EDGE LINES) PERM.PVMT.MARKING. 132,550.000. LF. 8" WHITE SOLID LINES PERM.PVMT.MARKINGS. 170.000. LF. 24" WHITE SOLID LI
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING July 10, 2018
REVISED Call No. 230, File No. 4606001 Cost of Bridge Plans: $154.00 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia, SC Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. The following items will be made available on June 12, 2018 unless otherwise noted: • EBS (Electronic Bidding System) files via Bid Express website • Hardcopy plans & proposals will be printed upon request only via Engineering Publications o Located in room G23 SCDOT Headquarters o Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orders o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)
Access the Construction Extranet for the following items: • Plans • Announcements • Bids as Received • CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx. Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-1656. The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice.
6/1/2018
South Carolina Department of Transportation
Call No.: 010
SC File NO(S).: 0283890 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: 0042131RD01 CO(S).: Aiken
Description: S-145 INTERSECTION W/ S-65
Project No.: SA02009 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
12.0% $44.00 $0.00 $0.00 $15.00 0.4570
Completion Date: 8/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
1.000
EA
TRAFFIC CONTROL
1.000
LS
CPM PROGRESS SCHEDULE
1.000
LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY
1.000
LS
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT
2,276.000
SY
UNCLASSIFIED EXCAVATION
2,267.000
CY
BORROW EXCAVATION
1,818.000
CY
FINE GRADING
7,284.000
SY
FLOWABLE FILL MAINTENANCE STONE
25.000
CY
100.000
TON
HOT MIX ASPHALT BASE COURSE - TYPE A
1,005.000
TON
HOT MIX ASPHALT BASE COURSE - TYPE B
120.000
TON
LIQUID ASPHALT BINDER PG64-22
177.000
TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
526.000
SY
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B
1,534.000
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C
TON
80.000
TON
HOT MIX ASPHALT SURFACE COURSE TYPE B
923.000
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
60.000
TON
STAINED CONCRETE PAVEMENT (8" UNIFORM) PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) PAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES
1
3,953.000
SF
392.000
SF
50.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES
14,250.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES
15,800.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES
200.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES PAVEMENT MARKINGS (TEMPORARY PAINT) 24"X36" WHITE TRIANGLE YIELD BAR TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
150.000
LF
75.000
LF
75.000
EA
6/1/2018
South Carolina Department of Transportation
Call No.: 010
Description 8" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
Page: Quantity Units 125.000
LF
2,000.000
LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
400.000
LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL
100.000
LF
4,300.000
LF
30.000
EA
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN
175.200
SF
U-SECTION POST FOR SIGN SUPPORTS - 3P
300.000
LF
REFLECTIVE SIGN POST PANELS
160.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
DESIGN & INSTALLATION OF RDWY. LIGHTING ELECTRICAL SYSTEM 001 SGL.LIGHT STD.35'HT.AL.POLE-INCL TOP TENON MT. 18" SMOOTH WALL PIPE
1.000
LS
10.000
EA
2,116.000
LF
CATCH BASIN -TYPE 16
15.000
EA
BEVELING OF PIPE END
12.000
EA
522.000
LF
2,512.000
LF
CONCRETE DRIVEWAY(6" UNIFORM)
492.000
SY
CONCRETE MEDIAN
472.000
SY
RIP-RAP (CLASS B)
367.000
TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B
460.000
SY
31.000
EA
RIGHT OF WAY PLAT
1.000
LS
PERMANENT COVER
1.043
ACRE
0.522
ACRE
CONCRETE CURB AND GUTTER(1'-6") OGEE CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE
RIGHT OF WAY MARKER(REBAR AND CAP)
TEMPORARY COVER FERTILIZER (NITROGEN)
157.000
LB
FERTILIZER (PHOSPHORIC ACID)
157.000
LB
FERTILIZER (POTASH)
157.000
LB
3,130.000
LB
AGRICULTURAL GRANULAR LIME SELECTIVE WATERING MOWING LANDSCAPING
54,300.000
GAL
3.130
ACRE
1.000
LS
1,810.000
SF
MUHLENBERGIA CAPILLARIS (PINK MUHLY GRASS) #1 CONT.
35.000
EA
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1
0.344
ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3
0.296
ACRE
DOUBLE-SHREDDED HARDWOOD MULCH
INLET STRUCTURE FILTER - TYPE F (WEIGHTED)
90.000
LF
INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED)
90.000
LF
SEDIMENT TUBES FOR DITCH CHECKS SILT FENCE REPLACE/REPAIR SILT FENCE REMOVAL OF SILT RETAINED BY SILT FENCE CLEANING INLET STRUCTURE FILTERS
260.000
LF
5,157.000
LF
516.000
LF
1,290.000
LF
30.000
EA
2
6/1/2018
South Carolina Department of Transportation
Call No.: 010
Description STABILIZED CONSTRUCTION ENTRANCE
Page: Quantity Units 550.000
SY
3
6/1/2018
South Carolina Department of Transportation
Call No.: 020
SC File NO(S).: 0287540 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P028045 CO(S).: Aiken
Description: I-20/S-144 (BETTIS ACADEMY ROAD) INTERCHANGE IMPROVEMENT
Project No.: P028045 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
6.00% $47.00 $10.00 $22.00 $15.00 0.7480
Completion Date: 7/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BRIDGE CONSTRUCTION ACCESS
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
1.000
EA
TRAFFIC CONTROL
1.000
LS
CPM PROGRESS SCHEDULE
1.000
LS
CLEARING & GRUBBING WITHIN ROADWAY
1.000
LS
REMOVAL & DISPOSAL OF EXISTING CONCRETE
1.670
CY
REMOVAL OF EXIST. GUARDRAIL
662.500
LF
UNCLASSIFIED EXCAVATION
552.000
CY
BORROW EXCAVATION
1,222.000
CY
FINE GRADING
1,932.000
SY
MAINTENANCE STONE
50.000
TON
HOT MIX ASPHALT BASE COURSE - TYPE A
732.000
TON
LIQUID ASPHALT BINDER PG64-22
182.000
TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
100.000
SY
MILLING EXISTING ASPHALT PAVEMENT 2.0"
20,730.000
SY
500.000
SY
1.040
MI
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B HOT MIX ASPHALT SURFACE COURSE TYPE B PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED)
166.000 2,654.000
TON TON
408.000
SF
70.000
SF
3,701.000
LF
84.000
LF
PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2
2.000
EA
PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(70MPH)
2.000
EA
ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2)
2.000
EA
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER
2.000
EA
16.000
EA
TEMPORARY CONCRETE BARRIER BARRICADE - TYPE 3
TYPE B - FLASHING LIGHT
4
6/1/2018
South Carolina Department of Transportation
Call No.: 020
Description
Page: Quantity Units
PREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE 4"WH.SOLID PREF.
1,088.000
LF
PREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE4"YEL.SOLID PREF.
1,088.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
440.000
LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING
396.000
LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
1,000.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
6,742.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
440.000
LF
1,054.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
308.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
24.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
20.000
EA
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
12,068.000
LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT
1,550.000
LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
1,000.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
4,310.000
LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
1,264.000
LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL
36.000
LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL
16.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
308.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
24.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
20.000
EA
8,356.000
LF
299.000
EA
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM. 60MIL 3" BLACK SOLID
10.000
EA
127.000
EA
15.000
LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN
111.000
LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID
530.000
LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL.
530.000
LF
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN
267.000
SF
FLAT SHEET, TYPE III, SIZE DETERMINED BY MSG
279.000
SF
Flat Sheet, Type XI, Size Determined by MSG, Overhead
75.000
SF
MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE
10.000
EA
U-SECTION POST FOR SIGN SUPPORTS - 2P
30.000
LF
U-SECTION POST FOR SIGN SUPPORTS - 3P
646.000
LF
U-SECTION POST FOR SIGN BRACING - 2P
130.000
LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
335.000
LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT
1,646.000
LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT
92.000
LF
148.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY
3,093.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK)
2,211.000
LF
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED)
5
6/1/2018
South Carolina Department of Transportation
Call No.: 020
Description FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE INSTALL WIRELESS NETWORK COMMUNICATIONS LINK BETWEEN TWO SIGNALS (2 RADIOS) SAWCUT FOR LOOP DETECTOR FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL
Page: Quantity Units 2,707.000
LF
1.000
EA
972.000
LF
2.000
EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
17.000
EA
F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
2.000
EA
FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION
8.000
EA
1,044.000
LF
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001
2.000
EA
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD
2.000
EA
12.000
EA
4.000
EA
14.000
EA
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 FURNISH & INSTALL PEDESTRIAN PUSH BUTTON AND SIGN (R-10-4B) BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. FURNISH & INSTALL CONCRETE CABINET FOUNDATION SPALL REPAIR EPOXY CRACK INJECTION
2.000
EA
65.000
SF
30.000
LF
COMPRESSION SEAL JOINT
144.200
LF
GROOVED SURFACE FINISH
1,258.000
SY
ENVIRONMENTAL AND WORKER PROTECTION
1.000
LS
CLEANING AND PAINTING EXISTING STRUCTURAL STEEL
1.000
LS
CONCRETE DRIVEWAY(10" UNIFORM) CONCRETE MEDIAN ELASTOMERIC BEARING
40.000
SY
859.000
SY
42.000
EA
1,266.000
SY
126.600
SY
CONCRETE OVERLAY (LATEX)
43.300
CY
VERY EARLY STRENGTH CONCRETE OVERLAY (LATEX)
20.900
CY
HYDRO-DEMOLITION OF EXISTING SURFACE PARTIAL DEPTH REMOVAL OF SOUND CONCRETE
JACKING BRIDGE
1.000
LS
645.500
LF
END ANCHOR-TYPE B
1.000
EA
END TERMINAL - TYPE T
1.000
EA
PERMANENT COVER
0.930
ACRE
0.465
ACRE
STEEL BEAM GUARDRAIL STEEL BEAM GR.
