ROAD CLOSURES

1 downloads 217 Views 377KB Size Report
6 days ago - START DATE END DATE TIME. REASON ... open at all times, alternating traffic. 08/31/17 ... Mellen Ave. Betwe
ROAD CLOSURES ROAD NAME

LOCATION

TYPE OF CLOSURE

Alcoa Highway

Between Maloney Road and Woodson Drive

Alcoa Highway

At Woodson Drive

Shifting lane closures; 12/02/16 construction workers present; reduced speed limits No left turns from southbound 12/05/17 Alcoa Hwy onto Woodson or from Woodson onto southbound Alcoa. Detours via John Sevier Hwy and Maryville Pike. Street closure. N. Central 04/23/18 Street traffic not effected. Multiple lane and sidewalk 08/31/17 closures; minimum of one lane open at all times, alternating traffic.

Bearden Place Blount Ave

Between N. Central Street and intersection Between Henley Street and Gay Street

START DATE END DATE TIME 11/01/19

8 a.m. - 12 a.m.

11/01/19

24 hours

REASON Intersection improvement project Intersection improvement project

05/11/18

6 a.m. - 6 p.m.

06/30/18

7 a.m. - 7 p.m.

Storm drain installation Streetscapes and utility upgrades, including new traffic signals.

Bona Road

Between Silva Drive and Grata Road Street closure with detours posted

04/05/18

05/05/18

7 a.m. - 7 p.m.

Sewer rehab

Cedar Lane

Between Rockcrest and Knox roads Temporary road closures in sections; road reopens after work hours. Detour signs posted

03/26/18

05/11/18

9 a.m. - 3 p.m.

KUB replacing gas line

Cherokee Blvd

Between Iskagna Drive and S. Garden Road

05/05/18

05/05/18

8 - 9:15 a.m.

Law Enforcement Memorial Run

Closed to traffic

5/3/2018

ROAD CLOSURES ROAD NAME

LOCATION

TYPE OF CLOSURE

START DATE END DATE TIME

REASON

Cherokee Blvd

Between Southgate Road and Lakeland Drive

Westbound Cherokee Blvd closed; eastbound lane to remain open

05/01/18

05/04/18

7 a.m. - 5 p.m.

Wastewater collection system

Clinton Highway

At Merchants Drive

Intermittent lane closures with 04/23/18 on-site traffic control. No work on weekends. Between S. Gay Street and Williams Temporary closure of both 02/22/18 lanes.

05/11/18

9 a.m. - 3 p.m.

Work on overhead electrical system

07/31/18

24 hours

East Depot Ave

at 700 E. Depot Ave between Randolph St. and 300 block of N. Georgia

05/04/18

05/04/18

5 - 9 p.m.

Crane placement for Regas Square construction Downtown Dogs vendor show

Emory Road Bridge

Over Kerns Branch near Beeler Road Temporary lane closures with in Harbison Crossroads flaggers directing traffic

04/24/17

05/31/18

24 hours

Bridge replacement project

Forestal Drive

At 411 Forestal between Butler Drive and McCamy Road) Between West Park Drive and Grenoble Drive

Road closure

05/07/18

05/21/18

8 a.m. - 5 p.m.

Road closed

05/02/18

05/04/18

9 a.m. - 3 p.m.

Storm sewer installation Replace man holes and sewer line

Between Parva Drive and Asheville Highway

Street closure with detours posted

04/05/18

05/05/18

7 a.m. - 7 p.m.

Depot Ave

Frances Road

Grata Road

Street closure

5/3/2018

Sewer rehab

ROAD CLOSURES ROAD NAME

LOCATION

Holston Drive

TYPE OF CLOSURE

START DATE END DATE TIME

REASON

At 4712 between Holston Court and Section of road closed with S. Chilhowee Drive detour signs and flaggers posted to assist with traffic control

05/03/18

05/03/18

8:30 a.m. - 4 p.m.

Installation of new water line

I-640

Broadway exit

Shifting lanes

12/02/16

07/31/18

8 a.m. - 12 a.m.

Interchange and bridge construction

Kenesaw Ave

Between 661 and 619 Kenesaw

Street closure

06/01/18

06/09/18

3 - 7 p.m.

Block party

Keowee Ave

Between Woodland and Wester Wood Ave

Road closures with on-site 04/23/18 traffic control. Alternate routes via Noelton Drive, Dogwood Lane, Arrowhead Trail and Lyons View Pike. Lanes reopen after work hours and on weekends.

05/04/18

7 a.m. - 5 p.m.

Sewer project

Lake Ave

Between 18th and 19th streets

Street and sidewalk closures 04/20/18 dictated by work schedule and proximaty to vehicle and pedestrian areas.

05/16/18

6 a.m. - 5 p.m.

Construction of parking garage for University of Tennessee

5/3/2018

ROAD CLOSURES ROAD NAME

LOCATION

TYPE OF CLOSURE

START DATE END DATE TIME

Market Street

Between Union and Clinch

Street closed to thru traffic Saturdays thru November

05/05/18

11/17/18

6:45 a.m. - 3:30 p.m. Market Square Farmers' Market

Mellen Ave

Between Lyons View Pike and Arrowhead Trail

Complete road closure

04/09/18

05/04/18

24 hours

Middlebrook Pike

at Weisgarber intersection

Lane shifts, narrowed lanes

05/04/17

tba

9 a.m. - 3 p.m. a.m. - 6 p.m.

Morgan Street

Between Depot and Jackson Ave

No thru traffic; access to local 03/26/18 businesses will be maintained. Detours posted.

