pt. salim ivomas pratama - RSPO

0 downloads 117 Views 3MB Size Report
Jun 11, 2013 - its, as well as review of client document's such as RSPO manual, ... This includes review of management s
RSPO CERTIFICATION ASSESSMENT PUBLIC SUMMARY REPORT PT. TUVNORD Indonesia System Certification Management Has assessed

PT. SALIM IVOMAS PRATAMA Sungai Dua Factory and its supply bases for Compliance to RSPO Principles and Criteria for Sustainable Palm Oil Production

Date of assessment: November 18-23, 2013 Report Number: P&C-K-133

Head office System Certification Management Perkantoran Hijau Arkadia Tower F, 7th Fl Suite 706 Jl. Let. Jend. TB Simatupang Kav. 88 Jakarta 12520 - Indonesia Tel : +6221 7883 Fax : +6221 7883 7336

Laboratory Division Branch office Jl. Jababeka XVII E Blok U No. 27BGraha Pangeran 7-H1 Fl Kawasan Industri Jababeka I CikarangJl. Jend. A Yani 286 Bekasi 17530 - Indonesia Surabaya 60234 - Indonesia Tel : +6231 8292602 Fax : +6231 8292723

President Director: Mr. Robert Napitupulu Email: [email protected] Website : www.tuev-nord.de

CONTENTS 1.

Scope of the Certification Assessment.

3

1.1

National Interpretation used for the assessment

3

1.2

Assessment type. (mill, plantation and mill, plantation only etc. etc)

3

1.3

Location map

3

1.4

1.3.1 Location map of PT Salim Ivomas Pratama

3

1.3.2. Map of Estate‟s Land Tittle

4

1.3.3. Map of Estate‟s Block

5

Description of mill and its supply base

6

1.4.1 Description of mill

6

1.4.2 Description of the supply bases

6

1.5

Date of planting and cycle 1.5.1 Date of planting and replanting

7

1.5.2 Time bound plan for other management units and justifications.

7

1.6

Other certifications held

9

1.7

Organizational information/contact person

9

1.8

Tonnages certified

9

2.

Assessment Process

2.1

Assessment methodology (program, site visits)

10

2.2

Date of next surveillance visit

13

2.3

Lead assessor/assessment team

13

2.4

Certification body

15

2.5

Outline of how stakeholder consultation was managed

15

3.

Assessment Findings

3.1

Lead auditor‟s summary and recommendation for certification

18

3.2

Summary of findings and noteworthy positive components

28

3.3

Issues raised on public consultation meeting

30

4. Certified organization‟s acknowledgement of internal responsibility Attachment A: List of Abbreviations Attachment B: Draft of Certificate Attachment C: Module E- Mass Balance Supply Chain

1. SCOPE OF THE CERTIFICATION ASSESSMENT. 1.1 National Interpretation used The management of the palm oil mill and associated suppliers of FFB were assessed for compliance against the Indonesian National Interpretation of RSPO Principles and Criteria (RSPO INA-NIWG) version May 2008 and the RSPO Principles and Criteria April 2013 1.2 Assessment type The assessment of this report regard to the mill and plantations, i.e Sungai Dua Factory and Sungai Dua Estate Balam Estate and owned by PT. SALIM IVOMAS PRATAMA (herein after refer to SIMP). The other supply base for the mill is Sungai Rumbia 1 Estate, owned by PT Gunung Mas Raya (GMR). Both of PT. SIMP and PT. GMR are under the Indoagri. Location of them are mentioned below. 1.3 Location and GPS coordinate Name of Mill and Plantation

Location Balai Jaya Kota Village, Bagan Sinembah Subdistrict, Rokan Hilir District, Riau Province of Indonesia.

E: 100°35'27.85" N: 01°45'05"

Sungai Dua Estate (SDE)

Balai Jaya Kota Village, Bagan Sinembah Subdistrict, Rokan Hilir District, Riau Province of Indonesia.

E: 100°34'31.12" N: 01°44'47.31"

Sei Rumbia 1 Estate (SRE1)

Balai Jaya Kota Village, Bagan Sinembah Subdistrict, Rokan Hilir District, Riau Province of Indonesia.

E: 100°38'25.90" N: 01°48'55.80"

Balam Estate (BLE)

Balam Sempurna Village, Bagan Sinembah Subdistrict, Rokan Hilir District, Riau Province of Indonesia..

E: 100°39'57.85" N: 01°48'37.51"

Sungai Dua Factory (SDF)

Figure 1.1 Location of PT SIMP and PT GMR, Riau Province of Indonesia

GPS Coordinate

1.3.2.a Map of Land Use Tittle (Hak Guna Usaha) Sungai Sungai Dua & Balam Estate

1.3.2.b Map of Land Use Tittle (Hak Guna Usaha) Sungai Rumbia 1 & Sungai Rumbia 2 Estate

1.3.3 Map of Plantation Block

Figure 1.2 Map of Plantation Block of Sungai Dua Estate

Figure 1.3 Map of Plantation Block of Balam Estate

Figure 1.4. Map of Plantation Block of Sungai Rumbia -1 (SRE-1)

1.4 Description of mill and its supply base 1.4.1 Description of mill Name of Plantation and Other

Location

GPS(1)

Balai Jaya Kota Village, Bagan Sinembah E: 100°35'27.85" Subdistrict, Rokan Hilir N: 01°45'05" District, Riau Province of Indonesia. (1) GPS coordinates were in front of mill office. Sungai Dua Factory

Mill Capacity (Ton/hr)

45

Total production (ton/year) 2011 (actual) CPO PK

39,616

10,041

2012 (actual) CPO PK

42,479

10,888

2013 (budgeted) CPO PK

40,773

10,451

1.4.2 Description of supply bases (fruit sources ) Name of Plantation

Location

GPS

(1)

Sungai Dua Estate (SDE)

Balai Jaya Kota Village, E: 100°34'31.12" N: 01°44'47.31" Bagan Sinembah Subdistrict, Rokan Hilir District, Riau Province of Sungai Rumbia 1 Indonesia. E: 100°38'25.90" Estate (SRE 1) N: 01°48'55.80"

Balam Estate (BLE)

Balam Sempurna Village, Bagan E: 100°39'57.85" Sinembah Subdistrict, N: 01°48'37.51" Rokan Hilir District, Riau Province of Indonesia. TOTAL