TEMPORARY COVER COMPOST
250.000
CY
FERTILIZER (NITROGEN)
93.000
LB
FERTILIZER (PHOSPHORIC ACID)
93.000
LB
FERTILIZER (POTASH)
93.000
LB
1,860.000
LB
AGRICULTURAL GRANULAR LIME SELECTIVE WATERING
54,300.000
GAL
MOWING
2.790
ACRE
TURF REINFORCEMENT MATTING (TRM) TYPE 1
0.075
MSY
6
6/1/2018
South Carolina Department of Transportation
Call No.: 020
Description
Page: Quantity Units
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1
0.300
ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 2
0.300
ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3
0.300
ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 4
0.300
ACRE
SEDIMENT TUBES FOR DITCH CHECKS
60.000
LF
2,500.000
LF
REPLACE/REPAIR SILT FENCE
250.000
LF
REMOVAL OF SILT RETAINED BY SILT FENCE
625.000
LF
STABILIZED CONSTRUCTION ENTRANCE
825.000
SY
1,266.000
SY
126.600
SY
SILT FENCE
SURFACE MILLING 001 BRIDGE DECK PATCHING, FULL DEPTH 002 ANCHOR BOLT REPLACEMENT WITH CONCRETE CORING
5.000
EACH
REMOVE AND RE-BUILD BEAM SEAT BUILD-UPS
4.000
EACH
7
6/1/2018
South Carolina Department of Transportation
Call No.: 030
SC File NO(S).: 0848540
Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P029715 PCN: P031997 PCN: P037325 CO(S).: Berkeley
Description: RECLAMATION, WIDENING, RESURF
Project No.: P029715 Project No.: P031997 Project No.: P037325 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 12.5000
Completion Date: 11/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
6.000
EA
TRAFFIC CONTROL
1.000
LS
CSX RAILROAD INSURANCE AND FLAGGING 001
1.000
LS
UNCLASSIFIED EXCAVATION
1,295.000
CY
BORROW EXCAVATION
6,724.000
CY
EXCAVATION FOR SHOULDER PAVING
25.000
STA
HAULING OF EXCAVATED SHOULDER MATERIAL
25.000
STA
ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION
4,365.000
TON
CEMENT MODIFIED RECYCLED BASE (10" UNIFORM)
195,275.000
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE
SY
6,837.175
TON
MAINTENANCE STONE
237.000
TON
HOT MIX ASPHALT BASE COURSE - TYPE A
176.000
TON
2,083.097
TON
LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP
200.000
SY
5,250.000
SY
11.080
MI
HOT MIX ASPHALT SURFACE COURSE TYPE B
31,455.913
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
6,264.720
TON
DRIVEWAY PAVING-SURFACE TYPE C
1,023.000
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING
962.000
SF
60.000
LF
132,550.000
LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS
170.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING
288.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING
2.000
EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING
2.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
8
6/1/2018
South Carolina Department of Transportation
Call No.: 030
Description
Page: Quantity Units
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING
2.000
EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING
3.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING
12,000.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING
50,855.000
LF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
180.000
LF
527,140.000
LF
510.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
1,112.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
6.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
6.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
6.000
EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT
12.000
EA
48,000.000
LF
200,780.000
LF
16.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
868.000
EA
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
730.000
LF
SAWCUT FOR LOOP DETECTOR
300.000
LF
15" SMOOTH WALL PIPE
48.000
LF
24" SMOOTH WALL PIPE
88.000
LF
36" SMOOTH WALL PIPE
48.000
LF
12.122
ACRE
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
PERMANENT GRASSING FOR SMALL PROJECTS SILT FENCE
2,150.000
LF
9
6/1/2018
South Carolina Department of Transportation
Call No.: 040
SC File NO(S).: 0908820 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030169 CO(S).: Calhoun
Description: S-158 (COMMUNITY CLUB RD) BRIDGE OVER HUNGERPILLER POND (DR-
Project No.: P030169 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $11.00 $0.00 $15.00 0.0000
Completion Date: 7/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
1.000
EA
TRAFFIC CONTROL
1.000
LS
SELECTED REMOVAL OF MARKED TREES
1.000
LS
24.000
SY
1.000
LS
UNCLASSIFIED EXCAVATION
120.000
CY
BORROW EXCAVATION
240.000
CY
5.000
CY
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT REMOVAL & DISPOSAL OF EXISTING BRIDGE
ROCK EXCAVATION FOR BRIDGES PERMANENT SHEET PILING
1,200.000
SF
FLOWABLE FILL
20.000
CY
MAINTENANCE STONE
20.000
TON
LIQUID ASPHALT BINDER PG64-22
3.000
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
40.000
TON
PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED)
70.000
SF
BARRICADE - TYPE 3
84.000
LF
TYPE B - FLASHING LIGHT
16.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
400.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING
400.000
LF
1,100.000
LF
800.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" CONC. FOR STRUCTURES - CLASS 4000 REINF. STEEL FOR STRUCTURES (BRIDGE) REINF. PILE TIPS (HP12 X 53)
8.000
EA
50.000
CY
8,000.000
LB
14.000
EA
240.000
LF
CONCRETE CURB (TRANSITION)
30.000
LF
RIP-RAP (CLASS B)
40.000
TON
STEEL H BEARING PILING (HP12 X 53)
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B
2,000.000
10
SY
6/1/2018
South Carolina Department of Transportation
Call No.: 040
Description STEEL BEAM GUARDRAIL STEEL BEAM GR. END TERMINAL - TYPE T THRIE BEAM G.R.BRIDGE CONN. ADDITIONAL LENGTH GUARDRAIL POST
Page:
11
Quantity Units 400.000
LF
4.000
EA
4.000
EA
400.000
LF
PERMANENT GRASSING FOR SMALL PROJECTS
1.000
ACRE
TEMPORARY COVER
1.000
ACRE
2.000
MSY
TEMPORARY EROSION CONTROL BLANKET (ECB) SEDIMENT TUBES FOR DITCH CHECKS
80.000
LF
1,000.000
LF
REPLACE/REPAIR SILT FENCE
100.000
LF
REMOVAL OF SILT RETAINED BY SILT FENCE
300.000
LF
SILT FENCE
DITCH CHECK
20.000
TON
AGGREGATE NO.5 OR 57 FOR EROSION CONTROL
20.000
TON
STABILIZED CONSTRUCTION ENTRANCE
200.000
SY
TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 12"
100.000
LF
PRESTRESSED CONCRETE BOX GIRDER
960.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 050
SC File NO(S).: 1014381 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P032295 CO(S).: Charleston
Description: 2018 FDP, MILL, RESURFACING
Project No.: P032295 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 10.3200
Completion Date: 9/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
2,455.000
SY
273.000
LF
1,786.000
CY
REMOVAL & DISPOSAL OF EXISTING PAVEMENT REMOVAL & DISPOSAL OF EXISTING CURB BORROW EXCAVATION MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22
62.400
TON
876.003
TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
4,925.000
SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
1,315.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.5"
17,140.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.75"
7,645.000
SY
15,860.000
SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) HOT MIX ASPHALT SURFACE COURSE TYPE B
738.213
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
13,029.188
TON
875.000
TON
HOT MIX ASPHALT SURFACE COURSE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING
2,640.000
SF
300.000
LF
24,400.000
LF
1,204.000
LF
12" WHITE SOLID LINES - PERM.PVMT.MARKINGS
70.000
LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK
40.000
LF
1,033.000
LF
12.000
EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING
2.000
EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING
4.000
EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING
3.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 8" WHITE SOLID LINES PERM.PVMT.MARKINGS
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
12
150.000
LF
53,935.000
LF
600.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 050
Description 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT
Page: Quantity Units 48,030.000
LF
1,676.000
LF
70.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
1,972.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
22.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
4.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
7.000
EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT
2.000
EA
300.000
LF
84,195.000
LF
110.000
LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
18.000
EA
727.000
EA
90.000
LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
5,150.000
LF
SAWCUT FOR LOOP DETECTOR
2,550.000
LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
4.000
EA
CONCRETE CURB (9" X 15")
300.000
LF
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE
253.000
LF
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE
20.000
LF
1,360.000
SY
DETECTABLE WARNING MATERIAL
440.000
SF
CONCRETE DRIVEWAY(6" UNIFORM)
500.000
SY
CONCRETE SIDEWALK(4" UNIFORM)
CONCRETE MEDIAN
45.000
SY
PEDESTRIAN RAMP CONSTRUCTION
550.000
SY
SURFACE APPLIED DETECTABLE WARNING
300.000
SF
PERMANENT GRASSING FOR SMALL PROJECTS ROOT BARRIER
13
8.804 50.000
ACRE LF
6/1/2018
South Carolina Department of Transportation
Call No.: 060
SC File NO(S).: 1025800 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P028928
CO(S).:
Description: I-526 SYSTEMS AND TIMINGS PROJECT
Project No.: P028928 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $98.00 $0.00 $0.00 $15.00 0.0000
Completion Date: 10/31/2020
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
1,028.000
SY
474.000
LF
6,055.000
LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL
112.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
964.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
9.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
2.000
EA
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL
1.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.
