(Department of Ecology â State of Washington). Scope of Work. Replace the current ... Peak flow: 1.5 mgd. SPACE REQUIR
Spiraltec Case Study
www.aqualitec.com www.aqualitec.com
1
Screentec Case Study
City of Everson (WA) - Headworks’ Improvement Scope of Work
Previous installation Installation of the Spiral Screen Spiraltec Conclusion
www.aqualitec.com www.aqualitec.com
Menu2
Spiraltec Case Study
Scope of Work Replace the current mechanical screen City has to comply with the Biosolids rule*
* All biosolids (including septage) or sewage sludge must be treated by a process such as physical screening (3/8’’) to significantly remove manufactured inerts prior to final disposition.
(Department of Ecology – State of Washington)
www.aqualitec.com www.aqualitec.com
Menu3
Spiraltec Case Study
Scope of Work City of Everson Technical ID HYDRAULIC CONDITIONS Influent: Raw Municipal Average flow: 0.9 mgd Peak flow: 1.5 mgd
City of Everson (WA) - Headworks’ Improvement Scope of Work
Previous installation Installation of the Spiral Screen Spiraltec Conclusion
www.aqualitec.com www.aqualitec.com
Menu5
Spiraltec Case Study WASTEWATER TREATMENT EQUIPENT
Previous Installation Headworks with a mechanical screen
www.aqualitec.com
Menu6
Spiraltec Case Study WASTEWATER TREATMENT EQUIPENT
Previous Installation Issues
Have to comply with the Biosolids rule Previous screen: ½’’ spacing
Structural Constraint
Narrow channel, width = 12’’
www.aqualitec.com
Menu7
Screentec Case Study
City of Everson (WA) - Headworks’ Improvement Scope of Work
Previous installation Installation of the Spiral Screen Spiraltec Conclusion
www.aqualitec.com www.aqualitec.com
Menu8
Spiraltec Case Study
Installation of the Spiraltec
Aqualitec’s R&D suggested the Spiral Screen Spiraltec, in order to comply
with the biosolids rule using the existing structure. www.aqualitec.com www.aqualitec.com
Menu9
Spiraltec Case Study
Installation of the Spiraltec
www.aqualitec.com www.aqualitec.com
10 Menu
Spiraltec Case Study
Installation of the Spiraltec
www.aqualitec.com www.aqualitec.com
Menu
Spiraltec Case Study
Installation of the Spiraltec
www.aqualitec.com www.aqualitec.com
Menu
Spiraltec Case Study
Installation of the Spiraltec
www.aqualitec.com www.aqualitec.com
Menu
Spiraltec Case Study
Installation of the Spiraltec
Previous
Current
www.aqualitec.com www.aqualitec.com
14 Menu
Spiraltec Case Study
Installation of the Spiraltec
www.aqualitec.com www.aqualitec.com
15 Menu
Spiraltec Case Study
Installation of the Spiraltec
City of Everson, WA – Spiraltec
www.aqualitec.com www.aqualitec.com
16 Menu
Spiraltec Case Study WASTEWATER TREATMENT EQUIPENT
Installation of the Spiraltec Benefits Biosolids rule Structural Constraint
www.aqualitec.com
City complies No structural changes
17 Menu
Spiraltec Case Study
Installation of the Spiraltec
www.aqualitec.com www.aqualitec.com
18 Menu
Spiraltec Case Study
City of Everson (WA) - Headworks’ Improvement Scope of Work
Previous installation Installation of the Spiral Screen Spiraltec Conclusion
www.aqualitec.com www.aqualitec.com
19 Menu
Spiraltec Case Study
Conclusion 5 Reasons to buy Spiraltec: 1. Fits into narrow structures 2. All in one solution 3. Requires minimal maintenance (Easy brushes replacement) 4. Customizes to any footprint (small to large) 5. Easy to install