I.
1 2 3
SYSTEM PLANNING CAPITAL PROJECTS A.
4
Introduction And Overview SCE constructs projects that incur capital expenditures to accommodate customer load growth,
5
grid reliability, interconnect new generation to our system, and respond to customer requests for
6
nonstandard service. These projects and expenditures fall into five primary categories: (1)
7
Transmission Planning Projects, (2) the Load Growth Planning Program, (3) the System
8
Improvement/Reinforcement Program, (4) the Generator Interconnection Program, and (5) Added
9
Facilities projects.
10
The Transmission Planning Projects are further divided into four sub-categories in which
11
location specific projects are identified to implement large scale upgrades o f existing substations or
12
transmission lines or to construct new transmission lines. These are:
13
1. Grid Reliability Projects
14
2. Transmission System Generation Interconnection Projects
15
3. Other Transmission Planning Projects with CPUC-jurisdictional costs greater than $1 million 1
16 17
4. Other Transmission Planning Projects with CPUC-jurisdictional costs less than $1 million
18
The Load Growth Planning Program is divided into four distinct sub-categories as well to
19
increase system capacity by substation expansion, new substation construction, existing subtransmission
20
line upgrades, or new subtransmission line construction. These projects can vary significantly in size
21
and complexity depending on the specific system need being addressed. These are:
22
1. A-Bank Plan
23
2. Subtransmission Lines Plan
24
3. Subtransmission Volt-Ampere Reactive (VAR) Plan
25
4. Distribution Substation Plan (DSP)
26
The System Improvement/Reinforcement Program includes smaller scale categories of work
27
that are associated with upgrading substation equipment and the distribution system to accommodate
28
load growth. The locations and specifications of these projects are identified annually based on near
29
term system evaluation. They include: 1
The CPUC jurisdiction costs for these projects are primarily telecommunication and IT equipment and associated labor.
1
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
1. Substation Equipment Replacement Program (SERP)
2
2. DSP Circuits
3
3. Distribution Plant Betterment
4
4. Distribution VAR Plan
5
5. Capacitor Automation Program
6
6. Circuit Automation Program
7
7. Substation Load Information Monitor Program (SLIM)
8
The Generator Interconnection Program includes projects and capital expenditures driven by
9 10
requests from generation project developers who choose to have SCE construct the facilities necessary to interconnect their projects to the SCE grid.
11
The Added Facilities projects include projects SCE constructs when a load side customer
12
requests non-standard service. These projects may include portions that are customer cost responsibility
13
and portions that are rate payer funded.
14 15
Total costs for these projects are shown below in Table I-1 and CPUC-jurisdictional costs are shown below in Table I-2.
Table I-1 System Planning Capital Projects Expenditure Summary CPUC and FERC Jurisdictional (Nominal $000) Line No. 1
Project C ategory Transmission & Interconnection Planning Projects
Prior
2013
2014
2015
2,880,640
1,075,689
580,662
214,934
2016 80,715
2017
Total
32,441
4,865,082
2
Load Growth Planning Programs
448,920
194,889
371,272
412,991
307,802
57,699
1,793,572
3
System Improvement/Reinforcement Programs
25,905
122,662
114,032
108,494
101,143
112,746
584,981
4 5
Generator Interconnection Program Added Facilities Projects Total System Planning Capital Projects
38,725 91 ,255
66,292 52,426
11,993 32,466
11,617 24,290
11,126 18,527
10,000 18,216
149,752 237,182
3,485,445
1,511,959
1,110,426
772,326
519,312
231,101
7,630,569
6
2
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
3 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Table I-2 System Planning Capital Projects Expenditure Summary CPUC Jurisdictional (Nominal $000) Line No.
P rio r
2013
1
Transmission & Interconnection Planning Projects
171,450
114,302
44,279
13,239
1,347
55
344,672
2 3
Load Growth Planning Programs System Improvement/Reinforcement Programs
404,554 25,905
178,395 122,662
325,627 114,032
371,341 108,494
265,681 101,143
36,452 112,746
1,582,051 584,981
2 3
B.
2014
2015
2016
2017
T otal
4
Generator Interconnection Program
26,873
64,338
11,993
11,617
11,126
10,000
135,947
5
Added Facilities Projects T otal System Planning C ap ital P ro je c ts
91,255
52,411
32,466
24,290
18,527
18,216
237,167
720,037
532,109
528,398
528,982
397,823
177,469
2,884,818
6
1
P ro je c t C a te g o ry
Electric System Overview Figure I-1 below is a simplified diagram of our electric power system. It shows the flow of
electricity from generating plants to end-use customers. I describe the system below.
Figure I-1 Simplified System Diagram
3
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
Generating plants produce electricity and typically interconnect to our high voltage (220 kV 2 and
2
500 kV) transmission system. Our transmission system is designed to transfer large quantities of power
3
over long distances to substations that step down voltage to the subtransmission level (66 kV or 115
4
kV). We refer to these kinds of substations as “A-substations.” Our A-substations connect the
5
transmission system to the subtransmission system and are like the off-ramps that move freeway traffic
6
onto main boulevards and thoroughfares.
7
From the A-substations, networks of subtransmission lines (operating at 66 kV and 115 kV)
8
deliver smaller amounts of electricity to substations that we call “B-substations.” These substations
9
step-down voltage from the subtransmission levels (66 kV and 115 kV) to distribution levels (typically 4
10
kV, 12 kV, and 16 kV). This next reduction in vo ltage allows us to safely move electricity from our
11
subtransmission lines to distribution circuits, similar to traffic signals that direct automobiles from main
12
boulevards and thoroughfares onto neighborhood streets.
13
From the B-substations, primary distribution circuits (typically operating at 4 kV, 12 kV, or 16
14
kV) deliver electricity over localized areas to serv ice transformers mounted overhead on utility poles or
15
placed at ground level. These service transformer s provide the final voltage reduction on our system,
16
stepping down voltage to the levels used by our customers (e.g., 120/240 volts for single-phase service
17
to residential customers). This last reduction in voltage allows us to safely “package” electricity for its
18
final delivery to consumers. From the low voltage side of our service transformers, secondary
19
conductors carry electricity directly to customers’ electric panels and billing meters through a service
20
connection.
21
At all levels o f our electric power system, capacitor banks are used to supply needed reactive
22
power to our system and help maintain voltage at adequate levels. These capacitor banks may be
23
installed inside substations (at our A-substations and B-substations) or directly connected to our
24
distribution circuits.
25
Collectively, these facilities form a continuous pathway to deliver electricity from generating
26
plants to end-use customers. Just as a chain is only as strong as its weakest link, the reliability of our
27
electric system is only as strong as its weakest component. The failure of any link in the chain could
28
result in the interruption o f service to customers. 2
kV is an abbreviation for “kilovolts” or one thousand volts. See workpaper entitled “Electrical Abbreviations” for a list of commonly used abbreviations (and their corresponding definitions) that appear throughout this testimony and corresponding workpapers.
Workpaper Part 1, page 1_________ 4
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
5 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
To maintain service reliability as the demand for electricity increases, we must plan to expand,
2
upgrade, and reinforce all levels o f our electric system, including transmission, subtransmission, and
3
distribution assets. By properly planning and executing system expansion projects, we are able to:
4
• Preserve employee and public safety by operating our transmission, subtransmission,
5
distribution, and substation facilities within their established loading limits;
6
• Maintain sufficient capacity to serve our customers especially during periods of peak
7
demand;
8
•
9
fashion rather than an emergency, reactive fashion; and
10
• Provide generators the opportunity to connect to our system as required by federal and state
11 12 13
Minimize overall costs to our customers by expanding our system in an orderly, proactive
regulations.
C.
2012 GRC Authorization and Recorded Costs Figure I-2 below shows the capital expend iture authorized in the 2012 GRC and the capital
14
expenditure recorded by the programs discussed in this chapter. As compared to the Commission’s
15
authorization in our 2012 GRC, SCE spent more on the Distribution Substation Program (DSP), DSP
16
Circuits, and Added Facility/Interconnection Facility (AF/IF) projects. Conversely, SCE spent less on
17
Transmission Substation Projects (TSP) and Transmission Projects. In total, SCE was authorized $478
18
million and spent $464 million on the categories of work discussed in this chapter.
5
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Figure I-2 Comparison o f 2012 GRC Authorized and Recorded Expenditure (Total Company Nominal $000) 600
$464
$52 ($1)
2012 A u th o riz e d
DSP
DSP M i Circ. A u to m atio n
1
D S P C ircu its
TSP
($ 7 4 )
($1)
T rans P ro je c ts
Circ. A u to m atio n
ss D S P C ircuits
H TSP
= A F /IF
■ O ther
A F /IF
O th er
2012 R e c o rd ed
T rans Projects □ D iff fro m A uth
The amounts we are authorized and record can vary for a variety o f reasons including (1) longer
2
licensing times than initially anticipated, (2) changes in our load growth forecast, and (3) uncertainty
3
regarding authorized spending levels due to the delay in receiving a 2012 GRC decision. When these
4
kinds o f things happen, SCE redirects funds among categories o f work to account for changes.
5
With regard to DSP, SCE recorded capital expenditures o f approximately $145 million in 2012
6
as compared to $89 million authorized by the Commission. However, SCE still had to expend at a level
7
similar to its forecast and thus recorded more than authorized. Conversely, we spent less on TSP and
8
Transmission projects. This was driven primarily by project delays and changes in project operating
9
dates. For example, the Alberhill Project recorded less capital expenditure in 2012 than we initially
10
forecast. This was caused by delays in the licensing process. Table I-3 below shows projects included
11
in the 2012 GRC that have been delayed into the 2015-2017 timeframe. Some o f these changes are
12
because of our new planning process described be low and others are due to permitting and construction
13
delays.
6
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
7 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Table I-3 Operating Date Changes fo r Projects Included in 2012 GRC to Current 2015-2017 Forecast P roject
P roject Name
Number (PIN)
2 0 1 2 GRC
C urrent
OD
OD
6/1/2012 2/1/2014 6/1/2013 6/1/2014
12/31/2015 3/1/2016 6/1/2017 6/1/2017
6/1/2012 12/31/2012 6/1/2011 6/1/2012
12/31/2015 12/31/2015 6/1/2016 6/1/2016
6/1/2013 6/1/2013 6/1/2013
6/1/2015 6/1/2016 6/1/2016
T ra n sm issio n Substation Plan - A B ank
06824 06670 06107 06092
La Fresa 220/66 kVSubstation Valley 500/115 kVSubstation Saugus 220/66 kVSubstation Alberhill 500/115 kVSubstation
T ra n sm issio n Substation Plan - S u btransm ission Lines
06030 04891 05329 04518
Valley-Ivyglen 115 kV Arrowhead Reconfiguration Project Moorpark-Newbury 66 kV Goleta 220 kVN-2 Line Contingency
D istribution Substation P lan (D SP )
05403 05411 06619 1
Colonia 66/16 kVSubstation Lakeview 115/12 kVSubstation Banducci 66/12 kVSubstation
In 2012, SCE began a program called “Op erational Excellence” aimed at making our operations
2
more efficient. As described in Mr. M ead’s testimony in Exhibit SCE-03, Volume 1, two o f the
3
Operational Excellence initiatives transformed our load growth planning methods. This resulted in
4
fewer major load growth projects and more miscellaneous work on distribution circuits. Specifically,
5
we began considering available capacity over a wider area and improved the accuracy in the way we
6
analyze area temperatures.
7
The capacity planning optimization effort focused on increasing the use o f existing assets by
8
establishing processes and tools that allow system planners to evaluate available capacity within a wider
9
planning area. This involved utilizing existing infrastructure to balance electric power from highly
10
loaded substation and circuits to less loaded substations and circuits. The objective is to more uniformly
11
utilize adjacent substations and circuits in a given area. Although this approach can only balance
12
utilization over a specific area, the change in our method has eliminated projects or reduced project scale
13
for our load growth plan.
14
As a summer peaking utility, our load growth plan is driven in part by an analysis o f historical
15
temperatures in an area. We have incorporated changes in the tools we use for this analysis that allow
16
system planners to perform more rigorous statistical analysis o f temperatures. We have also begun
17
using more years of history in our data set. This allows us to better normalize peak load data and to
7
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
more accurately forecast loading during heat storms. The result o f these changes is an improvement in
2
our ability to plan for load growth.
3
D.
Planning Process 1.
4
Overview of Project Planning
5
Two groups plan the projects in this chapter, Transmission & Interconnection Planning
6
(TIP) and Distribution Engineering. TIP is responsible for 220 kV and 500 kV transmission projects,
7
transmission voltage substation projects, and certain projects on our subtransmission (66 kV and 115
8
kV) system. The projects planned by TIP are on the portion o f SCE’s system under operational control
9
o f the California Independent System Operator (CAISO).3
10
TIP’s projects include those developed as part o f CAISO’s Comprehensive Transmission
11
Planning Process. As described in Section 24 o f the CAISO Tariff, this process identifies projects
12
needed for reliability, projects needed to interconnect large generation, projects needed to meet policy
13
goals, and projects driven by economics.4 As part of CAISO’s planning process, SCE’s transmission
14
plan is designed to facilitate compliance with NERC, WECC, and CAISO system performance
15
requirements. These requirements include the NERC Transmission Planning standards,5 the WECC
16
Regional Business Practice document entitled “TPL-001-WECC-RBP,”6 and the California ISO
17
Planning Standards. Lastly, SCE maintains and follows its own transmission planning standards, which
18
reference the regulatory documents discussed above and describe the technical design components
19
necessary to meet our regulatory compliance obligations.
20
The second group, Distribution Engineering, is responsible for projects on the portion of
21
the system not controlled by the CAISO. This includes certain subtransmission projects, distribution
22
voltage level substation projects, and distribution circuit work.7 Distribution Engineering uses electrical
3
California Independent System Operator Corporation, Fifth Replacement FERC Electric Tariff, (available at http://www.caiso.com/rules/Pages/Regulatory/Default.aspx).
4
California Independent System Operator Corporation, Fifth Replacement FERC Electric Tariff, (available at http://www.caiso.com/rules/Pages/Regulatory/Default.aspx).
5
North American Energy Reliability Corporation (NERC) Reliability Standards are available at www.nerc.com and describe the design and operating requirements for transmission systems.
6
Western Electricity Coordinating Council (WECC), System Performance TPL-001-WECC-RBP-2, December 2011. (Available at www.wecc.biz).
7
Subtransmission voltages are 66 kV and 115 kV. Typical distribution voltages on SCE’s system include 16 kV, 12 kV, and 4 kV.
8
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
9 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
facility peak loading data, load growth forecasts, and forecasted additions to our system to develop
2
projects to support reliable, safe delivery of service. Distribution Engineering’s plan also incorporates
3
data about third party generators.
4
These engineers plan projects to mitigate existing or expected violations o f SCE’s
5
loading thresholds. They evaluate whether or not our facilities will exceed their rating under normal and
6
abnormal conditions. If we find that our existing facilities cannot meet projected demand, we must
7
develop a mitigation plan to maintain system reliability. Mitigation might be as simple as upgrading an
8
existing circuit to transfer load from one substation to another or as complicated as greenfield
9
construction o f a new large substation.
10
Whether projects are developed under the processes managed by TIP or by Distribution
11
Engineering, the project sponsor develops a preliminary scope and cost for the project. This scope and
12
cost are then reviewed with various internal stakeholders to validate that the solution is achievable and
13
can be accomplished in the manner planned. In most cases, primary and alternative projects are
14
developed.
15
Once approved, the appropriate design and execution groups take over the project.8 In
16
addition, SCE determines whether or not a project needs to be licensed under G.O. 131-D.9 Larger
17
projects are managed by the Major Projects Organization (MPO) through licensing, design, and
18
construction. During this process, TIP and Distribution Engineering remain engaged to make sure the
19
final project meets the original intent and need.
2.
20
Transmission Planning Processes
21
SCE performs an Annual Transmission Reliability Assessment (ATRA) for its portion of
22
the California Independent System Operator (CAISO) controlled grid. The purpose o f this assessment is
23
to:
24
•
25
Evaluate the performance o f the SCE transmission system under peak and off-peak conditions for near-term and longer-term planning horizons;1 0
26
• 8
9
10
Determine transmission constraints, if any, under stressed system conditions;1 1 and
SCE organizes its work into a few categories. Work might be managed by Technical Planning, Substation Engineering, or Transmission Planning. Rules Relating to the Planning and Construction of Electric Generation, Transmission,/Power/Distribution Line Facilities and Substations Located in California, General Order 131-D (1995). For planning horizons, “near-term” refers to one- to five-years-out while “longer-term” refers to six- to ten-years-out.
9
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
•
Identify upgrades needed to maintain reliability o f the transmission system and
2
comply with FERC approved NERC Reliability Standards, WECC approved
3
Regional Criteria, CAISO Planning Standards, and SCE Transmission Planning
4
Criteria.