(1) GPS coordinates were in front of estate office. *) All FFB from SDE are processed by SDF **) FFB received from SRE1 ***) FFB received from BLE

Planted Ha Total FFB production (ton/year) (as per Octo ber 2013) 2011 2012 2013

4.369

Total FFB supplied to Sungai Dua Factory(ton/year) 2011

2012

2013

130,096

128,605

121,043 130,096 128,605

123,043*

4,722

101,649

102,537

103,528

46,593

44,662

43,949**

5,823

150,472

156,936

143,458

41,290

40,708

38,393***

15,687

382,217

388,078

368,029 217,978 213,975

205,385

1.5 Description of planting and replanting cycle 1.5.1 Areal Statement for Sungai Dua Estate and Sungai Rumbia 1 Estates as per October 2013 Planted area in each estate (Ha) Year of planting

SRE1

1984 1985 1986 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Total

SDE

1.366 364 65 127 184 294 220 245 122 149 208 331 334 52 223 62 23 4,369

BLE

99 2.051 1.761 464 394 680 36 5,485

Total Ha

1.558 1.716 655 195 699 139 49 75 138 403 122 74 5,823

99 2.051 1.761 1.568 3.546 1.413 260 1.506 323 343 295 383 561 122 149 282 331 334 52 223 62 23 15,687

1.5.1 Replanting program for Sungai Dua Estate, Sungai Rumbia 1 Estates, and Balam Estate Total Ha Year of Planting 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Total

2015 BLE

SDE 99 2.043 1.759

SRE1

454 393

34

1.355 375 65 127 184 294 220 244 119

5.458

149 214 331 379 52 223 411 32 4.774

676

2016 BLE

SDE 99 725 201 1.558 1.716 655 195 699 139 49 75 138 403 122 74

SRE1

BLE SDE

SRE1

482 76

BLE SDE

355 676

438 89

SRE1

394 63

2019

BLE SDE

637 296

SRE1

2020

2023

BLE SDE

SRE1

SDE

SRE1

BLE

SDE

SRE1

BLE

326 586

593 66

Year of Replanting Program 2018

2017

483 62

312 161

204 90 94 91 121 62

33

203 58

441 260

122 307

368 87

375 95

62 64

396 61 30

94 91 121 62

278

25 284

93 83 34 88

65 156 92 63

55

5.823

1.025

527

496

1.13

457

593

995

473

573

1.484

352

701

825

368

455

340

362

470

431 -

309

1.5.1.a Block Map of replanting program for Sungai Dua Estate

2020

2020 2019

2020

2018

2016 2017 2015

2016

1.5.1.b Block Map of replanting for Sungai Rumbia 1 Estate

1.5.1.c Block Map of replanting program for Balam Estate

1.5.3 Mill and Plantation facilities not included the RSPO Certification at this time: a. Mill not included during this RSPO Certification Annual Output Year (ton)

Name of Mill

Location

Balam Factory

Rokan Hilir - Riau

Mill Capacity (ton/hr)

Time bound timetable for certification

CPO

Kernel Oil

50.604

11.209

45

2013 2014 2014

Lubuk Raja Factory

Pelalawan - Riau

78.225

15.825

75

Napal Factory

Indragiri Hulu - Riau

19.867

4.773

30

b. Plantation not included during this RSPO Certification: Name of Plantation

Location

Area Summary (ha)

FFB Production (ton/year)

Time bound timetable for certification

Total

Planted

Kayangan Estate

Rokan Hilir - Riau

6.620

4.722

102.151

Certified in 2012

Kencana Estate

Rokan Hilir - Riau

4.338

5.104

73.000

Certified in 2012

Cibaliung Estate

Rokan Hilir - Riau

5.046

4.816

132.292

2013

Sungai Bangko Estate

Rokan Hilir - Riau

2.983

2.799

69.026

2013 2014

Lubuk Raja Estate

Pelalawan-Riau

7.137

6.824

129.729

Bukit Raja Estate

Pelalawan-Riau

5.337

5.101

118.607

2014

Napal Estate

Rokan Hulu-Riau

5.500

5.111

40.827

2014

1.6 Other certifications or awards held by the company Certification Name Proper Riau Province 2011 Indonesia Environment Week „09 Zero Accident (Days Work Without Lost Time Injury)

Certificate Number No. Kep:.02/Men/I/2005

Date of Certification June 3, 2011 May 31, 2009 January 3, 2005

Valid until July 2012. -

1.7 Organisational information contact person Company Name

PT SALIM IVOMAS PRATAMA

RSPO Member 1-10041-07-000-00 Principle Contact person: IB Mayun Business address: Sudirman Plaza Lt. 11 & 12, Jl Jendral Sudirman Kav. 76-78, Jakarta, Indonesia Group name if applicable: Salim Group Office telephone: 021-57958822 Mobile telephone: 0811759990 Fax: 021-57937504 e-mail: Web site:

[email protected] www.simp.co.id

1.8 Tonnages to be certified Name of Mill

Sungai Dua Factory

Name of Plantation

Sungai Dua Estate Sungai Rumbia 1 Estate Balam Estate

CPO PK

40,773 (ton) budgeted in 2013 10,451 (ton) budgeted in 2013

2. ASSESSMENT PROCESS 2.1 Assessment methodology (program, site visits) 2.1.1 General overview. The assessment was carried out refer to TUV NORD Indonesia Certification Procedure, PRSPOTNI-01, Rev.0, dated 01.06.2008.This procedure described the assessment process, which consist of three stages, such as audit preparation, pre audit, certification audit, and issuance of the certificate. Audit preparation included sending questionnaire relevant to the strandard equiement and review its, as well as review of client document's such as RSPO manual, procedures, and working instructions. This preparation was conducted on July 2013. Based on this document review the auditors were able to perform the audit schedule for pre audit. Pre audit was required to assess the client's readiness toward the certification audit. This includes review of management system documentation and implementation on site. Pre audit was performed August 26-29, 2013 Based on findings and recomendation from pre audit, auditor team will ask client to prepare correction and its evidences, and when it is confirmed the auditor will issue notification for certification audit to RSPO Executive Board to be published at RSPO website. The notification was published in the RSPO website on October 18,2013. Following the web notofication, the certification audit was conducted on November 18-23, 2013. This certification is applicable for Sungai Dua Factory (SDF) and three of its supply bases, i.e Sungai Dua Estate, Sungai Rumbia 1 Estate, and Balam Estate. Another certification for Balam Factory (BLF) was carried out by the other team in paralel. The team of Sungai Dua factory only audited Sungai Dua Estate and Sungai Rumbia 1 Estate, while the Balam Estate was audited by the other team.The auditor team carried out field and document assessments to verify the compliance for all the RSPO principles and criteria. Interview with managers and workers were conducted both for mill and plantations and all evidence was recorded accordingly.

