New Look at Project Management Triangle - WordPress.com

15 downloads 160 Views 2MB Size Report
Introduce the main elements any Project Manager should take into account .... software! • The capability level depends
2° °International Conference on IT Data collection, Analysis and Benchmarking Tokyo (Japan) - October 22, 2014

New Look at Project Management Triangle

Pekka Forselius

Insert here a picture

4SUM Partners [email protected]

http://itconfidence2014.wordpress.com

Prj Mgmt Triangle

Goals of the presentation

G1. Introduce the main elements any Project Manager should take into account G2. Propose new viewpoints on the PM Triangle for a better management of a project G3. Introduce the “northernSCOPE™” approach and related process

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

2

Prj Mgmt Triangle

Project Scope Management – What?

•One of the ten knowledge areas of project management (source: Project Management Body of Knowledge, PMI) •… is primarily concerned with defining and controlling what is and is not included in the project.

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

3

Prj Mgmt Triangle

Project Management Triangle

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

4

4

Prj Mgmt Triangle

Observations about PM triangle

”If you can’t measure it, you cannot manage it!” – For management purposes all three dimensions need to be measured, and the measurement principles shall be defined. Examples: Cost = Supplier’s development cost from requirements specification to ready to install. Time = Duration of development in months, from the same activities as above. Scope = Quantity or size of the outcomes.

Shape and size of the triangle are not constant!

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

5

Prj Mgmt Triangle

A new look at the PM triangle

Everybody wants more outcomes with same cost and time, i.e. ”higher triangle”, but how to get it? What are the important elements of a triangle? How to influence the shape of a triangle?

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

6

Prj Mgmt Triangle

Elements of a PM triangle

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

7

Prj Mgmt Triangle

Examples of IT PM triangles

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

8

Prj Mgmt Triangle

Public sector reality in 2013

The numbered projects (1-6) used northernSCOPE™ management concept! IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

9

Prj Mgmt Triangle

My target cost and speed for budgeting

Is this level acceptable for my company? Is it too ambitious? What will be the target Pay Back Period? IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

10

Prj Mgmt Triangle

My sub-system estimates vs. ”standards”

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

11

Prj Mgmt Triangle

Business case, starting point

• Early requirements from a feasibility study, including business processes • Stakeholder analysis, including users • Scope statement, system overview picture • Will another system be replaced? • Investment calculations, including numbers of transactions, volumes, etc. • Rough budget and schedule IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

12

Prj Mgmt Triangle

Amount of outcomes

• Size of the software, estimated and measured in Function Points • Methods: all ISO/IEC FSM standards, most likely FiSMA method (ISO/IEC 29881:2010) at all accuracy levels • Tools: FiSMA 1.1 Size Estimator and Experience® Service • An independent Scope Manager recommended (not necessary to be external) IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

13

Prj Mgmt Triangle

Focus on quality too

• Quality requirements MUST be connected to functional requirements • Method: start connection from entire system and business processes • Tools: FiSMA Quality Requirements Analysis, ISO/IEC 9126 and 25010 (Software product quality standards) IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

14

Prj Mgmt Triangle

Capability of Developer Team

• The better the capability of developer team, the less re-work needed, and the more competitive price they can propose! • The capability level depends on how well the developers can: • • • • •

Read, question, communicate, and understand the functional requirements Design the functions Provide the program code Test the outcome units and integrated components Prepare the installation of software. IT Confidence 2014 – October 22, 2014

NOTE! The required developer skills are all related to SDLC –standard (ISO/IEC 12207)

http://itconfidence2014.wordpress.com

15

Prj Mgmt Triangle

Capability of Product Owner

• The better the capability of product owner, the faster the delivery of software! • The capability level depends on how clearly the product owner can: • • • • • • •

Recognize and define all users Write all necessary user stories Specify terms and define ER model Draw business process charts Write and update use cases Define functional requirements Specify quality requirements

IT Confidence 2014 – October 22, 2014

NOTE! The skills required from the product owner have NOTHING to do with management approach (agile or not). http://itconfidence2014.wordpress.com

16

Prj Mgmt Triangle

The most important metrics

• To evaluate first the reality of project plans, and in the end the success of the project we need to measure: – Delivery speed = h/b (FPs/month) – Unit price = a/h (€/FP)

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

17

Prj Mgmt Triangle

northernSCOPE™ - What?

• A professional scope management concept for software intensive development and maintenance from Finnish Software Measurement Association (FiSMA). • A management concept that describes the Scope Manager’s work with twelve steps, covering the development life cycle from feasibility study and initial requirements to program closure and collecting lessons learned.

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

18

Prj Mgmt Triangle

Three corner stones of northernSCOPE™

• Software project sizing using Functional Size Measurement (where appropriate) FP • Unit pricing in cost per function point €/FP • Independent Scope Manager provides scope transparency and governance

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

19

Prj Mgmt Triangle

12 steps of northernSCOPE™

Source: CrossTalk January/February 2010

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

20

Prj Mgmt Triangle

Functional size – Function points

5 ISO/IEC standard methods Easy to learn and use Training and support available FiSMA 1.1 method transparent equally for the product owner and the developer • All methods based on functional user requirements • If no requirements or no delivered functionality, no size measurement can be done. • • • •

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

21

Prj Mgmt Triangle

Unit price €/FP

ISBSG has collected more than 7000 projects FiSMA has collected more than 1000 projects Almost 1000 applications in the M&S repository Productivity varies a lot, but with good data and good classifiers it’s possible to find very realistic price level. • Experience® tools support estimation with high quality knowledge databases. • • • •

• 100 €/FP is very inexpensive, 2000 €/FP is extremely expensive in most of the cases. IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

22

Prj Mgmt Triangle

Independent Scope Manager

• Almost 150 northernSCOPE™ Certified Scope Managers (see ECQA and 4sumpartners.com) • Finland, Germany, Denmark, The Netherlands, Peru, USA • Also in Victoria, Australia, where the southernSCOPE is applied • Five days training program available in English and in Finnish, also partially in Danish.

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com

23

Prj Mgmt Triangle

Thank you!

• Pekka Forselius,

MSc, MBA, Certified Scope Manager, Immediate Past President of ISBSG, Senior Advisor at FiSMA

• email: [email protected]

• see also www.4sumpartners.com, www.fisma.fi and www.isbsg.org

IT Confidence 2014 – October 22, 2014

http://itconfidence2014.wordpress.com