5
The ATRA is performed in coordination with the CAISO in accordance with the
6
CAISO’s FERC jurisdictional tariff12 and NERC Reliability Standards. SCE also performs the ATRA in
7
parallel with the CAISO’s annual comprehensive Transmission Planning Process and can be described
8
in 6 stages. Figure I-3 below illustrates the ATRA process.
Figure I-3 SCE Reliability Planning Process SCE Reliability Planning
CAISO
9
3.
10 11
Generator Interconnection Process SCE facilitates the CAISO generator interconnection process to assist power plants to
interconnect to SCE’s CAISO-controlled grid. For a comprehensive reference o f CAISO’s process and
C o n tin u e d f ro m th e p re v io u s p a g e 11 12
“Stressed system conditions” refers to an instance of the electric grid when there is maximum transmission line loading. California Independent System Operator Corporation, Fifth Replacement FERC Electric Tariff, May 2013, (available at http://www.caiso.com/Documents/CombinedConformedTariff-May1_2013.pdf).
10
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
11 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
requirements, please refer to CAISO’s business practice manual and procedures found on their
2
website.13
3
SCE’s Generation Interconnection Planning group performs its Phase 1 and Phase 2
4
studies in coordination with the CAISO in accordance with the CAISO’s FERC jurisdictional tariff14 and
5
NERC Reliability Standards. The SCE Generator Interconnection Process is illustrated in Figure I-4
6
below.
Figure I-4 SCE Generation Interconnection Planning Processes
7 8
4.
Load Growth Planning Process Capital projects necessary to serve new load added to the system are identified through an
9
annual planning process. This process uses technical studies that determine the system requirements to
10
serve projected load growth. The major steps in the planning process for all o f the load growth planning
11
programs are described below.
12 13 14
a)
Development Of Peak Load Forecasts The first step in our planning process is to develop peak load forecasts for all of
our distribution circuits, B-substations, and A-substations. Our forecasts cover the next 10 years and are — California Independent System Operator Corporation, Business Practice Manual for Generator Interconnection Procedures, (available at http://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx). 14 California Independent System Operator Corporation, FERC order 1000 compliance phase 1 - tariff, (available at http://www.caiso.com/informed/Pages/StakeholderProcesses/FERCOrder1000Compliance.aspx).
11
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
developed using a bottom-up approach.15 To build the load forecasts, we consider historical growth
2
rates, local economic conditions, and development plans.16
3
We also incorporate the effects of new lighting standards, SmartConnect Meters,
4
increased electrical demand associated with Plug-in Electric Vehicles (PEV), and distributed generation.
5
This information, gathered from a variety o f sources, is synthesized to produce our forecast for each
6
distribution circuit, B-substation, and A-substation in our system.
7
Our forecast incorporates two specific energy efficiency factors. The first is the
8
effects of the Huffman Bill (AB 1109) which encouraged the use o f more energy efficient lighting.17
9
The second factor is the effect o f Edison SmartConnect meter deployment. We expect that customers
10
will reduce usage with the greater transparency that SmartConnect provides. We anticipate both o f these
11
factors to reduce future load growth.
12
We also expect increasing use of PEVs to increase load on our system. In the
13
2012 GRC filing, capital investment due to PEV load growth was forecasted separately.18 Subsequently,
14
we began including PEV load directly into our load growth forecast. The PEV forecast used in this
15
filing is documented in Mr. Kjaer’s Integrated Planning & Environmental Affairs testimony in Exhibit
16
SCE-09, Volume 2.
17
SCE has also incorporated the effects of distributed generation in our load
18
forecast.19 In 2012, SCE has evaluated how much photovoltaic distributed generation can be reasonably
19
relied on to offset load peak conditions. SCE's study determined that the amount of photovoltaic
20
generation that can be considered dependable varies with the time o f day. For example, our study
21
showed that at noon approximately 17 percent o f nameplate capacity can be considered dependable,
22
while approximately two percent o f nameplate capacity can be considered dependable at 5:00 PM. We
23
use the information produced by the study to adjust peak loads and forecast loads for our planning
15 Our aggregated B-substation load forecast for the 2013-2022 period under the “likely case” scenario is 1.53 percent per year, although we expect differences station to station. 16 These plans come from municipalities in our service territory, developers, large commercial customers, and industrial customers. 17 AB 1109 (Huffman) Lightning Efficiency & Toxics Reduction Act, October 2007. 18 D.12-11-051, p. 144. 19 Distributed generation in our forecast was the subject of a settlement SCE reached with the Vote Solar initiative. This settlement and SCE’s actions to meet its terms are discussed later in this exhibit.
12
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
13 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
process. In making this adjustment, we consider the time o f day when the peak occurs and the
2
dependable generation at that time.
3
The result o f our planning i s a forecast o f peak loads through all of our
4
distribution circuits, B-substations, and A-substations.20 This forecast is the basis o f our load growth
5
plan.22
b)
6 7
Identification Of System Requirements The next step is to perform technical studies that determine whether peak load
8
around the system can be accommodated using existing transmission, subtransmission, distribution, and
9
substation facilities. We also determine whether, under peak loading condition, we can maintain
10
acceptable system reliability.
11
We use planning criteria as the basis for designing a reliable system. We consider
12
loading limits for system facilities under normal and contingency conditions based on manufacturer
13
equipment limitations and thermal loading characteristics. Loading limits are also compared to load
14
forecasts for each year in our 10-year plan considering potential heat storm conditions during that
15
period.
16
When our analysis indicates load will exceed loading limits, we identify potential
17
projects to mitigate violations o f our planning criteria. These projects are necessary to minimize the risk
18
o f overloading equipment, which increases the risk o f failures (like transformer fires) and service
19
interruptions that might impact many customers o ver widespread geographic areas.
20
For example, if we forecast that a particular B-substation will be at 103 percent of
21
capacity in the year 2016, our distribution engineers will develop a plan to mitigate that violation o f our
22
criteria. In planning, we consider the most cost effective way to mitigate overloads within reasonable
23
operating constraints. We first consider utilizing existing infrastructure to balance loading between area
24
substation and circuits. If that is not possible, we consider upgrading existing facilities to transfer load
25
to adjacent substations. In some cases, the appropriate alternative is the addition o f a new transformer to
26
an existing substation or, possibly, a new B-substation altogether.
20 In rare cases, SCE also develops high case based scenarios to avoid deferring projects that require licensing and long lead times. Deferring these projects can increase costs and prevent SCE from deliver the most cost effective solution. 21 The bottoms-up forecast is compared to SCE’s top-down ESM forecast as discussed in Mr. Cushnie's testimony in Exhibit SCE-02, Volume 4. Once developed, these forecasts are compared and any difference are analyzed.
13
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
In D.12-11-051, the Commission directed SCE to include in this filing “an
2
estimate o f unused distribution capacity for the test year, and address it in connection with SCE’s
3
forecast Load Growth during the rate cycle at issue.”2 2 To estimate this capacity, we have summed the
4
differences between the capacity of each Parent B -Substation in the system and the forecast load on that
5
station in the test year.2 3 Our system is currently approximately 77 percent utilized.
6
However, this calculation cannot be used in planning capacity additions. For
7
example, consider two similarly sized substations; one substation in northernmost part o f our system
8
might be at 110 percent utilization, while a substation in the southernmost part o f our system might be at
9
80 percent utilization. This aggregates to 95 percent using the calculation described above. However,
10
geographic constraints and current location of distribution facilities prevent us from using the southern
11
substation to serve load in the north. Therefore capacity is still needed at the overloaded northern
12
substation. To properly plan our system, we must examine loading and capacity on a facility by facility
13
basis.
14
In addition, this utilization calculation is influenced by the fact that capacity can
15
only be added in discrete quantities. Typically, a capacity increase involves adding one new transformer
16
to a substation. For our B substations, these transformers are typically 28 MVA o f capacity.2 4 If a
17
station is overloaded by 5 MVA, we would add a new 28 MVA transformer. Immediately after this
18
addition, a calculation like the one above would show 23 MVA of “unused capacity” at this substation.
19
This is reflected in the system utilization calculation. Therefore, the aggregated system utilization is
20
misleading.
21
c)
22
Development of Alternatives and Project Selection Where our load forecast indicates loading limits will be exceeded, we identify
23
potential projects to address that. In doing so, we identify and evaluate project alternatives, considering
24
a range of options, including load balancing between substations, new circuits, and substation capacity
25
increases. 22 23
24
See
D.12-11-051, at pp. 19-20.
In this case, Parent B-Substations are those that are directly downstream from an A-Substation. Some of our BSubstations are served from Parent B-Substation and are defined as Child B-Substations. If we were to include the capacity and load through these stations, we would be double counting. For this reason, we have only considered Parent B-Substation in our calculation. MVA stands for mega volt-amperes and is a measure of power transfer capacity. One MVA is equal to 1 MW at a power factor of 1.
14
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
15 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
As mentioned previously, we review the technical feasibility o f each alternative
2
with various internal stakeholders responsible for design, construction, operation, and maintenance of
3
the project. Using stakeholder input, we eliminate alternatives that are not technically feasible. From
4
the feasible set o f alternatives, we select a project considering reliability, operational flexibility, and cost
5
effectiveness.
5.
6 7
Construction Licensing under G.O. 131-D SCE is required to comply with the licensing provisions of General Order 131-D (G.O.
8
131-D) before constructing electric facilities operating at voltages greater than 50 kV.2 5 During SCE’s
9
last GRC proceeding, the Commission disallowed some o f SCE’s Distribution Substation Plan and
10
Subtransmission Line capital forecast because “there was insufficient data [on construction authority] to
11
timely evaluate whether the projects were likely to come into service during [the] rate case cycle.”2 6
12
Table I-4, Table I-5, and Table I-6 below contain licensing and exemption information
13
for each o f these projects. In addition to identifying the projects for which Certificate o f Public
14
Convenience and Necessity (CPCN)2 7 or Permit to Construction (PTC) 2 8 applications have already been
15
filed pursuant to G.O. 131-D, a review o f the remaining listed projects was made to determine (1) the
16
need for a CPCN or PTC application to be filed pursuant to G.O. 131-D, (2) whether a project could
17
qualify for an exemption under G.O. 131-D, or (3) whether a project was subject to the G.O. 131-D
18
provisions. The determinations regarding the application and exemption status for the projects in our
19
current load growth plan are provided in Table I-4 below.
20
Based on these determinations, the planned projects fall into four primary categories.
21
First, there are those projects for which a CPCN 2 9 or PTC 3 0 has already been filed. Second, there are
22
those projects for which SCE currently expects a CPCN or PTC to be filed. Third, there are those
23
projects which are considered exempt under the provisions o f G.O. 131-D, Section III.B.1. (e.g., a
25
Rules Relating to the Planning and Construction of Electric Generation, Transmission,/Power/Distribution Line Facilities and Substations Located in California, General Order 131-D (1995).
26
D.12-11-051, at 142.
27
General Order 131-D, Section A.
28
See Id.
29
CPCNs are required for projects involving construction of transmission line facilities operating at 200 kV or greater.
30
Section B.
PTCs are required for projects involving construction of subtransmission line facilities operating between 50 kV and 200 kV and substations operating above 50 kV.
15
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
16 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
1
project involving construction for the minor relocation o f existing power lines facilities up to 2,000 in
2
length may qualify for a PTC exemption under G. O. 131-D, Section III.B.1.c.). Lastly, there are those
3
projects known as “substation modification” projects31 which are not subject to PTC requirements
4
because they involve construction within an existing substation that does not exceed the substation’s
5
previously rated voltage.
31
See Id.
Section B.
16
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
17 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Table I-4 Licensing and Exemption Status Distribution Substation Plan Line No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Project # 05353 04458 05023 05432 06093 06220 06577 06605 06870 06948 07160 04445 06292 06691 06958 07216 07263 07391 05403 06301 07307 07480 05411 06067 06619 06836 07293 07516 06575 05397
Project Name Triton 115/12 kVSubstation Pepper 115/12 kV Substation El Sobrante 33/12 kVSubstation Roadway 115/12 kV Substation Bloomington 66/12 kV Substation Fillmore 66/16 kVSubstation Devers 115/12 kV Substation La Habra 66/12 kVSubstation Estrella 66/12 kV Substation Carodean 115/12 kV Substation Delano 66/12 kVSubstation Glen Avon 66/12 kVSubstation Lampson 66/12 kV Substation Downs 115/12 kV Substation Pebbly Beach 12/2.4 kV Substation Del Amo Jr 66/12 kV Substation La Palma 66/12 kV Substation Lark Ellen 66/12 kV Substation Colonia 66/16 kV Substation Canyon 66/12 kVSubstation San Dimas 66/12 kV Substation Orange 66/12 kV Substation Lakeview 115/12 kV Substation Yokohl 66/12 kVSubstation Banducci 66/12 kV Substation Greenhorn 66/2.4 kV Substation Mainframe 66/4.16 kV Substation Safari 33/12 kV Substation Circle City 66/12 kV Substation (Phase 1) Falcon Ridge 66/12 kVSubstation
Operating Date Apr 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2013 Jun 2014 Jun 2014 Jun 2014 Jun 2014 Jun 2014 Jun 2014 Jun 2015 Jun 2015 Jun 2015 Jun 2015 Jun 2016 Jun 2016 Jun 2016 Jun 2016 Jun 2016 Jun 2016 Jun 2016 Dec 2016
Preliminary Licensing Determination PTC Already Filed Substation Modification Substation Modification Substation Modification Not Subject to PTC Substation Modification Substation Modification Exemption C Substation Modification Substation Modification Substation Modification Substation Modification Not Subject to PTC PTC Already Filed Not Subject to PTC Substation Modification Substation Modification Substation Modification Substation Modification Substation Modification Substation Modification Substation Modification PTC Already Filed Customer EIR PTC Already Filed Substation Modification PTC Filing Expected Substation Modification PTC Filing Expected PTC Already Filed
17
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
18 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Table I-5 Licensing and Exemption Status Subtransmission Lines Plan Line No.
P ro je c t #
P ro je c t Name
O perating
P re lim in a ry L icensing
Date
D eterm ination Exemption G
1
06392
Santiago-Borrego-M orro 66 kV R econductor
M ar 2013
2
06028
Etwiwanda-Alder-Randall 66 kV R econductor
A p r 2013
Exemption G
3
05316
A lder-Declez 66 kV Recable Bundle
Jun 2013
Exemption D
4
07040
Camarillo S ubstation 66 kV C apacitor B ank
Jun 2013
Substation M odification
5
05364
W eldon Substation 66 kV C apacitor B ank
D ec 2013
Substation M odification
6
06070
M esa-Laguna Bell-Narrows 66 kV R econductor
D ec 2013
Exemption G
7
06844
M esa-R ush No. 3 66 kV R ecabel
Jun 2014
Exemption B & C
8
07208
9
M ultiple
Carodean Substation 115 kV C apacitor B ank
Jun 2014
S ubstation M odification
La Cienega Subtransm ission Line Project
Jun 2015
10
Exemption G
07507
Springville-Strathmore 66 kV R econductor
Jun 2015
Exemption G
11
07508
Vestal-Columbine-Delano-Earlimart 66 kV R econductor
Jun 2015
Exemption G
12
07512
Vestal-Delano-Browning 66 kV R econductor
Jun 2015
Exemption G
13
04891
A rrow head R econfiguration Project
D ec 2015
Exemption B
14
06030
Valley-Ivyglen 115 kV Line
D ec 2015
PTC A lready Filed
15
04518
Santa B arbara C ounty Reliability Project
Jun 2016
PTC A lready Filed
16
05329
M oorpark-N ew bury 66 kV Line
Jun 2016
Expecting to File
17
07382
Yucca 115/12 kV Substation Loop-In
Jun 2016
Exemption G
18
07384
Santiago-Irvine No. 2 66kV Recable
Jun 2016
Exemption B
18
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 Witness: R. Woods
19 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Table I-6 Licensing and Exemption Status A-Bank Plan Line No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1
E.
Project # 05075 05360 06807 06221 06845 06227 06284 06824 06263 07518 06670 06092 06107 05383
Operating Date Jun 2013 Jun 2013 Jun 2013 Jun 2013 Nov 2013 Dec 2013 Jun 2014 Dec 2014 Jun 2015 Jun 2015 Mar 2016 Jun 2017 Jun 2017 Jun 2016
Project Name El Casco 220/115 kV Substation Devers-Mirage 115 kV System Split Valley 'C' 500/115 kV Substation Ellis 'C' 220/66 kV Substation Gould 220/66 kV Substation Santiago 220/66 kV Substation La Cienega 220/66 kVSubstation La Fresa 220/66 kV Substation Vestal 220/66 kV Substation Springville 220/66 kV Substaiton Valley 'AB' 500/115 kV Substation Alberhill 500/115 kV Substation Saugus 'C' 220/66 kV Substation Chino 220/66 kV Substation (Phas e 1)
Preliminary Licensing Determination PTC Already Filed PTC Already Filed Substation Modification Substation Modification Substation Modification Substation Modification Substation Modification Exemption G Substation Modification Substation Modification Substation Modification CPCN Already Filed Exemption G Substation Modification
Transmission & Interconnection Planning Projects As discussed earlier, these projects fall into four categories: (1) projects needed to support grid
2
3
reliability, (2) projects needed to interconnect generation, including renewable energy, to SCE’s
4
transmission system, (3) primarily FERC-jurisdictional projects with more than $1 million in CPUC
5
jurisdictional information technology expenditures, and (4) projects with less than $1 million in CPUC-
6
jurisdictional expenditures. These projects are discussed below in Table I-7.
