REVISED

4 downloads 196 Views 286KB Size Report
EDGE LINES) PERM.PVMT.MARKING. 132,550.000. LF. 8" WHITE SOLID LINES PERM.PVMT.MARKINGS. 170.000. LF. 24" WHITE SOLID LI
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING July 10, 2018

REVISED Call No. 230, File No. 4606001 Cost of Bridge Plans: $154.00 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia, SC Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. The following items will be made available on June 12, 2018 unless otherwise noted: • EBS (Electronic Bidding System) files via Bid Express website • Hardcopy plans & proposals will be printed upon request only via Engineering Publications o Located in room G23 SCDOT Headquarters o Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orders o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)

Access the Construction Extranet for the following items: • Plans • Announcements • Bids as Received • CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx. Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-1656. The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice.

6/1/2018

South Carolina Department of Transportation

Call No.: 010

SC File NO(S).: 0283890 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: 0042131RD01 CO(S).: Aiken

Description: S-145 INTERSECTION W/ S-65

Project No.: SA02009 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

12.0% $44.00 $0.00 $0.00 $15.00 0.4570

Completion Date: 8/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

1.000

EA

TRAFFIC CONTROL

1.000

LS

CPM PROGRESS SCHEDULE

1.000

LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY

1.000

LS

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT

2,276.000

SY

UNCLASSIFIED EXCAVATION

2,267.000

CY

BORROW EXCAVATION

1,818.000

CY

FINE GRADING

7,284.000

SY

FLOWABLE FILL MAINTENANCE STONE

25.000

CY

100.000

TON

HOT MIX ASPHALT BASE COURSE - TYPE A

1,005.000

TON

HOT MIX ASPHALT BASE COURSE - TYPE B

120.000

TON

LIQUID ASPHALT BINDER PG64-22

177.000

TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

526.000

SY

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B

1,534.000

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C

TON

80.000

TON

HOT MIX ASPHALT SURFACE COURSE TYPE B

923.000

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

60.000

TON

STAINED CONCRETE PAVEMENT (8" UNIFORM) PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) PAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES

1

3,953.000

SF

392.000

SF

50.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES

14,250.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES

15,800.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES

200.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES PAVEMENT MARKINGS (TEMPORARY PAINT) 24"X36" WHITE TRIANGLE YIELD BAR TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

150.000

LF

75.000

LF

75.000

EA

6/1/2018

South Carolina Department of Transportation

Call No.: 010

Description 8" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

Page: Quantity Units 125.000

LF

2,000.000

LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

400.000

LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL

100.000

LF

4,300.000

LF

30.000

EA

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN

175.200

SF

U-SECTION POST FOR SIGN SUPPORTS - 3P

300.000

LF

REFLECTIVE SIGN POST PANELS

160.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

DESIGN & INSTALLATION OF RDWY. LIGHTING ELECTRICAL SYSTEM 001 SGL.LIGHT STD.35'HT.AL.POLE-INCL TOP TENON MT. 18" SMOOTH WALL PIPE

1.000

LS

10.000

EA

2,116.000

LF

CATCH BASIN -TYPE 16

15.000

EA

BEVELING OF PIPE END

12.000

EA

522.000

LF

2,512.000

LF

CONCRETE DRIVEWAY(6" UNIFORM)

492.000

SY

CONCRETE MEDIAN

472.000

SY

RIP-RAP (CLASS B)

367.000

TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B

460.000

SY

31.000

EA

RIGHT OF WAY PLAT

1.000

LS

PERMANENT COVER

1.043

ACRE

0.522

ACRE

CONCRETE CURB AND GUTTER(1'-6") OGEE CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE

RIGHT OF WAY MARKER(REBAR AND CAP)

TEMPORARY COVER FERTILIZER (NITROGEN)

157.000

LB

FERTILIZER (PHOSPHORIC ACID)

157.000

LB

FERTILIZER (POTASH)

157.000

LB

3,130.000

LB

AGRICULTURAL GRANULAR LIME SELECTIVE WATERING MOWING LANDSCAPING

54,300.000

GAL

3.130

ACRE

1.000

LS

1,810.000

SF

MUHLENBERGIA CAPILLARIS (PINK MUHLY GRASS) #1 CONT.

35.000

EA

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1

0.344

ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3

0.296

ACRE

DOUBLE-SHREDDED HARDWOOD MULCH

INLET STRUCTURE FILTER - TYPE F (WEIGHTED)

90.000

LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED)

90.000

LF

SEDIMENT TUBES FOR DITCH CHECKS SILT FENCE REPLACE/REPAIR SILT FENCE REMOVAL OF SILT RETAINED BY SILT FENCE CLEANING INLET STRUCTURE FILTERS

260.000

LF

5,157.000

LF

516.000

LF

1,290.000

LF

30.000

EA

2

6/1/2018

South Carolina Department of Transportation

Call No.: 010

Description STABILIZED CONSTRUCTION ENTRANCE

Page: Quantity Units 550.000

SY

3

6/1/2018

South Carolina Department of Transportation

Call No.: 020

SC File NO(S).: 0287540 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P028045 CO(S).: Aiken

Description: I-20/S-144 (BETTIS ACADEMY ROAD) INTERCHANGE IMPROVEMENT

Project No.: P028045 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

6.00% $47.00 $10.00 $22.00 $15.00 0.7480

Completion Date: 7/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BRIDGE CONSTRUCTION ACCESS

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

1.000

EA

TRAFFIC CONTROL

1.000

LS

CPM PROGRESS SCHEDULE

1.000

LS

CLEARING & GRUBBING WITHIN ROADWAY

1.000

LS

REMOVAL & DISPOSAL OF EXISTING CONCRETE

1.670

CY

REMOVAL OF EXIST. GUARDRAIL

662.500

LF

UNCLASSIFIED EXCAVATION

552.000

CY

BORROW EXCAVATION

1,222.000

CY

FINE GRADING

1,932.000

SY

MAINTENANCE STONE

50.000

TON

HOT MIX ASPHALT BASE COURSE - TYPE A

732.000

TON

LIQUID ASPHALT BINDER PG64-22

182.000

TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

100.000

SY

MILLING EXISTING ASPHALT PAVEMENT 2.0"

20,730.000

SY

500.000

SY

1.040

MI

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B HOT MIX ASPHALT SURFACE COURSE TYPE B PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED)

166.000 2,654.000

TON TON

408.000

SF

70.000

SF

3,701.000

LF

84.000

LF

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2

2.000

EA

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(70MPH)

2.000

EA

ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2)

2.000

EA

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER

2.000

EA

16.000

EA

TEMPORARY CONCRETE BARRIER BARRICADE - TYPE 3

TYPE B - FLASHING LIGHT

4

6/1/2018

South Carolina Department of Transportation

Call No.: 020

Description

Page: Quantity Units

PREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE 4"WH.SOLID PREF.

1,088.000

LF

PREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE4"YEL.SOLID PREF.

1,088.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING

440.000

LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING

396.000

LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

1,000.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

6,742.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

440.000

LF

1,054.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

308.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

24.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

20.000

EA

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

12,068.000

LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT

1,550.000

LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

1,000.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

4,310.000

LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

1,264.000

LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL

36.000

LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL

16.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

308.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

24.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

20.000

EA

8,356.000

LF

299.000

EA

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM. 60MIL 3" BLACK SOLID

10.000

EA

127.000

EA

15.000

LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN

111.000

LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID

530.000

LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL.

530.000

LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN

267.000

SF

FLAT SHEET, TYPE III, SIZE DETERMINED BY MSG

279.000

SF

Flat Sheet, Type XI, Size Determined by MSG, Overhead

75.000

SF

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE

10.000

EA

U-SECTION POST FOR SIGN SUPPORTS - 2P

30.000

LF

U-SECTION POST FOR SIGN SUPPORTS - 3P

646.000

LF

U-SECTION POST FOR SIGN BRACING - 2P

130.000

LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

335.000

LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT

1,646.000

LF

FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT

92.000

LF

148.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY

3,093.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK)

2,211.000

LF

FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED)

5

6/1/2018

South Carolina Department of Transportation

Call No.: 020

Description FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE INSTALL WIRELESS NETWORK COMMUNICATIONS LINK BETWEEN TWO SIGNALS (2 RADIOS) SAWCUT FOR LOOP DETECTOR FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL

Page: Quantity Units 2,707.000

LF

1.000

EA

972.000

LF

2.000

EA

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

17.000

EA

F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

2.000

EA

FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION

8.000

EA

1,044.000

LF

F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001

2.000

EA

FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD

2.000

EA

12.000

EA

4.000

EA

14.000

EA

FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE

FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 FURNISH & INSTALL PEDESTRIAN PUSH BUTTON AND SIGN (R-10-4B) BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. FURNISH & INSTALL CONCRETE CABINET FOUNDATION SPALL REPAIR EPOXY CRACK INJECTION

2.000

EA

65.000

SF

30.000

LF

COMPRESSION SEAL JOINT

144.200

LF

GROOVED SURFACE FINISH

1,258.000

SY

ENVIRONMENTAL AND WORKER PROTECTION

1.000

LS

CLEANING AND PAINTING EXISTING STRUCTURAL STEEL

1.000

LS

CONCRETE DRIVEWAY(10" UNIFORM) CONCRETE MEDIAN ELASTOMERIC BEARING

40.000

SY

859.000

SY

42.000

EA

1,266.000

SY

126.600

SY

CONCRETE OVERLAY (LATEX)

43.300

CY

VERY EARLY STRENGTH CONCRETE OVERLAY (LATEX)

20.900

CY

HYDRO-DEMOLITION OF EXISTING SURFACE PARTIAL DEPTH REMOVAL OF SOUND CONCRETE

JACKING BRIDGE

1.000

LS

645.500

LF

END ANCHOR-TYPE B

1.000

EA

END TERMINAL - TYPE T

1.000

EA

PERMANENT COVER

0.930

ACRE

0.465

ACRE

STEEL BEAM GUARDRAIL STEEL BEAM GR.

