Background. The Silver Lake Reservoir Restoration Project fulfills. LADWP's commitment to restore the water in Silver La
SILVER LAKE RESERVOIR WATER RESTORATION PROJECT FACT SHEET
Background The Silver Lake Reservoir Restoration Project fulfills LADWP’s commitment to restore the water in Silver Lake Reservoir to its historic 440-foot elevation, using local groundwater sources that will not impact the drinking water supply. Silver Lake Reservoir was drained to enable construction of a critical bypass pipeline project to meet water quality regulations and ensure a safe drinking water supply.
Pollock Well Rehabilitation May 2016 – April 2017
What to Expect
As part of this project, upgrades will be made to the Pollock Wells including a new pump and motor. Construction will generally take place Monday through Friday between 7:00 a.m. to 4:00 p.m.
• Possible reduced traffic lanes along construction route
Pipeline Construction January 2017 – April 2017
Silver Lake Reservoir Refill May 2017 - Late 2018
The Silver Lake Restoration Project involves installing approximately 3,100 feet of a new 12-inch pipeline from the Pollock Wells located at LADWP’s Ripple Street Yard to existing pipeline infrastructure at Silver Lake and Ivanhoe Reservoirs. The pipeline route will travel from the Ripple Street Yard on Worthen Avenue to Ripple St, continue west under Fletcher Drive to Glendale Boulevard, and then connect to the existing pipeline at the Ivanhoe Tunnel at the intersection of Glendale Boulevard and Fletcher Drive (map on reverse). In addition, construction will take place inside LADWP property at the reservoir to modify the inlet and isolate the reservoirs from the drinking water systems. Construction activities will take place in Silver Lake and Ivanhoe Reservoirs to make necessary improvements for water circulation to maintain water quality. Construction will generally take place Monday through Friday between 7:00 a.m. to 4:00 p.m., advance notice will be provided if night or weekend construction is required.
1/2017
• Parking may be restricted at certain times • Access to businesses and homes will be maintained
LADWP Contact Information Project Manager: Jennifer Barrick 213-367-4188
[email protected] Community Affairs: Dawn Cotterell 213-367-4208
[email protected] To receive email notifications about the project, sign-up at www.ladwp.com/SLRestoration.
Schedule Work Area 1
Worthen Ave. to Ripple St.
January 2017 – February 2017
Work Area 2
Ripple St. to Fletcher Dr. to Riverside Dr.
February 2017 – March 2017
Work Area 3
Fletcher Dr. at Riverside Dr. to Glendale Blvd. (includes tie-in to existing infrastructure)
March 2017 – April 2017
POLLOCK WELLS EN GL
VE
RS
ID
RI
WORK AREA 1
PP
ED
WORK AREA 2
ST
N
WORK AREA 3
WO
RT H
R
LE
AV E
RI
EN
D
FL
BLV
ET CH E
R
DR
LE DA
RIPPLE ST RIPPLE YARD ST YARD
G
ON
TR
MS
AR E AV OS DR SA N LE AL
SIL VE
RL
AK
EB LVD
T
GLENDALE BLVD
SILVER LAKE RESERVOIR
LEGEND NEW PIPELINE IVANHOE TUNNEL