fully equipped OT/PT room Separate classroom for the speech pathologist Conference room for 12-15 people 3-4 small rooms for behavior management/time out More power and data throughout Make all entrances ADA compliant Improve hot water at life skills room Address heat in vestibules and corridors Provide A/C in library & media room (heat from computers) Tech. computer lab has 19 computers for 24 students Provide dust free finishing area at tech shop Provide larger classrooms Provide wi-fi throughout Provide smartboards throughout Storage for ELA materials General building storage needed Improve acoustics at music rooms Provide fume hood venting at science labs Prep rooms for science labs Need a teacher work room (copy, laminate, printer, etc.) Norine believes her room does not meet OSHA standards Replace countertops in library Expand library shelving to accommodate more books Create a professional library for materials More power in the library replace ceiling tile in library Add dome mirrors in library to eliminate blind spots replace screens at windows Provide A/C in server room Add a computer workstation at the library desk

Construction Cost

Category

Generated By P P P P P P P P P P P P P P P P P P P P P P P P

Priority 1 2 1 3 1 1 1 1 1 1 3 3 1 2 3 2 1 1 1 3 1 3 2 3

P P P P P P

1 2 2 2 1 1

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments Recheck need with CSE Could be part of LGIR

If we do doors they will be ADA compliant

No aid on storage

Put in lounge? small science room In-house?

In-house project?

Massena Central School District Potential Capital Project Scope MARCH No. 1613

J.W. Leary Junior High School No.

Item Add display cases in the library for books & artwork Improve ventillation at Nurse's suite Add door operator to Nurse's suite Add observation window to nurse office Create triage desk at nurse's office New lockers in girls locker room Expand gym storage Install tennis courts at the back fields Add a small gym for adapted PE (at Jefferson?) Improve heat in music rooms Upgrade A/V in music rooms Instrument/music storage upgrades Risers at the band room Replace chalk board with white board in music rooms Unit Ventillators are loud in band room Provide A/C in classrooms Wider corridors Hue-changing lighting in classrooms Create nooks and break-out spaces for group activity Marker-walls for teaching wall Create marker spaces Standing desks Lounge type cafeteria Breakout space with comfortable furniture Charging stations

Roll out "Singlewire InformaCast" system Establish dedicated network closets Provide air conditioning in network closets (211, 108) Add SMART Table at Library

Construction Cost

Category

Generated By P P P P P P P P P P P P P P P P P P P P P P P P P

Priority 3 2 3 2 1 1 3 3 3 1 1 1 2 1 3 3 3 3 2 3 3 3 3 3 1

T T T T

2 1 1 NA

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments Done in 2009 part of refiguring the vestibule area

portable IT equipment

Massena Central School District Potential Capital Project Scope MARCH No. 1613

J.W. Leary Junior High School No.

Generated By T T T T

Priority 2 2 2 1

Address kitchen code issues Replace aging food service equipment Reconfigure kitchen area & upgrade services

FS FS FS

1 1 1

Reconfigure JH baseball field

A

1

Item Add keyless entry to 5 exterior doors Add 52 wireless access points & wiring Replace 10 existing wireless access points Rewire all classrooms w/ 5 CAT6

Construction Cost

PRIORITY 1 TOTAL

$0.00

PRIORITY 2 TOTAL

$0.00

PRIORITY 3 TOTAL

$0.00

J.W. Leary Junior High Subtotal

Category

$0.00

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments