Apr 29, 2016 - Submitter Role: Public. Submission ... New natural gas WILL NOT put us on track to ... CA solar? Source:
DOCKETED Docket Number: 15-RETI-02 Project Title: Renewable Energy Transmission Initiative 2.0 TN #: 211309 Document Title: Presentation - Achieving a More Flexible Power System by Hal Harvey, 52-16 Description: N/A Filer: Misa Milliron Organization: America's Power Plan and Energy Innovation Policy & Technology LLC Submitter Role: Public Submission 4/29/2016 2:44:06 PM Date: Docketed Date: 4/29/2016

ACHIEVING A MORE FLEXIBLE POWER SYSTEM HAL HARVEY

1

RETI 2.0 IN CONTEXT

40% GHG reduction by 2030… On the path to 80% GHG reduction by 2050

Source: Low-Carbon Grid Study: Phase II Results, 2016 2

WHY A FLEXIBLE GRID? Helps achieve 2050 emissions goal (beyond 50% renewables) Addresses two kinds of variability created by renewables:  Known variability – daily or seasonal trends are often predictable

 Unknown variability (short-term) – relatively small, even under high shares of wind and solar

3

A SUITE OF FLEXIBILITY OPTIONS High Cost

Flexibility Resource Supply Curve

Low Cost

Increasing Need for Grid Flexibility

Graphic adapted from: Paul Denholm et al., 4 “The Role of Energy Storage with Renewable Electricity Generation” (NREL, January 2010).

IMPROVED OPERATIONS

Expand the EIM

Flexible Imports

5

IMPROVED OPERATIONS E XPAND T HE E I M

Additional regions

Additional products

6

IMPROVED OPERATIONS FLE XI BLE I MP O R T S

7

DEMAND RESPONSE TWO KINDS OF DEMAND RESPONSE Dispatchable

Price-responsive

8

DEMAND RESPONSE

GWs of latent DR

opportunities across the economy

9

GRID INFRASTRUCTURE TRANSMISSION Regional optimization Geographic diversity Technological diversity

10

GRID INFRASTRUCTURE R E G I O NAL O P T I MI Z AT I O N

Managing unpredictable variations

11

GRID INFRASTRUCTURE G E O G R AP HI C DI VE R SI T Y

Managing predictable variations

12

M. Jacobson, M. Delucchi. “A Path to Sustainable Energy by 2030.” Scientific American. 2009

GRID INFRASTRUCTURE G E O G R AP HI C DI VE R SI T Y

WY & CA Wind

Example: complementary wind resources in the region

Source: J. Naughton, Wind Diversity Enhancement of Wyoming, California Wind Energy Projects: Phase 2, Univ. of Wyoming, Wind Energy Research Center, July 2015

13

GRID INFRASTRUCTURE T E CHNO LO G I CAL DI VE R SI T Y Diverse Resource Mix

High Solar Case

Source: Low-Carbon Grid Study: Phase II Results, 2016

14

FAST RAMPING SUPPLY IMPROVE FOSSIL FLEXIBILITY

Only use existing capacity Use only for power, not energy

15

FAST RAMPING SUPPLY New natural gas WILL NOT put us on track to meeting 2050 GHG goals

16 Duke Energy (Flickr)

ENERGY STORAGE

1.3 GW storage mandate drives deployment up, costs down

17

CURTAILMENT

T HE MO ST E XP E NSI VE O P T I O N

Curtailment (%)

Flexibility is key to reducing curtailment

10 9 8 7 6 5 4 3 2 1 0

Enhanced flexibility

BaselineTarget High Solar

Conventional flexibility

Baseline Target High Solar

Source: G. Brinkman, California Low-Carbon Grid Study,18 Presentation to RETI 2.0 Stakeholder Meeting, April 18, 2016.

CURTAILMENT … O R LO NG -T E RM E LAST I CI T Y ? Time of use rates

Desalinization

Battery Electric Vehicles Data Processing Air Gases

Excess energy can be a competitive advantage for California

19

PUTTING IT ALL TOGETHER These resources provide a vast suite of options, yielding power that is:

RELIABLE

CLEAN

AFFORDABLE

RETI 2.0 scope should be REGIONAL to capture the full range of cost-effective flexibility options 20

OPPORTUNITY #1

E XP O R T I NG SO LAR E AST WAR D

New market for excess CA solar?

21

Source: Arizona Public Service 2014 IRP

OPPORTUNITY #2

TAK E ADVANTAG E O F COAL R E T I R E ME NT S

Add clean resources where transmission lines already exist

330 MW

Coal Plant Retirement Incremental wind resource Incremental solar resource

770 MW

684 MW

Source: WECC 2012 Coal Retirements Study

22

OPPORTUNITY #3

CO NNE CT NE G AT I VE LY CO R R E LAT E D R E SO UR CE S

23

Source: D. Corbus et al., California-Wyoming Grid Integration Study: Phase 1—Economic Analysis, NREL, March 2014.

OPPORTUNITY #4

I NCR E ASE I NT E G R AT I O N… I NCR E ASE R E SI LI E NCE

Southwest Intertie Project (SWIP) Completes transmission loop Reduces region-wide congestion 

Southwest solar → Northwest



Wyoming/Montana wind → Southwest

(solid red lines are illustrative)

24

@USPOWERPLAN @ E N E R G Y I N N O V L LC

W W W. A M E R I C A S P O W E R P L A N .C O M W W W. E N E R G Y I N N O VAT I O N .O R G

THANK YOU 25