West Alternative 2 Central Alternative 1 West Alternative 1

10 downloads 248 Views 2MB Size Report
Build 6-lane I-69 bridge. • Remove both US 41 bridges from service. • Reconstruct US 60 interchange and new intercha
Indiana and Kentucky are committed to improving the I-69 corridor by creating an I-69 Ohio River Crossing between Evansville and Henderson.

Preliminary Alternatives

Howard Frankland Bridge Howard Frankland Bridge This is what we areaccommodate proposing to build 2020. This is how we alternatives would rail transit in the The Project Team has developed preliminary for each corridor toin include the future. number of lanes

needed for long-term cross-river mobility, how each alternative meets that need, potential property impacts and financial feasibility. A preferred alternative is expected to be identified this fall.

West Alternative 1 Howard Frankland Bridge

• Build 4-lane I-69 bridge

This is what we are proposing to build in 2020.

• Retain one US 41 bridge for local traffic • Reconstruct US 60 interchange and new interchanges at Watson Lane and US 41/Veterans Memorial Parkway (north end) • Maintain visibility to remaining businesses with all cross-river traffic • Alignment shifted to avoid Eagle Slough

New I-69 Bridge

US 41 Bridge

West Alternative 2 • Build 6-lane I-69 bridge

• Remove both US 41 bridges from service • Reconstruct US 60 interchange and new Howard Frankland Bridge interchanges at Watson Wolf ThisLane, is how weHills/Stratman would accommodate rail transit in the future. Road, Nugent Drive and US 41/Veterans Memorial Parkway (north end) Howard Frankland Bridge • Primarily avoids businesses on the east side of Howard Frankland Bridge US 41 while maintaining access via frontage road

This is what we are proposing to build in 2

This is how we would accommodate rail transit in the future.

New I-69 Bridge

• Alignment shifted to avoid Eagle Slough

Central Alternative 1 • Build 4-lane I-69 bridge • Retain one US 41 bridge for local traffic • New interchanges at US 41 (south end), US 60 and Veterans Memorial Parkway • Bypasses the US 41 corridor • Alignment shifted to avoid wetland mitigation site and historic properties at US 60

US 41 Bridge

New I-69 Bridge

093017

River Bridge Configuration West Alternative 1

n n 'V' 'V'

4)-. 4)-. LI LI

A

New 1-69 Bridge



lJ

Not in Service*

1�III��III�

Existing Existing SB NB us 41 us 41 Bridge Bridge

West Alternative 2

Not in Not in Service Service

--1 �

__.......... A

New 1-69 Bridge

� lJ

t t t �� t t t �

Existing Existing NB SB us 41 us 41 Bridge Bridge '

Centra I Alternative 1 Not in Service*

� III ��II I��

Existing Existing SB NB us 41 us 41 Bridge Bridge

n n

'V' 'V'

A

4)-. 4)-. LI LI

New 1-69 Bridge

* Which bridge to remain for 2-way traffic to be determined through NEPA/Section 106 process

Proposed West Alternative 1 Interchange

0

Proposed West Alternative 2 Interchange



Proposed West Alternatives 1 & 2 Interchange Proposed Central Alternative 1 Interchange

--

Existing Interchange to Remain DEIS Project Area

0

1 Miles

2 0 February 2018

The Project Team is preparing a Draft Environmental Impact Statement (DEIS)

A Draft Environmental Impact Statement (DEIS) is required by the National Environmental Policy Act for large, federally-funded projects such as I-69 ORX.

The detailed document will include a full description of the affected environment, a range of reasonable alternatives and an analysis of the benefits and impacts of each alternative.

DEIS Considerations

DEIS Considerations Purpose and Need

Construction

Costs

The DEIS is a tool for decision making. The information gathered will allow executive leadership in both states to make an informed decision to deliver an I-69 ORX.

Modeling

Public Involvement

Properties Impacted

Funding Solutions

Human Environment

Natural Environment

What’s Next

Now – Summer 2018

Fall 2018

Fall 2019

Field work, engineering analyses, traffic forecasting and preliminary design work continue.

Preferred alternative is identified, and Draft Environmental Impact Statement (DEIS) is published. Public Hearings held on DEIS.

The Final Environmental Impact Statement and Record of Decision are expected.

Follow our progress

I69ohiorivercrossing.com

I-69 Ohio River Crossing

@I69ORX

Visit us: Project offices are open 8 a.m. – 5 p.m., or by appointment. Evansville Project Office

Open Monday, Tuesday and Thursday

320 Eagle Crest Dr., Ste. C Evansville, IN 47715

(888) 515-9756 [email protected]

Henderson Project Office

Open Wednesday and Friday

1970 Barrett Ct., Ste. 100 Henderson, KY 42420

(888) 515-9756 [email protected]