TEMPORARY COVER COMPOST

250.000

CY

FERTILIZER (NITROGEN)

93.000

LB

FERTILIZER (PHOSPHORIC ACID)

93.000

LB

FERTILIZER (POTASH)

93.000

LB

1,860.000

LB

AGRICULTURAL GRANULAR LIME SELECTIVE WATERING

54,300.000

GAL

MOWING

2.790

ACRE

TURF REINFORCEMENT MATTING (TRM) TYPE 1

0.075

MSY

6

6/1/2018

South Carolina Department of Transportation

Call No.: 020

Description

Page: Quantity Units

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1

0.300

ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 2

0.300

ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3

0.300

ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 4

0.300

ACRE

SEDIMENT TUBES FOR DITCH CHECKS

60.000

LF

2,500.000

LF

REPLACE/REPAIR SILT FENCE

250.000

LF

REMOVAL OF SILT RETAINED BY SILT FENCE

625.000

LF

STABILIZED CONSTRUCTION ENTRANCE

825.000

SY

1,266.000

SY

126.600

SY

SILT FENCE

SURFACE MILLING 001 BRIDGE DECK PATCHING, FULL DEPTH 002 ANCHOR BOLT REPLACEMENT WITH CONCRETE CORING

5.000

EACH

REMOVE AND RE-BUILD BEAM SEAT BUILD-UPS

4.000

EACH

7

6/1/2018

South Carolina Department of Transportation

Call No.: 030

SC File NO(S).: 0848540

Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P029715 PCN: P031997 PCN: P037325 CO(S).: Berkeley

Description: RECLAMATION, WIDENING, RESURF

Project No.: P029715 Project No.: P031997 Project No.: P037325 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 12.5000

Completion Date: 11/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

6.000

EA

TRAFFIC CONTROL

1.000

LS

CSX RAILROAD INSURANCE AND FLAGGING 001

1.000

LS

UNCLASSIFIED EXCAVATION

1,295.000

CY

BORROW EXCAVATION

6,724.000

CY

EXCAVATION FOR SHOULDER PAVING

25.000

STA

HAULING OF EXCAVATED SHOULDER MATERIAL

25.000

STA

ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION

4,365.000

TON

CEMENT MODIFIED RECYCLED BASE (10" UNIFORM)

195,275.000

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE

SY

6,837.175

TON

MAINTENANCE STONE

237.000

TON

HOT MIX ASPHALT BASE COURSE - TYPE A

176.000

TON

2,083.097

TON

LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP

200.000

SY

5,250.000

SY

11.080

MI

HOT MIX ASPHALT SURFACE COURSE TYPE B

31,455.913

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

6,264.720

TON

DRIVEWAY PAVING-SURFACE TYPE C

1,023.000

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING

962.000

SF

60.000

LF

132,550.000

LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS

170.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING

288.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING

2.000

EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING

2.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING

8

6/1/2018

South Carolina Department of Transportation

Call No.: 030

Description

Page: Quantity Units

WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING

2.000

EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING

3.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING

12,000.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING

50,855.000

LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT

180.000

LF

527,140.000

LF

510.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

1,112.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

6.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

6.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT

6.000

EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT

12.000

EA

48,000.000

LF

200,780.000

LF

16.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

868.000

EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

730.000

LF

SAWCUT FOR LOOP DETECTOR

300.000

LF

15" SMOOTH WALL PIPE

48.000

LF

24" SMOOTH WALL PIPE

88.000

LF

36" SMOOTH WALL PIPE

48.000

LF

12.122

ACRE

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

PERMANENT GRASSING FOR SMALL PROJECTS SILT FENCE

2,150.000

LF

9

6/1/2018

South Carolina Department of Transportation

Call No.: 040

SC File NO(S).: 0908820 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030169 CO(S).: Calhoun

Description: S-158 (COMMUNITY CLUB RD) BRIDGE OVER HUNGERPILLER POND (DR-

Project No.: P030169 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $11.00 $0.00 $15.00 0.0000

Completion Date: 7/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

1.000

EA

TRAFFIC CONTROL

1.000

LS

SELECTED REMOVAL OF MARKED TREES

1.000

LS

24.000

SY

1.000

LS

UNCLASSIFIED EXCAVATION

120.000

CY

BORROW EXCAVATION

240.000

CY

5.000

CY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT REMOVAL & DISPOSAL OF EXISTING BRIDGE

ROCK EXCAVATION FOR BRIDGES PERMANENT SHEET PILING

1,200.000

SF

FLOWABLE FILL

20.000

CY

MAINTENANCE STONE

20.000

TON

LIQUID ASPHALT BINDER PG64-22

3.000

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

40.000

TON

PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED)

70.000

SF

BARRICADE - TYPE 3

84.000

LF

TYPE B - FLASHING LIGHT

16.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING

400.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING

400.000

LF

1,100.000

LF

800.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" CONC. FOR STRUCTURES - CLASS 4000 REINF. STEEL FOR STRUCTURES (BRIDGE) REINF. PILE TIPS (HP12 X 53)

8.000

EA

50.000

CY

8,000.000

LB

14.000

EA

240.000

LF

CONCRETE CURB (TRANSITION)

30.000

LF

RIP-RAP (CLASS B)

40.000

TON

STEEL H BEARING PILING (HP12 X 53)

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B

2,000.000

10

SY

6/1/2018

South Carolina Department of Transportation

Call No.: 040

Description STEEL BEAM GUARDRAIL STEEL BEAM GR. END TERMINAL - TYPE T THRIE BEAM G.R.BRIDGE CONN. ADDITIONAL LENGTH GUARDRAIL POST

Page:

11

Quantity Units 400.000

LF

4.000

EA

4.000

EA

400.000

LF

PERMANENT GRASSING FOR SMALL PROJECTS

1.000

ACRE

TEMPORARY COVER

1.000

ACRE

2.000

MSY

TEMPORARY EROSION CONTROL BLANKET (ECB) SEDIMENT TUBES FOR DITCH CHECKS

80.000

LF

1,000.000

LF

REPLACE/REPAIR SILT FENCE

100.000

LF

REMOVAL OF SILT RETAINED BY SILT FENCE

300.000

LF

SILT FENCE

DITCH CHECK

20.000

TON

AGGREGATE NO.5 OR 57 FOR EROSION CONTROL

20.000

TON

STABILIZED CONSTRUCTION ENTRANCE

200.000

SY

TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 12"

100.000

LF

PRESTRESSED CONCRETE BOX GIRDER

960.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 050

SC File NO(S).: 1014381 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P032295 CO(S).: Charleston

Description: 2018 FDP, MILL, RESURFACING

Project No.: P032295 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 10.3200

Completion Date: 9/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

2,455.000

SY

273.000

LF

1,786.000

CY

REMOVAL & DISPOSAL OF EXISTING PAVEMENT REMOVAL & DISPOSAL OF EXISTING CURB BORROW EXCAVATION MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22

62.400

TON

876.003

TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

4,925.000

SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF

1,315.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.5"

17,140.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.75"

7,645.000

SY

15,860.000

SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) HOT MIX ASPHALT SURFACE COURSE TYPE B

738.213

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

13,029.188

TON

875.000

TON

HOT MIX ASPHALT SURFACE COURSE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING

2,640.000

SF

300.000

LF

24,400.000

LF

1,204.000

LF

12" WHITE SOLID LINES - PERM.PVMT.MARKINGS

70.000

LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK

40.000

LF

1,033.000

LF

12.000

EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING

2.000

EA

WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING

4.000

EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING

3.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 8" WHITE SOLID LINES PERM.PVMT.MARKINGS

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

12

150.000

LF

53,935.000

LF

600.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 050

Description 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT

Page: Quantity Units 48,030.000

LF

1,676.000

LF

70.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

1,972.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

22.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

4.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT

7.000

EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT

2.000

EA

300.000

LF

84,195.000

LF

110.000

LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

18.000

EA

727.000

EA

90.000

LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

5,150.000

LF

SAWCUT FOR LOOP DETECTOR

2,550.000

LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

4.000

EA

CONCRETE CURB (9" X 15")

300.000

LF

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE

253.000

LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE

20.000

LF

1,360.000

SY

DETECTABLE WARNING MATERIAL

440.000

SF

CONCRETE DRIVEWAY(6" UNIFORM)

500.000

SY

CONCRETE SIDEWALK(4" UNIFORM)

CONCRETE MEDIAN

45.000

SY

PEDESTRIAN RAMP CONSTRUCTION

550.000

SY

SURFACE APPLIED DETECTABLE WARNING

300.000

SF

PERMANENT GRASSING FOR SMALL PROJECTS ROOT BARRIER

13

8.804 50.000

ACRE LF

6/1/2018

South Carolina Department of Transportation

Call No.: 060

SC File NO(S).: 1025800 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P028928

CO(S).:

Description: I-526 SYSTEMS AND TIMINGS PROJECT

Project No.: P028928 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $98.00 $0.00 $0.00 $15.00 0.0000

Completion Date: 10/31/2020

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

1,028.000

SY

474.000

LF

6,055.000

LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL

112.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

964.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

9.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

2.000

EA

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL

1.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.