2.1.2 Assessment Agenda Main assessment or certification audit was performed on March 6-8, 2012. The audit covered the Sungai Dua Factory (SDF), Sungai Dua Estate (SDE) and Sungai Rumbia I Estate (SRE1) as supply bases. For another supply base of Sungai Balam Estate (SBE) was audited by other team and reported as another single report. The schedule available as below. Client:

PT Salim Ivomas Pratama & PT Gunung Mas Raya (Salim Group)

Address:

Sudirman Plaza Lt. 11 & 12, Jl Jendral Sudirman Kav. 76-78, Jakarta

MR Name, Pos.:

Mr. IB Manyun

Number of Mills:

1

Standard:

RSPO P&C (Principles & Criteria) May 2008 & RSPO SCC for Mills ver. November 2011.

Type of audit:

Certification Audit Stage 2

Lead Auditor:

Anita Masduki (AM)

Number of estate(s): 2

Order No.

-

Audit date:

Business No. -

November 18 - 22, 2013 Suprijatno (SJ) as agronomi expert

Trainee/Expert: Auditor(s):

Dede Aditya (DE)

Tim Auditor

Mill Sungai Dua Factory

Date / Time1)

Site / Shift / Organizational Unit

18.11.2013

Day one: Travelling

16.00 - 17.00

Opening meeting

17:00

End of day one

19.11.2013

Day two

Rizal Bahtiar (RB) as social expert Estate Sungai Dua Estate (SDE) Sungai Rumbia Estate 1 (SRE I)

Auditor (Abbrev.)

All auditor team

P&C

RSPO team

AM, DE, RB

AM, DE, RB

Public Consultation

-

-

Sungai Dua Estate

12:00

Break

13.00 - 17.00

Estate Office

17:00

End of day two

20.11.2013

Day Three

 Brief explanation from RSPO Team on General Information for RSPO  Confirmation of audit schedule

 Field Operations - Herbicide application programmes. - Harvesting sites and efficiency. Fertilising operations. SOP‟s. - Soil maps. Soil erosion. Land preparation. GIPM. First aiders and boxes. Ground cover. Field observations of all operations.  Worker interviews. OSH. Sexual, religious, racial harassment.Pay and contracts. Child labour. First aid. Awareness.  Road maintenance. Run off.  POME and EFB application – site verification and records  HCV’s. HCV Identification. Management plans. Environmen talImpact Assessments. Implementation.  Riparian zones. Width. Current and future management. Non maint enance regimes.  Local communities. Contributions made. Employment opportunities. So cial impacts. Complaints procedures.  Water management. Water courses. Water monitoring  Social Impact Assessments.  New planting sites. Zero burn

-

08.00 - 12.00

Explanation

P 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, 4.8, P 5.1, 5.2, 5.3, 5.4, 5.5, 5.6 P 6.2, 6.3, 6.4, 6.5, 6.6, 6.8, 6.9, 6.10, 6.11

Date / Time1)

Site / Shift / Organizational Unit

Auditor (Abbrev.)

P&C -

-

08.00-17.00

Sungai Rumbia I Estate

17.00

End of day three

21.11.2013

Day Four

Explanation

P 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, 4.8, P 5.1, 5.2, 5.3, 5.4, 5.5, 5.6

-

P 6.2, 6.3, 6.4, 6.5, 6.6, 6.8, 6.9, 6.10, 6.11

-

P 4.1, 4.6. 4.8 P 5.3, 5.6 P 6.5, 6.7, 6.10

AM, DE, SJ

-

AM, DE

4.4,  Mill 4.7, SOP‟s. Safe working environment. Gen sets. Walk ways. Signs. EFB. POME treatment. Emissions. Ma 5.4, ss balance. Diesel tanks. PPE. Fire extinguishers. F irst aiders and boxes. Fuel and water usage. 6.6,  Workshops. 6.9, Oil traps. Safe working environment. PPE. Diesel tanks. Environmental waste management. OSH Co mmitee. Training. Management structure. First aiders.  Worker interviews. OSH. Sexual, religious, racial harassment. Pay and contracts.  Chemical stores. Storage. MSDS leaflets. Herbicide mixing areas. PP E. Ventilation. Security.  Waste Treatment Interviews with householders. Inspection of water di scharge points. Water improvement plans. Waste di sposal  Energy Eficiency. Energy use and use of renewable energy.

08.00 - 17.00

Sungai Dua Factory

17.00

End of day four

22.11.2013

Day five

08.00-16.00

Audit Review

17.00

End of day 5

23.11.2013

Day Six

08.00

Closing Meeting

14.00

End of certification audit stage 2 and travelling to Jakarta

AM, DE, RB, SJ

All auditor

 Field Operations - Herbicide application programmes. - Harvesting sites and efficiency. Fertilising operations. SOP‟s. - Soil maps. Soil erosion. Land preparation. Ground cover. IPM. First aiders and boxes. Ground cover. Field observations of all operations.  Worker interviews. OSH. Sexual, religious, racial harassment.Pay and contracts. Child labour. First aid. Awareness.  Road maintenance. Run off.  POME and EFB application – site verification and records  HCV’s. HCV Identification. Management plans. Environmen talImpact Assessments. Implementation.  Riparian zones. Width. Current and future management. Non maint enance regimes.  Local communities. Contributions made. Employment opportunities. So cial impacts. Complaints procedures.  Water management. Water courses. Water monitoring  Social Impact Assessments.  New planting sites. Zero burn

RSPO team

2.2 Date of next surveillance visit The surveillance audit will be scheduled later on, at least nine (9) months up to one (1) year after the issuance of certificate. 2.3 Lead assessor/assessment team. 2.3.1 Lead assessor: Anita Masduki RSPO REQUIREMENT A minimum of post high school (post secondary school) training in either agriculture/forestry, environmental science or social sciences;

