Roll out "Singlewire InformaCast" system. T. 2. Establish dedicated network closets. T. 1. Add telematics GPS units for
Massena Central School District Potential Capital Project Scope MARCH No. 1613
Transportation - Bus Garage No.
Generated By
Priority
BCS BCS BCS
1 1 3
Replace fuel dispensing/tracking system Replace fuel dispensers Address surface rust on fuel tanks Replace power poles with guardrail Provide lighting at bus parking area Address settled pavement at bus parking area Address north elevation water issues Address rust at base of building Address rust at man doors Address rust at overhead doors Replace unit heaters in work area Consider automatic bus wash Repaint rooms Provide more effective entrance matting Provide a sign for the Transportation Department Address frozen roof drain at storage bay
P P P P P P P P P P P P P P P P
1 1 2 1 1 1 1 1 1 1 2 2 1 3 2 1
Roll out "Singlewire InformaCast" system Establish dedicated network closets Add telematics GPS units for buses Add wireless to buses Add more surveillance cameras Keyless door entries/secure entry
T T T T T T
2 1 1 2 1 2
Item
Replace EPDM roofing Replace fire alarm systems Replace flooring in bathrooms, traffic areas
Construction Cost
Category
Comments
over 15 years old; end of useful life original construction; moisture infiltration Some tiles have popped; evaluate price
Might complete in-house Some buses hit the poles limited lighting now from building only slippery conditions in winter; safety issue water from roof infiltrating block
working but aging; venting issues no painting in 14 years Could do in-house
(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency
Massena Central School District Potential Capital Project Scope MARCH No. 1613
Transportation - Bus Garage No.
Item
Construction Cost
PRIORITY 1 TOTAL
$0.00
PRIORITY 2 TOTAL
$0.00
PRIORITY 3 TOTAL
$0.00
Trans-Bus Garage Subtotal
Category
Generated By
Priority
$0.00
(A) ADA Accessibility /(LS) Life Safety /(S) Security /(R) Replacement /(M) Maintenance /(P) Program Change /(E) Efficiency