Table I-7 Transmission & Interconnection Planning Projects Capital Expenditure Summary (Total Company Nominal $000) Line
Project C ategory
No.
7 8 9
Prior
2013
2014
2015
2016
2017
-
Total
CPUC
1
Grid Reliability Projects
94,514
71,497
37,365
4,987
-
208,362
2
Transmission System G eneration Interconnection
1,756,841
767,990
325,605
113,971
34,123________ -
2,998,530
170,208
3
Subtotal o f Transmission & Interconnection Projects
1,851,355
839,486
362,970
118,958
34,123
-
3,206,892
309,849
4
Projects with CPUC-jurisdictional SCE Cost
G)
C U - 0 0 - O P -N S -0 0 0 3 1 4
C ET- E T -T P- R L -7 2 4 30 0
$2,108
$720
$ 1 ,3 8 8
Total $138
2013 $1,2 5 0
2014
$0
$858
$1,250
$0 _____________ $7 2 0 _______________$0
$0
Prior
$0
$0
R eal P ro p e rtie s lan d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re s h o w n h e re a s a s e p a ra te lin e item .
$0
&
$0
2017
O n th is s c h e d u le E n v iro n m e n ta l a n d Real P ro p e rtie s lab or c o s ts a re in clu d e d a g a in s t th e W B S e le m e n t w h e re th o s e c o s t w ill settle. T h e s e c o s ts a re in clu d e d in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a p ro ra te basis.
Footnotes:
Total
IT /T e le c o m
S u b station
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h W B S . E a c h W B S re p re s e n ts th e total c o s t fo re c a s t fo r p ro je ct e le m e n ts a s s ig n e d to th is s p e c ific W B S in th e project.
20 1 5 G R C W o rk p a p e r
PIN:7243
Devers 115 kV SPS
Capital Forecast by W BS
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CO
cn
64 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Q.
(A 0 w
C
O
z
s
*
j§
1
«
3
a
(O lH (A
Q < O
_i
eo = w Z
o
io
r>
o z rg „ «n t ft,
oi
P 2 3 V CO
2 i(A
(J
-5
- 1
IH D
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
65 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R E LIA BILITY PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R eliability Projects D atabase ID: 428 / RO Model ID: 620 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RELIAB
Pin #
7111
W BS Elem ent
CET-ET-TP-RL-711100
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind U pgrades Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Load Growth X
Reliability Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
12/1/2014
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
820
2014
595
2015
0
2016
0
2017
0
Total
1,415
7 (a). SYSTEM SH O R T TEXT
Bank on Breaker, La Cienega
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA NA
P ro je c t M a n a q e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
2 2 0 kV c ircu it b re a k e rs a t La C ie n e g a 2 2 0 kV S u b s ta tio n to c o n n e c t th e tw o 2 2 0 /6 6 kV tra n s fo rm e rs to th e 2 2 0 kV b uses.
fa u lts o n o th e r s u b s ta tio n e q u ip m e n t a n d p re v e n t rem ov al o f la rg e s e c tio n s o f a s u b s ta tio n fro m o p e ra tio n . T h e s c o p e o f th e p ro je ct in clu d e s in stallin g four-
e ith e r a " d o u b le - b r e a k e r" o r" b re a k e r- a n d - a - h a lf" p osition , a s a p p ro p ria te . T h e s e b re a k e r a rra n g e m e n ts m ain tain e lec trica l c o n n e c tio n o f th e tra n s fo rm e rs fo r
m a in ta in a b ility , S C E in itia te d a p ro g ram fo r all 2 2 0 /6 6 kV tra n s fo rm e rs th a t a re c u rre n tly c o n n e c te d d ire ctly to th e b u s a s d e s c rib e d a b o v e to c o n n e c t into
a s u b s ta tio n fro m o p e ra tio n , w h ic h s ig n ific a n tly re d u c e s reliability. A s p art o f a s y s te m -w id e e ffo r t to im p ro v e reliab ility a n d re sto re o p e ra tio n a l fle xib ility an d
fa u lt is a s itu a tio n in w h ic h a prim ary b re a k e r fails to o p e n , n e c e ss ita tin g a n u m b e r o f b re ake rs to o p e n . T h is c a n th e n lead to an o u ta g e o f larg e s e c tio n s o f
re co g n iz e s th e d iffic u ltie s o f m a n a g in g o p e ra tio n s a n d m a in te n a n c e w ith th is p ra c tic e , e sp e c ia lly a t th e h ig h e r lo ad le ve ls w e n o w have. B a c k -u p c le a rin g o f a
w it h o u t bre ake rs. T h is s u b s ta tio n w a s o rig in a lly c o n s tru c te d in th is a rra n g e m e n t a n u m b e r o f y e a rs a g o w h e n S C E u se d fe w e r b re ake rs p e r e lem e n t. SCE
S C E w ill install fo u r c ircu it b re a k e rs a t La C ie n e g a S u b s ta tio n . A t La C ie n e g a S u b s ta tio n , tw o 2 2 0 /6 6 kV tra n s fo rm e rs a re c o n n e c te d d ire ctly to th e b u se s
SCE-03, Vol 3
GRC Volum e Reference
P ro je c t R ea so n
$4,036
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:7111
La Cienega 220/66 kV Substation
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
G> G)
C E T -E T -T P -R L - 7 1 1 1 0 0
Total
$4,036
$4 ,0 3 6
Prior
$2,620
$2,6 2 0
$820
$8 2 0
2013
$595
$595
2014
$0
$0
2015
$0
$0
2016
R eal P ro p e rtie s lan d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re s h o w n h e re a s a s e p a ra te lin e item .
$0
$0
2017
O n th is s c h e d u le E n v iro n m e n ta l a n d Real P ro p e rtie s lab or c o s ts a re in clu d e d a g a in s t th e W B S e le m e n t w h e re th o s e c o s t w ill settle. T h e s e c o s ts a re in clu d e d in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a p ro rata basis.
Footnotes:
Total
S u b station
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h W B S . E a c h W B S re p re s e n ts th e total c o s t fo re c a s t fo r p ro je ct e le m e n ts a s s ig n e d to th is s p e c ific W B S in th e project.
20 1 5 G R C W o rk p a p e r
PIN:7111
La Cienega 220/66 kV Substation
Capital Forecast by W BS
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD
2 T ra n s fo r m e r B an ks 2 2 0 kv s id e u p g ra d e
R eal P ro p e rtie s
w it h p ro te ctio n
LCO R
^
yp
^
711100
$4,036
|2
$4 ,0 3 4
(1 ) C o s t e stim a te s fo r e a ch e le m e n t a re d e v e lo p e d by S u b je c t M a te r E x p e rts in v a rio u s fu n c tio n a l g ro u p a t S o u th e rn C a lifo rn ia E diso n.
Total
R eal E state
S u b station
($ in th o u s a n d s; nom in al)
$820
$820
$595
$595
$0
S u m m a rie s o f e a ch e stim a te a re in clu d e d in th is w o rk p a p e r packag e.
$2,620
R.
$2,6 1 9
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h p ro je ct e lem e n t. E a c h p ro je ct e le m e n t r e p re s e n ts a d is c re te e le m e n t o f w o rk n e c e s s a r y to c o m p le te th e project.
20 1 5 G R C W o rk p a p e r
PIN 7111
La Cienega 220/66 kV Substation
Capital Forecast by Project Elem ent
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
cn oo
2 T r a n s fo rm e r B an k s 2 2 0 k v s id e u p g ra d e w ith p ro te c tio n
$4,002
$0
$0
$0
$389
$2,236
$7
$803
$568
$0
$0
$0
2012 YTD______ 2012_______ 2013_______2014_______ 2015______ 2016______ 2017
0 .8 7
16.69%
S C E L abo r O H
10.00%
0 .75%
P ro c u re m e n t S erv ice s C h a rg e b a c k
V e h ic le OH
6 5 .0 0 %
Pay roll L oad in g s
0 .15%
2 0 .0 0 %
Paid A b se n c e
13.14%
9 .60%
N o n -L a b o r O H
S u p p ly E xp en se
9 .70%
M ate rial S ales T a x
T o o l E xp en se
0 .20% 2 0 .0 0 %
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E L abor
S C E C ra ft L abo r
A ll M ate rials
S C E L abor
Pro c u re d M a te ria l a n d C o n tra c t C o s t
G ro ss D irect E x p e n d itu re s
S C E L abo r (N o rm al T im e )
C o n tra ct Labo r, M a te ria ls, O th e r
M ate rial S a le s T a x
In v e n to rie d M ate rial C o s t
A ll M ate rials
Basis G ro ss D irect E x p e n d itu re s
0.93
3 .30%
B-Item
$0
0.93
Overhead Type________________________ Rate (%)
0 .8 9
0 .8 9
$0
A d m in is tra tiv e a n d G eneral
Overhead Rates
0 .8 7
N o n -L a b o r
$4,034
L abo r
Escalation Type
Escalation Factors
G ro ss D irect E x p e n d itu re
0 .9 7
0 .9 7
$0
1.00
1.00
$376
1.02
1.02
$2,236
1.05
1.05
$7
1.07
1.07
$820
1.09
1.09
$595
1.12
1.12
$0
$0
$0
Cost Category______________________________ Total_______ 2008_______2009_______2010_______2011___2012 YTD_______ 2012_______2013_______2014_______2015_______ 2016______ 2017
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
Cost Category______________________________ Total_______ 2008_______2009_______ 2010______ 2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 7111
Project Name: La Cienega Bank on Breaker PIN 7111
CET-ET-TP-RL-711100
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD CD
70 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
s
E
I! i n l ! i .
I
!
!
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
R eal P ro p e r tie s
$2
$0
$0
$0
$0
0 .8 7
2 .20% 10.55% 9 .70% 2 0 .0 0 % 6 5 .0 0 % 0 .75%
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
M ate rial S ales T a x
Paid A b se n c e
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
Pro c u re d M a te ria l a n d C o n tra c t C o s t
G ro ss D irect E x p e n d itu re s
S C E L abo r (N o rm al T im e )
M ate rial S a le s T a x
In v e n to rie d M ate rial C o s t
Labo r, M ate rial, C o n tra ct
Basis G ro ss D irect E x p e n d itu re s
0.93
3 .30%
BPI O H
$0
0.93
Overhead Type________________________ Rate (%)
0 .8 9
0 .8 9
$0
A d m in is tra tiv e a n d G eneral
Overhead Rates
0 .8 7
N o n -L a b o r
$2
L abo r
Escalation Type
Escalation Factors
G ro ss D irect E x p e n d itu re
0 .9 7
0 .9 7
$0
1.00
1.00
$0
Cost Category______________________________ Total_______2008_______2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
Cost Category______________________________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 7111
Project Name: La Cienega Bank on Breaker PIN 7111
LCOR
$0
$0
$0
$0
$0
$0
1.02
1.02
$2
1.05
1.05
$0
1.07
1.07
$0
1.09
1.09
$0
1.12
1.12
$0
$0
$0
2012 YTD_______2012_______2013_______ 2014_______2015_______2016______ 2017
$2
2012 YTD_______ 2012_______ 2013_______ 2014_______ 2015_______ 2016______ 2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
R eal P ro p e r tie s
O th e r M aterial
S C E C ra ft S C E P ro je c t M a n a g e m e n t S C E E n g in ee rin g
C o n tra c t C o n s tru c tio n C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k Paid A b se n c e M ate rial S ales T a x BPI OH
M aterial
Labo r
Labo r
Labo r
C o n tra cto r
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
T o ta ls
Cost Category
Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 7111
Project Name: La Cienega Bank on Breaker PIN 7111
L abor
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
Category
Escalation Recorded (2012
Committed (2012
To Go (2012
New (2012
Projected Forecast
0 0 0 0
0 0 0 0
0 0 0 0
0
0
0
0
0 0
0 0 0 0
0
2
0
0
0 0
_o________________ 0________________ 0________________ 0________________ o_ $2 $2 $0 $0 $2
0 0 0 0
0
0
0
0
0
0
2
2
0
0 0
0
0 0
0
0 0
0
(2012 Constant)_________ Constant)_________ Constant)_________ Constant)_________ Constant)
Original Estimate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
-vl N>
73 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
u
IU
§
Q.
Z
2
I
u 111 z
2
.
o y
-.5 £ 380
S
'i
QL
Z
H Q < z °l— l tf) (/) I— I
HI
^
(A ■§ (A
Jfi in
° M
3l_ J^j S^ o ^ ■> i1 'SQ. W
z
(/)
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
74 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern California Edison Company CAPITAL W O RK PA PERS - 2015 GRC PR O JECT DETAIL W O RK SH EET: RELIABILITY PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : LOAD G ROW TH Category: TRANS PROJECTS Detail: R eliability Projects D atabase ID: 1640 / RO Model ID: 645 1. W ITN ESS
Robert G. Woods
2. PR O JECT DETAIL Program Group
(N O T S PEC IFIED)
Program
(N O T S PEC IFIED)
Pin #
7518
W BS Element
C ET-ET-TP-RL-751800
3. PR O JECT TYPE
Select one
Select one Compliance: Safety, Environmental, Licenses
Customer Growth
Replacements in Kind
Load Growth X
Upgrades Blanket: FE, Tools, Spare Parts, Lab, Computer Equip
Reliability Capitalized Software Various (See Below)
4. A SSET TYPE
Transmission Substations
5. C LO SE DATE
6/1/2015
6. RIIM ELIGIBLE
No
7. C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
0
2,500
2014
2,131
2,000
2015
2,176
1,500
2016
0
1,000
2017
0
Total
4,307
0
2013
7 (a). SYSTEM SH O R T TEXT
(Not Specified)
7 (b). D ETAILED DESCR IPTIO N
See workpaper for details
8. SC O PE
See workpaper for details
9. JUSTIFICATION
See workpaper for details
2014
2015
2016
2017
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA NA
S p rin g v ille S u b s ta tio n is a 2 2 0 /6 6 s ta tio n lo ca te d in th e city o f S trath m o re .
GRC Volum e Reference
P ro je c t M a n a q e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
S C E w ill install fo u r c ircu it b re ake rs a t S p rin g v ille S u b s ta tio n . A t S p rin g ville
tra n s fo rm e r to th e 66 kV b u s e s w ill a ls o b e re p lace d . T h e e xis tin g g ro u n d b an k w ill b e re located a n d in stalled w ith th e n e w tran sfo rm er.
tra n s fo rm e r b an k w ill b e c o n n e c te d to th e 2 2 0 k V b u se s th ro u g h tw o n e w 2 2 0 kV c ircu it bre ake rs. T h e t w o -6 6 k V c ircu it b re a k e rs th a t c o n n e c t th e 2 2 0 /6 6 kV
T h e s c o p e o f th e p ro je ct in clu d e s re p la cin g tw o s in g le p h a se 2 2 0 /6 6 k V tra n s fo rm e r b a n k s w ith o n e n e w 2 2 0 /6 6 k V th re e p h a se tra n s fo rm e r b an k. T h e n ew
rem ov al o f la rg e s e c tio n s o f a s u b s ta tio n fro m o pe ration .
a s a p p ro p ria te . T h e s e b re a k e r a rra n g e m e n ts m aintain e le c trica l c o n n e c tio n o f t h e tra n s fo rm e rs fo r fa u lts on o th e r s u b s ta tio n e q u ip m e n t a n d p re v e n t
tra n s fo rm e rs th a t a re cu rre n tly c o n n e c te d d ire ctly to th e b u s a s d e sc rib e d a b o v e to c o n n e c t in to e ith e r a " d o u b le - b r e a k e r" o r " b re a k e r-a n d - a -h a lf" position ,
A s p art o f a s y s te m -w id e e ffo r t to im p ro v e reliab ility a n d re sto re o p e ra tio n a l fle x ib ility a n d m a in ta in a b ility, S C E in itia te d a p ro g ram fo r all 2 2 0 /6 6 kV
fa ils to o p e n , n e c e ss ita tin g a n u m b e r o f b re ake rs to o p e n w h ic h c a n re su lt in an o u ta g e o f larg e s e c tio n s o f a s u b s ta tio n , w h ic h c a n re d u c e reliability.
m a in te n a n c e w ith th is p ra c tic e , e sp e c ia lly a t h ig h e r lo ad le vels c o m p a re d w it h p ast ye ars. B a c k -u p c le a rin g o f a fa u lt is a s itu atio n w h e re a prim ary bre ake r
S u b s ta tio n , o n e 2 2 0 /6 6 kV tra n s fo rm e r is c o n n e c te d d ire ctly to th e b us w it h o u t bre ake rs. S C E re co g n iz e s th e d iffic u ltie s o f m a n a g in g o p e ra tio n s an d
$4,307 SCE-03, Vol 3
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:7518
Springville 220/66 kV Substation
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
cn
C E T -E T -L G -T S -7 5 1 8 0 0
$4,307
$4 ,3 0 7
Total
$0
$0
Prior
$0
$0
2013
$2,131
$2,131
2014
$2,176
$2 ,1 7 6
2015
$0
$0
2016
R eal P ro p e rtie s lan d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re s h o w n h e re a s a s e p a ra te lin e item.