130.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

492.000

LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" REMOVAL OF PAVEMENT MARKINGS REMOVAL OF PAVEMENT MARKINGS FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN Flat Sheet, Type XI, Size Determined by MSG, Overhead MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE REMOVAL OF MOUNTING ASSEMBLY FOR FS.SIGN ON SPAN WIRE F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM

24.000

EA

1,722.000

LF

5.000

EA

36.000

SF

667.000

SF

89.000

EA

7.000

EA

3.000

EA

120.000

LF

U-SECTION POST FOR SIGN BRACING - 2P

0.000

LF

REMOVAL OF U-SECTION POST

0.000

EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

1,052.000

LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT

10,268.000

LF

FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT

175.000

LF

U-SECTION POST FOR SIGN SUPPORTS - 3P

FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK

14

382.000

LF

1,940.000

LF

20,940.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 060

Description

Page: Quantity Units

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY

46,395.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK)

22,555.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY)

36,145.000

LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

79,235.000

LF

1,570.000

LF

6.000

EA

FURNISH & INSTALL FIBER OPTIC CABLE-SINGLE MODE FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER FIBER OPTIC TRANSCEIVER (SMFO) OTDR TEST FOR EXISTING FIBER BETWEEN SIGNALS PER 677.3 INSTALL WIRELESS NETWORK COMMUNICATIONS RADIO AT SIGNAL CABINET (1 RADIO) 001 FURNISH & INSTALL WIRELESS DETECTION SYSTEM PER SIGNAL

2.000

EA

14.000

EA

4.000

EA

4.000

EA

30,763.000

LF

FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL

10.000

EA

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

20.000

EA

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

157.000

EA

F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

7.000

EA

FURNISH & INSTALL 40' WOOD POLE - CLASS II-CCA TREATED(0.60)

8.000

EA

FURNISH & INSTALL 3/8" SIDEWALK GUY

3.000

EA

10.000

EA

FURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE

260.000

LF

FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE

2,617.000

LF

FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE

56.000

EA

F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 17

17.000

EA

FURNISH AND INSTALL BATTERY BACK-UP INCLUDING FOUNDATION

4.000

EA

FURNISH & INSTALL 2070L CONTROLLER UNIT IN EXISTING CABINET INSTALL 2070L CONTROLLER UNIT &/OR CONFLICT MONITOR IN EXISTING CABINET FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD

4.000

EA

2.000

EA

10.000

EA

FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD

50.000

EA

FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002

150.000

EA

F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD F&I - 16" 1-WAY-1SECT.HAND/MAN/COUNTDOWN LED PEDESTRIAN SIGNAL HEAD - LEFT F&I - 16" 1-WAY-1SECT.HAND/MAN/COUNTDOWN LED PEDESTRIAN SIGNAL HEAD - RIGHT F&I-PED PUSH BUT.SOLID STATE W/ LIGHT&TONE ASSEM 9"X15"&SIGN (R-10-3E or R10-4a) F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM

114.000

EA

3.000

EA

1.000

EA

116.000

EA

20.000

EA

BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG.

283.000

EA

F&I-PEDESTRIAN TRAF. SIGNAL HEAD MOUNTING ASSEM FOR POST TOP

2.000

EA

F&I-PED. TRAF. SIGNAL HEAD MOUNT. ASSY FOR DUAL POST TOP

3.000

EA

REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT

1.000

LS

TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT

1.000

LS

SAWCUT FOR LOOP DETECTOR

FURNISH & INSTALL 13" X 28' STEEL STRAIN POLE AND FOUNDATION

15

6/1/2018

South Carolina Department of Transportation

Call No.: 060

Description

Page: Quantity Units

FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN

1.000

EA

INSTALL 12" 1-WAY-3 SECTION(R.Y.G.)VEHICLE TRAFFIC SIGNAL

7.000

EA

INSTALL 12" 1-WAY-1 SECTION(RA)VEHICLE TRAFFIC SIGNAL

2.000

EA

FURNISH & INSTALL CONCRETE CABINET FOUNDATION

10.000

EA

FURNISH & INSTALL 332 SIGNAL CABINET - BASE MOUNTED

12.000

EA

INSTALL PEDESTRIAN SIGNAL HEAD

4.000

EA

CONCRETE SIDEWALK(4" UNIFORM)

154.000

SY

DETECTABLE WARNING MATERIAL

503.000

SF

71.000

SY

1,292.000

SY

464.000

SF

CONCRETE MEDIAN PEDESTRIAN RAMP CONSTRUCTION SURFACE APPLIED DETECTABLE WARNING

16

6/1/2018

South Carolina Department of Transportation

Call No.: 070

Page:

Project No.: P037415 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Description: I-26 PAVEMENT MARKINGS - CHARLESTON Cost of X-Sections: COUNTY Cost of Proposal: Approx. Length (miles):

SC File NO(S).: 1048430 Letting Date: July 10, 2018 Letting Time: 02:00 PM

PCN: P037415 CO(S).: Charleston

0.00% $22.00 $0.00 $0.00 $15.00 10.3200

Completion Date: 11/30/2018

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

6" WHITE BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 6" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION-EPOXY PAINT 12" WHITE SOLID LINES (GORE MARKINGS) EPOXY PAINT 24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)EPOXY PAINT 24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) EPOXY PAINT

2,200.000

LF

152,000.000

LF

2,575.000

LF

23,625.000

LF

175.000

LF

2,025.000

LF

WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT

35.000

EA

WHITE WORD MESSAGE "ONLY" - EPOXY PAINT

31.000

EA

WHITE COMBINATION ARROW (STR.&RT.OR STR.<) EPOXY PAINT

11.000

EA

4.000

EA

149,500.000

LF

4,440.000

EA

415,600.000

LF

1.000

LS

66,600.000

LF

WHITE LANE DROP ARROW (LEFT OR RIGHT) EPOXY PAINT 6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE - EPOXY PAINT PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" REMOVAL OF PAVEMENT MARKINGS EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL8"WH.CONTRAST BROKEN

17

6/1/2018

South Carolina Department of Transportation

Call No.: 080

SC File NO(S).: 1048440 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P037416 CO(S).: Charleston

Description: SC-30 PAVEMENT MARKINGS

Project No.: P037416 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $8.00 $0.00 $0.00 $15.00 3.0500

Completion Date: 11/30/2018

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4"

910.000

EA

124,600.000

LF

1.000

LS

11,800.000

LF

100.000

LF

52,400.000

LF

225.000

LF

8,325.000

LF

850.000

LF

11.000

EA

POLYUREA WHITE WORD MESSAGE "ONLY"

2.000

EA

POLYUREA WHITE COMBINATION ARROW (STR.&RT.OR STR.<)

4.000

EA

47,600.000

LF

REMOVAL OF PAVEMENT MARKINGS EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL8"WH.CONTRAST BROKEN POLYUREA 12"X18" WHITE YIELD BAR POLYUREA 6" WHITE SOLID LINES (PVT. EDGE LINES) POLYUREA 8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION POLYUREA 12" WHITE SOLID LINES (GORE MARKINGS) POLYUREA 24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) POLYUREA WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT)

POLYUREA 6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE

18

6/1/2018

South Carolina Department of Transportation

Call No.: 090

SC File NO(S).: 1209150 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030042 PCN: P030050 CO(S).: Chester

Description: CMRB, MILLING, HMA BASE/SURFACE

Project No.: P030042 Project No.: P030050 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 3.6200

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL REMOVAL OF EXIST. GUARDRAIL UNCLASSIFIED EXCAVATION BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE HOT MIX ASPHALT BASE COURSE - TYPE B LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT 6.0" MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP

1.000

LS

300.000

LF

5,247.000

CY

724.000

CY

30,067.000

SY

902.010

TON

29.000

TON

12,250.187

TON

1,029.466

TON

22,106.000

SY

800.000

SY

7.240

MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B

2,578.987

TON

HOT MIX ASPHALT SURFACE COURSE TYPE B

2,608.987

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

2,202.300

TON

250.250

TON

DRIVEWAY PAVING-SURFACE TYPE C ASPHALT SURFACE TREATMENT(SINGLE TREATMENT)

30,067.000

SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

714.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

534.000

LF

114,690.000

LF

480.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.

19

4,740.000

LF

90,120.000

LF

178.000

LF

38,230.000

LF

160.000

LF

1,580.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 090

Description 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" STEEL BEAM GUARDRAIL STEEL BEAM GR. GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING END TERMINAL - TYPE T ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS

Page:

20

Quantity Units 30,040.000

LF

246.000

EA

4,325.000

LF

300.000

LF

34.000

EA

519.000

LF

4.000

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 100

SC File NO(S).: 1309230 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030051 CO(S).: Chesterfield

Description: CMRB AND OVERLAY

Project No.: P030051 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 0.4300

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

UNCLASSIFIED EXCAVATION

86.000

CY

BORROW EXCAVATION

86.000

CY

6,000.000

SY

CEMENT MODIFIED RECYCLED BASE (10" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

180.000

TON

27.500

TON

51.119

TON

1,000.000

SY

HOT MIX ASPHALT SURFACE COURSE TYPE C

654.987

TON

DRIVEWAY PAVING-SURFACE TYPE C

197.000

TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT)

6,000.000

SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

552.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

320.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

9,200.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

380.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

4.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

4.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT

4.000

EA

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

9,200.000

LF

160.000

LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

4,600.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

190.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

2.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

2.000

EA

WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL

2.000

EA

4,600.000

LF

4.000

EA

30.000

EA

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

21

6/1/2018

South Carolina Department of Transportation

Call No.: 100

Description

Page: Quantity Units

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

750.000

LF

SAWCUT FOR LOOP DETECTOR

250.000

LF

PERMANENT GRASSING FOR SMALL PROJECTS

22

0.500

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 110

SC File NO(S).: 1808900 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030036 CO(S).: Dorchester