QUALIFICATION Chemical Engineer, Bandung Indonesia, passed 1987

Institute

of

Technology-

COMPLIANCE Yes

Diploma of Biological Treatment Management, Hiroshima University-Japan, 199-1992 Diploma of Environmental Management, Institute of Environmental Management and Assessment, LondonUnited Kingdom, 1999 Magister on Education, Ibnu Khaldun University,BogorIndonesia, 2007-2009

Doctoral Program on Education, Ibnu Khaldun University,Bogor-Indonesia, 2010-now Training in the practical application of the RSPO Lead Auditor Training by Wild Asia, April 11-15, 2011, Kuala RSPO criteria, and RSPO certification Lumpur, Malaysia systems; Training in the practical application of the RSPO Lead Auditor Training by Wild Asia, April 11-15, 2011, Kuala RSPO criteria, and RSPO certification Lumpur, Malaysia systems; Successfully completion of an ISO 9001, Certified Lead Auditor ISO9001:2000, by SGS International ISO 14001, OHSAS 18001 lead Certification Services, 2002, Jakarta-Indonesia assessors course; SA 8000 Certifiied Lead Auditor of Environmental Management System (ISO 14001:1996), by EARA -RIET - REDECON Jakarta

Yes

Yes

Yes

Certifiied Lead Auditor of Environmental Management System (ISO 14001:1996), by Institute of Environmental Management and Assessment, London- United Kingdom, 1999 Certified Lead Auditor of Ocupational Safety and Health Audit Scheme (OSHAS) 18001, by SGS-Jakarta 2002 Social Accountability (SA 8000) Course, Korean Productivity Consultant, 2004 At least 5 years professional experience in 1992-1995:; area of work relevant to the assessment Assessment the environmental impact for several industries of pulp (e.g., palm oil management; and paper , wood product , pharmacy, at Java, Sumatera, and agriculture/forestry; ecology; social Kalimantan 1996: science); Cleaner Production Division for GTZ-Germany and Environmental Impact Control Agency -Indonesia) and SwissContact; responsible for research and develop program to integrate cleaner production in the strategic planning of industrial development program, including identifying candidates for implementing cleaner production program in Indonesia. The project include of information dissemination, assist on pilot projects, develop guidance manual for cleaner production integration, develop cleaner production training workshops, deliver training for trainer, etc. This project based on social services provided by GTZGermany and Environmental Impact Control Agency of Indonesia as an Awareness for Indonesian Cleaner Production Program. 1997- 1998: Global Climate Division of State Ministry of Environment, Jakarta and World Bank - Washington; responsible for preparing Investment Project Proposal for Ozone Depleting Substances Phaseout in Indonesia to be granted by Montreal Protocol Multilateral Fund through World Bank. This project focused on research in identifying industries as candidates for investment project. The project covered dissemination of information, assist on pilot projects, develop guidance manual for cleaner production integration, develop investment project proposal, delivered training, workshops for trainer, public training, etc. 1998-2011 Audit and consultancy experiences for more than 80 companies for ISO 9001, ISO 14001, OHSAS 18001, SA 8000, since 1996 up to 2011 in wide range of audit scope, such as plantations, oil and gas, pulp and paper, electronic manufacturing, school and university, contractors, etc

Yes

RSPO REQUIREMENT QUALIFICATION Practical assessmenting against the RSPO Having experiences >15 days assessment in RSPO assessment criteria or similar sustainability standards, (Jan 2011 – Oct 2013). See experiences below with a minimum of 15 days assessment Experience

1.

RSPO PNC Auditor for Main Audit of Mill and Estates London Sumatera Musi Banyuasin, Palembang-Indonesia, Feb. 21-25, 2011 (5 days) 2. RSPO PNC Auditor for Pre Audit-1 of Salim Ivomas PRATAMA Mill and Estate, Riau-Indonesia, April 25-28, 2011 (4 days) RSPO Supply Chain Lead Auditor for Main Audit of Wilmar Group, 2 mills and 2 refineries, Sumatera and Kalimantan-Indonesia, May 23-25,June 13-17, 2011 (7 days) 3. RSPO PNC Auditor for Main Audit of Mill and Estates London Sumatera, Site North Sumatera-Indonesia, June 20-28, 2011 (9 days) 4. RSPO PNC Auditor for Tapian Nadenggan-SMART Group, July 4-8, 2011 (5 days) 5. RSPO PNC Lead Auditor for Pre Audit of PT SIMP Agri Binanga Mill and Estates, Site SALIM IVOMAS PRATAMA & Tungkal Ulu, North Sumatera -Indonesia, Juli 18-20, 2011 (3 days) 6. RSPO PNC Lead Audit for Main Audit of Inti Indosawit Plasma Estates, Site SALIM IVOMAS PRATAMA and Tungkal Ulu-Indonesia, Sep 12-14, 2011 (3 days) 7. RSPO PNC Lead Auditor for Pre Audit -2 of Salim Ivomas PRATAMA Mill and Estates, Riau-Indonesia, September 2630, 2011 (5 days) 8. RSPO PNC Lead Auditor for Main Audit of PT SALIM IVOMAS PRATAMA Mill and Estates, Site SALIM IVOMAS PRATAMA & Tungkal Ulu, North Sumatera -Indonesia, October 11-14, 2011 (4 days) 9. RSPO Supply Chain Lead Auditor for Main Audit of Dr. Oetker Foods Industry, Oerlinghosen-Germany, November 7-11, 2011 (5 days) 10. RSPO PNC Lead Auditor for Pre Audit of Austindo Nusantara Jaya Agri Mill and Estates, Site Binanga, North Sumatera Indonesia, November 28-December 2, 2011 (5 days) 11. RSPO PNC Lead Auditor for Main Audit of Salim Ivomas PRATAMA Mill and Estates, Riau-Indonesia, December 19-23, 2011 (5 days) 12. RSPO PNC Lead Auditor for Pre Audit of UPOIC Thailand, Feb 8-9, 2012 (2 days) 13. RSPO PNC Lead Auditor for Pre Audit of Perkebunan Nusantara !V Mill and Estates, North Sumatera -Indonesia, Feb. 20- 24, 2012 (5 days) 14. RSPO PNC Lead Auditor for Main Audit of Austindo Nusantara Jaya Agri Mill and Estates, Site Binanga, North Sumatera Indonesia, March 5-9, 2012 (5 days) 15. RSPO Supply Chain Lead Auditor for pre audit of Lam Soon Thailand, March 13-15, 2012 (5 days) 16. RSPO Supply Chain Lead Auditor for Main Audit of Lam Soon Thailand, April 29-May 5, 2012 (6days) 17. RSPO PNC Lead Auditor for Surveillance Audit of PT Sahabat Mewah Makmur, North Sumatera -Indonesia, August 2012 (5 days) 18. RSPO PNC Lead Auditor for Main Audit of 3 mills of PT Perkebunan Nusantara 4, North Sumatera -Indonesia, September, 2012 (15 days) 19. RSPO PNC Lead Auditor for Surveillance Audit of PT Aek Tarum Sampoerna Agro, South Sumatera -Indonesia, March t 2013 (5 days) 20. RSPO PNC Lead Auditor for Surveillance Audit for Austindo Nusantara Jaya Agri Mill and Estates, Site Binanga, North Sumatera -Indonesia, September 2-6, 2013 (5 days)