$0
$0
2017
O n th is s c h e d u le E n v iro n m e n ta l a n d Real P ro p e rtie s lab or c o s ts a re in clu d e d a g a in s t th e W B S e le m e n t w h e re th o s e c o s t w ill settle. T h e s e c o s ts a re in clu d e d in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a p ro ra te basis.
Footnotes:
Total
S u b station
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h W B S . E a c h W B S re p re s e n ts th e total c o s t fo re c a s t fo r p ro je ct e le m e n ts a s s ig n e d to th is s p e c ific W B S in th e project.
20 1 5 G R C W o rk p a p e r
PIN:7518
Springville 220/66 kV Substation
Capital Forecast by W BS
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD
t w it h p ro te ctio n
($ in th o u s a n d s; nom in al)
$0
$0
$ 4 ,3 0 7
$4,307
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h p ro je ct e lem e n t. E a c h p ro je ct e le m e n t r e p re s e n ts a d is c re te e le m e n t o f w o rk n e c e s s a r y to c o m p le te th e project.
20 1 5 G R C W o rk p a p e r
PIN 75 1 8
Springville 220/66 kV Substation
Capital Forecast by Project Elem ent
$0
$0
$2,1 3 1
$2,131
$ 2 ,1 7 6
$2,176
$0
$0
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
2 T r a n s fo rm e r B an k s 2 2 0 k v s id e u p g ra d e w ith p ro te c tio n
$4,069
$0
$0
$0
$0
0 .8 7
16.69%
S C E L abo r O H
10.00%
0 .75%
P ro c u re m e n t S erv ice s C h a rg e b a c k
V e h ic le OH
6 5 .0 0 %
Pay roll L oad in g s
0 .15%
2 0 .0 0 %
Paid A b se n c e
13.14%
9 .60%
N o n -L a b o r O H
S u p p ly E xp en se
9 .70%
M ate rial S ales T a x
T o o l E xp en se
0 .20% 2 0 .0 0 %
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E L abor
S C E C ra ft L abo r
A ll M ate rials
S C E L abor
Pro c u re d M a te ria l a n d C o n tra c t C o s t
G ro ss D irect E x p e n d itu re s
S C E L abo r (N o rm al T im e )
C o n tra ct Labo r, M a te ria ls, O th e r
M ate rial S a le s T a x
In v e n to rie d M ate rial C o s t
A ll M ate rials
Basis G ro ss D irect E x p e n d itu re s
0.93
3 .30%
B-Item
$0
0.93
Overhead Type________________________ Rate (%)
0 .8 9
0 .8 9
$0
A d m in is tra tiv e a n d G eneral
Overhead Rates
0 .8 7
N o n -L a b o r
$4,307
L abo r
Escalation Type
Escalation Factors
G ro ss D irect E x p e n d itu re
0 .9 7
0 .9 7
$0
1.00
1.00
$0
Cost Category______________________________ Total_______ 2008_______2009_______2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
Cost Category______________________________ Total_______ 2008_______ 2009_______ 2010______ 2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 7518
Project Name: Springville 220/66 kV Substation
CET-ET-LG-TS-751800
$0
$0
$2,035
$2,035
$0
$0
1.02
1.02
$0
1.05
1.05
$0
1.07
1.07
$0
1.09
1.09
$2,131
1.12
1.12
$2,176
$0
$0
2012 YTD_______2012_______2013_______ 2014_______2015_______2016______ 2017
$0
2012 YTD_______ 2012_______ 2013______ 2014_______ 2015_______ 2016______ 2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
00
-v]
2 T r a n s fo rm e r B an k s 2 2 0 k v s id e u p g ra d e w ith p ro te c tio n
C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k S C E L abo r O H
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
O v e rh e a d
O v e rh e a d
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods B-Item M ate rial S ales T a x O v e rh e a d C o rre c tio n s
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
T o ta ls
Paid A b se n c e V e h ic le OH
O v e rh e a d
T o o l E xp en se
C o n tra c t C o n s tru c tio n
C o n tra cto r
O v e rh e a d
L abo r C o rrectio n s
Labo r
N o n -L a b o r O H
S C E E n g in ee rin g
Labo r
S u p p ly E xp en se
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d
S C E C ra ft
Labo r
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
M aterial
Cost Category
Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 7518
Project Name: Springville 220/66 kV Substation
L abor
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
Category
Escalation
0 0
0
34 0
794
0 0 0 0 0 0 0 0 0 $0
128 294 3 82 100 78 1 196 0 $5,413
0
0
102
57
0
643
0
0
233
0
0
0
21
0
0
222
0
7
0
0
0
0
0
0
46
0
170
393
0 0
0
0
0
0
467
0
0
747
0
0
220
0
$0
$162
0
Constant)
(2012 Constant)
214
Recorded (2012
Original Estimate
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Constant)
Committed (2012
$4,0 6 9
(0)
159
3
58
71
63
2
261
96
39
18
164
291
34
588
0
25
75
476
173
0
0
5
0
0
126
0
346
0
0
158
0
553
163
$1 2 0
Constant)
To Go (2012
$4,0 6 9
(0)
159
3
58
71
63
2
261
96
39
18
164
291
34
588
0
25
75
476
173
0
0
5
0
0
126
0
346
0
0
158
0
553
163
$120
Constant)
New (2012
Projected Forecast
Workpaper - Southern California Edison / 2015 GRC - APPLICATION CD
-vJ
80 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
< _i Q. c o
U IU —
IQ W
^
z 0
i s
h Z Q
S g z ■D U S
00
C E T -E T -T P -R L - 7 1 2 0 0 0
£3 ,4 9 1
$3,491
$336
$344
$2,811
$0
R eal P ro p e rtie s lan d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re s h o w n h e re a s a s e p a ra te lin e item.
$0
| 0 _____________| 3 3 6 _____________$344___________ £2,811_______________ $0_______________ $0
$0
O n th is s c h e d u le E n v iro n m e n ta l a n d Real P ro p e rtie s lab or c o s ts a re in clu d e d a g a in s t th e W B S e le m e n t w h e re th o s e c o s t w ill settle. T h e s e c o s ts a re in clu d e d in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a p ro rata basis.
Footnotes:
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h W B S . E a c h W B S re p re s e n ts th e total c o s t fo re c a s t fo r p ro je ct e le m e n ts a s s ig n e d to th is s p e c ific W B S in th e project.
20 1 5 G R C W o rk p a p e r
PIN:7120
Chino 220/66 kV Substation
Capital Forecast by W BS
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
00 00
Footnote:
CE1-_E1-_T P _R L _7 1 2 00 0
$344
S u m m a rie s o f e a ch e stim a te a re in clu d e d in th is w o rk p a p e r packag e.
$336
$ 2 811
$2,811
$0
$344
$3,491
$3 3 6 '
$0
'
$3 4 9 1
(1 ) C o s t e stim a te s fo r e a ch e le m e n t a re d e v e lo p e d by S u b je c t M a te r E x p e rts in v a rio u s fu n c tio n a l g ro u p a t S o u th e rn C a lifo rn ia E diso n.
w it h p ro te ctio n
1 T ra n s fo r m e r B an k 2 2 0 kv s id e u p g ra d e
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h p ro je ct e lem e n t. E a c h p ro je ct e le m e n t r e p re s e n ts a d is c re te e le m e n t o f w o rk n e c e s s a r y to c o m p le te th e project.
20 1 5 G R C W o rk p a p e r
PIN 71 2 0
Chino 220/66 kV Substation
Capital Forecast by Project Elem ent
$0
$0
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo
1 T r a n s fo rm e r B an k 2 2 0 k v s id e u p g ra d e w ith p ro te c tio n
$3,285
$0
$0
$0
$0
2011
0 .8 7
16.69%
S C E L abo r O H
10.00%
0 .75%
P ro c u re m e n t S erv ice s C h a rg e b a c k
V e h ic le OH
6 5 .0 0 %
Pay roll L oad in g s
0 .15%
2 0 .0 0 %
Paid A b se n c e
13.14%
9 .60%
N o n -L a b o r O H
S u p p ly E xp en se
9 .70%
M ate rial S ales T a x
T o o l E xp en se
0 .20% 2 0 .0 0 %
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E L abor
S C E C ra ft L abo r
A ll M ate rials
S C E L abor
Pro c u re d M a te ria l a n d C o n tra c t C o s t
G ro ss D irect E x p e n d itu re s
S C E L abo r (N o rm al T im e )
C o n tra ct Labo r, M a te ria ls, O th e r
M ate rial S a le s T a x
In v e n to rie d M ate rial C o s t
A ll M ate rials
Basis G ro ss D irect E x p e n d itu re s
0.93
3 .30%
B-Item
$0
0.93
Overhead Type________________________ Rate (%)
0 .8 9
0 .8 9
$0
A d m in is tra tiv e a n d G eneral
Overhead Rates
0 .8 7
N o n -L a b o r
$3,491
L abo r
Escalation Type
Escalation Factors
G ro ss D irect E x p e n d itu re
0 .9 7
0 .9 7
$0
1.00
1.00
$0
Cost Category______________________________ Total_______2008_______2009_______2010_______ 2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
Cost Category______________________________ Total_______ 2008_______2009_______ 2010
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 7120
Project Name: Chino PIN 7120
CET-ET-TP-RL-712000
$0
$329
$329
$2,628
$0
$0
1.02
1.02
$0
1.05
1.05
$0
1.07
1.07
$336
1.09
1.09
$344
1.12
1.12
$2,811
$0
$0
2012 YTD_______2012_______2013_______2014_______2015_______2016_______2017
$0
2012 YTD______ 2012_______ 2013_______2014_______ 2015______ 2016______ 2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
cn
00
1 T r a n s fo rm e r B an k 2 2 0 k v s id e u p g ra d e w ith p ro te c tio n
C o n tra c t C o n s tru c tio n C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k
C o n tra cto r
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
T o ta ls
N o n -L a b o r O H S u p p ly E xp en se T o o l E xp en se
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E E n g in ee rin g
Labo r
S C E L abo r O H
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d
S C E C ra ft
Labo r
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
M aterial
Cost Category
Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 7120
Project Name: Chino PIN 7120
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
Category
Escalation
0 0 0 $0
4 171 $ 4 ,4 3 6
0
666
63
0
28
0
0
84
79
0
522
0
0
197
0
0
0
0
0
0
3
0
0
69
0
0
286
0
0
0
0
97
0
0
0
0
0
360
32
0
0
20
0
0
106
0
0
0
0
0
176
0
748
0
0
174
0
$0
$189
38
Constant)
tant)
325
Recorded (2012
mate
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Constant)
Committed (2012
$3,2 8 5
127
3
47
58
51
2
211
78
24
15
131
241
28
493
21
62
387
146
0
0
0
0
0
72
0
267
0
0
0
0
554
129
$1 4 0
Constant)
To Go (2012
$3,285
127
3
47
58
51
2
211
78
24
15
131
241
28
493
21
62
387
146
0
0
0
0
0
72
0
267
0
0
0
0
554
129
$140
Constant)
New (2012
Projected Forecast
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
00 CD
87 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
bJD
O
13 0> = =
o o u 0>
u
0> = =
o &
o
u 4J
o u 0>
s
=
o
§ O
u
o £ u
s^ £
O
cc
O
fl
1/5 1/5
o
S
5C
«) =
*a &
e* u
M =
H
1/5 u 0> &
u
H
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Sandlot 220 kV Substation (PIN:6960)
Transmission System Generation Interconnection
T R A N S M IS S IO N AND IN TER C O N N EC TIO N PLA N N IN G
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo oo
89 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 553 / RO Model ID: 722 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6960
W BS Elem ent
C ET-ET-TP-RN -696000
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.583
2014
0
2015
0
2016
0
2017
0
Total
1.583
7 (a). SYSTEM SH O R T TEXT
Lugo(NU):SPS relays, CTs. PSC: Rplc RTUs
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
90 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 554 / RO Model ID: 723 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6960
W BS Elem ent
C ET-ET-TP-RN-696001
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
252
2014
0
2015
0
2016
0
2017
0
Total
252
7 (a). SYSTEM SH O R T TEXT
V icto r (NU): SPS relays. PSC: Rplc RTUs.
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
91 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 555 / RO Model ID: 724 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6960
W BS Elem ent
C ET-ET-TP-RN -696002
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
12
2014
0
2015
0
2016
0
2017
0
Total
12
7 (a). SYSTEM SH O R T TEXT
Kram er(N U ):N etworkU pgradesforW aterV alley
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
92 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 556 / RO Model ID: 725 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6960
W BS Elem ent
C ET-ET-TP-RN -696003
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
461
2014
0
2015
0
2016
0
2017
0
Total
461
7 (a). SYSTEM SH O R T TEXT
Roadway(NU): Install conduit & ma nhole
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
93 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 80 / RO M odel ID: 337 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C -696000
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
6.766
2014
0
2015
0
2016
0
2017
0
Total
6.766
7 (a). SYSTEM SH O R T TEXT
C onstruct new W a te r Valley 220kV Sub(IF)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
94 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 81 / RO M odel ID: 338 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
CET-ET-C R -W C-696001
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
2.219
2014
0
2015
0
2016
0
2017
0
Total
2.219
7 (a). SYSTEM SH O R T TEXT
Loop Cool W ater-Kram er#1intoW atrValy(IF)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
95 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 82 / RO M odel ID: 339 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C-696002
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
2.087
2014
0
2015
0
2016
0
2017
0
Total
2.087
7 (a). SYSTEM SH O R T TEXT
C oolw ater - Replace 4-220KV CB; Upgrade
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
96 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 83 / RO M odel ID: 340 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C -696003
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.133
2014
0
2015
0
2016
0
2017
0
Total
1.133
7 (a). SYSTEM SH O R T TEXT
DO N O T USE
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
97 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 84 / RO M odel ID: 341 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C -696007
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
110
2014
0
2015
0
2016
0
2017
0
Total
110
7 (a). SYSTEM SH O R T TEXT
Tortilla - C onstruction Telecom m un icatio
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
98 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 85 / RO M odel ID: 342 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C -696009
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1,000
2014
0
2015
0
2016
0
2017
0
Total
1,000
7 (a). SYSTEM SH O R T TEXT
A lpha&Beta 220 G enTies into W trV aly (IF)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
99 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 86 / RO M odel ID: 343 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C -696010
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Lines
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
12
2014
0
2015
0
2016
0
2017
0
Total
12
7 (a). SYSTEM SH O R T TEXT
Hutt 12 KV Relocation (W ater Valley)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
100 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 87 / RO M odel ID: 344 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
CET-ET-C R -W C-696011
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Lines
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
12
2014
0
2015
0
2016
0
2017
0
Total
12
7 (a). SYSTEM SH O R T TEXT
SCE C FF Tem porary Power (W ate r Valley)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
101 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 88 / RO M odel ID: 345 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C-696012
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Lines
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
112
2014
0
2015
0
2016
0
2017
0
Total
112
7 (a). SYSTEM SH O R T TEXT
SCE SL&P at W a te r Valley
7 (b). D ETAILED DESCR IPTIO N See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
102 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 89 / RO M odel ID: 346 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C -696013
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
75
2014
0
2015
0
2016
0
2017
0
Total
75
7 (a). SYSTEM SH O R T TEXT
Alpha G enFacility: Install RTU PSC (IF)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
103 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 90 / RO M odel ID: 347 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6960
W BS Elem ent
C ET-ET-C R -W C -696014
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
63
2014
0
2015
0
2016
0
2017
0
Total
63
7 (a). SYSTEM SH O R T TEXT
Beta GenFacility: Install RTU PSC (IF)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
104 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 1324 / RO Model ID: 839 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6960
W BS Elem ent
CIT-00-O P-N S-000278
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
4. A SSET TYPE
Telecom m unications
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
2,010
2014
0
2015
0
2016
0
2017
0
Total
2,010
7 (a). SYSTEM SH O R T TEXT
Abengoa M ojave - W a te r Valley Network U
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
105 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 1325 / RO Model ID: 840 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6960
W BS Elem ent
CIT-00-O P-N S-000279
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
4. A SSET TYPE
Telecom m unications
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.490
2014
0
2015
0
2016
0
2017
0
Total
1.490
7 (a). SYSTEM SH O R T TEXT
Abengoa M ojave - W a te r Valley Interconn
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA NA
A n e w 2 2 0 kV c o lle cto r s u b s ta tio n (S a n d lo t) is n e e d e d to in te rc o n n e c t a n d in te g ra te n e w re n e w a b le g e n e ra tio n in H in kley. T h is p ro je ct w ill p ro v id e th e
GRC Volum e Reference
P ro je c t M a n a q e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
P ro te c tiv e re lays a n d te le c o m m u n ic a tio n s e q u ip m e n t a re re q u ire d to
S u b station s.
