MAXIMIZE - HEAL Systems

0 downloads 260 Views 263KB Size Report
www.healsystems.com or email [email protected]. The HEAL System™. The foundation for efficient artificial lift in h
MAXIMIZE DRAWDOWN MINIMIZE COSTS

Optimize the Montney Efficient sucker rod pumping in gassy environments

The HEAL System™

The foundation for efficient artificial lift in horizontal wells

1825 – 2440 mTVD

5990 – 8010 ftTVD Oil Rate

As a result of these benefits, smaller pumping equipment can efficiently achieve higher production rates while simultaneously maximizing drawdown and reducing unit lifting costs. In 11 installs, the HEAL System has increased production by over 200% across the previous production decline trend while using the same or smaller pumpjacks than offsetting wells. 16

1 – 21 m3/d oil 6 – 130 bbl/d oil

14

Watercut 0-70% Gas Oil Rate (GOR)

12

2400 – 28,400 scf/bbl The Challenge The Montney unconventional play extends from west-central Alberta into northeast British Columbia, Canada. Production grades from gassy oil in the shallower parts of the play, through wet gas into dry gas. Many wells in the oil and wet gas window require artificial lift after natural flow. Due to the depth, high initial decline rates and high GOR, it is difficult to design and operate an effective, efficient rod pumping system.

Oil Production Rate (m3/d)

425 – 5050 m3/m3

100 Group Average Pre-HEAL Decline Post-HEAL Decline

10

80

60

8 40

6

Oil Production Rate (bbl/d)

Depth

HEAL System Installed

Montney, West-Central Alberta, Canada

The HEAL System provides three main benefits to the sucker rod pumping in the Montney formation: • Minimizes the slug flow from the horizontal so the HEAL Vortex Separator and pump get consistent production rate. • Provides extremely efficient downhole separation to minimize gas interference and gas locking to maximize pump fillage. • Lifts the produced fluids from the horizontal to the shallower pump depth in the vertical while maintaining a very low bottomhole pressure.

4 20 2

0

0

-6 -5 -4 -3 -2 -1 0

1

2

3

4

5

6

7

8

9 10 11 12

Months Post-HEAL Install (0 = Install Month)

Learn more about the HEAL System™ www.healsystems.com or email [email protected]