04/30/18

7 a.m. - 5 p.m.

Installation of 36inch water main in roadway

N. Broadway

I-640

12/02/16

07/31/18

8 p.m. - 5 a.m.

Bridge work

Neyland Drive

Between Joe Johnson and Walnut

Shifting lane closures and traffic delays Closed to traffic

05/05/18

05/05/18

8-10 a.m.

LEAP 5K race

Temporary lane closures

02/01/17

02/01/18

24 hours

Road-widening project; sewer installation; pedestrian bridge construction

Oak Ridge Highway / Between Schaad Road and I-640 Western Avenue

5/3/2018

REASON

Sewer installation

7 Intersection improvement project

ROAD CLOSURES ROAD NAME

LOCATION

TYPE OF CLOSURE

START DATE END DATE TIME

REASON

Park Hill Circle

Between Glade Hill Drive and Toxaway Drive

Road closed

05/01/18

05/08/18

7 a.m. - 5 p.m.

Replace man holes and sewer line

Scenic Drive

Between Towanda Trail and Glenfield Drive Between Bona and Indian roads

Road closure

05/01/18

05/11/18

9 a.m. - 2 p.m.

Street closure; detour signs posted

04/16/18

05/12/18

7 a.m. - 7 p.m.

Wastewater collection system Sewer rehab

St. Paul Street

Between W. Blount Ave and Hawthorne Ave

Street closure

03/19/18

05/01/18

7 a.m. - 5 p.m.

Unloading of trucks

State Street

Between Cumberland Ave and W. Church Ave

Street closure

04/17/18

04/20/18

9 p.m. - 6 a.m.

KUB access to underground cable via electric manholes in area

State Street

Between W. Hill Ave and Union Ave Intermittent lane closures with 04/24/18 flaggers and signs on site for traffic control. Closures will be repeated multiple times over the coming weeks.

04/26/18

8:30 a.m. - 6 p.m.

Access to manholes

State Street

Between Church and Clinch

05/07/18

3 p.m. - 4 a.m.

Broadway show load-out from Tennessee Theatre

Silva Drive

Road closed

05/06/18

5/3/2018

ROAD CLOSURES ROAD NAME

LOCATION

TYPE OF CLOSURE

START DATE END DATE TIME

Taliluna Avenue

Between Southgate Road and Lakeland Drive

Road closures with on-site 04/23/18 traffic control. Detours via Noelton Drive, Dogwood Lane, Arrowhead Trail and Lyons View Pike. Lanes reopen after work hours and on weekends.

05/04/18

7 a.m. - 5 p.m.

Union Ave

Between Walnut and Gay

Street closed to thru traffic Saturdays thru November

05/05/18

11/17/18

6:45 a.m. - 3:30 p.m. Market Square Farmers' Market

W. Emory Road

Near the Cate Road intersection

Alternating lane closures affecting eastbound and westbound traffic. Access to local driveways maintained.

04/23/18

05/18/18

9 a.m. - 3 p.m.

Electrical work

W. Fifth Ave

Between Cooper St and Broadway

No thru traffic; access to local 04/06/18 businesses will be maintained. Detours posted.

05/11/18

7 a.m. - 5 p.m.

Installation of 36inch water main in roadway

W. Fifth Ave

Between Broadway and N. Gay Street

No thru traffic; access to local 04/02/18 businesses will be maintained. Detours posted.

05/11/18

7 a.m. - 5 p.m.

Installation of 36inch water main in roadway

W. Fifth Ave

Between Gay and Williams Street

No thru traffic; access to local 04/02/18 businesses will be maintained. Detours posted.

05/11/18

7 a.m. - 5 p.m.

Installation of 36inch water main in roadway

W. Fifth Ave

Between N. Broadway and Williams No thru traffic; access to local 04/23/18 St. businesses will be maintained. Detours posted.

05/11/18

7 a.m. - 5 p.m.

Water distribution system work

5/3/2018

REASON Sewer project

ROAD CLOSURES ROAD NAME

LOCATION

TYPE OF CLOSURE

START DATE END DATE TIME

REASON

Wall Ave

Between S. Gay Street and Walnut Street

Closed to traffic

04/30/18

05/04/18

24 hours

Water and electrical systems work

Western Ave

Between Texas and Major avenues

Temporary lane closures

04/04/17

05/31/20

24 hours

Western Ave

Between Schaad Road and I-640

Temporary lane closures

04/04/17

03/01/19

24 hours

Western Ave

Between Copper Kettle and west of Lane closures Schaad Road

04/30/18

05/04/18

9 a.m. - 3 p.m.

Road-widening project Road-widening project Pedestrian bridge construction

Williams Street

Between W. Fifth Ave and Magnolia Road closed to through traffic. 04/30/18 Access to local businesses will be maintained.

05/31/18

7 a.m. - 6 p.m.

Installation of water main

Woodland Drive

Between Oakhurst Drive and Kennesaw Ave

05/04/18

7 a.m. - 5 p.m.

Sewer project

World's Fair Park / UT Campus

Clinch Ave to World's Fair park Drive Rolling closures to James Agee to Phil Fulmer to Lake Loudon, to Neyland Drive to Second Creek Greenway back to World's Fair park

05/05/18

10 a.m. - 12 p.m.

JDRF One Walk Knoxville

Road closures with on-site 04/23/18 traffic control. Detours via Noelton Drive, Dogwood Lane, Arrowhead Trail and Lyons View Pike. Lanes reopen after work hours and on weekends. 05/05/18

5/3/2018