S a n d lo t a n d Kram er; S a n d lo t a n d T o rtilla ; a n d V ic to r to K ra m e r as w e ll a s m u ltip le x e q u ip m e n t a n d c h a n n e l e q u ip m e n t a t th e Kram e r, L u g o , a n d V icto r
te le co m m u n ic a tio n sys te m fo r c o m m u n ic a tio n s b e tw e e n g e n e ra tio n c u s to m e r fa c ilitie s a n d S a n d lo t S u b station . T h is in clu d e s fib e r o p tic c a b le b e tw e e n
T h is p ro je ct h as a te le co m m u n ic a tio n c o m p o n e n t o f o v e r $1 m illion d ollars. T h e te le c o m m u n ic a tio n s s c o p e in clu d e s n e w d iv e rs e ly ro ute d fib e r optic
s u p p o rt a sp ec ia l p ro te ctio n syste m (SPS).
n e w S a n d lo t S u b s ta tio n to fo rm th e K ra m e r-S a n d lo t a n d C o o l W a t e r 2 2 0 kV lines.
T h e p ro je ct in clu d e s c o n s tru c tio n o f a n e w 2 2 0 kV s u b s ta tio n . T h e C o o l W a te r- K ra m e r No. 1 2 2 0 k V lin e w ill b e c o n n e c te d in to a n d o u t o f (" lo o p e d in to ") th e
tra n s m iss io n in fra s tru c tu re n e e d e d to in te rc o n n e c t s o la r g e n e ra tio n a lo n g th e C o o l W a te r- K ra m e r 2 2 0 kV tra n s m iss io n corridor.
$50,103 SCE-03, Vol 3
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:6960
Sandlot 220 kV Substation
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
o CD
$936 $1 ,1 2 8 $83
C E T -E T -C R -W C -6 9 6 0 0 7 C E T -E T -C R -W C -6 9 6 0 0 9 C E T -E T -C R -W C -6 9 6 0 1 0
$231
$30,706
$8 ,3 4 0 $1,721
$50,103
C IT-0 0 -O P -N S -0 0 0 2 7 9
$6,3 3 0
$31
$31
$2 6 9
$79
$71
$1 2 8
$8 2 6
$2,271
$2,143
$3,035
$ 1 4 ,2 66
$121
$51
$323
$501
Prior
C IT-0 0 -O P -N S -0 0 0 2 7 8
$94
$3 ,4 0 4
C E T -E T -C R -W C -6 9 6 0 0 3
$107
$4 ,2 3 0
C E T -E T -C R -W C -6 9 6 0 0 2
C E T -E T -C R -W C -6 9 6 0 1 4
$5 ,2 5 4
C E T -E T -C R -W C -6 9 6 0 0 1
C E T -E T -C R -W C -6 9 6 0 1 3
$21,031
C E T -E T -C R -W C -6 9 6 0 0 0
$91
$582
C E T -E T -T P -R N -6 9 6 0 0 3
$381
$63
C E T -E T -T P -R N -6 9 6 0 0 2
C E T -E T -C R -W C -6 9 6 0 1 2
$575
C E T -E T -T P -R N -6 9 6 0 0 1
C E T -E T -C R -W C -6 9 6 0 1 1
$2,085
C E T -E T -T P -R N -6 9 6 0 0 0
Total
$19,397
$1,4 9 0
2010
$63
$75
$12 $12 $112
$110
$1,0 0 0
$1,133
$2,0 8 7
$2,2 1 9
$6,7 6 6
$461
$12
$2 5 2
$1,583
2013
$0
$0
$0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0
2015
$0 $0 $0 $0
2014
$0
$0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0
2016
R eal P ro p e rtie s lan d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re s h o w n h e re a s a s e p a ra te lin e item .
$0
$0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0
2017
O n th is s c h e d u le E n v iro n m e n ta l a n d Real P ro p e rtie s lab or c o s ts a re in clu d e d a g a in s t th e W B S e le m e n t w h e re th o s e c o s t w ill settle. T h e s e c o s ts a re in clu d e d in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a p ro ra te basis.
Footnotes:
IT /T e le c o m
T r a n s (< 2 0 0 kV)
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h W B S . E a c h W B S re p re s e n ts th e total c o s t fo re c a s t fo r p ro je ct e le m e n ts a s s ig n e d to th is s p e c ific W B S in th e project.
20 1 5 G R C W o rk p a p e r
PIN:6960
Sandlot 220 kV Substation
Capital Forecast by W BS
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
o
o oo
Eldorado Ivanpah Transmission Upgrades (PIN:6551)
Transmission System Generation Interconnection
TRANSMISSION AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
109 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 520 / RO Model ID: 695 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-ET-TP-RN-655101
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
15,465
2014
13,427
2015
0
2016
0
2017
0
Total
28,892
20,000
10,000 5,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
Ivanpah: Construct new 220/115kV substat
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
2015
2016
2017
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
110 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 522 / RO Model ID: 697 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-ET-TP-RN -655104
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
5/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
24,720
30,000
2014
3,145
25,000
2015
0
2016
0
2017
0
Total
27,865
20,000 15,000 10,000 5,000
i----- 1
0
2013
7 (a). SYSTEM SH O R T TEXT
Eldorado-Ivanpah No. 2 (California)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2014
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
111 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 523 / RO Model ID: 698 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-ET-TP-RN -655105
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
5/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
117,715
2014
26,375
140.000 120.000 100,000
2015
0
2016
0
2017
0
Total
144,090
80,000 60,000 40.000 20.000 0
2013
7 (a). SYSTEM SH O R T TEXT
Eldorado-Ivanpah No. 2 (Nevada)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2014
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
112 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 519 / RO Model ID: 694 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-ET-TP-RN -655100
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
5/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
5.058
2014
0
2015
0
2016
0
2017
0
Total
5.058
7 (a). SYSTEM SH O R T TEXT
Eldorado-Ivanpah 220kV: 29m i 2 20 kV dbl c
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
113 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 521 / RO Model ID: 696 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-ET-TP-RN -655103
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
7/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
9,551
12,000
2014
7,370
10,000
2015
0
2016
0
2017
0
Total
16,921
8,000 6,000 4,000 2,000 0
2013
7 (a). SYSTEM SH O R T TEXT
Eldorado: Install 2 line pos, upgrade se
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2014
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
114 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 526 / RO Model ID: 700 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-ET-TP-RN -655109
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
17
2014
0
2015
0
2016
0
2017
0
Total
17
7 (a). SYSTEM SH O R T TEXT
Cool W aterG S:U pgradeLineP rotect ionRelays
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
115 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 524 / RO Model ID: 699 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-ET-TP-RN -655106
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Lines
5. C LO SE DATE
7/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.445
2014
0
2015
0
2016
0
2017
0
Total
1.445
7 (a). SYSTEM SH O R T TEXT
Nipton 33kV:Extend to create loop (EITP)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
116 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1314 / RO Model ID: 830 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6551
W BS Elem ent
CIT-00-O P-N S-000249
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
7/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
2.400
2014
0
2015
0
2016
0
2017
0
Total
2.400
7 (a). SYSTEM SH O R T TEXT
Eldorado Ivanpah
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
117 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 733 / RO Model ID: 797 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6551
W BS Elem ent
C ET-R P-TP-R N-655100
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission - Land Rights
4. A SSET TYPE 5. C LO SE DATE
7/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
180
2014
0
2015
0
2016
0
2017
0
Total
180
7 (a). SYSTEM SH O R T TEXT
FERC - El Dorado Ivanpah
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA
T h e E ld o ra d o Iv a n p a h T ra n s m is s io n U p g ra d e s p ro je ct is n e e d e d in o rd e r to: (1 ) c o m p ly w ith th e s ta te -m a n d a te d R PS; a n d (2 ) in te g ra te p la n n e d re n e w a b le
P ro je c t M a n a g e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
s u p p o rts s ta te a n d fe d e ra l re n e w a b le e n e rg y
s e le c te d a s th e m ost fe a s ib le a lte rn a tiv e th a t m e e ts all o f t h e p ro je ct o bje ctive s.
S C E p e rfo rm e d an a lte rn a tiv e a n a lys is, w h ic h w a s in clu d e d in th e P E A a p p lic a tio n (A p p lic a tio n A .0 9 -0 5 -0 2 7 ) file d M a y 28, 2009. T h e p ro p o s e d p ro je ct w a s
te le c o m m u n ic a tio n s p a th w a y s a n d c o m m u n ic a tio n e q u ip m e n t to c o n n e c t th e p ro je ct to S C E's e x is tin g te le co m m u n ic a tio n s system .
B o u ld e r C ity, N e v a d a ; (4 ) u p g ra d e s a t E ld o ra d o S u b s ta tio n to s u p p o rt th e c o n n e c tio n o f n e w tra n s m iss io n lines; a n d (5) c o n s tru c tin g tw o s e p a ra te
kV s u b tra n s m is sio n lin e w ith a 3 5 -m ile d o u b le - c irc u it 2 2 0 kV tra n s m iss io n line; (3) c o n n e c tin g th e n e w I v a n p a h S u b s ta tio n to S C E's E ld o ra d o S u b s ta tio n near
T h is s c o p e o f th is p ro je ct in clu d es: (1 ) c o n s tru c tin g a n e w 220 /1 1 5 kV I v a n p a h s u b s ta tio n n ear Prim m , N e vad a; (2 ) re p la cin g o f a p o rtio n o f an e x is tin g 115
g o a ls a n d s u p p o rts th e re d u c tio n o f g re e n h o u s e g a s em ission .
I t w ill a ls o e n a b le N e va d a to e x p o rt c le a n e n e rg y to C alifornia. T h e E ld o ra d o Iv a n a p a h U p g a d e s P ro je c t a ls o
T h e E ld o ra d o -Iv a n p a h T ra n s m is s io n P ro je c t w ill p ro v id e th e e le c trica l fa c ilitie s a n d c a p a city n e c e ss a ry to a c ce s s a n d d e liv e r p o w e r fro m re n e w a b le reso u rce s.
S C E 's e xis tin g tra n s m iss io n fa c ilitie s in th e are a w ill n ot b e a b le to p ro v id e th e tra n s m iss io n c a p a city n e e d e d fo r th e p ro je cte d s o la r g e n e ra tio n d e v e lo p m e n t.
g e n e ra tio n re so u rce s fro m th e Iv a n p a h D ry L a k e A rea.
SCE-03, Vol 3 NA
GRC Volum e Reference
$384,511
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:6551
Eldorado Ivanpah Transm ission Upgrades
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo
$224,151
CET-ET-TP-RN-655105
$274
CET-ET-TP-RN-655109
CET-RP-TP-RN-655100
CTT-00-OP-NS-000249 $336
$ 1 5 7 ,6 4 3
$516
$4,957
$725
$257
$ 3 8 4 ,5 1 1
$7,357
$2,170
$717
CET-ET-TP-RN-655107
CET-ET-TP-RN-655106
$4,560
$21,481 $717
$27,589
$56,331
CET-ET-TP-RN-655103
$11,946
$80,061
$14,730
$11,765
P rio r
CET-ET-TP-RN-655101
$17,004
$42,595
CET-ET-TP-RN-655100
$11,915
CET-ET-TP-RN-655104
T o tal
CET-ET-TP-RN-655101
WBS $150
$ 1 7 6 ,5 5 0
$2,400
$1,445
$17
$9,551
$15,315
$5,058
$117,715
$24,720
2013
$ 5 0 ,3 1 7
$7,370
$13,427
$26,375
$3,145
2014
2015
2016
2017
Substation elements on a prorata basis. Real Properties land acquisition costs are recorded against separate WBS item and are therefore shown here as a separate line item.
On this schedule Environmental and Real Properties labor costs are included against the WBS element where those cost will ultimately settle. These costs are included in the Transmission and
F o o tn o te s :____________________________________________________________________________________________________________________________________________________________________
T o tal
Real Estate (Land Acquisition)
IT/Telecom
Distribution
Substation
Trans(200kV)
($ in thousands; nominal)
2015 GRC Workpaper
C ap ita l F o r e c a s t b y W BS E ld o ra d o I v a n p a h T ra n s m is s io n U p g ra d e s PIN : 6 5 5 1 , OD: 7 /2 0 1 3
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
$9,627
install CB
C ET- RP-TP- RN-655100 LCO R
Real Properties
CIT-00-O P-NS-000249
EHS
CET-ET-TP-RN -655106
CET-ET-TP-RN -655109
Land Acquisition
Teleco m m u n ica tions
M onitoring & m itigation costs
Station Light & P ow er
Cool W ater Substation
CET-ET-TP-RN -655107
$384,51 1
$584
$516
$7,439
$40,197
$1,407
$717
$19,758
CET-ET-TP-RN -655103
Mountain Pass: rem ove transform er and
$54,078
CET-ET-TP-RN -655101
E ldorado U pgrad es
$15,856
$198,719
$35,329
Construct a n e w Ivanpah Substation
CET-ET-TP-RN -655100
CET-ET-TP-RN -655105
Install Eldorado-IvanPah 2 2 0 k V T L , NV
Rem ove and install n e w 115kV facilities
CET-ET-TP-RN -655104
CET-ET-TP-RN -655101
Install Eldorado-IvanPah 2 2 0 k V T L , CA
Engineering
Licensing & Perm it, Prelim inary
To tal
$ 157 ,6 4 3
$584
$336
$5,039
$24,947
$725
$257
$717
$3,629
$26,662
$11,938
$63,239
$10,093
$150
$176 ,5 5 0
$180
$2,400
$13,799
$8,931
$14,496
$3,918
$109,702
$22,263
$2,973
$5 0 ,3 1 7
$1,450
$7,198
$12,920
$25,778
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
(1) C ost estim ates fo r each elem ent are developed by S ub ject M ater Experts in various functional group at Southern California Edison.
S um m aries o f each estim ate are included in this w orkpape r package.
Footnote:_________________________________________________________________________________________________________________________________________________________________
To tal
Real Estate
IT/Telecom
Environm ental
Distribution
Substation
Trans(< 200kV )
Trans(> 200kV )
($ in thousands; nom inal)
2015 GRC
PIN: 6 5 5 1 , O D: 7 / 2 0 1 3
Eld o rad o Iv an p ah T ran sm issio n U p g ra d es
C a p ita l F o re cast b y W B S
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
N> O
Devers - Colorado River (DCR) (PIN:4847)
Transmission System Generation Interconnection
TRANSMISSION AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
122 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 331 / RO Model ID: 541 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484700
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7. C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
-28,906
2014
431
2015
0
10,000
2016
0
20.000
5,000 0 - 5,000
15.000 25.000
2017
0
Total
-28,475
30.000
2013
2014
2015
7 (a). SYSTEM SH O R T TEXT
D EVER S-PA LO V E R D E : PRELIM I NARY ENGINEERI
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
123 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 332 / RO Model ID: 542 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484701
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7. C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
122,289
2014
42,344
2015
0
2016
0
2017
0
Total
164,632
20,000
2013
2014
7 (a). SYSTEM SH O R T TEXT
D EVER S-PA LO V E R D E NO. 2 500KV T/L (CA):
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
2015
2016
2017
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
124 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 1572 / RO Model ID: 543 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
(N O T S PEC IFIED)
Program
(N O T S PEC IFIED)
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484704
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
34
2014
1,412
2015
0
2016
0
2017
0
Total
1,446
1,500
1,000
500
0
2013
7 (a). SYSTEM SH O R T TEXT
(Not Specified)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
2014
2015
2016
2017
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
125 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern California Edison Company CAPITAL W O RK PA PERS - 2015 GRC PR O JECT DETAIL W O RK SH EET: R ENEW ABLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 334 / RO Model ID: 544 1. W ITN ESS
Robert G. Woods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Element
CET-ET-TP-EC-484705
3. PR O JECT TYPE
Select one
Select one Compliance: Safety, Environmental, Licenses
X
Customer Growth
Replacements in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, Computer Equip
Capitalized Software Various (See Below)
4. A SSET TYPE
Transmission Lines
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 1 5 G R C - C a p i t a l E x p e n d it u r e s F o r e c a s t
Yr
SCE $
2013
112,078
120,000
2014
34,367
100,000
2015
0
2016
0
2017
0
Total
146,445
80,000 60,000 40,000 20,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
DEVERS-VALLEY #2 500KV T/L: BUILD A N E W
7 (b). D ETAILED DESCR IPTIO N
See workpaper for details
8.