COMPLIANCE Yes

Yes

2.3.2 Assessment team. RSPO REQUIREMENT

ASSESSOR

Fluent in main local languagesand Rizal (RZ), English. Suprijatno (SJ) Dede Aditya (DE) Field working experience in the palm Suprijatno (SJ) oil sector, or a demonstrable equivalent. Good agricultural practices(GAP), Suprijatno (SJ) integrated pest management (IPM), pesticide and fertilizer use.

Dede Aditya (DE)

QUALIFICATIONS

Compliance

Citizen of Indonesia, fluent in English

Yes

More than 10 years working experience as consultant in palm oil plantation

Yes

Doctorate in Plantation Ecology with considerable experience in several areas of oil palm plantation activities, such as expert auditor in RSPO Implementation, ISO 14000, feasibility studies, and has carried out research in Plantation Best Management Practices More than 10 years working experience in oil palm plantation which includes GAP, IPM,pesticide and fertilizer use

Yes

Health and Safety assessment on the farm and in processing facilities. (For example OHSAS 18001 or occupational. Health and safety assurance system). Workers welfare issues and social assessment experience. (For example with SA8000 or related social or ethical accountability codes).

Anita Masduki (AM)

More than 5 years of auditing experience in OHSAS for plantations, contractors, power plant, etc

Yes

Anita Masduki (AM)

Yes

Environmental and ecological assessmenting. (For example experience with organic agriculture, ISO 14001 or environmental management systems).

Anita Masduki (AM)

Having experience in SA 8000 assessment in 2 (two) companies ini Indonesia, in 2009 Having experience in CSR project as assessor for oil palm company over the past 3 years. More than 15 years for preparing the environmental impact assessment and ISO 14001. Preparing ISO 14001 for plantations, contractors, power plant, etc More than 15 years for preparing the environmental impact assessment and forestry assessment Having experience in CSR project as assessor for oil palm company over the past 3 years.

Yes

Rizal (RZ),

Dede Aditya (DE)

Economic issues

Rizal (RZ)

Yes

Yes

Yes

2.4 Certification Body PT. TÜV NORD Indonesia is a subsidiary of the German TÜV NORD Group. Our company is a market leader in Indonesia for inspection, testing and certification services. Through more than 800 clients, we offer not just a high added value service but also the trust and confidence embedded in our issued certificates / reports. We satisfy not only our direct customers but also other stakeholders, like regulators and interested society including NGOs, through our competent auditors, inspectors and analysts. PT. TÜV NORD Indonesia, through its HQ in Germany, is a member of International Accreditation Forum (IAF) and accredited by DAR-German and locally by the Indonesian Accreditation Committee (KAN). Services provided by the Strategic Business Unit Systems Certifications are: Food Safety Management System ISO 22000, Information Security Management System ISO 27001, Social Accountability SA 8000, Food Hygiene HACCP, Medical Device Directive MDD, ISO 13485, Occupational Health and Safety OHSAS 18001, Product Certification: GS-Mark, CE-Mark, SNI Mark, Inspection for ISPS Code, Clean Development Mechanism (CDM) Validation & Verification, British Retail Consortium, BRC Issue 5. 2.5 Outline of how stakeholder consultation was managed 2.5.1 Summary. As part of document review, auditor team has reviewed list of local stakeholders provided by PT SALIM IVOMAS PRATAMA. The company has identified all relevant stakeholders and they were invited in the stakeholders meeting which was scheduled regularly once in a year, according to Prosedur Komunikasi, Partisipasi, dan Konsultasi Communication Procedure (SOP SIMP-PROS-04, 02.01.012 The meeting was held on October 19, 2013 and the topic about socialization of sustainable palm oil to stakeholders PT. SALIM IVOMAS PRATAMA. The meeting was aimed to explain the RSPO program. PT. SALIM IVOMAS PRATAMA want to make palm oil plantations in the internationally

recognized, especially by local people, and explains the background of the RSPO, the development of oil palm plantations in Indonesia, positive and negative impacts of oil palm development, mission and vision RSPO and the impact of RSPO P & C to community. Another meeting was about HCV held on November 2011, which explained about Public Consultation and Socialization of High Conservation Value to Stakeholders. It was expected that all stakeholders could have good understanding about HCV. Auditor has verified that the minute of these meeting are available and found all of them are properly maintained Based on list of stakeholder and the stakeholder's minute of meeting above, auditor team asked company to organize the public consultation meeting, which was scheduled on November 19, 2013 at SIMP‟s auditorium. All stakeholders were sent a letter which included the agenda of the meeting. They were invited to make any comments on several issues related to them, such as:  Information about RSPO to the public and stakeholders  Company approach to community development.  Environmental protection and biodiversity conservation.  Opportunities for employment.  Provision of housing, sanitation, amenities and educational support.  Participation in decision making.  If there any complaints and grievance, land conflict  Any other issue, both positive and negative that relevance to the assessment. There were 35 persons attended the public consultation meeting from various institution listed in stakeholder list and discussed the above matters.They were freely to express their opinions and sugestions without the presence of the company. Minute of meeting of the public consultation was mention in part 3.3 2.5.2 List of stakeholders contacted Public consultation meeting was held at Auditorium Sungai Dua Estate, and below were the stakeholder list and the attenders of public consultation meeting. - List of stakeholder Statutory Bodies