Description: CMRB-12 UNIF STC STB

Project No.: P030036 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

23

0.00% $0.00 $0.00 $0.00 $15.00 1.5700

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

1.000

EA

TRAFFIC CONTROL

1.000

LS

UNCLASSIFIED EXCAVATION

150.000

CY

BORROW EXCAVATION

950.000

CY

ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION

392.500

TON

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM)

24,000.000

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE

SY

1,080.000

TON

MAINTENANCE STONE

150.000

TON

LIQUID ASPHALT BINDER PG64-22

253.999

TON

MILLED-IN RUMBLE STRIP

2.600

MI

HOT MIX ASPHALT SURFACE COURSE TYPE B

4,243.354

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

100.000

TON

DRIVEWAY PAVING-SURFACE TYPE C

385.000

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING

320.000

SF

16,880.000

LF

40.000

LF

2,500.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING

16,880.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

52,640.000

LF

160.000

LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERMANENT GRASSING FOR SMALL PROJECTS

7,500.000

LF

52,640.000

LF

104.000

EA

1.522

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 120

SC File NO(S).: 1908190 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P029984 PCN: P030390 CO(S).: Edgefield

Description: CMRB AND OVERLAY

Project No.: P029984 Project No.: P030390 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 7.4200

Completion Date: 10/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

2.000

EA

TRAFFIC CONTROL

1.000

LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT REMOVAL OF EXIST. GUARDRAIL BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 10"UNIF MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C DRIVEWAY PAVING-SURFACE TYPE C DRIVEWAY PAVING-SURFACE TYPE D ASPHALT SURFACE TREATMENT (TRIPLE TREATMENT) TYPE 2

105.000

SY

3,207.000

LF

2,187.000

CY

115,340.000

SY

4,153.000

TON

5.350

TON

673.632

TON

535.000

SY

1,500.000

SY

8.380

MI

10,846.360

TON

300.000

TON

77.000

TON

44,380.000

SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

732.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

462.000

LF

134,961.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

276.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

6.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT

6,390.000

LF

132,657.000

LF

154.000

LF

45,409.000

LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL

30.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

92.000

LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

24

6/1/2018

South Carolina Department of Transportation

Call No.: 120

Description WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

Page: Quantity Units 2.000

EA

2,130.000

LF

44,620.000

LF

7.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

520.000

EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

500.000

LF

1,212.000

LF

404.000

LF

1.000

EA

4,910.000

LF

96.000

LF

500.000

LF

28.000

EA

4.000

EA

304.000

LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE SAWCUT FOR LOOP DETECTOR 13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD STEEL BEAM GUARDRAIL STEEL BEAM GR. GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING STEEL BEAM GUARDRAIL (THRIE) END TERMINAL - TYPE T THRIE BEAM G.R.BRIDGE CONN. ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS SEDIMENT TUBES FOR DITCH CHECKS

5.420

ACRE

1,110.000

LF

11,080.000

LF

REPLACE/REPAIR SILT FENCE

1,108.000

LF

REMOVAL OF SILT RETAINED BY SILT FENCE

2,770.000

LF

SILT FENCE

25

6/1/2018

South Carolina Department of Transportation

Call No.: 130

SC File NO(S).: 2009160

Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030044 PCN: P030052 PCN: P033598 CO(S).: Fairfield

Description: CMRB AND OVERLAY

Project No.: P030044 Project No.: P030052 Project No.: P033598 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 6.9800

Completion Date: 11/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

1,100.000

LF

968.000

CY

12,800.000

CY

REMOVAL OF EXIST. GUARDRAIL UNCLASSIFIED EXCAVATION BORROW EXCAVATION STATION GRADING

109.570

STA

CEMENT MODIFIED RECYCLED BASE (10" UNIFORM)

25,009.600

SY

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM)

84,217.000

SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE

3,688.016

TON

MAINTENANCE STONE

227.000

TON

LIQUID ASPHALT BINDER PG64-22

923.920

TON

MILLING EXISTING ASPHALT PAVEMENT 2.0"

36,468.000

SY

MILLING EXISTING ASPHALT PAVEMENT 3.0"

33,229.000

SY

3,125.000

SY

9.900

MI

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C DRIVEWAY PAVING-SURFACE TYPE C ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

26

14,768.667

TON

630.000

TON

25,009.600

SY

1,346.000

SF

824.000

LF

246,050.000

LF

920.000

LF

6.000

EA

12,350.000

LF

179,045.000

LF

296.000

LF

73,710.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 130

Description

Page: Quantity Units

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

430.000

LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.

2.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

4,700.000

LF

48,465.000

LF

475.000

EA

10,162.500

LF

GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING

90.000

LF

END TERMINAL - TYPE T

80.000

EA

4.000

EA

2,751.000

LF

STEEL BEAM GUARDRAIL STEEL BEAM GR.

THRIE BEAM G.R.BRIDGE CONN. ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS SILT FENCE

27

19.000

ACRE

2,000.000

LF

REPLACE/REPAIR SILT FENCE

200.000

LF

REMOVAL OF SILT RETAINED BY SILT FENCE

200.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 140

SC File NO(S).: 2109550 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030492 CO(S).: Florence

Description: 2017 CMRB AND SURFACE COURSE

Project No.: P030492 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

28

0.00% $0.00 $0.00 $0.00 $15.00 4.0900

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

818.000

CY

47,989.000

SY

BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE LIQUID ASPHALT BINDER PG64-22 MILLED-IN RUMBLE STRIP

1,727.000

TON

292.303

TON

8.180

MI

HOT MIX ASPHALT SURFACE COURSE TYPE C

4,225.317

TON

HOT MIX ASPHALT SURFACE COURSE TYPE D

615.625

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

378.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

150.000

LF

129,600.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

120.000

LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT

14,400.000

LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

10,800.000

LF

50.000

LF

43,200.000

LF

40.000

LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.

4,800.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

3,600.000

LF

270.000

EA

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERMANENT GRASSING FOR SMALL PROJECTS

3.966

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 150

SC File NO(S).: 2688710 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P028288 CO(S).: Horry

Description: US 17 BUSINESS ACCESS MANAGEMENT PROJECT

Project No.: P028288 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

17.50% $253.00 $0.00 $67.00 $15.00 3.0770

Completion Date: 11/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

1.000

EA

UTILITY RELOCATION NO. ____ 001

1.000

EA

TRAFFIC CONTROL

1.000

LS

CPM PROGRESS SCHEDULE

1.000

LS

CLEARING & GRUBBING WITHIN ROADWAY

1.000

LS

REMOVAL & DISPOSAL OF HIGH LEVEL CONTAMINATED SOIL

250.000

TON

REMOVAL & DISPOSAL ITEM NO. 002

1.000

LS

REMOVAL & DISPOSAL ITEM NO. 003

1.000

LS

10,170.000

SY

20.000

CY

UNCLASSIFIED EXCAVATION

11,000.000

CY

BORROW EXCAVATION

19,200.000

CY

3,000.000

CY

500.000

CY

65.000

CY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT REMOVAL & DISPOSAL OF EXISTING CONCRETE

MUCK EXCAVATION SELECT MATERIAL FOR LANDSCAPING FLOWABLE FILL MAINTENANCE STONE

300.000

TON

HOT MIX ASPHALT BASE COURSE - TYPE A

4,585.000

TON

LIQUID ASPHALT BINDER PG64-22

1,085.000

TON

MILLING EXISTING ASPHALT PAVEMENT 2.0" HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B HOT MIX ASPHALT SURFACE COURSE TYPE B PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

133,015.000

SY

1,260.000

TON

15,355.000

TON

1,140.000

SF

204.000

LF

PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES

28,620.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES

70,710.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES

BARRICADE - TYPE 3

29

70,890.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES

6,520.000

LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES

11,750.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 150

Description PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"YELLOW SOLID LINES PAVEMENT MARKINGS (TEMPORARY PAINT) 12"X18" WHITE TRIANGLE YIELD BAR PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW

Page: Quantity Units 800.000

LF

32.000

LF

318.000

EA

PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE COMBINATION ARROWS

12.000

EA

PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE LANE DROP ARROWS

22.000

EA

230.000

EA

PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE WORD 'ONLY 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT

1,985.000

LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

14,310.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

35,355.000

LF

3,260.000

LF

16.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

5,875.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

159.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

115.000

EA

6.000

EA

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL

WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL

11.000

EA

35,445.000

LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL.

400.000

LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

585.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

425.000

EA

REMOVAL OF PAVEMENT MARKINGS

4,350.000

LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN

1,127.500

SF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

Flat Sheet, Type XI, Size Determined by MSG, Overhead

396.000

SF

FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG.

36.000

SF

MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE

12.000

EA

F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM

54.000

EA

1,920.000

LF

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

410.000

LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT

5,081.000

LF

FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT

210.000

LF

FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE

1,723.000

LF

FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS)

1,723.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK

5,610.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY

9,110.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK)

10,840.000

LF

FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY)

6,960.000

LF

26,398.000

LF

FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER

1.000

EA

FIBER OPTIC TRANSCEIVER (SMFO)

1.000

EA

9,461.000

LF

3.000

EA

U-SECTION POST FOR SIGN SUPPORTS - 3P

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

SAWCUT FOR LOOP DETECTOR FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL

30

6/1/2018

South Carolina Department of Transportation

Call No.: 150

Description

Page: Quantity Units

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

48.000

EA

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

27.000

EA

F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD

7.000

EA

FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION

2.000

EA

610.000

LF

23.000

EA

F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 002

7.000

EA

FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD

1.000

EA

FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD

13.000

EA

FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 003

68.000

EA

F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD F&I-PED PUSH BUT.SOLID STATE W/ LIGHT&TONE ASSEM 9"X15"&SIGN (R-10-3E or R10-4a) F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM

36.000

EA

36.000

EA

64.000

EA

BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG.

FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE

82.000

EA

REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT

1.000

LS

TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT

1.000

LS

F&I - VIDEO DETECTION SYSTEM W/ ONE CAMERA, HARDWARE & LEAD-IN

4.000

EA

FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN

18.000

EA

TRAFFIC ADAPTIVE SYSTEM

3.000

EA

FURNISH & INSTALL FACTORY TERMINATED PATCH PANEL INSTALL WIRELESS NETWORK COMMUNICATIONS LINK BETWEEN TWO SIGNALS 001 POWDERCOATING PER MAST ARM OVER GALVANIZED DESIGN, FURNISH & INSTALL STEEL POLE WITH TWIN MAST ARMS INCLUDING FOUNDATION 001 DESIGN, FURNISH & INSTALL STEEL POLE WITH MAST ARM INCLUDING FOUNDATION POWDERCOATING OPTION FOR 10' ALUMINUM PEDESTAL POLE

1.000

EA

2.000

EA

17.000

EA

6.000

EA

11.000

EA

23.000

EA

PERMANENT CONCRETE BOLLARD

2.000

EA

15" SMOOTH WALL PIPE

344.000

LF

18" SMOOTH WALL PIPE

7,312.000

LF

24" SMOOTH WALL PIPE

2,828.000

LF

30" SMOOTH WALL PIPE

2,533.000

LF

CLEANING EXISTING PIPE

2,730.000

LF

BRICK SIDEWALK (MORTARLESS)

23.000

SY

CATCH BASIN -TYPE 16

15.000

EA

DROP INLET (24" X 36")

18.000

EA

DROP INLET TYPE 112

64.000

EA

DROP INLET TYPE 112 WITH 4X4 BOX

14.000

EA

DROP INLET TYPE 115 WITH STANDARD 6' X 6' BOX

11.000

EA

1,585.000

LF

2.000

EA

TRENCH DRAIN-4" INTERIOR DIMENSION WITH 2.0' CURB & GUTTER MANHOLE WITH STANDARD 5' X 5' BOX

31

6/1/2018

South Carolina Department of Transportation

Call No.: 150

Description

Page: Quantity Units

MANHOLE WITH STANDARD 6' X 6' BOX

2.000

EA

48" X 48" JUNCTION BOX

4.000

EA

ADJUST MANHOLE

2.000

EA

ADJUST DROP INLET ADJUST D. I.

3.000

EA

ADJUST JUNCTION BOX

1.000

EA

JUNCTION BOX - CONVERT CB T-16

1.000

EA

BEVELING OF PIPE END

20.000

EA

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE

560.000

LF

CONCRETE SIDEWALK(4" UNIFORM)

300.000

SY

CONCRETE SIDEWALK(6" UNIFORM)

55.000

SY

DETECTABLE WARNING MATERIAL

300.000

SF

CONCRETE DRIVEWAY(6" UNIFORM)

105.000

SY

CONCRETE MEDIAN

855.000

SY

1.000

EA

200.000

SY

60.000

SF

90.000

TON

CONCRETE FLUME PEDESTRIAN RAMP CONSTRUCTION SURFACE APPLIED DETECTABLE WARNING RIP-RAP (CLASS B) GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B

110.000

SY

MOVING ITEM NO. 007

1.000

LS

MOVING ITEM NO. 008

1.000

LS

MOVING ITEM NO. 009

1.000

LS

MOVING ITEM NO. 010

32

1.000

LS

11.000

EA

RIGHT OF WAY PLAT

1.000

LS

PERMANENT COVER

9.850

ACRE

13.900

ACRE

RIGHT OF WAY MARKER(REBAR AND CAP)

TEMPORARY COVER FERTILIZER (NITROGEN)

985.000

LB

FERTILIZER (PHOSPHORIC ACID)

985.000

LB

985.000

LB

19,700.000

LB

FERTILIZER (POTASH) AGRICULTURAL GRANULAR LIME SELECTIVE WATERING

135,750.000

GAL

MOWING

47.500

ACRE

LANDSCAPING ITEM NO. 001

40.000

EA

LANDSCAPING ITEM NO. 002

36.000

EA

LANDSCAPING ITEM NO. 003

604.000

EA

LANDSCAPING ITEM NO. 004

480.000

EA

LANDSCAPING ITEM NO. 005

373.000

EA

LANDSCAPING ITEM NO. 006

530.000

EA

LANDSCAPING ITEM NO. 007

28.000

EA

LANDSCAPING ITEM NO. 008

2,960.000

EA

LANDSCAPING ITEM NO. 009

495.000

EA

LANDSCAPING ITEM NO. 010

3,466.000

EA

6/1/2018

South Carolina Department of Transportation

Call No.: 150

Description

Page: Quantity Units

LANDSCAPING ITEM NO. 011

232.000

EA

LANDSCAPING ITEM NO. 012

1,062.000

EA

6,316.000

EA

50,000.000

SF

LANDSCAPING ITEM NO. 013 DOUBLE-SHREDDED HARDWOOD MULCH

33

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1

47.000

ACRE

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3

0.880

ACRE

INLET STRUCTURE FILTER - TYPE F (WEIGHTED)

112.000

LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED)

104.000

LF

SEDIMENT TUBES FOR DITCH CHECKS

1,956.000

LF

SILT FENCE

7,195.000

LF

720.000

LF

1,800.000

LF

148.000

EA

INLET STRUCTURE FILTER - TYPE A

4,460.000

LF

STABILIZED CONSTRUCTION ENTRANCE

1,650.000

SY

REPLACE/REPAIR SILT FENCE REMOVAL OF SILT RETAINED BY SILT FENCE CLEANING INLET STRUCTURE FILTERS

6/1/2018

South Carolina Department of Transportation

Call No.: 160

SC File NO(S).: 2747710 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030693 CO(S).: Jasper

Description: RESURFACING SC 3 JASPER

Project No.: P030693 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

34

0.00% $0.00 $0.00 $0.00 $15.00 1.5200

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

1.000

EA

TRAFFIC CONTROL

1.000

LS

BORROW EXCAVATION

604.000

CY

EXCAVATION FOR SHOULDER PAVING

161.000

STA

HAULING OF EXCAVATED SHOULDER MATERIAL

161.000

STA

29.000

TON

HMA SHOULDER WIDENING COURSE

802.560

TON

LIQUID ASPHALT BINDER PG64-22

283.903

TON

MAINTENANCE STONE

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP

2,900.000

SY

500.000

SY

3.040

MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B

2,318.507

TON

HOT MIX ASPHALT SURFACE COURSE TYPE B

2,368.507

TON

DRIVEWAY PAVING-SURFACE TYPE C

180.000

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

176.000

SF

16,050.000

LF

15.000

LF

520.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING

13,600.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

48,150.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERMANENT GRASSING FOR SMALL PROJECTS

45.000

LF

1,560.000

LF

40,800.000

LF

100.000

EA

1.474

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 170

SC File NO(S).: 3291930 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P028138 CO(S).: Lexington

Description: SUMMIT SIDEWALK PROJECT

Project No.: P028138 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

17.50% $27.00 $0.00 $0.00 $15.00 0.3410

Completion Date: 8/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

CONSTRUCTION STAKES, LINES & GRADES

1.000

EA

TRAFFIC CONTROL

1.000

LS

CPM PROGRESS SCHEDULE

1.000

LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY

1.000

LS

REMOVAL & DISPOSAL ITEM NO. 001

1.000

LS

REMOVAL & DISPOSAL ITEM NO. 002

1.000

LS

REMOVAL & DISPOSAL ITEM NO. 003

1.000

LS

REMOVAL & DISPOSAL ITEM NO. 004

1.000

LS

REMOVAL & DISPOSAL ITEM NO. 005

1.000

LS

REMOVAL & DISPOSAL ITEM NO. 006

1.000

LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT

5.000

SY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT

20.000

SY

181.000

CY

FLOWABLE FILL

50.000

CY

MAINTENANCE STONE

10.000

TON

2.646

TON

42.000

TON

UNCLASSIFIED EXCAVATION

LIQUID ASPHALT BINDER PG64-22 HOT MIX ASPHALT SURFACE COURSE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

344.000

SF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

322.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

30.000

LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN

24.750

SF

U-SECTION POST FOR SIGN SUPPORTS - 3P

48.000

LF

4.000

LF

15" SMOOTH WALL PIPE BEVELING OF PIPE END

35

1.000

EA

CONCRETE SIDEWALK(4" UNIFORM)

937.000

SY

DETECTABLE WARNING MATERIAL

100.000

SF

CONCRETE DRIVEWAY(6" UNIFORM)

47.000

SY

PEDESTRIAN RAMP CONSTRUCTION

200.000

SY

6/1/2018

South Carolina Department of Transportation

Call No.: 170

Description

Page:

36

Quantity Units

MOVING ITEM NO. 001

1.000

LS

MOVING ITEM NO. 002

1.000

LS

RIGHT OF WAY MARKER(REBAR AND CAP)

8.000

EA

RIGHT OF WAY PLAT

1.000

LS

PERMANENT GRASSING FOR SMALL PROJECTS

0.264

ACRE

TEMPORARY COVER

0.132

ACRE

MOWING

0.793

ACRE

SODDING

1.000

MSY

SEDIMENT TUBES FOR DITCH CHECKS SILT FENCE STABILIZED CONSTRUCTION ENTRANCE

10.000

LF

1,200.000

LF

550.000

SY

6/1/2018

South Carolina Department of Transportation

Call No.: 180

SC File NO(S).: 3748160 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P037223 CO(S).: Oconee

Description: RESURFACING/RECONSTRUCTION

Project No.: P037223 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 2.3600

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

UNCLASSIFIED EXCAVATION

438.000

CY

BORROW EXCAVATION

448.000

CY

29,216.000

SY

CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT 2.0" MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP

1,169.000

TON

50.000

TON

282.055

TON

3,098.000

SY

278.000

SY

2.500

MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C

1,161.600

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

3,375.386

TON

396.250

TON

DRIVEWAY PAVING-SURFACE TYPE C PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

1,004.000

SF

240.000

LF

60,296.000

LF

1,660.000

LF

216.000

LF

2.000

EA

125,660.000

LF

60.000

LF

24,921.000

LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

830.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

102.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

1.000

EA

26,188.000

LF

14.000

EA

206.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

37

6/1/2018

South Carolina Department of Transportation

Call No.: 180

Description FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

Page:

38

Quantity Units 210.000

LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

3,770.000

LF

SAWCUT FOR LOOP DETECTOR

1,370.000

LF

3.000

EA

2.172

ACRE

F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD PERMANENT GRASSING FOR SMALL PROJECTS SEDIMENT TUBES FOR DITCH CHECKS

40.000

LF

SILT FENCE

80.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 190

SC File NO(S).: 3805390 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P029541

CO(S).:

Description: I-26 EB/WB OVER SC 33 & CSX RR BRIDGE REHABILITATION

Project No.: P029541 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $36.00 $0.00 $15.00 0.0560

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

LIQUID ASPHALT BINDER PG76-22 MILLING EXISTING ASPHALT PAVEMENT 3.0" MILLED-IN RUMBLE STRIP

64.000

TON

6,205.000

SY

0.500

MI

HOT MIX ASPHALT SURFACE COURSE TYPE A

621.000

TON

OPEN-GRADED FRICTION COURSE

376.000

TON

CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER

3.000

EA

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

2,200.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

2,000.000

LF

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

1,150.000

LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

2,200.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

2,000.000

LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

1,150.000

LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" POLYMER MODIFIED ASPHALT EXPANSION JOINT

39

30.000

EA

294.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 200

SC File NO(S).: 4048260 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P037228 CO(S).: Richland

Description: 2018 RICHLAND COUNTY CTC

Project No.: P037228 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 5.0400

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

BORROW EXCAVATION

802.000

CY

EXCAVATION FOR SHOULDER PAVING

250.280

STA

HAULING OF EXCAVATED SHOULDER MATERIAL

250.280

STA

85.650

TON

1,210.293

TON

450.335

TON

MAINTENANCE STONE HMA SHOULDER WIDENING COURSE LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

6,885.000

SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF

1,680.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.5"

13,650.000

SY

MILLING EXISTING ASPHALT PAVEMENT 2.0"

2,600.000

SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

2,380.000

SY

1.400

MI

MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C

2,081.973

TON

HOT MIX ASPHALT SURFACE COURSE TYPE D

4,204.860

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

1,382.000

SF

40.000

LF

82,880.000

LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT

130.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

551.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

1.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

1.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT

1.000

EA

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

40

2.000

EA

480.000

LF

81,780.000

LF

20.000

LF

41,440.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 200

Description

Page: Quantity Units

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

130.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

547.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

1.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

1.000

EA

WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL

1.000

EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.

2.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" ADJUST DROP INLET ADJUST D. I.

41

240.000

LF

41,090.000

LF

2.000

EA

290.000

EA

11.000

EA

PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS

2.650

ACRE

MOWING

3.888

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 210

Page:

Project No.: P033680 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Description: 2018 FA RECLAM SUMTER 4/5/2018 12:10:50 Cost of X-Sections: PM Cost of Proposal: Approx. Length (miles):

SC File NO(S).: 4325780 Letting Date: July 10, 2018 Letting Time: 02:00 PM

PCN: P033680 CO(S).: Sumter

42

0.00% $0.00 $0.00 $0.00 $15.00 3.7100

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

CSX RAILROAD INSURANCE AND FLAGGING 001

1.000

LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT

40.000

SY

742.000

CY

53,180.000

SY

BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE

1,870.000

TON

LIQUID ASPHALT BINDER PG64-22

333.188

TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

800.000

SY

5.000

MI

MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C

5,062.640

TON

DRIVEWAY PAVING-SURFACE TYPE C

490.500

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

871.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

300.000

LF

158,800.000

LF

756.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

4.000

EA

2,940.000

LF

163,300.000

LF

300.000

LF

39,700.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

204.000

LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.

1.000

EA

1,780.000

LF

29,450.000

LF

392.000

EA

DETECTABLE WARNING MATERIAL

12.500

SF

PEDESTRIAN RAMP CONSTRUCTION

25.000

SY

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

PERMANENT GRASSING FOR SMALL PROJECTS

3.598

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 220

SC File NO(S).: 4409240 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030054 CO(S).: Union

Description: CMRB AND OVERLAY

Project No.: P030054 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 1.4200

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

UNCLASSIFIED EXCAVATION

284.000

CY

BORROW EXCAVATION

284.000

CY

20,000.000

SY

CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE

900.000

TON

32.000

TON

LIQUID ASPHALT BINDER PG64-22

202.802

TON

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF

750.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.25"

1,000.000

SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

1,300.000

SY

HOT MIX ASPHALT SURFACE COURSE TYPE C

3,089.040

TON

DRIVEWAY PAVING-SURFACE TYPE C

291.000

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

360.000

SF

MAINTENANCE STONE

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

450.000

LF

45,000.000

LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT

730.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

480.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

6.000

EA

12.000

EA

6.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

43

2,850.000

LF

30,150.000

LF

150.000

LF

15,000.000

LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

730.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

160.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

2.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

4.000

EA

6/1/2018

South Carolina Department of Transportation

Call No.: 220

Description

Page: Quantity Units

WHITE WORD MESSAGE "STOP AHEAD" -THERMOPLASTIC - 125 MIL.

1.000

EA

WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL

2.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

950.000

LF

10,050.000

LF

8.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

100.000

EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

690.000

LF

SAWCUT FOR LOOP DETECTOR

230.000

LF

PERMANENT GRASSING FOR SMALL PROJECTS

44

1.500

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 230

SC File NO(S).: 4606001 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P029556 PCN: P037446 CO(S).: York

Description: I-77 OVER CATAWBA RIVER - YORK COUNTY

Project No.: P029556 Project No.: P037446 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

10.00% $0.00 $154.00 $0.00 $15.00 0.0000

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL OFF-DUTY LAW ENFORCEMENT OFFICER REMOVAL & DISPOSAL OF EXISTING CONCRETE

1.000

LS

1,656.000

HR

43.000

CY

2,400.000

LF

REMOVAL & DISPOSAL OF DESIGNATED PORTIONS OF EXISTING BRIDGE

1.000

LS

LIQUID ASPHALT BINDER PG64-22

4.500

TON

LIQUID ASPHALT BINDER PG76-22

163.000

TON

FULL DEPTH ASPH. PAV. PATCHING 12"UNIF

667.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.0"

45,925.000

SY

0.480

MI

REMOVAL & DISPOSAL OF CONCRETE MEDIAN BARRIER

MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE E

75.000

TON

OPEN-GRADED FRICTION COURSE

2,710.000

TON

PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE 4"WH.SOLID

5,425.000

LF

PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE4"YEL.SOLID

4,300.000

LF

TEMPORARY CONCRETE BARRIER

5,650.000

LF

1.000

EA

18,475.000

LF

50.000

SF

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(60 MPH) REMOVAL OF PAVEMENT MARKINGS (LINES) (TRAFFIC CONTROL) REMOVAL OF PAVEMENT MARKINGS(HIGH PRESSURE WATER)(ARROWS, WORDS, RR CROSSING SYMBOLS, TRIANGLE YIELD)(TRAFFIC CONTROL) TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4"

450.000

EA

TEMPORARY YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X4"

450.000

EA

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

9,350.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

45

17,050.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

2.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

2.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT

2.000

EA

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

20,450.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 230

Description

Page: Quantity Units

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

50.000

LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

6,800.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

6,800.000

LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

6,800.000

LF

PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4"

400.000

EA

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL6"WH.BROKEN

1,880.000

LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID

2,150.000

LF

PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL.

2,150.000

LF

2.0" SCHEDULE 40 PVC CONDUIT

1,092.000

LF

INSTALL 12" 1-WAY-4 SECTION(R.Y.G.GA)VEHICLE TRAFFIC SIGNAL

2.000

EA

INSTALL 12" 1-WAY-3 SECTION(RA.YA.GA.)VEHICLE TRAFFIC SIGN

2.000

EA

2,486.200

CY

504.000

SY

11,188.000

SY

815,048.000

LB

521.200

LF

CONC. FOR STRUCTURES - CLASS 4000 PARTIAL DEPTH PATCHING OF EXISTING DECK GROOVED SURFACE FINISH REINF. STEEL FOR STRUCTURES (BRIDGE) CONCRETE BRIDGE BARRIER PARAPET CONCRETE BRIDGE BARRIER PARAPET TRANSITION

1.000

EA

36.000

CY

CONCRETE MEDIAN BARRIER (TYPE-2)

2,400.000

LF

CONCRETE BARRIER EXTENSION

2,400.000

LF

110.000

LF

CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING

MAINT REPAIR OF JERSEY TY 2 W GLARE CATCH BASIN 15 AND PLUG WITH TEMPORARY TRAFFIC

46

15.000

EACH

6/1/2018

South Carolina Department of Transportation

Call No.: 240

SC File NO(S).: 4609190 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P030048 PCN: P030055 CO(S).: York

Description: CMRB AND OVERLAY

Project No.: P030048 Project No.: P030055 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 3.5900

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

CLEARING & GRUBBING WITHIN ROADWAY

1.000

LS

REMOVAL & DISPOSAL OF EXISTING CONCRETE UNCLASSIFIED EXCAVATION SITE EXCAVATION BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP

1.000

CY

718.000

CY

1.000

LS

718.000

CY

53,000.000

SY

2,385.000

TON

40.500

TON

285.535

TON

1,900.000

SY

7.180

MI

HOT MIX ASPHALT SURFACE COURSE TYPE B

1,623.387

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

3,000.430

TON

322.000

TON

DRIVEWAY PAVING-SURFACE TYPE C ASPHALT SURFACE TREATMENT(SINGLE TREATMENT)

53,000.000

SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

924.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

642.000

LF

113,760.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

705.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

12.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

47

6.000

EA

2,250.000

LF

103,260.000

LF

214.000

LF

37,920.000

LF

235.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 240

Description

Page: Quantity Units

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

4.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

2.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

750.000

LF

34,420.000

LF

4.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

244.000

EA

STEEL BEAM GUARDRAIL STEEL BEAM GR.

