Madison Elementary School [PDF]

1 downloads 228 Views 266KB Size Report
Replace roof in select areas (14,000 SF). BCS. 1. Replace corridor walls/cubbies. BCS. 3. Replace carpeting. BCS. 3. Replace gym floor. BCS. 3. Refinished in ...
Massena Central School District Potential Capital Project Scope MARCH No. 1613

Madison Elementary School No.

Generated By

Priority

Replace roof in select areas (14,000 SF) Replace corridor walls/cubbies Replace carpeting Replace gym floor Provide intruder function locksets at remaining doors (12) Reconstruct loading dock Provide shades in all rooms Replace exterior doors with mag locks (1 pair) Replace exterior HM doors (1 pair, 2 single) Replace wall paneling along kitchen area Masonry repointing Window sealants Replace flagpole Replace wood siding at door #2 Replace playscape Repave bus loop Replace concrete walks at bus loop Provide concrete dumpster pad Replace asphalt walk to Pontoon Bridge Road

BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS BCS

1 3 3 3 1 1 1 1 1 3 2 1 1 ? 1 1 1 1 1

Upgrade sanitary lines (fan room, 100 wing) Address HVAC system below slab Address leaks at gymnasium walls Replace clock, PA, & fire alarm systems Upgrade public toilets Address crawlspace access & ventilation Provide copy room ventilation Reconstruct ball field and backstop

FAC FAC FAC FAC FAC FAC FAC FAC

3 1 1 1 1 1 1 1

Item

Construction Cost

Category

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments

Refinished in 2009 Very deteriorated

HM?

energy issue original construction Need more information Terrible shape

Belly in line Air quality Issues

original construction

Massena Central School District Potential Capital Project Scope MARCH No. 1613

Madison Elementary School No.

Item Improve site lighting Replace water service Investigate loud rooftop unit Asbestos abatement in fan room & crawl space Convert remaining pneumatic controls to DDC

Create a series of small rooms for behavior management, social skills, time out, test accomodation, etc. Create a separate room (400 sf) for each speech pathologist (2 total) Provide a dedicated OT/PT room Create a SE classroom for each teacher (4 total) w/ A/C Need 4 reading rooms at 400 sf each Create a reading library for teachers to access Conference room for 12-15 people Remove bookshelves in front of white boards Provide air conditioning throughout building Potential for 6 SE classrooms in future Smart boards mounted on walls Additional power/charging in rooms Additional storage Improve acoustics in music room (159) Expand parking Add sidewalk next to dumpsters to connect parking lot Revise dumpster pad to service from parking lot side Address lighting/ceilings in cafeteria and kitchen Create parent lobby at door #2 Add canopy at outdoor freezer Expand cafeteria towards main entrance Reconfigure PE Teacher/storage/shower area

Construction Cost

Category

Generated By FAC FAC FAC FAC FAC

Priority 1 1 2 1 1

P

2

New construction or subdivide existing rooms

P P P P P P P P P P P P P P P P P P P P P

3 2 3 3 3 1 1 3 3 1 1 1 3 3 1 1 1 3 2 2 3

New construction

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments

Vibration issue

Same as Nightengale

More outlets

Add to site work Add to site work T-5 added in 2009 in café

original construction

Massena Central School District Potential Capital Project Scope MARCH No. 1613

Madison Elementary School No.

Item Upgrade corridor finishes/walls Replace drinking fountains with EWC/bottle filling stations Toilet room lights shut off by themselves Create new band room in courtyard Remove wall between principal and conference room Reconfigure main office suite to funnel visitors direcly inside Replace heaved concrete at playground Better gym storage Add 4 more classrooms Replace computer lab with carts Bullet proof glass at lobby Address air conditioning at main office Address humidity in copy room Replace cubbies with lockers Provide a washer & dryer in the building Dimmable lights would be preferred Better use of open pods/wasted space Kitchen is dangerously small Provide ventilation in kitchen Provide lighting in kitchen Some kitchen equipment needs to be replaced Outdoor freezer is impractical Create larger classrooms (intervention-2 groups) Create a stage somewhere. Cafeteria? Create an auditorium Stabilize heat between the classrooms and the corridor Repair window seals (ice buildup)

Roll out "Singlewire InformaCast" system Establish dedicated network closets

Construction Cost

Category

Generated By P P P P P P P P P P P P P P P P P P P P P P P P P P P

Priority 2 1 2 3 1 2 1 1 2 2 3 2 1 3 3 3 2 1 1 1 1 3 2 3 3 1 1

T T

2 1

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments

Same as conference room request Work in space done in 2009

Special Education, additional primary security

Poverty issue

Massena Central School District Potential Capital Project Scope MARCH No. 1613

Madison Elementary School No.

Item Mount Smart Boards in classrooms Add outlets to support charging stations Add a new network closet at back of building Add 2 SMART Tables at Library Add 45 wireless access points & wiring Replace 11 existing wireless access points Rewire all classrooms w/ 5 CAT6

Construction Cost

Address kitchen code issues Replace aging food service equipment Reconfigure kitchen area & upgrade services

PRIORITY 1 TOTAL

$0.00

PRIORITY 2 TOTAL

$0.00

PRIORITY 3 TOTAL

$0.00

Madison Elementary Subtotal

Category

Generated By T T T T T T T

Priority 2 3 1 3 2 2 1

FS FS FS

1 1 1

$0.00

(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency

Comments