130.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
492.000
LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" REMOVAL OF PAVEMENT MARKINGS REMOVAL OF PAVEMENT MARKINGS FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN Flat Sheet, Type XI, Size Determined by MSG, Overhead MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE REMOVAL OF MOUNTING ASSEMBLY FOR FS.SIGN ON SPAN WIRE F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM
24.000
EA
1,722.000
LF
5.000
EA
36.000
SF
667.000
SF
89.000
EA
7.000
EA
3.000
EA
120.000
LF
U-SECTION POST FOR SIGN BRACING - 2P
0.000
LF
REMOVAL OF U-SECTION POST
0.000
EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
1,052.000
LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT
10,268.000
LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT
175.000
LF
U-SECTION POST FOR SIGN SUPPORTS - 3P
FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK
14
382.000
LF
1,940.000
LF
20,940.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 060
Description
Page: Quantity Units
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY
46,395.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK)
22,555.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY)
36,145.000
LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
79,235.000
LF
1,570.000
LF
6.000
EA
FURNISH & INSTALL FIBER OPTIC CABLE-SINGLE MODE FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER FIBER OPTIC TRANSCEIVER (SMFO) OTDR TEST FOR EXISTING FIBER BETWEEN SIGNALS PER 677.3 INSTALL WIRELESS NETWORK COMMUNICATIONS RADIO AT SIGNAL CABINET (1 RADIO) 001 FURNISH & INSTALL WIRELESS DETECTION SYSTEM PER SIGNAL
2.000
EA
14.000
EA
4.000
EA
4.000
EA
30,763.000
LF
FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL
10.000
EA
F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
20.000
EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
157.000
EA
F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
7.000
EA
FURNISH & INSTALL 40' WOOD POLE - CLASS II-CCA TREATED(0.60)
8.000
EA
FURNISH & INSTALL 3/8" SIDEWALK GUY
3.000
EA
10.000
EA
FURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE
260.000
LF
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE
2,617.000
LF
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE
56.000
EA
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 17
17.000
EA
FURNISH AND INSTALL BATTERY BACK-UP INCLUDING FOUNDATION
4.000
EA
FURNISH & INSTALL 2070L CONTROLLER UNIT IN EXISTING CABINET INSTALL 2070L CONTROLLER UNIT &/OR CONFLICT MONITOR IN EXISTING CABINET FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD
4.000
EA
2.000
EA
10.000
EA
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD
50.000
EA
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002
150.000
EA
F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD F&I - 16" 1-WAY-1SECT.HAND/MAN/COUNTDOWN LED PEDESTRIAN SIGNAL HEAD - LEFT F&I - 16" 1-WAY-1SECT.HAND/MAN/COUNTDOWN LED PEDESTRIAN SIGNAL HEAD - RIGHT F&I-PED PUSH BUT.SOLID STATE W/ LIGHT&TONE ASSEM 9"X15"&SIGN (R-10-3E or R10-4a) F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM
114.000
EA
3.000
EA
1.000
EA
116.000
EA
20.000
EA
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG.
283.000
EA
F&I-PEDESTRIAN TRAF. SIGNAL HEAD MOUNTING ASSEM FOR POST TOP
2.000
EA
F&I-PED. TRAF. SIGNAL HEAD MOUNT. ASSY FOR DUAL POST TOP
3.000
EA
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT
1.000
LS
TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT
1.000
LS
SAWCUT FOR LOOP DETECTOR
FURNISH & INSTALL 13" X 28' STEEL STRAIN POLE AND FOUNDATION
15
6/1/2018
South Carolina Department of Transportation
Call No.: 060
Description
Page: Quantity Units
FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN
1.000
EA
INSTALL 12" 1-WAY-3 SECTION(R.Y.G.)VEHICLE TRAFFIC SIGNAL
7.000
EA
INSTALL 12" 1-WAY-1 SECTION(RA)VEHICLE TRAFFIC SIGNAL
2.000
EA
FURNISH & INSTALL CONCRETE CABINET FOUNDATION
10.000
EA
FURNISH & INSTALL 332 SIGNAL CABINET - BASE MOUNTED
12.000
EA
INSTALL PEDESTRIAN SIGNAL HEAD
4.000
EA
CONCRETE SIDEWALK(4" UNIFORM)
154.000
SY
DETECTABLE WARNING MATERIAL
503.000
SF
71.000
SY
1,292.000
SY
464.000
SF
CONCRETE MEDIAN PEDESTRIAN RAMP CONSTRUCTION SURFACE APPLIED DETECTABLE WARNING
16
6/1/2018
South Carolina Department of Transportation
Call No.: 070
Page:
Project No.: P037415 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Description: I-26 PAVEMENT MARKINGS - CHARLESTON Cost of X-Sections: COUNTY Cost of Proposal: Approx. Length (miles):
SC File NO(S).: 1048430 Letting Date: July 10, 2018 Letting Time: 02:00 PM
PCN: P037415 CO(S).: Charleston
0.00% $22.00 $0.00 $0.00 $15.00 10.3200
Completion Date: 11/30/2018
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
6" WHITE BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 6" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION-EPOXY PAINT 12" WHITE SOLID LINES (GORE MARKINGS) EPOXY PAINT 24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)EPOXY PAINT 24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) EPOXY PAINT
2,200.000
LF
152,000.000
LF
2,575.000
LF
23,625.000
LF
175.000
LF
2,025.000
LF
WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT
35.000
EA
WHITE WORD MESSAGE "ONLY" - EPOXY PAINT
31.000
EA
WHITE COMBINATION ARROW (STR.&RT.OR STR.<) EPOXY PAINT
11.000
EA
4.000
EA
149,500.000
LF
4,440.000
EA
415,600.000
LF
1.000
LS
66,600.000
LF
WHITE LANE DROP ARROW (LEFT OR RIGHT) EPOXY PAINT 6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE - EPOXY PAINT PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" REMOVAL OF PAVEMENT MARKINGS EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL8"WH.CONTRAST BROKEN
17
6/1/2018
South Carolina Department of Transportation
Call No.: 080
SC File NO(S).: 1048440 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P037416 CO(S).: Charleston
Description: SC-30 PAVEMENT MARKINGS
Project No.: P037416 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $8.00 $0.00 $0.00 $15.00 3.0500
Completion Date: 11/30/2018
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4"
910.000
EA
124,600.000
LF
1.000
LS
11,800.000
LF
100.000
LF
52,400.000
LF
225.000
LF
8,325.000
LF
850.000
LF
11.000
EA
POLYUREA WHITE WORD MESSAGE "ONLY"
2.000
EA
POLYUREA WHITE COMBINATION ARROW (STR.&RT.OR STR.<)
4.000
EA
47,600.000
LF
REMOVAL OF PAVEMENT MARKINGS EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL8"WH.CONTRAST BROKEN POLYUREA 12"X18" WHITE YIELD BAR POLYUREA 6" WHITE SOLID LINES (PVT. EDGE LINES) POLYUREA 8"WHITE SOLID LINES-CROSSWALK&CHANNELIZATION POLYUREA 12" WHITE SOLID LINES (GORE MARKINGS) POLYUREA 24"WHITE SOLID LINES(STOP LINES/DIAG.LINES) POLYUREA WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT)
POLYUREA 6"YELLOW SOLID LINES-PVT.EDGE&NO PASS. ZONE
18
6/1/2018
South Carolina Department of Transportation
Call No.: 090
SC File NO(S).: 1209150 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030042 PCN: P030050 CO(S).: Chester
Description: CMRB, MILLING, HMA BASE/SURFACE
Project No.: P030042 Project No.: P030050 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 3.6200
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL REMOVAL OF EXIST. GUARDRAIL UNCLASSIFIED EXCAVATION BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE HOT MIX ASPHALT BASE COURSE - TYPE B LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT 6.0" MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP
1.000
LS
300.000
LF
5,247.000
CY
724.000
CY
30,067.000
SY
902.010
TON
29.000
TON
12,250.187
TON
1,029.466
TON
22,106.000
SY
800.000
SY
7.240
MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B
2,578.987
TON
HOT MIX ASPHALT SURFACE COURSE TYPE B
2,608.987
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
2,202.300
TON
250.250
TON
DRIVEWAY PAVING-SURFACE TYPE C ASPHALT SURFACE TREATMENT(SINGLE TREATMENT)
30,067.000
SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
714.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
534.000
LF
114,690.000
LF
480.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.
19
4,740.000
LF
90,120.000
LF
178.000
LF
38,230.000
LF
160.000
LF
1,580.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 090
Description 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" STEEL BEAM GUARDRAIL STEEL BEAM GR. GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING END TERMINAL - TYPE T ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS
Page:
20
Quantity Units 30,040.000
LF
246.000
EA
4,325.000
LF
300.000
LF
34.000
EA
519.000
LF
4.000
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 100
SC File NO(S).: 1309230 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030051 CO(S).: Chesterfield
Description: CMRB AND OVERLAY
Project No.: P030051 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 0.4300
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
UNCLASSIFIED EXCAVATION
86.000
CY
BORROW EXCAVATION
86.000
CY
6,000.000
SY
CEMENT MODIFIED RECYCLED BASE (10" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
180.000
TON
27.500
TON
51.119
TON
1,000.000
SY
HOT MIX ASPHALT SURFACE COURSE TYPE C
654.987
TON
DRIVEWAY PAVING-SURFACE TYPE C
197.000
TON
ASPHALT SURFACE TREATMENT(SINGLE TREATMENT)
6,000.000
SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
552.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
320.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
9,200.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
380.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
4.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
4.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
4.000
EA
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
9,200.000
LF
160.000
LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
4,600.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
190.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
2.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
2.000
EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL
2.000
EA
4,600.000
LF
4.000
EA
30.000
EA
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
21
6/1/2018
South Carolina Department of Transportation
Call No.: 100
Description
Page: Quantity Units
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
750.000
LF
SAWCUT FOR LOOP DETECTOR
250.000
LF
PERMANENT GRASSING FOR SMALL PROJECTS
22
0.500
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 110
SC File NO(S).: 1808900 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030036 CO(S).: Dorchester
Description: CMRB-12 UNIF STC STB
Project No.: P030036 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
23
0.00% $0.00 $0.00 $0.00 $15.00 1.5700
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
1.000
EA
TRAFFIC CONTROL
1.000
LS
UNCLASSIFIED EXCAVATION
150.000
CY
BORROW EXCAVATION
950.000
CY
ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION
392.500
TON
CEMENT MODIFIED RECYCLED BASE (12" UNIFORM)
24,000.000
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE
SY
1,080.000
TON
MAINTENANCE STONE
150.000
TON
LIQUID ASPHALT BINDER PG64-22
253.999
TON
MILLED-IN RUMBLE STRIP
2.600
MI
HOT MIX ASPHALT SURFACE COURSE TYPE B
4,243.354
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
100.000
TON
DRIVEWAY PAVING-SURFACE TYPE C
385.000
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING
320.000
SF
16,880.000
LF
40.000
LF
2,500.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING
16,880.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
52,640.000
LF
160.000
LF
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERMANENT GRASSING FOR SMALL PROJECTS
7,500.000
LF
52,640.000
LF
104.000
EA
1.522
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 120
SC File NO(S).: 1908190 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P029984 PCN: P030390 CO(S).: Edgefield
Description: CMRB AND OVERLAY
Project No.: P029984 Project No.: P030390 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 7.4200
Completion Date: 10/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
2.000
EA
TRAFFIC CONTROL
1.000
LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT REMOVAL OF EXIST. GUARDRAIL BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 10"UNIF MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C DRIVEWAY PAVING-SURFACE TYPE C DRIVEWAY PAVING-SURFACE TYPE D ASPHALT SURFACE TREATMENT (TRIPLE TREATMENT) TYPE 2
105.000
SY
3,207.000
LF
2,187.000
CY
115,340.000
SY
4,153.000
TON
5.350
TON
673.632
TON
535.000
SY
1,500.000
SY
8.380
MI
10,846.360
TON
300.000
TON
77.000
TON
44,380.000
SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
732.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
462.000
LF
134,961.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
276.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
6.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT
6,390.000
LF
132,657.000
LF
154.000
LF
45,409.000
LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL
30.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
92.000
LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
24
6/1/2018
South Carolina Department of Transportation
Call No.: 120
Description WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
Page: Quantity Units 2.000
EA
2,130.000
LF
44,620.000
LF
7.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
520.000
EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
500.000
LF
1,212.000
LF
404.000
LF
1.000
EA
4,910.000
LF
96.000
LF
500.000
LF
28.000
EA
4.000
EA
304.000
LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE SAWCUT FOR LOOP DETECTOR 13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD STEEL BEAM GUARDRAIL STEEL BEAM GR. GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING STEEL BEAM GUARDRAIL (THRIE) END TERMINAL - TYPE T THRIE BEAM G.R.BRIDGE CONN. ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS SEDIMENT TUBES FOR DITCH CHECKS
5.420
ACRE
1,110.000
LF
11,080.000
LF
REPLACE/REPAIR SILT FENCE
1,108.000
LF
REMOVAL OF SILT RETAINED BY SILT FENCE
2,770.000
LF
SILT FENCE
25
6/1/2018
South Carolina Department of Transportation
Call No.: 130
SC File NO(S).: 2009160
Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030044 PCN: P030052 PCN: P033598 CO(S).: Fairfield
Description: CMRB AND OVERLAY
Project No.: P030044 Project No.: P030052 Project No.: P033598 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 6.9800
Completion Date: 11/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
1,100.000
LF
968.000
CY
12,800.000
CY
REMOVAL OF EXIST. GUARDRAIL UNCLASSIFIED EXCAVATION BORROW EXCAVATION STATION GRADING
109.570
STA
CEMENT MODIFIED RECYCLED BASE (10" UNIFORM)
25,009.600
SY
CEMENT MODIFIED RECYCLED BASE (12" UNIFORM)
84,217.000
SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE
3,688.016
TON
MAINTENANCE STONE
227.000
TON
LIQUID ASPHALT BINDER PG64-22
923.920
TON
MILLING EXISTING ASPHALT PAVEMENT 2.0"
36,468.000
SY
MILLING EXISTING ASPHALT PAVEMENT 3.0"
33,229.000
SY
3,125.000
SY
9.900
MI
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C DRIVEWAY PAVING-SURFACE TYPE C ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
26
14,768.667
TON
630.000
TON
25,009.600
SY
1,346.000
SF
824.000
LF
246,050.000
LF
920.000
LF
6.000
EA
12,350.000
LF
179,045.000
LF
296.000
LF
73,710.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 130
Description
Page: Quantity Units
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
430.000
LF
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.
2.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
4,700.000
LF
48,465.000
LF
475.000
EA
10,162.500
LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING
90.000
LF
END TERMINAL - TYPE T
80.000
EA
4.000
EA
2,751.000
LF
STEEL BEAM GUARDRAIL STEEL BEAM GR.
THRIE BEAM G.R.BRIDGE CONN. ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS SILT FENCE
27
19.000
ACRE
2,000.000
LF
REPLACE/REPAIR SILT FENCE
200.000
LF
REMOVAL OF SILT RETAINED BY SILT FENCE
200.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 140
SC File NO(S).: 2109550 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030492 CO(S).: Florence
Description: 2017 CMRB AND SURFACE COURSE
Project No.: P030492 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
28
0.00% $0.00 $0.00 $0.00 $15.00 4.0900
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
818.000
CY
47,989.000
SY
BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE LIQUID ASPHALT BINDER PG64-22 MILLED-IN RUMBLE STRIP
1,727.000
TON
292.303
TON
8.180
MI
HOT MIX ASPHALT SURFACE COURSE TYPE C
4,225.317
TON
HOT MIX ASPHALT SURFACE COURSE TYPE D
615.625
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
378.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
150.000
LF
129,600.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
120.000
LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT
14,400.000
LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
10,800.000
LF
50.000
LF
43,200.000
LF
40.000
LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.
4,800.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
3,600.000
LF
270.000
EA
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERMANENT GRASSING FOR SMALL PROJECTS
3.966
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 150
SC File NO(S).: 2688710 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P028288 CO(S).: Horry
Description: US 17 BUSINESS ACCESS MANAGEMENT PROJECT
Project No.: P028288 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
17.50% $253.00 $0.00 $67.00 $15.00 3.0770
Completion Date: 11/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
1.000
EA
UTILITY RELOCATION NO. ____ 001
1.000
EA
TRAFFIC CONTROL
1.000
LS
CPM PROGRESS SCHEDULE
1.000
LS
CLEARING & GRUBBING WITHIN ROADWAY
1.000
LS
REMOVAL & DISPOSAL OF HIGH LEVEL CONTAMINATED SOIL
250.000
TON
REMOVAL & DISPOSAL ITEM NO. 002
1.000
LS
REMOVAL & DISPOSAL ITEM NO. 003
1.000
LS
10,170.000
SY
20.000
CY
UNCLASSIFIED EXCAVATION
11,000.000
CY
BORROW EXCAVATION
19,200.000
CY
3,000.000
CY
500.000
CY
65.000
CY
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT REMOVAL & DISPOSAL OF EXISTING CONCRETE
MUCK EXCAVATION SELECT MATERIAL FOR LANDSCAPING FLOWABLE FILL MAINTENANCE STONE
300.000
TON
HOT MIX ASPHALT BASE COURSE - TYPE A
4,585.000
TON
LIQUID ASPHALT BINDER PG64-22
1,085.000
TON
MILLING EXISTING ASPHALT PAVEMENT 2.0" HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B HOT MIX ASPHALT SURFACE COURSE TYPE B PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
133,015.000
SY
1,260.000
TON
15,355.000
TON
1,140.000
SF
204.000
LF
PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES
28,620.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES
70,710.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES
BARRICADE - TYPE 3
29
70,890.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES
6,520.000
LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES
11,750.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 150
Description PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"YELLOW SOLID LINES PAVEMENT MARKINGS (TEMPORARY PAINT) 12"X18" WHITE TRIANGLE YIELD BAR PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW
Page: Quantity Units 800.000
LF
32.000
LF
318.000
EA
PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE COMBINATION ARROWS
12.000
EA
PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE LANE DROP ARROWS
22.000
EA
230.000
EA
PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE WORD 'ONLY 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT
1,985.000
LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
14,310.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
35,355.000
LF
3,260.000
LF
16.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
5,875.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
159.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
115.000
EA
6.000
EA
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL
11.000
EA
35,445.000
LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL.
400.000
LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
585.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
425.000
EA
REMOVAL OF PAVEMENT MARKINGS
4,350.000
LF
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN
1,127.500
SF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
Flat Sheet, Type XI, Size Determined by MSG, Overhead
396.000
SF
FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG.
36.000
SF
MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE
12.000
EA
F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM
54.000
EA
1,920.000
LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
410.000
LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT
5,081.000
LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT
210.000
LF
FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE
1,723.000
LF
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS)
1,723.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK
5,610.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY
9,110.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK)
10,840.000
LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY)
6,960.000
LF
26,398.000
LF
FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER
1.000
EA
FIBER OPTIC TRANSCEIVER (SMFO)
1.000
EA
9,461.000
LF
3.000
EA
U-SECTION POST FOR SIGN SUPPORTS - 3P
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
SAWCUT FOR LOOP DETECTOR FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL
30
6/1/2018
South Carolina Department of Transportation
Call No.: 150
Description
Page: Quantity Units
F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
48.000
EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
27.000
EA
F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
7.000
EA
FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION
2.000
EA
610.000
LF
23.000
EA
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 002
7.000
EA
FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD
1.000
EA
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD
13.000
EA
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 003
68.000
EA
F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD F&I-PED PUSH BUT.SOLID STATE W/ LIGHT&TONE ASSEM 9"X15"&SIGN (R-10-3E or R10-4a) F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM
36.000
EA
36.000
EA
64.000
EA
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG.