100.000

LF

8.000

EA

160.000

LF

END TERMINAL - TYPE T ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS

48

5.000

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 250

SC File NO(S).: 4648250 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P037230 CO(S).: York

Description: CMRB, FDP, RESURF

Project No.: P037230 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 4.6700

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT

500.000

SY

REMOVAL & DISPOSAL OF EXISTING CURB

750.000

LF

5.500

CY

2,213.440

CY

792.000

CY

REMOVAL & DISPOSAL OF EXISTING CONCRETE UNCLASSIFIED EXCAVATION BORROW EXCAVATION STATION GRADING FLOWABLE FILL CEMENT MODIFIED RECYCLED BASE (8" UNIF)-CURING METHOD A

9.500

STA

10.000

CY

30,061.800

SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE

901.854

TON

MAINTENANCE STONE

514.250

TON

2,704.387

TON

545.574

TON

HOT MIX ASPHALT BASE COURSE - TYPE B LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

3,500.000

SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF

350.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.0"

2,137.330

SY

MILLING EXISTING ASPHALT PAVEMENT 1.5"

1,690.000

SY

MILLING EXISTING ASPHALT PAVEMENT 2.0"

8,937.000

SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

5,156.110

SY

HOT MIX ASPHALT SURFACE COURSE TYPE C

5,247.224

TON

HOT MIX ASPHALT SURFACE COURSE TYPE E

1,180.080

TON

754.875

TON

DRIVEWAY PAVING-SURFACE TYPE C PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT

49

2,024.000

SF

1,008.000

LF

86,704.000

LF

200.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

2,100.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

2.000

EA

6/1/2018

South Carolina Department of Transportation

Call No.: 250

Description RAILROAD CROSSING SYMBOLS - FAST DRY PAINT

Page: Quantity Units 2.000

EA

700.000

LF

100,762.000

LF

496.000

LF

34,960.000

LF

100.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

1,050.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

1.000

EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.

1.000

EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.

350.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

43,361.000

LF

8" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

50.000

LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

20.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

402.000

EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE

150.000

LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE

600.000

LF

DETECTABLE WARNING MATERIAL

225.000

SF

PEDESTRIAN RAMP CONSTRUCTION

450.000

SY

BITUMINOUS CURB

200.000

LF

PERMANENT GRASSING FOR SMALL PROJECTS

50

3.842

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 260

Page:

Project No.: P030531 P030531 Project No.: P033673 P033673 Project No.: P033674 P033674 Project No.: P033675 P033675 Project No.: P033683 P033683 Project No.: P033684 P033684 Project No.: P036898 P036898 Project No.: P036899 P036899 Letting Date: July 10, 2018 CO(S).: Lexington Richland DBE Goal Percent: Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2018 FED AID REHAB RICH AND LEX Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

SC File NO(S).: 5125690

51

PCN: PCN: PCN: PCN: PCN: PCN: PCN: PCN:

5.00% $0.00 $0.00 $0.00 $15.00 15.8200

Completion Date: 10/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

3,868.000

SY

20.000

SY

REMOVAL OF EXIST. GUARDRAIL

425.000

LF

UNCLASSIFIED EXCAVATION

100.000

CY

1,176.400

CY

REMOVAL & DISPOSAL OF EXISTING PAVEMENT REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT

BORROW EXCAVATION EXCAVATION FOR SHOULDER PAVING

367.120

STA

HAULING OF EXCAVATED SHOULDER MATERIAL

367.120

STA

MAINTENANCE STONE

223.080

TON

HMA SHOULDER WIDENING COURSE

1,840.960

TON

LIQUID ASPHALT BINDER PG64-22

2,893.389

TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

2,150.000

SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF

21,408.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.75"

31,350.000

SY

MILLING EXISTING ASPHALT PAVEMENT 2.0"

429,678.330

SY

MILLING EXISTING ASPHALT PAVEMENT 4.0"

3,300.000

SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

2,260.000

SY

3.100

MI

MILLED-IN RUMBLE STRIP HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B

1,997.600

TON

HOT MIX ASPHALT SURFACE COURSE TYPE B

44,561.303

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

5,044.807

TON

6/1/2018

South Carolina Department of Transportation

Call No.: 260

Description HOT MIX ASPHALT SURFACE COURSE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT

Page: Quantity Units 556.000

TON

8,200.000

SF

49,230.000

LF

214,086.000

LF

7,578.000

LF

30,014.000

LF

468.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

15,641.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

275.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

144.000

EA

26.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT

4.000

EA

38,170.000

LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

337,375.000

LF

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

8,962.000

LF

13,186.000

LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 24" YELLOW DIAGONAL LINES - FAST DRY PAINT 4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT

392.000

LF

1,034.000

LF

176.000

LF

WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT

7.000

EA

WHITE WORD MESSAGE "ONLY" - EPOXY PAINT

6.000

EA

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

26,643.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

88,802.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

3,789.000

LF

15,910.000

LF

12" WHITE SOLID LINES - THERMO. - 125 MIL.

562.000

LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL

181.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

7,765.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

140.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

73.000

EA

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL

15.000

EA

14,850.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

143,840.000

LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

4,481.000

LF

196.000

LF

1,328.000

EA

910.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

3,670.000

EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

2,374.000

LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

95,930.000

LF

SAWCUT FOR LOOP DETECTOR

27,677.000

LF

1.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.

ADJUST DROP INLET ADJUST D. I.

52

6/1/2018

South Carolina Department of Transportation

Call No.: 260

Description

Page: Quantity Units

CATCH BASIN T-17 (CONVERT C.B. TYPE 5)

1.000

EA

CATCH BASIN T-18 (CONVERT C.B. TYPE 7)

4.000

EA

DETECTABLE WARNING MATERIAL

1,887.500

SF

PEDESTRIAN RAMP CONSTRUCTION

3,775.000

SY

SURFACE APPLIED DETECTABLE WARNING

142.500

SF

STEEL BEAM GUARDRAIL STEEL BEAM GR.

425.000

LF

REMOVE AND REPLACE W BEAM GUARDRAIL

53

1,100.000

LF

REMOVE AND REPLACE END ANCHOR-TYPE B

2.000

EA

END TERMINAL - TYPE T

8.000

EA

REMOVE AND REPLACE END TERMINAL - TYPE T

3.000

EA

THRIE BEAM G.R.BRIDGE CONN.

3.000

EA

PERMANENT GRASSING FOR SMALL PROJECTS

7.908

ACRE

MOWING

3.879

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 270

Page:

Project No.: P030323 P030323 Project No.: P030326 P030326 Project No.: P033676 P033676 Project No.: P033687 P033687 Letting Date: July 10, 2018 CO(S).: Lexington Richland DBE Goal Percent: Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2018 RICH LEX CTY RECLAM Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

SC File NO(S).: 5148310

54

PCN: PCN: PCN: PCN:

0.00% $0.00 $0.00 $0.00 $15.00 15.5700

Completion Date: 10/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

97.000

SY

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT

100.000

SY

REMOVAL OF EXIST. GUARDRAIL

375.000

LF

UNCLASSIFIED EXCAVATION

1,266.000

CY

BORROW EXCAVATION

3,618.000

CY

REMOVAL & DISPOSAL OF EXISTING PAVEMENT

EXCAVATION FOR SHOULDER PAVING

15.840

STA

HAULING OF EXCAVATED SHOULDER MATERIAL

15.840

STA

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE HMA SHOULDER WIDENING COURSE LIQUID ASPHALT BINDER PG64-22

219,064.000

SY

9,634.000

TON

1.600

TON

79.200

TON

1,372.613

TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

50.000

SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF

110.000

SY

MILLING EXISTING ASPHALT PAVEMENT 2.0"

5,600.000

SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

3,230.000

SY

31.080

MI

MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE B

7,917.573

TON

HOT MIX ASPHALT SURFACE COURSE TYPE C

14,270.340

TON

HOT MIX ASPHALT SURFACE COURSE TYPE D

100.000

TON

DRIVEWAY PAVING-SURFACE TYPE C

992.250

TON

DRIVEWAY PAVING-SURFACE TYPE D

433.000

TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

1,578.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

2,302.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 270

Description 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

Page: Quantity Units 404,861.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

1,007.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

6.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

6.000

EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

50,942.000

LF

362,445.000

LF

360.000

LF

50.000

LF

1,412.000

LF

165,074.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

495.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

6.000

EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.

8.000

EA

8,299.000

LF

138,779.000

LF

26.000

EA

1,124.000

EA

17.000

LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

1,350.000

LF

SAWCUT FOR LOOP DETECTOR

459.000

LF

STEEL BEAM GUARDRAIL STEEL BEAM GR.

100.000

LF

END TERMINAL - TYPE T

6.000

EA

THRIE BEAM G.R.BRIDGE CONN.