See workpaper for details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See workpaper for details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
126 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 340 / RO Model ID: 550 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484728
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
-8,009
2014
-3,271
2015
0
2016
0
2017
0
Total
-11,280
7 (a). SYSTEM SH O R T TEXT
CRE D evelopm ent o f the M aterial Y ards
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
127 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 335 / RO Model ID: 545 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484716
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
B lanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
284
2014
758
2015
0
2016
0
2017
0
Total
1,042
7 (a). SYSTEM SH O R T TEXT
DEVERS SUB: REPLACE 7-230KV CBS AN D UPGR
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
128 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 336 / RO Model ID: 546 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484717
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
4,729
5,000
2014
3,462
4,000
2015
0
3,000
2016
0
2,000
2017
0
Total
8,191
1,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
DEVERS: EXTEN D BUS TW O POSITIO NS TO THE
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
129 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 337 / RO Model ID: 547 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
C ET-ET-TP-EC-484722
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7. C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
1,806
2,500
2014
2,080
2,000
2015
0
1,500
2016
0
1,000
2017
0
Total
3,886
0
2013
2014
7 (a). SYSTEM SH O R T TEXT
V A LLE Y SUB: IN STALL A LINE PO SITIO N TO T
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
130 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 338 / RO Model ID: 548 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484725
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
B lanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
C olorado River: Letter agreem ents
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
131 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 339 / RO Model ID: 549 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484726
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
34,060
2014
13,088
2015
0
2016
0
2017
0
Total
47,148
40,000
20,000 10,000 0
2013
7 (a). SYSTEM SH O R T TEXT
C olorado River: Build 500kV sw itch yard p
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
2014
2015
2016
2017
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
132 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 342 / RO Model ID: 552 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
C ET-ET-TP-EC-484732
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
366
2014
0
2015
0
2016
0
2017
0
Total
366
7 (a). SYSTEM SH O R T TEXT
Mirage: Install additional conduits
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
133 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 341 / RO Model ID: 551 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
CET-ET-TP-EC-484731
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Lines
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
553
2014
300
2015
0
2016
0
2017
0
Total
853
7 (a). SYSTEM SH O R T TEXT
D C R M iscellaneous D istrict Requirem ents
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
134 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1253 / RO Model ID: 800 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
4847
W BS Elem ent
C IT-00-O P-N S-000032
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
4. A SSET TYPE
Telecom m unications
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
2.787
2014
0
2015
0
2016
0
2017
0
Total
2.787
7 (a). SYSTEM SH O R T TEXT
D evers Colorado R iver Transm ission Line
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
135 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 713 / RO Model ID: 783 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
C ET-RP-TP-EC-484701
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission - Land Rights
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
FER C -Devers Palo Verde
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
136 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 714 / RO Model ID: 784 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ EC O N O M IC
Pin #
4847
W BS Elem ent
C ET-R P-TP-EC -484702
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
B lanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission - Land Rights
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
99
2014
0
2015
0
2016
0
2017
0
Total
99
7 (a). SYSTEM SH O R T TEXT
FER C -Devers Valley
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA
T h e D C R P ro je c t in clu d e s b u ild in g th e C a lifo rn ia p ortio n o f th e D e v e rs -P a lo V e rd e N o. 2 (D P V 2 ) tra n s m iss io n p ro je ct. T h is p ro je ct w ill p ro v id e th e
P ro je c t M a n a g e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
s e le c te d a s th e m ost fe a s ib le a lte rn a tiv e th a t m e e ts all o f t h e p ro je ct o bje ctive s.
S C E p e rfo rm e d an a lte rn a tiv e a n a lys is, w h ic h w a s in clu d e d in th e P E A a p p lic a tio n (A p p lic a tio n A .0 5 -0 4 -0 1 5 ) file d A p ril 11, 2005. T h e p ro p o s e d p ro je c t w a s
a s s o c ia te d m u ltip le x e rs a n d e q u ip m e n t a t v a rio u s location s.
C o lo ra d o R ive r S w itch y a rd to B uck B lvd. (W A P A ), fro m M ira g e S u b s ta tio n to th e 5 0 0 k V rig h t o f w a y o f t h e D e v e rs - C o lo ra d o R iv e r 5 0 0 k V T / L , an d
p ath fro m C h u c k w a lla C o m m u n ic a tio n S ite to C o lo ra d o R ive r S w itch y a rd , n e w fib e r o p tic c a b le fro m C o lo ra d o R ive r S w itch y a rd to B lythe S erv ice C e n te r, from
T h e te le co m m u n ic a tio n s s c o p e o f w o rk to s u p p o rt th e D e v e rs - C o lo ra d o R iv e r 5 0 0 kV tra n s m iss io n line in clu d e s th e in stallatio n o f a n e w d ig ital m icro w a v e
th e C a lifo rn ia p o rtio n o f th e p ro je ct in N o v e m b e r 2009.
re a c tiv e s u p p o rt e q u ip m e n t is n e e d e d fo r v o lta g e su p p o rt, in clu d in g s h u n t c a p a c ito rs a n d a S tatic V A R S ystem . T h e C P U C a p p ro v e d S C E 's a p p lica tio n to build
p a ra lle lin g an e xis tin g line c o n n e c tin g S C E's D e v e rs S u b s ta tio n to S C E 's e x is tin g V a lle y S u b s ta tio n in R o m o la n d C aliforn ia. A lso , a c o n s tru c tio n o f o th er
S w itch y a rd to S C E 's e x is tin g D e v e rs S u b station . T h is p ro je ct a ls o in volv es c o n s tru c tio n o f th e D e v e rs V a lle y No. 2 lin e, a n e w 4 2 m ile 5 0 0 kV tra n s m iss io n
g o a ls o f 3 3 % by 2020. T h e p ro je ct c o n s is ts o f c o n s tru c tin g th e C aliforn ia p o rtio n o f D C R , a n e w 113 m ile 5 0 0 kV line fro m th e n e w C o lo ra d o R ive r
a re a s o f e a ste rn R iv e rsid e C o u n ty to e n e rg y c u s to m e rs in S o u th e rn C aliforn ia. T h e p ro je ct w ill as sis t C a lifo rn ia in m e e tin g its a g g re ss iv e re n e w a b le e n e rg y
tra n s m iss io n in fra s tru c tu re n e e d e d fo r d e v e lo p e rs to tra n s fe r a d d itio n a l c a p a city fo r n e w re n e w a b le a n d c o n v e n tio n a l g e n e ra tio n fro m th e s o la r e n e rg y rich
SCE-03, Vol 3 NA
GRC Volum e Reference
$859,974
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:4847
Devers - Colorado River (DCR)
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CO
$9,785 $171 $114,354 $415
CET-ET-TP-EC-484722 CET-ET-TP-EC-484725 CET-ET-TP-EC-484726 CET-ET-TP-EC-484732
$ 8 5 9 ,9 7 4
$972 $2,198
CET-RP-TP-EC-484702
$7,392
CET-RP-TP-EC-484701
CTT-00-OP-NS-000032
$1,427
$4,345 $21,777
CET-ET-TP-EC-484716 CET-ET-TP-EC-484717
CET-ET-TP-EC-484731
$3
CET-ET-TP-EC-484703
($0)
CET-ET-TP-EC-484728
$33 $39,368
$6,392 $259,377
CET-ET-TP-EC-484704 CET-ET-TP-EC-484705
CET-ET-TP-EC-484700 CET-ET-TP-EC-484701
$10,449 $381,519
Total
CET-ET-TP-EC-484700 CET-ET-TP-EC-484701
WBS
$52 2 ,8 2 3
$2,099
$971
$4,605
$574
$67,206 $48
$5,899 $162
$3,303 $13,586
$3
$11,671
$33
$11,280
$4,946 $112,931
$38,925 $244,583
Prior
$ 24 2 ,1 8 1
$1 $99
$2,787
$553
$34,060 $366
$1,806 $9
$284 $4,729
-
$21,669
($8,009)
$34 $112,078
($28,906) $100,620
2 013
-
-
$ 94,970
-
-
$300
-
-
-
-
-
$ 13,088
-
$ 2,080
$758 $ 3,462
-
-
$ 6,028 -
-
$431
2 015
$ 36,316 $ 1,412 $ 34,367 ($ 3 , 271 )
2014
2 016
2017
On this schedule Environmental and Real Properties labor costs are included against the WBS element where those cost will ultimately settle. These costs are included in the Transmission and Substation elements on a prorata basis. Real Properties land acquisition costs are recorded against separate WBS item and are therefore shown here as a separate line item.
Footnotes:
Total
Real Estate (Land Acquisition)
n/Telecom
Distribution
Substation
Tran s(< 2 0 0 kV )
Tran s(> 2 0 0 kV )
($ in thousands; nominal)
Capital Forecast by WBS Devers - Colorado River (DCR) P IN : 4 84 7 , OD: 9 /2 0 1 3 2015 GRC Workpaper
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
00
CO
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods $3,301
$4,324
C E T -E T -T P -E C -4 8 4 7 16
Devers substaion: Replace CBs
$48
$415
C ET- E T-T P- EC-484732
M irage S ub - Install additional conduits
$1,612
$522,823
$1,612
$859,974
C ET- R P-T P-EC-4 84702 LC O R
Real Properties
$2,077
$972 $2,176
C ET- R P-T P-EC-4 84701
$971
$1,107
$3,498
Devers-San Bernardino-Vista acquire rights o f w ay e asem ent
$1,894
CIT-00-O P-N S-000032
$75,176
$574
D evers-Palo V e rd e acquire easem ent
$5,498
CIT-00-O P-N S-000032
$102,716
Edison Carrier Solutions
EHS
$1,427
T e leco m m u n ica tion s
M onitoring & m itigation costs
Station Light & Pow er
C ET- E T-T P- EC-484731
$60,846
$107,302
C E T-E T-T P-E C -48472 6
C olorado River Switchyard
($258)
$242,181
-
$99
$1
$787
$2,000
$24,000
$553
$366
$34,060
$258
$1,806
$5,318
C E T-E T-T P-E C -48472 5
($0)
$9,204
C E T-E T-T P-E C -48472 2
C olorado River Substation
east and e quip new position
Valley Substation
$4,729
$283
$21,669
($6,050)
$97,194
$34
$85,546
$432
($25,586)
2013
$12,979
$21,170
C E T -E T -T P -E C -4 8 4 7 17
Devers Substation: Extend 500kV bus tw o positions to the
$3
$3
C E T-E T-T P-E C -48470 3
Devers Substation: Install co nd uit T e leco m
$10,993
$33 $36,690
C ET- E T-T P- EC-484701
$33
$6,050
$91,793
C ET- E T-T P- EC-484700
$0
$4,733
$206,864
D E V E RS -C olorado River 500KV series cap
$221,801
C E T-E T-T P-E C -48472 8
$6,179
C ET- E T-T P- EC-484705
C E T-E T-T P-E C -48470 4
$326,108
Valley Substation #1 and #2
M aterial Yard Planning and D evelopm ent
circuit
Devers - Valley #2 5 0 0 k V T /L : build a new 42 m ile single
circuit
D evers-Valley: R elo cate app. 0.25 m ile o f existing single
sin gle circuit
C ET- E T-T P- EC-484701
$9,518
C ET- E T-T P- EC-484700
Devers - C olorad o River 500KV No.2 T/L: build 110 mile
$25,586
C ET- E T-T P- EC-484700
Prior
Loop-in DPV#1 5 0 0 k V T / L into C olorado River Substation
$10,450
Total
Prelim inary E ngineering & Licensing
WBS
$94,970
-
-
-
-
$3,540
$300
$12,396
$2,080
$3,462
$740
$4,028
-
$32,814
$1,412
$33,698
$500
2014
2015
2016
(1) C ost estim ates fo r each e lem en t are de veloped by S ub ject M ater Experts in various functional group at Southern California Edison. Sum m aries o f each estim ate are included in this w orkp ap e r package.
Footnote:_____________________________________________________________________________________________________________________________________________________
Total
Real Estate
IT/T eleco m
Environm ental
Distribution
Substation
T ra n s (> 2 0 0 k V )
($ in thousands; nom inal)
201 5 G R C W o rkpape r
Capital Forecast by WBS Devers - Colorado River (DCR) PIN: 4847, OD: 9/2013
2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION CO CD
R eg u lato ry, L ice n sin g , and L e g a l C o s t s
R e a l P ro p e rtie s ( L C O R )
3
4
S u b station M a jo r E q u ip m e n t (e.g. C irc u it B re a k e rs , D isc o n n e c t S w itch, R e a c to rs , S tructural S teel)
C ivil M a te ria ls and M is c H a rd w a re
P rio r c o s t ' 11
4
5
6
7
E le c tric a l C o n s tru c tio n
C o n s tru c tio n M a n a g e m e n t S e rv ic e s
P rio r c o s t ' 11
3
4
E nv iron m en tal
R e a l P ro p e rtie s A c q u isitio n s
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods $ 1 ,2 7 9
A llo c a te d (e.g., c h a rg e b a c k s , S C E la b o r lo a d e rs an d D ivision O v e rh e a d )
$ 3 ,4 8 8 $ 2 ,0 9 6
$859,974
$522,823
$ 2 0 ,3 80
$20,380
$4 6 ,3 71
$46,371
$4,767
$5,5 5 5
$7,651
E diso n C arrie r S o lu tio n s
$ 3 ,0 7 0
$3,070
$ 3 ,1 7 9
$3,179
$ 7 5 ,3 68
$75,368
$ 1 0 7 ,0 9 4
$107,094
$249,807
$493,854
' $ 2 4 9,80 7
$ 1 5 ,8 24 $ 2 4 9 ,8 0 7
' '
$ 3 0 ,9 79 $ 1 9 7 ,2 4 4
$106,701
$112,485
' $1 0 6,70 1
$ 1 0 6,70 1
$ 5 ,7 8 4
$ 6 2 ,7 32
$62,732
'
$ 4 ,4 5 0
$ 6 2 ,7 32
'
$89,340
'
$6,9 6 1
Prior
$ 1 5 ,1 98
Total
T e le c o m m u n ic a tio n s
(1) Prio r c o s ts n o t d isa g g re g a te d d u e to a c co u n tin g d a ta b a s e c o n ve rsion
Footnote:
TOTAL
To tal
1
A llo c a ted
T o ta l
2
1
IT /T e lec o m
To tal
1
R eal P ro p e rties
To tal
1
E n v iro n m e n ta l
To tal
C ivil and S tructural C o n s tru c tio n
1
2
C o n s tru c tio n
To tal
T ra n s fo rm e rs
T ra n s m is s io n L in e M a jo r E q u ip m e n t (e.g. Insulator, G ro u n d W ire , D a m p e rs )
3
S te e l and H a rd w a re (e.g. Stub A n g le s o r A n c h o r B olts)
C o n d u c to r an d C o n d u c to r H ard w are
1
2
M ate ria ls
To tal
P rio r c o s t ' 11
E n g in ee rin g an d D esig n
5
P ro je c t M a n a g e m e n t (e.g. Proj. Mgm t, Proj A d m in , Proj. C on trols, E stim atin g )
1
2
P ro je c t S u p p o rt
($ in th o u s a n d s; n om in al)
20 1 5 G R C W o rk p a p e r
PIN: 4847, OD: 9/2013
Devers - Colorado River (DCR)
Capital Forecast by W BS
$242,181
$8,873
$8 ,8 7 3
$2,885
$817
$2 ,0 6 7
$109
$109
$24,000
$ 2 4 ,0 0 0
$192,076
$ 1 5 ,8 24
$ 1 7 1 ,0 9 2
$ 5 ,1 5 9
$1,921
$1 ,9 2 1
$12,317
-
$ 1 ,7 4 6
$ 3 ,0 9 8
$7 ,4 7 3
2013
$94,970
$17,118
$1 7 ,1 18
$7,726
$7 ,7 2 6
$51,971
$2 6 ,1 52
$2 5 ,8 20
$3,863
$3,863
$14,292
$2 ,7 0 4
$3,863
$7 ,7 2 6
2014
2015
2016
2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Red Bluff 500/220 kV Substation (PIN:6929)
Transmission System Generation Interconnection
TRANSMISSION AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
142 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 544 / RO Model ID: 718 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6929
W BS Elem ent
C ET-ET-TP-RN -692905
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.044
2014
0
2015
0
2016
0
2017
0
Total
1.044
7 (a). SYSTEM SH O R T TEXT
Form Col R iv-R edBluff & Devers-R B 500TLs
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
143 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 546 / RO Model ID: 720 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6929
W BS Elem ent
C ET-ET-TP-RN -692907
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.037
2014
0
2015
0
2016
0
2017
0
Total
1.037
7 (a). SYSTEM SH O R T TEXT
LoopDCR#2 500kV intoR B ,form D -R B#2&CR-RB#2
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
144 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 547 / RO Model ID: 721 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6929
W BS Elem ent
C ET-ET-TP-RN -692908
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
57
2014
0
2015
0
2016
0
2017
0
Total
57
7 (a). SYSTEM SH O R T TEXT
R emoval fo r D P V # 1 T/L
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
145 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 541 / RO Model ID: 715 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6929
W BS Elem ent
C ET-ET-TP-RN -692900
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
68,337
2014
970
2015
0
2016
0
2017
0
Total
69,307
7 (a). SYSTEM SH O R T TEXT
C onstruct Red B luff Substation
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
146 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 542 / RO Model ID: 716 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6929
W BS Elem ent
C ET-ET-TP-RN-692901
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
11,525
2014
699
2015
0
2016
0
2017
0
Total
12,224
7 (a). SYSTEM SH O R T TEXT
M odify Existing Series Cap on DPV#1 (CA)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
147 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 543 / RO Model ID: 717 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6929
W BS Elem ent
C ET-ET-TP-RN -692904
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
-210
2014
0
2015
0
2016
0
2017
0
Total
-210
7 (a). SYSTEM SH O R T TEXT
Red Bluff:Siting Study,Pre-Eng & L icnsng
7 (b). D ETAILED DESCR IPTIO N See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
148 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 545 / RO Model ID: 719 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6929
W BS Elem ent
C ET-ET-TP-RN -692906
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Lines
5. C LO SE DATE
4/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
952
2014
0
2015
0
2016
0
2017
0
Total
952
7 (a). SYSTEM SH O R T TEXT
Red B luff M isc District R equirem ents
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
149 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1313 / RO Model ID: 829 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6929
W BS Elem ent
CIT-00-O P-N S-000247
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
2.748
2014
0
2015
0
2016
0
2017
0
Total
2.748
7 (a). SYSTEM SH O R T TEXT
Red B luff Substation Project
7 (b). D ETAILED DESCR IPTIO N See w orkpaper fo r details
8.