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE
82.000
EA
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT
1.000
LS
TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT
1.000
LS
F&I - VIDEO DETECTION SYSTEM W/ ONE CAMERA, HARDWARE & LEAD-IN
4.000
EA
FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN
18.000
EA
TRAFFIC ADAPTIVE SYSTEM
3.000
EA
FURNISH & INSTALL FACTORY TERMINATED PATCH PANEL INSTALL WIRELESS NETWORK COMMUNICATIONS LINK BETWEEN TWO SIGNALS 001 POWDERCOATING PER MAST ARM OVER GALVANIZED DESIGN, FURNISH & INSTALL STEEL POLE WITH TWIN MAST ARMS INCLUDING FOUNDATION 001 DESIGN, FURNISH & INSTALL STEEL POLE WITH MAST ARM INCLUDING FOUNDATION POWDERCOATING OPTION FOR 10' ALUMINUM PEDESTAL POLE
1.000
EA
2.000
EA
17.000
EA
6.000
EA
11.000
EA
23.000
EA
PERMANENT CONCRETE BOLLARD
2.000
EA
15" SMOOTH WALL PIPE
344.000
LF
18" SMOOTH WALL PIPE
7,312.000
LF
24" SMOOTH WALL PIPE
2,828.000
LF
30" SMOOTH WALL PIPE
2,533.000
LF
CLEANING EXISTING PIPE
2,730.000
LF
BRICK SIDEWALK (MORTARLESS)
23.000
SY
CATCH BASIN -TYPE 16
15.000
EA
DROP INLET (24" X 36")
18.000
EA
DROP INLET TYPE 112
64.000
EA
DROP INLET TYPE 112 WITH 4X4 BOX
14.000
EA
DROP INLET TYPE 115 WITH STANDARD 6' X 6' BOX
11.000
EA
1,585.000
LF
2.000
EA
TRENCH DRAIN-4" INTERIOR DIMENSION WITH 2.0' CURB & GUTTER MANHOLE WITH STANDARD 5' X 5' BOX
31
6/1/2018
South Carolina Department of Transportation
Call No.: 150
Description
Page: Quantity Units
MANHOLE WITH STANDARD 6' X 6' BOX
2.000
EA
48" X 48" JUNCTION BOX
4.000
EA
ADJUST MANHOLE
2.000
EA
ADJUST DROP INLET ADJUST D. I.
3.000
EA
ADJUST JUNCTION BOX
1.000
EA
JUNCTION BOX - CONVERT CB T-16
1.000
EA
BEVELING OF PIPE END
20.000
EA
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE
560.000
LF
CONCRETE SIDEWALK(4" UNIFORM)
300.000
SY
CONCRETE SIDEWALK(6" UNIFORM)
55.000
SY
DETECTABLE WARNING MATERIAL
300.000
SF
CONCRETE DRIVEWAY(6" UNIFORM)
105.000
SY
CONCRETE MEDIAN
855.000
SY
1.000
EA
200.000
SY
60.000
SF
90.000
TON
CONCRETE FLUME PEDESTRIAN RAMP CONSTRUCTION SURFACE APPLIED DETECTABLE WARNING RIP-RAP (CLASS B) GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B
110.000
SY
MOVING ITEM NO. 007
1.000
LS
MOVING ITEM NO. 008
1.000
LS
MOVING ITEM NO. 009
1.000
LS
MOVING ITEM NO. 010
32
1.000
LS
11.000
EA
RIGHT OF WAY PLAT
1.000
LS
PERMANENT COVER
9.850
ACRE
13.900
ACRE
RIGHT OF WAY MARKER(REBAR AND CAP)
TEMPORARY COVER FERTILIZER (NITROGEN)
985.000
LB
FERTILIZER (PHOSPHORIC ACID)
985.000
LB
985.000
LB
19,700.000
LB
FERTILIZER (POTASH) AGRICULTURAL GRANULAR LIME SELECTIVE WATERING
135,750.000
GAL
MOWING
47.500
ACRE
LANDSCAPING ITEM NO. 001
40.000
EA
LANDSCAPING ITEM NO. 002
36.000
EA
LANDSCAPING ITEM NO. 003
604.000
EA
LANDSCAPING ITEM NO. 004
480.000
EA
LANDSCAPING ITEM NO. 005
373.000
EA
LANDSCAPING ITEM NO. 006
530.000
EA
LANDSCAPING ITEM NO. 007
28.000
EA
LANDSCAPING ITEM NO. 008
2,960.000
EA
LANDSCAPING ITEM NO. 009
495.000
EA
LANDSCAPING ITEM NO. 010
3,466.000
EA
6/1/2018
South Carolina Department of Transportation
Call No.: 150
Description
Page: Quantity Units
LANDSCAPING ITEM NO. 011
232.000
EA
LANDSCAPING ITEM NO. 012
1,062.000
EA
6,316.000
EA
50,000.000
SF
LANDSCAPING ITEM NO. 013 DOUBLE-SHREDDED HARDWOOD MULCH
33
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1
47.000
ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3
0.880
ACRE
INLET STRUCTURE FILTER - TYPE F (WEIGHTED)
112.000
LF
INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED)
104.000
LF
SEDIMENT TUBES FOR DITCH CHECKS
1,956.000
LF
SILT FENCE
7,195.000
LF
720.000
LF
1,800.000
LF
148.000
EA
INLET STRUCTURE FILTER - TYPE A
4,460.000
LF
STABILIZED CONSTRUCTION ENTRANCE
1,650.000
SY
REPLACE/REPAIR SILT FENCE REMOVAL OF SILT RETAINED BY SILT FENCE CLEANING INLET STRUCTURE FILTERS
6/1/2018
South Carolina Department of Transportation
Call No.: 160
SC File NO(S).: 2747710 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030693 CO(S).: Jasper
Description: RESURFACING SC 3 JASPER
Project No.: P030693 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
34
0.00% $0.00 $0.00 $0.00 $15.00 1.5200
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
1.000
EA
TRAFFIC CONTROL
1.000
LS
BORROW EXCAVATION
604.000
CY
EXCAVATION FOR SHOULDER PAVING
161.000
STA
HAULING OF EXCAVATED SHOULDER MATERIAL
161.000
STA
29.000
TON
HMA SHOULDER WIDENING COURSE
802.560
TON
LIQUID ASPHALT BINDER PG64-22
283.903
TON
MAINTENANCE STONE
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP
2,900.000
SY
500.000
SY
3.040
MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B
2,318.507
TON
HOT MIX ASPHALT SURFACE COURSE TYPE B
2,368.507
TON
DRIVEWAY PAVING-SURFACE TYPE C
180.000
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
176.000
SF
16,050.000
LF
15.000
LF
520.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING
13,600.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
48,150.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERMANENT GRASSING FOR SMALL PROJECTS
45.000
LF
1,560.000
LF
40,800.000
LF
100.000
EA
1.474
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 170
SC File NO(S).: 3291930 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P028138 CO(S).: Lexington
Description: SUMMIT SIDEWALK PROJECT
Project No.: P028138 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
17.50% $27.00 $0.00 $0.00 $15.00 0.3410
Completion Date: 8/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
CONSTRUCTION STAKES, LINES & GRADES
1.000
EA
TRAFFIC CONTROL
1.000
LS
CPM PROGRESS SCHEDULE
1.000
LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY
1.000
LS
REMOVAL & DISPOSAL ITEM NO. 001
1.000
LS
REMOVAL & DISPOSAL ITEM NO. 002
1.000
LS
REMOVAL & DISPOSAL ITEM NO. 003
1.000
LS
REMOVAL & DISPOSAL ITEM NO. 004
1.000
LS
REMOVAL & DISPOSAL ITEM NO. 005
1.000
LS
REMOVAL & DISPOSAL ITEM NO. 006
1.000
LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT
5.000
SY
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT
20.000
SY
181.000
CY
FLOWABLE FILL
50.000
CY
MAINTENANCE STONE
10.000
TON
2.646
TON
42.000
TON
UNCLASSIFIED EXCAVATION
LIQUID ASPHALT BINDER PG64-22 HOT MIX ASPHALT SURFACE COURSE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
344.000
SF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
322.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
30.000
LF
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN
24.750
SF
U-SECTION POST FOR SIGN SUPPORTS - 3P
48.000
LF
4.000
LF
15" SMOOTH WALL PIPE BEVELING OF PIPE END
35
1.000
EA
CONCRETE SIDEWALK(4" UNIFORM)
937.000
SY
DETECTABLE WARNING MATERIAL
100.000
SF
CONCRETE DRIVEWAY(6" UNIFORM)
47.000
SY
PEDESTRIAN RAMP CONSTRUCTION
200.000
SY
6/1/2018
South Carolina Department of Transportation
Call No.: 170
Description
Page:
36
Quantity Units
MOVING ITEM NO. 001
1.000
LS
MOVING ITEM NO. 002
1.000
LS
RIGHT OF WAY MARKER(REBAR AND CAP)
8.000
EA
RIGHT OF WAY PLAT
1.000
LS
PERMANENT GRASSING FOR SMALL PROJECTS
0.264
ACRE
TEMPORARY COVER
0.132
ACRE
MOWING
0.793
ACRE
SODDING
1.000
MSY
SEDIMENT TUBES FOR DITCH CHECKS SILT FENCE STABILIZED CONSTRUCTION ENTRANCE
10.000
LF
1,200.000
LF
550.000
SY
6/1/2018
South Carolina Department of Transportation
Call No.: 180
SC File NO(S).: 3748160 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P037223 CO(S).: Oconee
Description: RESURFACING/RECONSTRUCTION
Project No.: P037223 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 2.3600
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
UNCLASSIFIED EXCAVATION
438.000
CY
BORROW EXCAVATION
448.000
CY
29,216.000
SY
CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT 2.0" MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP
1,169.000
TON
50.000
TON
282.055
TON
3,098.000
SY
278.000
SY
2.500
MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C
1,161.600
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
3,375.386
TON
396.250
TON
DRIVEWAY PAVING-SURFACE TYPE C PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
1,004.000
SF
240.000
LF
60,296.000
LF
1,660.000
LF
216.000
LF
2.000
EA
125,660.000
LF
60.000
LF
24,921.000
LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
830.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
102.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
1.000
EA
26,188.000
LF
14.000
EA
206.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
37
6/1/2018
South Carolina Department of Transportation
Call No.: 180
Description FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
Page:
38
Quantity Units 210.000
LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
3,770.000
LF
SAWCUT FOR LOOP DETECTOR
1,370.000
LF
3.000
EA
2.172
ACRE
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD PERMANENT GRASSING FOR SMALL PROJECTS SEDIMENT TUBES FOR DITCH CHECKS
40.000
LF
SILT FENCE
80.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 190
SC File NO(S).: 3805390 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P029541
CO(S).:
Description: I-26 EB/WB OVER SC 33 & CSX RR BRIDGE REHABILITATION
Project No.: P029541 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $36.00 $0.00 $15.00 0.0560
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
LIQUID ASPHALT BINDER PG76-22 MILLING EXISTING ASPHALT PAVEMENT 3.0" MILLED-IN RUMBLE STRIP
64.000
TON
6,205.000
SY
0.500
MI
HOT MIX ASPHALT SURFACE COURSE TYPE A
621.000
TON
OPEN-GRADED FRICTION COURSE
376.000
TON
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER
3.000
EA
6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
2,200.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
2,000.000
LF
6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
1,150.000
LF
6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
2,200.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
2,000.000
LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
1,150.000
LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" POLYMER MODIFIED ASPHALT EXPANSION JOINT
39
30.000
EA
294.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 200
SC File NO(S).: 4048260 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P037228 CO(S).: Richland
Description: 2018 RICHLAND COUNTY CTC
Project No.: P037228 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 5.0400
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
BORROW EXCAVATION
802.000
CY
EXCAVATION FOR SHOULDER PAVING
250.280
STA
HAULING OF EXCAVATED SHOULDER MATERIAL
250.280
STA
85.650
TON
1,210.293
TON
450.335
TON
MAINTENANCE STONE HMA SHOULDER WIDENING COURSE LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
6,885.000
SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
1,680.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.5"
13,650.000
SY
MILLING EXISTING ASPHALT PAVEMENT 2.0"
2,600.000
SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
2,380.000
SY
1.400
MI
MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C
2,081.973
TON
HOT MIX ASPHALT SURFACE COURSE TYPE D
4,204.860
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
1,382.000
SF
40.000
LF
82,880.000
LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
130.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
551.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
1.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
1.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
1.000
EA
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
40
2.000
EA
480.000
LF
81,780.000
LF
20.000
LF
41,440.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 200
Description
Page: Quantity Units
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
130.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
547.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
1.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
1.000
EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL
1.000
EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.