Contact Name

Phone Number

Address

PROVINSI RIAU Gubernur Sekda

H.M. Rusli Zainal, SE Drs. H. Wan Syamsir Yus

0761-33684 0761-33749 / 40302

Jl. Jend. Sudirman Jl. Jend. Sudirman No. 460

Kepala DPRD Kadis Perkebunan Kadis Kehutanan Kepala BLH Kadis Depnakertrans

Drs. H.M Djohar Firdaus, MSi M. Yafiz Ir. Fadrizal Labay, MP H.R. Lukman Mat, S.Sos

0761-857161 0761-23815 / 47153 0761-21630 / 31631 0761-45948 / 34148 0761-21733

Jl. Jend. Sudirman Jl. Cut Nyak Dien No. 6 Jl. Jend. Sudirman No.468 Jl. Thamrin No. 93 Jl. Pepaya No. 57 - 59

Kejaksaan Tinggi

Teuku Sofyan Oebit, SH, MH

Danrem

Kolonel Inf Zaedun, S.Sos

Jl. Mayor Ali Rasyid No. 1

Kapolda

Brigjen Pol Suedi Husein

Jl. Jend. Sudirman

KABUPATEN ROKAN HILIR Bupati

H. Annas Maamun

Kepala DPRD

Nasruddin

Sekda Kadis Perkebunan

Telp. (0767) 24287, 21011. Jl. Merdeka No. 58, Bagan Fax. (0767) 21801 Siapi-api - Riau. 0767-24567 Telp. (0767) 24287, 21011. Jl. Merdeka No. 58, Bagan Fax. (0767) 21801 Siapi-api - Riau.

Bakhtiar, ST

Kadis Kehutanan Kadis Bapedal

Drs. H. Surya Arfan, MSi

0767-24928

Jalan Lintas Bagansiapiapi Batu 6 Bagan Punak

Kadis Pendapatan Drs. H. Wan Achmad Syaiful, MSi 0767-22061 Daerah Kadis Depnakertrans

Jalan Lintas Bagansiapiapi Batu 6 Bagan Punak

Dandim

Letkol Inf Sonny Aprianto, SE

Jl. Sultan Syarif Qasim

Kapolres

AKBP Bambang Sudarmaji

0813-19051888

Ujung Tanjung

Email

-

Attendance list of stakeholder meeting

2.5.3 Information on stakeholder meeting Stakeolder meeting was held on 19.10 2013, and agenda of stakeholder meeting was about Information of Sustanable Palm Oil Sustanable Palm Oil Policy of PT SIMP & Subs Working Program implementation of Sustanable Palm Oil Policy of PT SIMP & Subs Stakeholders were informed about the RSPO and its benefit for them. The SIMP management has communicated the conflict settlement procedures to stakeholders and so far there was no complaint from stakeholders during company's operations. The stakeholder requested for some help and financial support to renovate school buildings and other infrastructure. There was no dispute on land issue. SIMP management maintained and consistently monitored the environmental impact and so far there was no significant impact on environment to stakeholders' living areas. So far, they have no complaint about the company's operations. They always invited by the company to discuss general programs for the local community in respect of freee medical services, donations for some villages for road maintenance, school renovation, preschool yard, playing fields for children and public, etc. 3.1 Lead auditor‟s summary and recommendation for certification The assessment team conducted a thorough assessment of all the principles, criteria and indicators. Evidence was sought for conformity with the RSPO NI of both systems and their implementation. The findings column reflects the findings in accordance with each criteria and indicator and the comments column includes some of the evidence found. (The full and complete checklist contains some confidential information and is an extensive document used for peer review and by the certification decision panel and certifier). Where non conformity was found, a summary of the non-conformity is included. AUDIT RESULT

COMPLIANCE

Criterion 1.1 Provide adequate information to other stakeholders on environmental social and legal issues relevant with RSPO Criteria, in appropriate languages and forms to allow for effective participation in decision-making Yes SIMP has prepared a system on how to provide adequate information to other stakeholders on environmental, social and legal issues relevant to RSPO, through procedure SOP 04, Prosedur Komunikasi, Partisipasi dan Konsultasi (Communication, Participation, and Consultation Procedure) Rev 01 dated on 02.01.2012. Auditor team assessed the implementation of this procedure and found that all information received from related parties and its responses was performed in “Log book Permintaan dan Tanggapan atas Permintaan Informasi” (Request and Responses Log Book). The book contain information of date, name, organization, information requested, action taken to request , person in charge, follow up, and other references i.e. letter. Auditor take a sample of record between Aug-October 2013 and found that most of request was about asking for assistances of infrastucture such as road repairing, school renovation, and other social event financing. This log book and other references as records were maintained for at least two years as stated in “Formulir Daftar Induk Rekaman (FORM/PROS-32/01)". Records were maintained under procedure SOP 05 Pengendalian Rekaman, Revisi 01, 2 JanuarI 2012 (Procedure of Record Control) and according to this procedure all records are maintained for at least five years. Criterion 1.2 Management documents are publicly available, except where these are prevented by commercial confidentiality or where disclosure of information would result in negative environmental or social outcomes PT Salim Ivomas Pratama has a policy of no objection for documents to be made publicly available, such as legal, social and environmental documents. Only documents which contain confidential and sensitive information are not publicly available and this has been verified by the auditor team. Mechanism of handling public request for documents is also mentioned in the same procedure as above in SOP 04, Prosedur Komunikasi, Partisipasi dan Konsultasi (Communication, Participation, and Consultation Procedure) Rev 01 dated on 02.01.2012. Auditor team has verified that these documents were available for public viewing upon request, such as: SOP 04, Prosedur Komunikasi, Partisipasi dan Konsultasi (Communication, Participation, and Consultation Procedure) SOP No : CR-AGR -102-GRL. 06.11-1:Prosedur Pembebasan / Ganti Rugi Lahan (Land Release Procedure) SOP No : CR-AGR -103-HGU. 06.11-1: Prosedur Perizinan Dalam Rangka Mendapatkan HGU (Hak Guna Usaha) (Procedure of How to Get Land Tittle Permit) SOP Agronomi No : CR-AGR -104-PKE. 06.11-1 Tentang Prosedur Penanganan Konflik Eksternal Perusahaan, Procedure for Handling of External Conflict and Dispute. AMDAL (environmental impact assessment ) Laporan Pemantauan RKL/RPL (Environmental Management and Monitoring Reports). Dokumen Izin Lokasi (Site Permit documents) Dokumen Hak Guna Usaha/HGU (Land Use Title, Land titles/user rights documents) Plantation Operation Permit (Izin Usaha Perkebunan). Identifikasi HCV (HCV identification), License to use water, (underground water use permit), The Health and Safety Manual and Program. Current and past FFB prices Compensation claims mechanism procedure