4.000

EA

PERMANENT GRASSING FOR SMALL PROJECTS

55

13.913

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 280

SC File NO(S).: 5413331 Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P031959 PCN: P031961 CO(S).: Chesterfield Lancaster

Description: '18 PRIM IMP IN C'FIELD AND LANC PM

Project No.: P031959 Project No.: P031961 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 2.0700

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL REMOVAL & DISPOSAL OF EXISTING CURB REMOVAL & DISPOSAL OF EXISTING CONCRETE BORROW EXCAVATION MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 8" UNIF FULL DEPTH ASPH. PAV. PATCHING 10"UNIF

1.000

LS

200.000

LF

18.500

CY

120.000

CY

15.000

TON

404.921

TON

4,800.000

SY

8,475.000

SY

MILLING EXISTING ASPHALT PAVEMENT 1.75"

31,235.000

SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)

21,950.000

SY

1.200

MI

MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE B HOT MIX ASPHALT SURFACE COURSE TYPE C PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

7,640.013

TON

78.000

TON

1,252.000

SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

13,560.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

14,316.000

LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT

3,200.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

1,600.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

84.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT

56

48.000

EA

5,000.000

LF

49,860.000

LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.

6,780.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.

7,158.000

LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.

1,600.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL

800.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.

42.000

EA

6/1/2018

South Carolina Department of Transportation

Call No.: 280

Description WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.

Page: Quantity Units 24.000

EA

2,500.000

LF

24,930.000

LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

382.000

EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.

248.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

524.000

EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

50.000

LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT

50.000

LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

930.000

LF

SAWCUT FOR LOOP DETECTOR

310.000

LF

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE

200.000

LF

SURFACE APPLIED DETECTABLE WARNING

475.000

SF

PERMANENT GRASSING FOR SMALL PROJECTS

57

0.582

ACRE

6/1/2018

South Carolina Department of Transportation

Call No.: 290

SC File NO(S).: 5413922

Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P032203 Project No.: P032203 PCN: P032204 Project No.: P032204 PCN: P032206 Project No.: P032206 CO(S).: Fairfield Lancaster DBE Goal Percent: York Cost of Road Plans:

Description: NFA MICROSURFACING

Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 7.9700

Completion Date: 5/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

1,150.000

SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF

350.000

SY

MICRO SURFACING SURFACE COURSE PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

58

96,000.000

SY

792.000

SF

484.000

LF

84,200.000

LF

60.000

LF

452.000

LF

1,700.000

LF

75,420.000

LF

484.000

LF

84,200.000

LF

60.000

LF

452.000

LF

1,700.000

LF

75,420.000

LF

533.000

EA

6/1/2018

South Carolina Department of Transportation

Call No.: 300

Page:

Project No.: P030576 P030576 Project No.: P030581 P030581 Project No.: P030583 P030583 Project No.: P030691 P030691 Project No.: P030697 P030697 Project No.: P030698 P030698 Project No.: P030699 P030699 Project No.: P030713 P030713 Letting Date: July 10, 2018 CO(S).: Beaufort Charleston DBE Goal Percent: Colleton Jasper Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2017 FA MICRO SURFACING Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

SC File NO(S).: 5610012

59

PCN: PCN: PCN: PCN: PCN: PCN: PCN: PCN:

0.00% $0.00 $0.00 $0.00 $15.00 18.0300

Completion Date: 10/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

240.000

SY

REMOVAL & DISPOSAL OF EXISTING PAVEMENT MAINTENANCE STONE FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. SURFACE PLANE ASPHALT PAVEMENT - VARIABLE MILLED-IN RUMBLE STRIP MICRO SURFACING SURFACE COURSE MICRO SURFACING LEVELING PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING

30.650

TON

3,065.000

SY

700.000

SY

10.720

MI

619,739.607

SY

1,382.420

TON

4,986.000

SF

38,585.000

LF

700.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING

118,692.000

LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING

44,420.000

LF

5,839.000

LF

390.000

LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK

45.000

LF

3,940.000

LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING

158.000

EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING

186.000

EA

46.000

EA

6.000

EA

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING

WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING

6/1/2018

South Carolina Department of Transportation

Call No.: 300

Description 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING

Page: Quantity Units 14,880.000

LF

178,637.000

LF

12" YELLOW SOLID LINES - PERM.PVMT.MARKING

445.000

LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING

230.000

LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

85,730.000

LF

381,464.000

LF

12,888.000

LF

780.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

8,880.000

LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

365.000

EA

45.000

EA

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT

WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

361.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT

92.000

EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT

72.000

EA

BIKE LANE SYMBOL - FAST DRY PAINT

38.000

EA

31,660.000

LF

390,584.000

LF

3,695.000

LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT

450.000

LF

12" YELLOW SOLID LINES - FAST DRY PAINT

785.000

LF

60.000

EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT

BIKE LANE SYMBOL -PREFORMED THERMO - 60MIL BIKE LANE ARROW - PREFORMED THERMO - 60MIL

67.000

EA

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

3,094.000

EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.

1,638.000

EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

3,166.000

EA

10.000

EA

DELINEATORS, SINGLE, BI., INCL. SUPPORTS

60

6/1/2018

South Carolina Department of Transportation

Call No.: 310

SC File NO(S).: 5613762

Letting Date: July 10, 2018 Letting Time: 02:00 PM

Page: PCN: P032158 Project No.: P032158 PCN: P032170 Project No.: P032170 PCN: P032209 Project No.: P032209 CO(S).: Berkeley Charleston DBE Goal Percent: Dorchester Cost of Road Plans:

Description: 2018 FDP, MICRO SURFACING

Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

0.00% $0.00 $0.00 $0.00 $15.00 16.2500

Completion Date: 7/31/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

1.000

LS

CSX RAILROAD INSURANCE AND FLAGGING 001 MAINTENANCE STONE FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

38.950

TON

3,895.000

SY

214,366.600

SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)

324.000

SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING

590.000

LF

58,200.000

LF

MICRO SURFACING SURFACE COURSE

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 8" WHITE SOLID LINES PERM.PVMT.MARKINGS 12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING

200.000

LF

1,002.000

LF

126.000

LF

76.000

LF

1,152.000

LF

21.000

EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING

9.000

EA

WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING

5.000

EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING

8.000

EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 24" YELLOW SOLID LINES - PERM.PVMT.MARKING 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

61

5,400.000

LF

110,020.000

LF

40.000

LF

1,180.000

LF

116,280.000

LF

400.000

LF

1,974.000

LF

252.000

LF

2,294.000

LF

6/1/2018

South Carolina Department of Transportation

Call No.: 310

Description

Page: Quantity Units

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT

38.000

EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT

18.000

EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT

10.000

EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT

16.000

EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT

10,800.000

LF

219,490.000

LF

270.000

LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"

52.000

EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.

40.000

EA

1,147.000

EA

10.000

SF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" SURFACE APPLIED DETECTABLE WARNING

62

6/1/2018

South Carolina Department of Transportation

Call No.: 320

Page:

Project No.: P030404 P030404 Project No.: P030575 P030575 Project No.: P030671 P030671 Project No.: P030672 P030672 Letting Date: July 10, 2018 CO(S).: Bamberg Barnwell DBE Goal Percent: Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2017 FA PIP - 03,05,06,25 Cost of X-Sections: Cost of Proposal: Approx. Length (miles):

SC File NO(S).: 5709650

63

PCN: PCN: PCN: PCN:

0.00% $0.00 $0.00 $0.00 $15.00 2.4000

Completion Date: 6/30/2019

ITEMS OF WORK INCLUDE THE FOLLOWING: Description

Quantity Units

MOBILIZATION

1.000

LS

BONDS AND INSURANCE

1.000

LS

TRAFFIC CONTROL

1.000

LS

1,150.000

SY

REMOVAL & DISPOSAL OF EXISTING PAVEMENT MAINTENANCE STONE

18.600

TON

354.799

TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.

110.000

SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF

1,750.000

SY

61,828.000

SY

LIQUID ASPHALT BINDER PG64-22

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) HOT MIX ASPHALT SURFACE COURSE TYPE B

6,430.585

TON

HOT MIX ASPHALT SURFACE COURSE TYPE D

160.000

TON

61.875

TON

DRIVEWAY PAVING-SURFACE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING

1,416.000

SF

134.000

LF

2,790.000

LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS

820.000

LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING

620.000

LF

84.000

LF

26,080.000

LF

164.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT

5,580.000

LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT

1,640.000

LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT

1,240.000

LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"

168.000

LF

52,160.000

LF

3.000

EA

201.000

EA

6/1/2018

South Carolina Department of Transportation

Call No.: 320

Description FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT

Page: Quantity Units 120.000

LF

1,000.000

LF

SAWCUT FOR LOOP DETECTOR

350.000

LF

DETECTABLE WARNING MATERIAL

575.000

SF

1,150.000

SY

200.000

SF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE

PEDESTRIAN RAMP CONSTRUCTION SURFACE APPLIED DETECTABLE WARNING

64

MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARY OF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THE FEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH IN THE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETY ACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS. CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNING SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED IN THIS CONTRACT. In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "Supplemental Specifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings: STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisement contemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways. The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the Federal Highway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for award. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and Special Provision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of the proposal. Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsible for carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called to the fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours and Safety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations. PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED A PREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BE ALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the Contracts Administration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by calling Jeff Elliott at (803)737-1253. BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT, written by a SURETY satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NO OTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED. SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express delivery service or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bid opening. 1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC 29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service. 2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No._______", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice. IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the following reasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the following reasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission. TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the sole judge of determining the local time and the arrival of the designated time for the opening and reading of the bids. THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES. Information in this notice is the latest available at the time of its publication. The information contained in the proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, and the bidder should check with the SCDOT Engineering Publications office for the cost of plans when the plans are indicated to be available. Prepared by L. Stuckey Issued by: J.Brian Parnell Contract Administrator