2.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" ADJUST DROP INLET ADJUST D. I.
41
240.000
LF
41,090.000
LF
2.000
EA
290.000
EA
11.000
EA
PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS
2.650
ACRE
MOWING
3.888
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 210
Page:
Project No.: P033680 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Description: 2018 FA RECLAM SUMTER 4/5/2018 12:10:50 Cost of X-Sections: PM Cost of Proposal: Approx. Length (miles):
SC File NO(S).: 4325780 Letting Date: July 10, 2018 Letting Time: 02:00 PM
PCN: P033680 CO(S).: Sumter
42
0.00% $0.00 $0.00 $0.00 $15.00 3.7100
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
CSX RAILROAD INSURANCE AND FLAGGING 001
1.000
LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT
40.000
SY
742.000
CY
53,180.000
SY
BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE
1,870.000
TON
LIQUID ASPHALT BINDER PG64-22
333.188
TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
800.000
SY
5.000
MI
MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE C
5,062.640
TON
DRIVEWAY PAVING-SURFACE TYPE C
490.500
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
871.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
300.000
LF
158,800.000
LF
756.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
4.000
EA
2,940.000
LF
163,300.000
LF
300.000
LF
39,700.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
204.000
LF
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.
1.000
EA
1,780.000
LF
29,450.000
LF
392.000
EA
DETECTABLE WARNING MATERIAL
12.500
SF
PEDESTRIAN RAMP CONSTRUCTION
25.000
SY
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
PERMANENT GRASSING FOR SMALL PROJECTS
3.598
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 220
SC File NO(S).: 4409240 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030054 CO(S).: Union
Description: CMRB AND OVERLAY
Project No.: P030054 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 1.4200
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
UNCLASSIFIED EXCAVATION
284.000
CY
BORROW EXCAVATION
284.000
CY
20,000.000
SY
CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE
900.000
TON
32.000
TON
LIQUID ASPHALT BINDER PG64-22
202.802
TON
FULL DEPTH ASPH. PAV. PATCHING 10"UNIF
750.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.25"
1,000.000
SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
1,300.000
SY
HOT MIX ASPHALT SURFACE COURSE TYPE C
3,089.040
TON
DRIVEWAY PAVING-SURFACE TYPE C
291.000
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
360.000
SF
MAINTENANCE STONE
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
450.000
LF
45,000.000
LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
730.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
480.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
6.000
EA
12.000
EA
6.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
43
2,850.000
LF
30,150.000
LF
150.000
LF
15,000.000
LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
730.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
160.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
2.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
4.000
EA
6/1/2018
South Carolina Department of Transportation
Call No.: 220
Description
Page: Quantity Units
WHITE WORD MESSAGE "STOP AHEAD" -THERMOPLASTIC - 125 MIL.
1.000
EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL
2.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
950.000
LF
10,050.000
LF
8.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
100.000
EA
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
690.000
LF
SAWCUT FOR LOOP DETECTOR
230.000
LF
PERMANENT GRASSING FOR SMALL PROJECTS
44
1.500
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 230
SC File NO(S).: 4606001 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P029556 PCN: P037446 CO(S).: York
Description: I-77 OVER CATAWBA RIVER - YORK COUNTY
Project No.: P029556 Project No.: P037446 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
10.00% $0.00 $154.00 $0.00 $15.00 0.0000
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL OFF-DUTY LAW ENFORCEMENT OFFICER REMOVAL & DISPOSAL OF EXISTING CONCRETE
1.000
LS
1,656.000
HR
43.000
CY
2,400.000
LF
REMOVAL & DISPOSAL OF DESIGNATED PORTIONS OF EXISTING BRIDGE
1.000
LS
LIQUID ASPHALT BINDER PG64-22
4.500
TON
LIQUID ASPHALT BINDER PG76-22
163.000
TON
FULL DEPTH ASPH. PAV. PATCHING 12"UNIF
667.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.0"
45,925.000
SY
0.480
MI
REMOVAL & DISPOSAL OF CONCRETE MEDIAN BARRIER
MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE E
75.000
TON
OPEN-GRADED FRICTION COURSE
2,710.000
TON
PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE 4"WH.SOLID
5,425.000
LF
PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE4"YEL.SOLID
4,300.000
LF
TEMPORARY CONCRETE BARRIER
5,650.000
LF
1.000
EA
18,475.000
LF
50.000
SF
PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(60 MPH) REMOVAL OF PAVEMENT MARKINGS (LINES) (TRAFFIC CONTROL) REMOVAL OF PAVEMENT MARKINGS(HIGH PRESSURE WATER)(ARROWS, WORDS, RR CROSSING SYMBOLS, TRIANGLE YIELD)(TRAFFIC CONTROL) TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4"
450.000
EA
TEMPORARY YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X4"
450.000
EA
6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
9,350.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
45
17,050.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
2.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
2.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
2.000
EA
6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
20,450.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 230
Description
Page: Quantity Units
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
50.000
LF
6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
6,800.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
6,800.000
LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
6,800.000
LF
PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4"
400.000
EA
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL6"WH.BROKEN
1,880.000
LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID
2,150.000
LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL.
2,150.000
LF
2.0" SCHEDULE 40 PVC CONDUIT
1,092.000
LF
INSTALL 12" 1-WAY-4 SECTION(R.Y.G.GA)VEHICLE TRAFFIC SIGNAL
2.000
EA
INSTALL 12" 1-WAY-3 SECTION(RA.YA.GA.)VEHICLE TRAFFIC SIGN
2.000
EA
2,486.200
CY
504.000
SY
11,188.000
SY
815,048.000
LB
521.200
LF
CONC. FOR STRUCTURES - CLASS 4000 PARTIAL DEPTH PATCHING OF EXISTING DECK GROOVED SURFACE FINISH REINF. STEEL FOR STRUCTURES (BRIDGE) CONCRETE BRIDGE BARRIER PARAPET CONCRETE BRIDGE BARRIER PARAPET TRANSITION
1.000
EA
36.000
CY
CONCRETE MEDIAN BARRIER (TYPE-2)
2,400.000
LF
CONCRETE BARRIER EXTENSION
2,400.000
LF
110.000
LF
CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING
MAINT REPAIR OF JERSEY TY 2 W GLARE CATCH BASIN 15 AND PLUG WITH TEMPORARY TRAFFIC
46
15.000
EACH
6/1/2018
South Carolina Department of Transportation
Call No.: 240
SC File NO(S).: 4609190 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P030048 PCN: P030055 CO(S).: York
Description: CMRB AND OVERLAY
Project No.: P030048 Project No.: P030055 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 3.5900
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
CLEARING & GRUBBING WITHIN ROADWAY
1.000
LS
REMOVAL & DISPOSAL OF EXISTING CONCRETE UNCLASSIFIED EXCAVATION SITE EXCAVATION BORROW EXCAVATION CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) MILLED-IN RUMBLE STRIP
1.000
CY
718.000
CY
1.000
LS
718.000
CY
53,000.000
SY
2,385.000
TON
40.500
TON
285.535
TON
1,900.000
SY
7.180
MI
HOT MIX ASPHALT SURFACE COURSE TYPE B
1,623.387
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
3,000.430
TON
322.000
TON
DRIVEWAY PAVING-SURFACE TYPE C ASPHALT SURFACE TREATMENT(SINGLE TREATMENT)
53,000.000
SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
924.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
642.000
LF
113,760.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
705.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
12.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
47
6.000
EA
2,250.000
LF
103,260.000
LF
214.000
LF
37,920.000
LF
235.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 240
Description
Page: Quantity Units
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
4.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
2.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
750.000
LF
34,420.000
LF
4.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
244.000
EA
STEEL BEAM GUARDRAIL STEEL BEAM GR.