Yes

Criterion 2.1 There is compliance with all applicable local, national and ratified international laws and regulations Yes The organization has mechanism on how to comply with all applicable laws and regulations through procedure SOP SMLK3 Prosedur 02 Identifikasi & Evaluasi Kepatuhan Penerapan Peraturan Perundangan & Persyaratan Lainnya. Revisi 01 Tanggal 2 Januari 2012 (Procedure of Identification dan Evaluation of Legal Requirement). Implementation of this procedure was followed up by providing Daftar Identifikasi Dan Evaluasi Peraturan Dan Perundang-Undangan (List Of Regulations And Legal Requirements) for 2013. This list of law and regulation including Land Titles, Environmental, Forestry, Water and Air Pollution prevention, Safety, Labor Wage, Waste Management, and relevant permits which are applicable to mill and plantation operations. The procedure is under the Sustainable Department. Head of department regularly monitor the regulation compliance in order to ensure that they can and will comply with applicable law and regulation. He is also responsible to check whether the new or revised laws and regulations are followed and update the list of regulation compliance. Auditor team has assessed that company has complied to all applicable laws and regulations. Criterion 2.2 The right to use the land can be demonstrated and is not legitimately contested by local communities with demonstrable rights PT Salim Ivomas Pratama has developed procedures to assure the right to use land (Land Titles Use) and to resolve conflict through procedure (SOP) such as: - CR-AGR -102-GRL. 06.11-1, Prosedur Pembebasan / Ganti Rugi Lahan, - CR-AGR -103-HGU. 06.11-1, Prosedur Perizinan Dalam Rangka Mendapatkan Hgu (Hak Guna Usaha) (Procedure How To Get Land Use Title), - CR-AGR -104-PKE. 06.11-1 Tentang Prosedur Penanganan Konflik Eksternal Perusahaan. The company has a list of documents showing ownership or lease of the land in accordance with relevant laws c alled Ijin Lokasi (Location Permit) and Hak Guna Usaha/HGU (Land Use Title). These documents for all estates of Sungai Dua Estate, Sungai Rumbia Estate, and Balam Estate were recorded in file Perijinan PT. Salim Ivom as Pratama,. Below are the list of Ijin Lokasi (Location Permit) and HGU for Sungai Dua Estate: ID No.

Ijin Lokasi (Location Permit) Date

No.KPTS.543/X/1986 No.13-VI/IL/PGT/1997 23-401/PGT/IL/X/1997

08.10.1986 26.06.1997 17.10.1997

Hak Guna Usaha/HGU (Land Use Tittle) Ha Valid until

Ha

ID No.

45,870 2,348 10,073

No. 02/1990 No. 04/1999 No. 02/2001

9,688.2 1,884 10,073

Ijin Tempat Usaha ( Commercial Permit) No. 503/KPT/SITU/2009/03 Ijin Gangguan (Disturbance Permit) HO 660/KPT/2009/08 Other permit for crane operator, tractor loader, forklift are avaialble and still valid

31.12.2023 29.07.2034 18.01.2036

Location Dua Estate, Balam Estate Sungai Rumbia Estate Sungai Dua Factory

Boundary stones were encountered along the legal boundaries of all the estates. The auditor observed that most of them were properly maintained. List and photograph of boundary stones were available. The legal status of boundary stones was approved by Badan Pertanahan Nasional (National Land Agency). Monitoring and maintenance of legal boundaries were instructed through Internal Memo from Vice President of Research, dated 23-27 Mei 2013 which reported the monitoring report of legal boundaries. Result of monitoring at Sungai Dua Estate, at coordinate 1o47'48" N-100o38‟30”, dated April 15,2013 for 29 boundary stones was available. PT Salim Ivomas Pratama has mechanism for the resolution of conflicts and disputes through SOP Agronomi No : CR-AGR -104-PKE. 06.11-1 Tentang Prosedur Penanganan Konflik Eksternal Perusahaan (Procedure for Handling of External Conflict and Dispute). This procedure mentioned that if the problem cannot be resolved by negotiation, the company will take legal action involving related institutions. So far no public dispute happened during the company operation. Criterion 2.3 Use of land for oil palm does not diminish the legal rights or customary rights of other users, without their free, prior and informed consent. Yes There were no findings which indicated the existence of customary rights in all estates. Criterion 3.1 There is an implemented management plan that aims to achieve long term economic and financial viability The company is committed to economic and financial sustainability with annual plan as outlined in the Annual Budget Plan. The plan include production forecast, operating and production costs both for estates and mill, based on yearly financial projections. For mill budget, it includes FFB received and processed, CPO and PKO production details, crop yield projections and income. Price of FFB was based on Peraturan Menteri Pertanian 17 tahun 2010 tentang Pedoman Pembelian TBS Kelapa Sawit Produksi Pekebunan, Decree of Ministry of Agriculture on Pricing Guidelines of Buying FFB for Palm Oil Plantation. There is no documented working plan of the company for a minimum of 3 years period available yet. The management plant for all three estates, SDE, BLE, and SRE1 and its mill, SDF only available for one year base. For this reason, auditor team issued the non conformity. The company has made the corrective action and has prepared an implemented management plan that aims to achieve long-term economic and financial viability for period 2014~2018 (5 year), which contain: - Attention to quality of planting materials - Crop projection or FFB yield trends - Mill extraction rates or OER trends - Cost of Production orcost per ton of CPO trends - Forecast prices - Financial indicators - FFB trends in 5-year - Re-planting program, projected for a minimum of 5 years