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA
A n e w 5 0 0 /2 2 0 kV c o lle cto r s u b s ta tio n (R e d B lu ff) is n e e d e d to in te rc o n n e c t n e w re n e w a b le g e n e ra tio n p ro je cts in th e D e s e rt C e n te r A rea . T h is p ro je ct w ill
P ro je c t M a n a g e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
netw o rk.
e q u ip m e n t a t D ev ers, R e d B lu ff a n d C o lo ra d o R ive r s u b s ta tio n s n e c e ss a ry to p ro v id e re d u n d a n t a n d d iv e rs e c ircu itry fo r p ro te ctio n o f th e 5 0 0 k V T / L
T h e te le co m m u n ic a tio n s s c o p e o f w o rk to s u p p o rt th e n e w s u b s ta tio n a n d tra n s m iss io n lines in clu d e s th e in stallatio n o f va rio u s te le co m m u n ic a tio n s
( P ro je c t # 0 4 8 4 7 ) w ill b e lo o p e d in to R e d B lu ff S u b s ta tio n to fo rm th e C o lo ra d o R iv e r-R e d B lu ff No. 2 a n d D e v e rs -R e d B lu ff No. 2 5 0 0 k V T / L 's .
in to ") R e d B lu ff S u b s ta tio n to fo rm th e C o lo ra d o R iv e r-R e d B lu ff No. 1 a n d D e v e rs -R e d B lu ff N o. 1 5 0 0 k V T / L 's . T h e D e v e rs -C o lo ra d o R ive r No. 2 5 0 0 kV line
tra n s fo rm e r b an ks, in itially e q u ip p e d w it h o n e tra n s fo rm e r b an k. T h e e x is tin g D e v e rs -P a lo V e rd e 5 0 0 kV lin e w ill b e c o n n e c te d in to a n d o u t o f ("lo o p e d
T h e p ro je ct c o n s is ts o f c o n s tru c tin g a n e w 5 0 0 /2 2 0 kV s u b s ta tio n fiv e m iles e a st o f D e s e rt C e n te r, C aliforn ia th a t is u ltim a te ly d e s ig n e d fo r fo u r 50 0 /2 2 0
p ro v id e th e tra n s m iss io n in fra s tru c tu re n e e d e d to in te rc o n n e c t a d d itio n a l c a p a city a lo n g th e D e v e rs -C o lo ra d o R iv e r tra n s m iss io n corrid or.
SCE-03, Vol 3 NA
GRC Volum e Reference
$234,014
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:6929
Red Bluff 500/220 kV Substation
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
o
cn
CrT-OO-OP-NS-000247
CET-ET-TP-RN-692906
CET-ET-TP-RN-692900 CET-ET-TP-RN-692901 CET-ET-TP-RN-692904
CET-ET-TP-RN-692905 CET-ET-TP-RN-692907 CET-ET-TP-RN-692908
WBS
$ 2 3 4 ,0 1 4
$5,707
$ 1 4 6 ,8 5 7
$2,959
$851
$210
$0 $1,803
$594
$ 8 5 ,4 8 8
$2,748
$952
$11,525 ($ 210 )
$68,337
$1,037 $57
$125,106
$1,044
$8,130 $107
2 013
$8,899
Prior
$194,413 $12,818
$164
$9,943 $9,167
T otal
$699
$970
$ 1 ,6 6 9
2014
2015
2016
2017
elements on a prorata basis. Real Properties land acquisition costs are recorded against separate WBS item and are therefore shown here as a separate line item.
On this schedule Environmental and Real Properties labor costs are included against the WBS element where those cost will ultimately settle. These costs are included in the Transmission and Substation
F o o tn o tes:
T otal
Real Estate (Land Acquisition)
IT/Telecom
Distribution
Substation
Trans(200kV)
($ in thousands; nominal)
2015 GRC Workpaper
C apital F o re c a st by WBS Red Bluff 5 0 0 /2 2 0 kV S u b sta tio n PIN: 6 9 2 9 , OD: 1 2 /2 0 1 3
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
R eal P r o p e rtie s
L a nd A c q u is itio n
T e l e c o m m u n ic a tio n s
M o n ito r in g & m it ig a t io n c o s ts
CrT-00-O P-N S-000247
$23 4,014
$ 5 ,7 0 7
$ 1 3 ,5 9 5
$ 1 ,8 0 3
$0
CET-ET-TP- R N -6 9 2 9 0 4
P r e lim in a r y E n g in e e rin g & L ic e n s in g (C a n c e lle d )
C ET-ET-T P-R N -6 9 2 90 6
($ 210 )
$210
$ 1 2 ,8 1 8
CET-ET-TP- R N -6 9 2 9 0 1
S ta tio n L ig h t & P o w e r
$ 1 1 ,5 2 5
$594
$ 1 8 0 ,8 1 8
CET-ET-TP- R N -6 9 2 9 0 0
Red B lu ff S u b s ta tio n
C a lifo rn ia s e r ie s c a p & R e m o v a l
$14 6,857
$ 2 ,9 5 9
$ 1 1 ,5 9 5
$851
$ 1 1 3 ,5 1 1
$107
$85 ,4 88
$ 2 ,7 4 8
$ 2 ,0 0 0
$952
$ 6 6 ,3 3 7
$57
$ 1 ,0 3 7
$164
CET-ET-TP- R N -6 9 2 9 0 8
$ 8 ,1 3 0
$ 9 ,1 6 7
CET-ET-TP- R N -6 9 2 9 0 7
R e m o v e o n e e x is tin g 500kV s in g le c irc u it
$ 1 ,0 4 4
L o op th e DCR # 2 lin e in to R ed B lu ff S u b s ta tio n
$8,899
$ 9 ,9 4 3
C ET-ET-T P-R N -6 9 2 90 5
L o op th e DCR # 1 lin e in to R ed B lu ff S u b s ta tio n
$1,669
$699
$970
( 1 ) C o st e s tim a te s f o r e a c h e le m e n t a r e d e v e lo p e d b y S u b je c t M a te r E x p e rts in v a r io u s fu n c tio n a l g r o u p a t S o u th e rn C a lifo rn ia E d is o n . S u m m a rie s o f e a c h e s tim a te a r e in c lu d e d in th is w o r k p a p e r p a c k a g e .
Footnote:_________________________________________________________________________________________________________________________________________________________________
Real E s ta te
IT /T e le c o m
E n v iro n m e n ta l
D is trib u tio n
T ra n s (> 2 0 0 k V )
($ in th o u s a n d s ; n o m in a l)
2 0 1 5 GRC
PIN: 6929, OD: 1 2 /2 0 1 3
Red B lu ff 5 0 0 /2 2 0 kV S u b statio n
C a p ita l F orecast b y W BS
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
cn K>
R e g u la to ry , L ic e n s in g , a n d L e g a l C o s t s
R e a l P ro p e r tie s ( L C O R )
3
4
T ra n s fo r m e rs
T ra n s m is s io n L in e M a jo r E q u ip m e n t (e.g. Insulator, G ro u n d W ire , D a m p e rs )
S u b s ta tio n M a jo r E q u ip m e n t (e.g. C irc u it B re a k e rs , D is c o n n e c t S w itch , R e a c to rs , S tru ctu ral S te e l)
C iv il M a t e ria ls an d M is c H a rd w a re
3
4
5
6
E le c tr ic a l C o n s tru c tio n
C o n s tru c tio n M a n a g e m e n t S e r v ic e s
3
E n v iro n m e n ta l
R e a l P ro p e r tie s A c q u is it io n s
TO TAL
T o ta l
1
A llo c a te d
A llo c a te d (e.g., c h a rg e b a c k s , S C E la b o r lo a d e r s an d D iv is io n O v e rh e a d )
E d is o n C a rrie r S o lu tio n s
T o ta l
T e le c o m m u n ic a tio n s
1
2
IT /T e le c o m
T o ta l
1
R ea l P ro p e rtie s
T o ta l
1
E n v iro n m e n ta l
T o ta l
C iv il an d S tru ctu ral C o n s tru c tio n
1
2
C o n s tru c tio n
T o ta l
S te e l an d H a rd w a re (e.g. S tu b A n g le s o r A n c h o r B olts)
C o n d u c t o r a n d C o n d u c t o r H a rd w a re
1
2
M a te ria ls
T o ta l
P ro je c t M a n a g e m e n t (e.g. Pro j. M gm t, Pro j A d m in , Pro j. C o n tro ls , E stim a tin g )
E n g in e e rin g a n d D e s ig n
1
2
P ro je c t S u p p o rt
($ in th o u s a n d s; nom in al)
2 0 1 5 G R C W o rk p a p e r
PIN: 6929, OD: 12/2013
Red Bluff 500/220 kV Substation
Capital Forecast by W BS
$375 $159
$10,978
$495 $1 5 9
$15,646
$ 4 ,8 3 2
$ 1 2 ,8 4 6
$12,846 $146,857
$ 1 8 ,8 10
$18,810 $234,014
$2,959
$400
$9 0 0
$5,707
$2,5 5 9
$4 ,8 0 7
$ 1 1 ,5 9 5
$11,595
$63,028
$128,204
$1 4 ,4 95
$ 2 ,4 2 0
$14,495
$ 2 ,7 0 0
$ 3 4 ,4 3 6
$85,488
$5,864
$ 5 ,8 6 4
$2,748
$500
$ 2 ,2 4 8
$2,000
$ 2 ,0 0 0
$65,176
$ 6 ,0 0 0 $ 5 6 ,4 7 6
$ 2 6 ,1 7 2
$5,700
$5 ,1 2 0
$45,451
$51,151
$ 9 0 ,9 12
$ 1 0 ,2 2 6
$868
$4,000
$100
$900
$ 3 ,0 0 0
2013
$ 3 2 ,1 72
$ 2 ,4 4 3 $ 1 2 ,3 3 4
$2,443
$ 1 5 ,0 58
$ 1 1 ,7 56
$ 1 2 ,3 34
$723 $ 1 0 ,8 8 8
$723
$ 8 ,8 3 7
$ 4 ,3 6 6
$8 ,8 3 7
$ 6 ,0 7 8
$5 ,3 1 6
Prior
$9 ,6 7 6
Total
$1,669
$100
$100
-
$900
$900
-
-
$668
$20
$50
$598
2014
2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
co
cn
Tehachapi Renewable Transmission Project - Seg. 7 (PIN:6438)
Transmission System Generation Interconnection
T R A N SM ISSIO N AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
cn
155 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 483 / RO Model ID: 661 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6438
W BS Elem ent
C ET-ET-TP-RN -643800
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
-227
2014
0
2015
0
2016
0
2017
0
Total
-227
7 (a). SYSTEM SH O R T TEXT
AN TELO P E -M E S A 220KV: REM OVE 16 MILES SIN
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
156 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 484 / RO Model ID: 662 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6438
W BS Elem ent
C ET-ET-TP-RN-643801
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
1/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
18,208
30,000
2014
25,434
25,000
2015
3,322
2016
0
2017
0
Total
46,964
20,000 15,000 10,000 5,000
I----- 1
0
2013
2014
2015
7 (a). SYSTEM SH O R T TEXT
AN TELO P E -M E S A 230KV T/L: C O N STR U C T N E W 1
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
157 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 486 / RO Model ID: 664 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6438
W BS Elem ent
C ET-ET-TP-RN -643803
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
12/1/2014
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1,197
2014
15
2015
0
2016
0
2017
0
Total
1,212
7 (a). SYSTEM SH O R T TEXT
V IN C E N T -R IO H O N DO #2: C O N N EC T N E W 27-MIL
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
158 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 485 / RO Model ID: 663 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6438
W BS Elem ent
C ET-ET-TP-RN -643802
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
107
2014
0
2015
0
2016
0
2017
0
Total
107
7 (a). SYSTEM SH O R T TEXT
VAR IO U S: REM OVE VAR IO U S 66 KV SUBTR ANSM IS
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
159 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1284 / RO Model ID: 817 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6438
W BS Elem ent
CIT-00-O P-N S-000156
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
1/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
225
2014
0
2015
0
2016
0
2017
0
Total
225
7 (a). SYSTEM SH O R T TEXT
TR TP Segm ent 7
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
160 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 728 / RO Model ID: 792 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6438
W BS Elem ent
C ET-R P-TP-R N-643800
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission - Land Rights
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
3.100
2014
0
2015
0
2016
0
2017
0
Total
3.100
7 (a). SYSTEM SH O R T TEXT
FER C -TR TP Seg 7
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA NA T h e T e h a c h a p i R e n e w a b le T ra n s m is s io n P ro je c t (T R T P ) is divid e d in to 11 seg m e n ts. S e g m e n t 1-3 c olle ctive ly a re re fe rre d to as th e A n te lo p e T ra n s m is s io n
GRC Volum e Reference
P ro je c t M a n a q e r
P ro je c t E n q in e e r
R e s p o n s ib le E n q in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
lin es a re re rou ted , a n d fib e r w r a p o p tic cables.
S u b s ta tio n , a n d th e in sta lla tio n o f a s so c ia te d m u ltip lex ers a n d e q u ip m e n t, co p p e r a n d fib e r o p tic c a b le s in u n d e rg ro u n d d u c ts w h e n 6 6 kV s u b tra n s m is sio n
S e g m e n t 7 a ls o in clu d e s a te le co m m u n ic a tio n p ortio n th a t in volv es th e e x te n sio n o f O p tic G ro u n d W ire (O P G W ) in to th e c o m m u n ic a tio n room a t R io H o n d o
b e tw e e n th e Rio H o n d o a n d M e s a are a s n ee d to be re lo ca ted to e ith e r n e w rig h t-o f-w ay o r S C E fran chise .