100.000
LF
8.000
EA
160.000
LF
END TERMINAL - TYPE T ADDITIONAL LENGTH GUARDRAIL POST PERMANENT GRASSING FOR SMALL PROJECTS
48
5.000
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 250
SC File NO(S).: 4648250 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P037230 CO(S).: York
Description: CMRB, FDP, RESURF
Project No.: P037230 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 4.6700
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT
500.000
SY
REMOVAL & DISPOSAL OF EXISTING CURB
750.000
LF
5.500
CY
2,213.440
CY
792.000
CY
REMOVAL & DISPOSAL OF EXISTING CONCRETE UNCLASSIFIED EXCAVATION BORROW EXCAVATION STATION GRADING FLOWABLE FILL CEMENT MODIFIED RECYCLED BASE (8" UNIF)-CURING METHOD A
9.500
STA
10.000
CY
30,061.800
SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE
901.854
TON
MAINTENANCE STONE
514.250
TON
2,704.387
TON
545.574
TON
HOT MIX ASPHALT BASE COURSE - TYPE B LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
3,500.000
SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
350.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.0"
2,137.330
SY
MILLING EXISTING ASPHALT PAVEMENT 1.5"
1,690.000
SY
MILLING EXISTING ASPHALT PAVEMENT 2.0"
8,937.000
SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
5,156.110
SY
HOT MIX ASPHALT SURFACE COURSE TYPE C
5,247.224
TON
HOT MIX ASPHALT SURFACE COURSE TYPE E
1,180.080
TON
754.875
TON
DRIVEWAY PAVING-SURFACE TYPE C PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
49
2,024.000
SF
1,008.000
LF
86,704.000
LF
200.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
2,100.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
2.000
EA
6/1/2018
South Carolina Department of Transportation
Call No.: 250
Description RAILROAD CROSSING SYMBOLS - FAST DRY PAINT
Page: Quantity Units 2.000
EA
700.000
LF
100,762.000
LF
496.000
LF
34,960.000
LF
100.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
1,050.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
1.000
EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL.
1.000
EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.
350.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
43,361.000
LF
8" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
50.000
LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
20.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
402.000
EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE
150.000
LF
CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE
600.000
LF
DETECTABLE WARNING MATERIAL
225.000
SF
PEDESTRIAN RAMP CONSTRUCTION
450.000
SY
BITUMINOUS CURB
200.000
LF
PERMANENT GRASSING FOR SMALL PROJECTS
50
3.842
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 260
Page:
Project No.: P030531 P030531 Project No.: P033673 P033673 Project No.: P033674 P033674 Project No.: P033675 P033675 Project No.: P033683 P033683 Project No.: P033684 P033684 Project No.: P036898 P036898 Project No.: P036899 P036899 Letting Date: July 10, 2018 CO(S).: Lexington Richland DBE Goal Percent: Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2018 FED AID REHAB RICH AND LEX Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
SC File NO(S).: 5125690
51
PCN: PCN: PCN: PCN: PCN: PCN: PCN: PCN:
5.00% $0.00 $0.00 $0.00 $15.00 15.8200
Completion Date: 10/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
3,868.000
SY
20.000
SY
REMOVAL OF EXIST. GUARDRAIL
425.000
LF
UNCLASSIFIED EXCAVATION
100.000
CY
1,176.400
CY
REMOVAL & DISPOSAL OF EXISTING PAVEMENT REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT
BORROW EXCAVATION EXCAVATION FOR SHOULDER PAVING
367.120
STA
HAULING OF EXCAVATED SHOULDER MATERIAL
367.120
STA
MAINTENANCE STONE
223.080
TON
HMA SHOULDER WIDENING COURSE
1,840.960
TON
LIQUID ASPHALT BINDER PG64-22
2,893.389
TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
2,150.000
SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
21,408.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.75"
31,350.000
SY
MILLING EXISTING ASPHALT PAVEMENT 2.0"
429,678.330
SY
MILLING EXISTING ASPHALT PAVEMENT 4.0"
3,300.000
SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
2,260.000
SY
3.100
MI
MILLED-IN RUMBLE STRIP HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B
1,997.600
TON
HOT MIX ASPHALT SURFACE COURSE TYPE B
44,561.303
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
5,044.807
TON
6/1/2018
South Carolina Department of Transportation
Call No.: 260
Description HOT MIX ASPHALT SURFACE COURSE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT
Page: Quantity Units 556.000
TON
8,200.000
SF
49,230.000
LF
214,086.000
LF
7,578.000
LF
30,014.000
LF
468.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
15,641.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
275.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
144.000
EA
26.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT
4.000
EA
38,170.000
LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
337,375.000
LF
6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
8,962.000
LF
13,186.000
LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 24" YELLOW DIAGONAL LINES - FAST DRY PAINT 4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT
392.000
LF
1,034.000
LF
176.000
LF
WHITE SINGLE ARROWS (LEFT, STRAIGHT, RIGHT) EPOXY PAINT
7.000
EA
WHITE WORD MESSAGE "ONLY" - EPOXY PAINT
6.000
EA
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
26,643.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
88,802.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
3,789.000
LF
15,910.000
LF
12" WHITE SOLID LINES - THERMO. - 125 MIL.
562.000
LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL
181.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
7,765.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
140.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
73.000
EA
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL
15.000
EA
14,850.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
143,840.000
LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
4,481.000
LF
196.000
LF
1,328.000
EA
910.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
3,670.000
EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
2,374.000
LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
95,930.000
LF
SAWCUT FOR LOOP DETECTOR
27,677.000
LF
1.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.
ADJUST DROP INLET ADJUST D. I.
52
6/1/2018
South Carolina Department of Transportation
Call No.: 260
Description
Page: Quantity Units
CATCH BASIN T-17 (CONVERT C.B. TYPE 5)
1.000
EA
CATCH BASIN T-18 (CONVERT C.B. TYPE 7)
4.000
EA
DETECTABLE WARNING MATERIAL
1,887.500
SF
PEDESTRIAN RAMP CONSTRUCTION
3,775.000
SY
SURFACE APPLIED DETECTABLE WARNING
142.500
SF
STEEL BEAM GUARDRAIL STEEL BEAM GR.
425.000
LF
REMOVE AND REPLACE W BEAM GUARDRAIL
53
1,100.000
LF
REMOVE AND REPLACE END ANCHOR-TYPE B
2.000
EA
END TERMINAL - TYPE T
8.000
EA
REMOVE AND REPLACE END TERMINAL - TYPE T
3.000
EA
THRIE BEAM G.R.BRIDGE CONN.
3.000
EA
PERMANENT GRASSING FOR SMALL PROJECTS
7.908
ACRE
MOWING
3.879
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 270
Page:
Project No.: P030323 P030323 Project No.: P030326 P030326 Project No.: P033676 P033676 Project No.: P033687 P033687 Letting Date: July 10, 2018 CO(S).: Lexington Richland DBE Goal Percent: Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2018 RICH LEX CTY RECLAM Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
SC File NO(S).: 5148310
54
PCN: PCN: PCN: PCN:
0.00% $0.00 $0.00 $0.00 $15.00 15.5700
Completion Date: 10/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
97.000
SY
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT
100.000
SY
REMOVAL OF EXIST. GUARDRAIL
375.000
LF
UNCLASSIFIED EXCAVATION
1,266.000
CY
BORROW EXCAVATION
3,618.000
CY
REMOVAL & DISPOSAL OF EXISTING PAVEMENT
EXCAVATION FOR SHOULDER PAVING
15.840
STA
HAULING OF EXCAVATED SHOULDER MATERIAL
15.840
STA
CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE MAINTENANCE STONE HMA SHOULDER WIDENING COURSE LIQUID ASPHALT BINDER PG64-22
219,064.000
SY
9,634.000
TON
1.600
TON
79.200
TON
1,372.613
TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
50.000
SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
110.000
SY
MILLING EXISTING ASPHALT PAVEMENT 2.0"
5,600.000
SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
3,230.000
SY
31.080
MI
MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE B
7,917.573
TON
HOT MIX ASPHALT SURFACE COURSE TYPE C
14,270.340
TON
HOT MIX ASPHALT SURFACE COURSE TYPE D
100.000
TON
DRIVEWAY PAVING-SURFACE TYPE C
992.250
TON
DRIVEWAY PAVING-SURFACE TYPE D
433.000
TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
1,578.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
2,302.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 270
Description 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
Page: Quantity Units 404,861.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
1,007.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
6.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
6.000
EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
50,942.000
LF
362,445.000
LF
360.000
LF
50.000
LF
1,412.000
LF
165,074.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
495.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
6.000
EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
8.000
EA
8,299.000
LF
138,779.000
LF
26.000
EA
1,124.000
EA
17.000
LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
1,350.000
LF
SAWCUT FOR LOOP DETECTOR
459.000
LF
STEEL BEAM GUARDRAIL STEEL BEAM GR.
100.000
LF
END TERMINAL - TYPE T
6.000
EA
THRIE BEAM G.R.BRIDGE CONN.