No NC # 1 of 2

Criterion 4.1 Operating Procedures are appropriately documented and consistently implemented and monitored PT Salim Ivomas Pratama has prepared the operating procedures both for mill and estates activities which are documented in the Daftar Isi SOP Agronomy (List of Agronomy‟s SOP) for estates operations and Daftar Isi SOP Engineering (List of Engineering‟s SOP) for mill operations. There are 31 agronomy‟s and mill‟s SOPs and of June 2011 edition, such as: Procedure No AGR-101-SKL.06.11-1 AGR-102-GRL.06.11-1 AGR-103-HGU.06.11-1 AGR-104-PKE.06.11-1 AGR-105-BBT.06.11-1 AGR-106-NEW.06.11-1 AGR-107-PKC.06.11-1 AGR-108-TSW.06.11-1 AGR-201-SIP.06.11-1 AGR-202-GLML.06.11-1 AGR-203-PHP.06.11-1 AGR-204-BHT.06.11-1 AGR-205-PST.06.11-1 AGR-206-PPK.06.11-1 AGR-207-JJK.06.11-1 AGR-208-EFL.06.11-1 AGR-209-TPK.06.11-1 AGR-301-PJJ.06.11-1 AGR-401-TBS.06.11-1 AGR-402-TRP.06.11-1 AGR-403-TRA.06.11-1 AGR-501-TRK.06.11-1 AGR-601-PAM.06.11-1 AGR-701-KTA.06.11-1 AGR-702-PLG.06.11-1 AGR-703-NKT.06.11-1 AGR-704-LB3-06.11-1 AGR-705PLK.06.11-1 AGR-706-LBD.06.11-1 AGR-707-KBR.06.11-1 AGR-708-CSR.06.11-1

Yes

Procedure Name Prosedur Survey Kesesuaian Lahan Prosedur Pembebasan /Ganti rugi lahan Prosedur Perizinan Dalam rangka Mendapatkan Hak HGU Prosedur Penanganan Konflik Eksternal Prosedur Pembibitan Prosedur Land Clearing dan Persiapan lahan Pra tanam Prosedur Penanaman kacangan Prosedur Penanaman Kelapa sawit Prosedur sensus dan identifikasi Pokok Prosedur Pengendalian Gulma Prosedur Pengendalian Hama dan Penyakit Prosedur Pengelolaan Burung Hantu Prosedur Penanganan dan Pengelolaan Pestisida Prosedur Pemupukan An Organik Prosedur Aplikasi Janjang Kosong Prsedur Aplikasi Effluent Prosedur Tunas Pokok Prosedur Pembuatan dan Perwatan Jalan Prosedur Pemanenan Buah sawit Prosedur Pengelolaan Transportasi buah ke PKS Prosedur Transportasi Air Prosedur Traksi Prosedur Pemeliharaan Prosedur Pengamanan Prosedur Konservasi Tanah dan Air Kebun Prosedur Pengelolaan Lahan Gambut Prosedur Identifikasi,Penanganan Perlindungan Kawasan Bernilai Konservasi Tinggi (HCV) Prosedur Penanganan Limbah B3 Prosedur Penanganan Limbah Klinik Prosedur Penanganan Limbah Domestik Perkebunan Kelapa Sawit Prosedur Penangan Kebakaran Program Tanggung Jawab Sosial Perusahaan (CSR)

These SOPs were well socialized to respective persons both at plantation and mill. All activities regarding the estate operation and mill was recorded in the Estate and Mill Monthly Report (DOC-SIMP-001) respectively. Monitoring of estate operations recorded in daily and monthly report includes house keeping, warehouse, field maintenance and harvesting. Auditor verified that the report of operational result such as FFB production and expenses, fertilizer, pesticide and herbicide applications, pruning, harvesting, hand picking, stock balances of warehouses, operational expenses, visitors, management structure, clinic report, labour and employees, rainfall, workshop, inventories of company properties are available. Criterion 4.2 Practices to maintain soil fertility at, or where possible improve soil fertility to, a level that ensures optimal and sustained yield Yes, PT Salim Ivomas Pratama has developed SOP to maintain soil fertility and water quality as stated in SOP: - CR-AGR-107-PKC.06.11-1 Penanaman Kacangan (Cover Crop Procedure) - AGR-206-PPK.06.11-1 Prosedur Pemupukan Anorganik (Anorganic Fertilizing Procedure). There are records of soil analysis and leaf analysis conducted in February 2013 by Research Department of the Salim Group, PT. Sarana Inti Pratama. Results of the analysis was recorded in the form Rekomendasi Pemupukan (Fertilizer Recommendation). The estates used anorganic fertilizer such as Urea, RP, MOP and Dolomite based on the recommendation of the Research Department. For the year 2013 the recommended dose of fertilizer are as follow: - urea fertilizer :2.07 to 2.50 kg /plant /yr - RP: 1.50 to 1.52 kg /plant /yr - MOP: 2.75 to 3.00 kg /plant/yr - Dolomite: 0.52 to 1.10 kg /plant /yr No.

Type of fertilizer

Budget in 2013 (kg)

Realization up to October 2013

1

Urea

1,025,335

899,654

2

MOP

1,203,217

850,956

3

RP

4

Dolomite

834 412,193

244,419

Total 2,641,579 1,995,029 To maintain soil fertility the company also used organic fertilizer such as POME and the implementation of these was mentioned in procedure CR-AGR-208-EFL.06.11-1 Aplikasi Effluen (Effluent Aplication).These mill wastes containing bio-nutrient applied in the fields to improve the soil organic matter content and to substitute or supplement anorganic fertilizer inputs. The company has Land Application permit for POME application, which was issued by the Regent of Rokan Hilir District No 12/BPDL/2011, dated on April 06, 2011 and valid until April 06, 2016. The BOD level permitted is 3,000 ppm. The EFB are also used as organic fertilizer and systematically stacked in the palm inter-rows to prevent soil erosion following pruning and after harvesting of FFB. The EFB dosage was 40 ton/ha or equivalent with 307 kg/plant. The working instruction for EFB application was available and well implemented.

Criterion 4.3 Practices to minimize and control erosion and degradation of soils PT Salim Ivomas Pratama has the map of topography in each estate. The topography of land in SDE, SRE and BLE are mostly > 80% flat topography and only