4.000
EA
PERMANENT GRASSING FOR SMALL PROJECTS
55
13.913
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 280
SC File NO(S).: 5413331 Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P031959 PCN: P031961 CO(S).: Chesterfield Lancaster
Description: '18 PRIM IMP IN C'FIELD AND LANC PM
Project No.: P031959 Project No.: P031961 DBE Goal Percent: Cost of Road Plans: Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 2.0700
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL REMOVAL & DISPOSAL OF EXISTING CURB REMOVAL & DISPOSAL OF EXISTING CONCRETE BORROW EXCAVATION MAINTENANCE STONE LIQUID ASPHALT BINDER PG64-22 FULL DEPTH ASPH. PAV. PATCHING 8" UNIF FULL DEPTH ASPH. PAV. PATCHING 10"UNIF
1.000
LS
200.000
LF
18.500
CY
120.000
CY
15.000
TON
404.921
TON
4,800.000
SY
8,475.000
SY
MILLING EXISTING ASPHALT PAVEMENT 1.75"
31,235.000
SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
21,950.000
SY
1.200
MI
MILLED-IN RUMBLE STRIP HOT MIX ASPHALT SURFACE COURSE TYPE B HOT MIX ASPHALT SURFACE COURSE TYPE C PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
7,640.013
TON
78.000
TON
1,252.000
SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
13,560.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
14,316.000
LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
3,200.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
1,600.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
84.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
56
48.000
EA
5,000.000
LF
49,860.000
LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
6,780.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
7,158.000
LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
1,600.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
800.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
42.000
EA
6/1/2018
South Carolina Department of Transportation
Call No.: 280
Description WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
Page: Quantity Units 24.000
EA
2,500.000
LF
24,930.000
LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
382.000
EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.
248.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
524.000
EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
50.000
LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT
50.000
LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
930.000
LF
SAWCUT FOR LOOP DETECTOR
310.000
LF
CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE
200.000
LF
SURFACE APPLIED DETECTABLE WARNING
475.000
SF
PERMANENT GRASSING FOR SMALL PROJECTS
57
0.582
ACRE
6/1/2018
South Carolina Department of Transportation
Call No.: 290
SC File NO(S).: 5413922
Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P032203 Project No.: P032203 PCN: P032204 Project No.: P032204 PCN: P032206 Project No.: P032206 CO(S).: Fairfield Lancaster DBE Goal Percent: York Cost of Road Plans:
Description: NFA MICROSURFACING
Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 7.9700
Completion Date: 5/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
1,150.000
SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
350.000
SY
MICRO SURFACING SURFACE COURSE PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
58
96,000.000
SY
792.000
SF
484.000
LF
84,200.000
LF
60.000
LF
452.000
LF
1,700.000
LF
75,420.000
LF
484.000
LF
84,200.000
LF
60.000
LF
452.000
LF
1,700.000
LF
75,420.000
LF
533.000
EA
6/1/2018
South Carolina Department of Transportation
Call No.: 300
Page:
Project No.: P030576 P030576 Project No.: P030581 P030581 Project No.: P030583 P030583 Project No.: P030691 P030691 Project No.: P030697 P030697 Project No.: P030698 P030698 Project No.: P030699 P030699 Project No.: P030713 P030713 Letting Date: July 10, 2018 CO(S).: Beaufort Charleston DBE Goal Percent: Colleton Jasper Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2017 FA MICRO SURFACING Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
SC File NO(S).: 5610012
59
PCN: PCN: PCN: PCN: PCN: PCN: PCN: PCN:
0.00% $0.00 $0.00 $0.00 $15.00 18.0300
Completion Date: 10/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
240.000
SY
REMOVAL & DISPOSAL OF EXISTING PAVEMENT MAINTENANCE STONE FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. SURFACE PLANE ASPHALT PAVEMENT - VARIABLE MILLED-IN RUMBLE STRIP MICRO SURFACING SURFACE COURSE MICRO SURFACING LEVELING PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING
30.650
TON
3,065.000
SY
700.000
SY
10.720
MI
619,739.607
SY
1,382.420
TON
4,986.000
SF
38,585.000
LF
700.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
118,692.000
LF
6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
44,420.000
LF
5,839.000
LF
390.000
LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK
45.000
LF
3,940.000
LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING
158.000
EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING
186.000
EA
46.000
EA
6.000
EA
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING
6/1/2018
South Carolina Department of Transportation
Call No.: 300
Description 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING
Page: Quantity Units 14,880.000
LF
178,637.000
LF
12" YELLOW SOLID LINES - PERM.PVMT.MARKING
445.000
LF
24" YELLOW SOLID LINES - PERM.PVMT.MARKING
230.000
LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
85,730.000
LF
381,464.000
LF
12,888.000
LF
780.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
8,880.000
LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
365.000
EA
45.000
EA
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT
WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
361.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
92.000
EA
WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT
72.000
EA
BIKE LANE SYMBOL - FAST DRY PAINT
38.000
EA
31,660.000
LF
390,584.000
LF
3,695.000
LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT
450.000
LF
12" YELLOW SOLID LINES - FAST DRY PAINT
785.000
LF
60.000
EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT
BIKE LANE SYMBOL -PREFORMED THERMO - 60MIL BIKE LANE ARROW - PREFORMED THERMO - 60MIL
67.000
EA
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
3,094.000
EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.
1,638.000
EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
3,166.000
EA
10.000
EA
DELINEATORS, SINGLE, BI., INCL. SUPPORTS
60
6/1/2018
South Carolina Department of Transportation
Call No.: 310
SC File NO(S).: 5613762
Letting Date: July 10, 2018 Letting Time: 02:00 PM
Page: PCN: P032158 Project No.: P032158 PCN: P032170 Project No.: P032170 PCN: P032209 Project No.: P032209 CO(S).: Berkeley Charleston DBE Goal Percent: Dorchester Cost of Road Plans:
Description: 2018 FDP, MICRO SURFACING
Cost of BridgePlans: Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
0.00% $0.00 $0.00 $0.00 $15.00 16.2500
Completion Date: 7/31/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
1.000
LS
CSX RAILROAD INSURANCE AND FLAGGING 001 MAINTENANCE STONE FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
38.950
TON
3,895.000
SY
214,366.600
SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
324.000
SF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING
590.000
LF
58,200.000
LF
MICRO SURFACING SURFACE COURSE
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 8" WHITE SOLID LINES PERM.PVMT.MARKINGS 12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING
200.000
LF
1,002.000
LF
126.000
LF
76.000
LF
1,152.000
LF
21.000
EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING
9.000
EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING
5.000
EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING
8.000
EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 24" YELLOW SOLID LINES - PERM.PVMT.MARKING 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12" WHITE SOLID LINES - FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
61
5,400.000
LF
110,020.000
LF
40.000
LF
1,180.000
LF
116,280.000
LF
400.000
LF
1,974.000
LF
252.000
LF
2,294.000
LF
6/1/2018
South Carolina Department of Transportation
Call No.: 310
Description
Page: Quantity Units
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
38.000
EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
18.000
EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
10.000
EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT
16.000
EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT
10,800.000
LF
219,490.000
LF
270.000
LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
52.000
EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.
40.000
EA
1,147.000
EA
10.000
SF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" SURFACE APPLIED DETECTABLE WARNING
62
6/1/2018
South Carolina Department of Transportation
Call No.: 320
Page:
Project No.: P030404 P030404 Project No.: P030575 P030575 Project No.: P030671 P030671 Project No.: P030672 P030672 Letting Date: July 10, 2018 CO(S).: Bamberg Barnwell DBE Goal Percent: Letting Time: 02:00 PM Cost of Road Plans: Cost of BridgePlans: Description: 2017 FA PIP - 03,05,06,25 Cost of X-Sections: Cost of Proposal: Approx. Length (miles):
SC File NO(S).: 5709650
63
PCN: PCN: PCN: PCN:
0.00% $0.00 $0.00 $0.00 $15.00 2.4000
Completion Date: 6/30/2019
ITEMS OF WORK INCLUDE THE FOLLOWING: Description
Quantity Units
MOBILIZATION
1.000
LS
BONDS AND INSURANCE
1.000
LS
TRAFFIC CONTROL
1.000
LS
1,150.000
SY
REMOVAL & DISPOSAL OF EXISTING PAVEMENT MAINTENANCE STONE
18.600
TON
354.799
TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
110.000
SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
1,750.000
SY
61,828.000
SY
LIQUID ASPHALT BINDER PG64-22
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) HOT MIX ASPHALT SURFACE COURSE TYPE B
6,430.585
TON
HOT MIX ASPHALT SURFACE COURSE TYPE D
160.000
TON
61.875
TON
DRIVEWAY PAVING-SURFACE TYPE D PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING
1,416.000
SF
134.000
LF
2,790.000
LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS
820.000
LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING
620.000
LF
84.000
LF
26,080.000
LF
164.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
5,580.000
LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
1,640.000
LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
1,240.000
LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
168.000
LF
52,160.000
LF
3.000
EA
201.000
EA
6/1/2018
South Carolina Department of Transportation
Call No.: 320
Description FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
Page: Quantity Units 120.000
LF
1,000.000
LF
SAWCUT FOR LOOP DETECTOR
350.000
LF
DETECTABLE WARNING MATERIAL
575.000
SF
1,150.000
SY
200.000
SF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
PEDESTRIAN RAMP CONSTRUCTION SURFACE APPLIED DETECTABLE WARNING
64
MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARY OF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THE FEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH IN THE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETY ACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS. CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNING SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED IN THIS CONTRACT. In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "Supplemental Specifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings: STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisement contemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways. The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the Federal Highway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for award. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and Special Provision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of the proposal. Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsible for carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called to the fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours and Safety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations. PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED A PREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BE ALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the Contracts Administration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by calling Jeff Elliott at (803)737-1253. BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT, written by a SURETY satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NO OTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED. SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express delivery service or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bid opening. 1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC 29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service. 2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No._______", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice. IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the following reasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the following reasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission. TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the sole judge of determining the local time and the arrival of the designated time for the opening and reading of the bids. THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES. Information in this notice is the latest available at the time of its publication. The information contained in the proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, and the bidder should check with the SCDOT Engineering Publications office for the cost of plans when the plans are indicated to be available. Prepared by L. Stuckey Issued by: J.Brian Parnell Contract Administrator