5 0 0 kV tra n s m iss io n line sectio n . In a d d itio n , in o rd e r to m axim ize th e u se o f th e e xistin g tra n s m iss io n rig h t-o f-w ay, sev era l 66 kV su b tra n s m is sio n lines
th e M e sa are a in volv e rem ov al o f th e re m a in in g se c tio n o f e x is tin g A n te lo p e -M e s a 2 2 0 kV a n d re p la cin g it w ith a p p ro x im a te ly 15 m iles o f n e w d o u b le-circu it
a n d th e A n g e le s N atio n al F o re s t a n d re p lacin g it w ith a n e w fiv e m ile 5 0 0 kV s in g le c ircu it tra n s m iss io n line. T h e u p g ra d e s b e tw e e n th e city o f D u arte an d
M e sa area. T h e u p g ra d e s n ea r V in c e n t involv e re m ov in g fiv e m iles o f th e V in c e n t-R io H o n d o N o .2 2 2 0 kV s in g le c ircu it tra n s m iss io n line b e tw e e n V in c e n t
H o n d o N o .2 2 2 0 kV tra n s m iss io n line w ith 5 0 0 kV c o n s tru c tio n , a n d u p g ra d in g e x is tin g tra n s m iss io n n ear V in c e n t a n d b e tw e e n th e city o f D u a rte a n d th e
S e g m e n t 7 o f t h e V in c e n t-M ira Lom a 5 0 0 kV tra n s m iss io n line se c tio n b e tw e e n V in c e n t a n d th e M e s a are a w ill be c o m p le te d by re p la cin g th e V in c e n t-R io
flexibility. W it h o u t this w o rk , S C E w ill je o p a rd iz e th e reliab ility a n d s a fe ty o f its electric g rid , a n d c o m p ro m is e its ab ility to serv e its cu sto m e rs.
th e rap id ly g ro w in g p o rtio n s o f b oth w e s te rn R ive rsid e a n d S an B e rn a rd in o C o u n tie s. T h is p ro je ct w ill h e lp im p rov e system reliab ility a n d in cre ase o p e ra tio n a l
th e p ro je ct w o u ld in cre a s e S C E 's ab ility to d e liv er ad d itio n al re n e w a b le e n e rg y fro m th e T e h a c h a p i to its lo ad ce n te rs in th e g re a te r Los A n g e le s b asin a n d in
th e e n e rg y u se d p ro d u c e d by re n e w a b le g e n e ra tio n s o u rc e s , s u c h a s biom ass, g e o th e rm a l, sm a ll h yd ro , solar, a n d w in d by th e ye ar 2 0 1 7. S p ecific to SC E,
T h e T e h a c h a p i R e n e w a b le T ra n s m is s io n P ro je c t s u p p o rts th e in te n t o f S e n a te Bill 1078, w h ic h e s ta b lish e d a pro gram req u irin g IO U s to have 20 p e rce n t o f
s ch e d u le d o p e ra tin g d a te o f Ja n u a ry 2015.
b e tw e e n M e sa S u b s ta tio n a n d M ira Lom a S u b s ta tio n , lo ca ted in th e city o f O n tario . B oth S e g m e n t 7 a n d 8 w e r e a p p ro v e d by th e C A IS O in 2 0 0 7 a n d h ave a
th e citie s o f P a lm d a le a n d M o n te re y Park re sp ectively. S e g m e n t 8 co n s is ts o f th e fin a l p h a se o f th e n e w V in c e n t-M ira Lom a 5 0 0 kV T ra n s m is s io n L in e
T R T P S e g m e n t 7 co n s is ts o f t h e initial p h a se o f a n e w V in c e n t-M ira L o m a 5 0 0 kV T ra n s m is s io n L in e b e tw e e n V in c e n t a n d th e M e sa S u b s ta tio n s , lo ca ted in
Pro ject. S e g m e n ts 4 -11 a re re fe rre d to as T R T P . T h is s e c tio n o f th e te s tim o n y in clu d es S e g m e n ts 7 a n d 8.
$207,134 SCE-03, Vol 3
Total Project Cost (Nominal, in thousands)
2015 G R C W o rk p a p e r
Tehachapi Renewable Transmission Project - Seg. 7 PIN:6438
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
C E T -E T -T P -R N -6 4 3 8 0 3
C E T -R P -T P -R N -6 4 3 8 0 0
C IT-0 0 -O P-N S -0 0 0 1 5 6
C E T -E T -T P -R N -6 4 3 8 0 2
$207,134
4 ,6 5 8
3,233
28 ,3 3 7
14,172
C E T -E T -T P -R N -6 4 3 8 0 1
C E T -E T -T P -R N -6 4 3 8 0 2
11,800 142,443
C E T -E T -T P -R N -6 4 3 8 0 0
12,027
$155,754
1,558
3,008
2,5 1 2
2 8 ,2 0 8
12,960
9 5 ,4 7 9
$
$
$
$
$
(2 2 7 )
$22,610
3,1 0 0
225
(2 2 )
129
1,197
18,208
$
$
$
$
$
$
$
$25,448
15
2 5 ,4 3 4
$ $
$3,322
3 ,3 2 2
$
$0
O n th is s ch e d u le E n v iro n m e n ta l a n d R eal Pro p e rtie s lab or c o s ts a re in clu d e d a g a in st th e W B S e le m e n t w h e re th o se c o s t w ill u ltim a te ly settle. T h e s e c o s ts a re in clu d ed in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a
Footnotes:
Real E sta te (L a n d A cq u isitio n )
I T /T e le c o m
D istrib ution
S u b station
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
($ in th o u s a n d s; n om in al)
2015 G R C W o rk p a p e r
Capital Forecast by WBS Tehachapi Renewable Transmission Project - Seg. 7 PIN: 6438
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD K>
Capital Forecast by W BS
6438. C E T -E T -T P -R N -6 4 3 8 0 2
C E T -E T -T P -R N -6 4 3 8 0 2
I: T R T P 7-7: L a n d A cq u isitio n . R eal Pro p ertie s. PIN 6438.
C O S -0 0 -R E-L R -6 4 38 0 0
C IT-0 0 -O P-N S -0 0 0 1 5 6
I: T R T P 7-3: A n te lo p e -M e s a 2 3 0 k V T / L : C o n s tru c t n e w 16-m ile c C E T -E T -T P -R N -6 4 3 8 0 1
I:R :E: T R T P 7-4: B ro oks - 12kV D istrib u tion . PIN 6438.
I:R :E: T R T P 7-4: W a s h UG - 1 2 kV D istrib ution . PIN
C E T -E T -T P -R N -6 4 3 8 0 2
C E T -E T -T P -R N -6 4 3 8 0 2
$155,754
$207,134
(2 2 7 )
$
$
$
$
$
$
$
$
$
$
$
$22,610
3,100
225
4,481
(1 4 )
2
$
$
( 10) $
87
75
(4 2 )
(3)
(2 4 )
24
11
13,727
1,197
$25,448
11,087
14,347
15
$
S u m m a rie s o f e a ch e stim a te a re in clu d ed in th is w o rk p a p e r package.
1,558
3,008
13,960
104
1,016
894
3,419
3,704
2,508
4 ,6 5 8
3,233
31,5 2 9
104
1,002
3 ,5 0 6
I:R: T R T P 7-4: Rio H o n d o -A m a d o r-Jo s e -M e s a 6 6 k V T / L o n Durfe C E T -E T -T P -R N -64 3 8 0 2
6438.
3 ,7 7 9
I:R :E: T R T P 7-4: Rio H o n d o -A m a d o r-Jo s e -M e s a 6 6 k V T / L D U C K C E T -E T -T P -R N -64 3 8 0 2
PIN 6438.
2,022
l:R:E: T R T P 7-4: R io H o n d o - A m a d o r & Rio H o n d o -A n it a N o 2 661 C ET-E T-T P-R N •643802
I:R :E: T R T P 7-4: D u sty O H - 12kV D istrib ution . PIN
2,064
5 ,0 7 2
I:R: T R T P 7-4: ET-0 0 6 8 1 R io H o n d o -B ra d b u ry & E T -0 1 6 9 2 Rio I- C E T -E T -T P -R N -64 3 8 0 2
I:R :E: T R T P 7-4: O tto w a /P e c o s - 1 2 kV D istrib ution .
5,075
2 ,4 8 4
I:R: T R T P 7-4: Rio H o n d o -A m a d o r & R io H o n d o -A n ita N o 2 66k\ C E T -E T -T P -R N -64 3 8 0 2
4 ,2 1 7
4 ,2 4 1
I:R: T R T P 7-4: M e s a -R u s h N o 2 6 6 kV M e s a -A n ita -E a to n 6 6 k V & C E T -E T -T P -R N -64 3 8 0 2
7,222
8 1 ,5 1 9
7 ,2 3 4
110,914
1
12,959
12,027
C E T -E T -T P -R N -64 3 8 0 2
I:R: T R T P 7-4: R IO -H O N D O -A M A D O R -JO S E M E S A 6 6 K V T / L O H
I: T R T P 7-3: A n te lo p e -M e s a 2 3 0 k V T / L : C o n s tru c t n e w 16-m ile c C E T -E T -T P -R N -6 4 3 8 0 1
1
14,171
R: T R T P 7-2: V in c e n t-R io H o n d o #2: C o n s tru c t 0.61 m ile D C 50( C E T -E T -T P -R N -6 4 3 8 0 3
11,800
R: T R T P 7-1: A n te lo p e -M e s a 220kV: R e m o v e 16 m iles s in g le circ C E T -E T -T P -R N -6 4 3 8 0 0
I: T R T P 7-2: V in c e n t-R io H o n d o #2: C o n s tru c t 0.61 m ile D C 50C C E T -E T -T P -R N -6 4 3 8 0 3
(1) C o s t e s tim a te s fo r e a ch e le m e n t a re d e v e lo p e d by S u b je c t M a te r E xp erts in va rio u s fu n c tio n a l g ro u p a t S o u th e rn C a lifo rn ia E dison.
R eal E state
I T /T e le c o m
E n v iro n m en ta l
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
($ in th o u s a n d s; n om in al)
20 1 5 G R C W o rk p a p e r
Tehachapi Renewable Transmission Project - Seg. 7 P I N :6438
$3,322
2,000
1,322
$
$
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CO
cn
164 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Tehachapi Renewable Transmission Project - Seg. 8 (PIN:6439)
Transmission System Generation Interconnection
T R A N SM ISSIO N AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
cn
CD
166 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern California Edison Company CAPITAL W O RK PA PERS - 2015 GRC PR O JECT DETAIL W O RK SH EET: R ENEW ABLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 487 / RO Model ID: 665 1. W ITN ESS
Robert G. Woods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Element
C ET-ET-TP-RN -643900
3. PR O JECT TYPE
Select one
Select one Compliance: Safety, Environmental, Licenses
X
Customer Growth
Replacements in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, Computer Equip
Capitalized Software Various (See Below)
4. A SSET TYPE
Transmission Lines
5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
-18
2014
0
2015
0
2016
0
2017
0
Total
-18
7 (a). SYSTEM SH O R T TEXT
CENTER-O LIN D A & OLINDA-W AL N U T 220KV: REM
7 (b). D ETAILED DESCR IPTIO N
See workpaper for details
8.
See workpaper for details
SC O PE
9. JUSTIFICATION
See workpaper for details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
167 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 488 / RO Model ID: 666 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN-643901
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
-72
2014
0
2015
0
2016
0
2017
0
Total
-72
7 (a). SYSTEM SH O R T TEXT
C HINO -M ESA 220KV: REM OVE IDLE C HINO -M ES A
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
168 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 489 / RO Model ID: 667 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN -643902
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
422
2014
378
2015
0
2016
0
2017
0
Total
800
7 (a). SYSTEM SH O R T TEXT
C H IN O -M IR A LOM A #1 & #2: CON S TR U C T C HINO
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
169 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 490 / RO Model ID: 668 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN -643903
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
9/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
-173
2014
1,042
2015
0
2016
0
2017
0
Total
870
7 (a). SYSTEM SH O R T TEXT
C H IN O -M IR A LOM A #1 #2 #3 220KV: REM OVE
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
170 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 491 / RO Model ID: 669 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN -643904
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
-136
2014
0
2015
0
2016
0
2017
0
Total
-136
7 (a). SYSTEM SH O R T TEXT
C O N STR U C T 0.44 M ILES 220K V T/L A T W A T E R
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
171 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 492 / RO Model ID: 670 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN -643905
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
3/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
5,259
2014
3,109
2015
0
2016
0
2017
0
Total
8,368
6,000 5,000 4.000 3.000 2,000 1,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
M A1-T4 TO M A1-T2: C O N STR U C T 1.33 M ILES D
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
172 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 493 / RO Model ID: 671 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN -643906
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
8/1/2014
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
27
2014
234
2015
0
2016
0
2017
0
Total
261
7 (a). SYSTEM SH O R T TEXT
M ES A -W A LN U T & CENTER-O LIN DA 220KV: REM OV
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
173 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 494 / RO Model ID: 672 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN -643907
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
3/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
56,737
2014
67,482
2015
24,086
2016
0
2017
0
Total
148,305
80,000
40,000 20,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
M IR A-LO M A-VIN C ENT: C O N S TR U C T N E W 33 MILE
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
174 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 495 / RO Model ID: 673 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-ET-TP-RN -643908
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
5.213
2014
0
2015
0
2016
0
2017
0
Total
5.213
7 (a). SYSTEM SH O R T TEXT
VAR IO U S SU BTR ANS LINES: R ELO CATE SM ALL P
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
175 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1285 / RO Model ID: 818 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6439
W BS Elem ent
CIT-00-O P-N S-000157
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
4. A SSET TYPE
Telecom m unications
5. C LO SE DATE
3/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
150
2014
0
2015
0
2016
0
2017
0
Total
150
7 (a). SYSTEM SH O R T TEXT
TR TP Segm ent 8
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
176 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 729 / RO Model ID: 793 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6439
W BS Elem ent
C ET-R P-TP-R N-643900
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission - Land Rights
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
359
2014
0
2015
0
2016
0
2017
0
Total
359
7 (a). SYSTEM SH O R T TEXT
FER C -TR TP Seg 8
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA NA
T h e T e h a c h a p i R e n e w a b le T ra n s m is s io n P ro je c t (T R T P ) is divid e d in to 11 seg m e n ts. S e g m e n t 1-3 c olle ctive ly a re re fe rre d to as th e A n te lo p e T ra n s m is s io n
GRC Volum e Reference
P ro je c t M a n a q e r
P ro je c t E n q in e e r
R e s p o n s ib le E n q in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
tra n s m iss io n line. W e w ill also in stall a s so c ia te d e q u ip m e n t a t va rio u s lo ca tio n s in clu d in g a n e w c o m m u n ic a tio n s room a t th e M ira Lom a sub station .
S C E p la n s to in stall fib e r o p tic ca b le s as p art o f S e g m e n t 8. T h is is n e ce ssary to re p lace th e fib e r o p tic c a b le s to be re m o v e d w ith th e M e s a -C h in o 2 2 0 kV
re p la ce m e n t w ith n e w 2 2 0 kV d o u b le -circu it line, a n d th e re lo c a tio n o f sev era l 66 kV s u b tra n s m is sio n lines in th e C h in o area.
T h e s e c o n s o lid a tio n s in clu d e th e rem oval o f an e xis tin g 2 2 0 kV " id le d " tra n s m iss io n line s e g m e n t, th e rem ov al o f an e x is tin g 2 2 0 kV s in g le -c ircu it line a n d
m ostly lo cated in e xis tin g S C E tra n s m iss io n line rig h t-o f-w ay. In o rd e r to u tilize th e e xis tin g rig h t-o f-w ay, 2 2 0 kV tra n s m iss io n c o n s o lid a tio n s w ill be required.
S e g m e n t 8, th e re m a in in g p ortio n o f V in c e n t-M ira Lom a 5 0 0 kV tra n s m iss io n line b e tw e e n th e M e sa are a a n d M ira Lom a, w ill b e d o u b le -circu it 5 0 0 kV
flexibility. W it h o u t this w o rk , S C E w ill je o p a rd iz e th e reliab ility a n d s a fe ty o f its electric g rid , a n d c o m p ro m is e its ab ility to serv e its cu sto m e rs.
th e rap id ly g ro w in g p o rtio n s o f b oth w e s te rn R ive rsid e a n d S an B e rn a rd in o C o u n tie s. T h is p ro je ct w ill h e lp im p rov e system reliab ility a n d in cre ase o p e ra tio n a l
th e p ro je ct w o u ld in cre a s e S C E 's ab ility to d e liv er ad d itio n al re n e w a b le e n e rg y fro m th e T e h a c h a p i to its lo ad ce n te rs in th e g re a te r Los A n g e le s b asin a n d in
th e e n e rg y u se d p ro d u c e d by re n e w a b le g e n e ra tio n s o u rc e s , s u c h a s biom ass, g e o th e rm a l, sm a ll h yd ro , solar, a n d w in d by th e ye ar 2 0 1 7. S p ecific to SC E,
T h e T e h a c h a p i R e n e w a b le T ra n s m is s io n P ro je c t s u p p o rts th e in te n t o f S e n a te Bill 1078, w h ic h e s ta b lish e d a pro gram req u irin g IO U s to have 20 p e rce n t o f
s ch e d u le d o p e ra tin g d a te o f Ja n u a ry 2015.
b e tw e e n M e sa S u b s ta tio n a n d M ira Lom a S u b s ta tio n , lo ca ted in th e city o f O n tario . B oth S e g m e n t 7 a n d 8 w e r e a p p ro v e d by th e C A IS O in 2 0 0 7 a n d h ave a
th e citie s o f P a lm d a le a n d M o n te re y Park re sp ectively. S e g m e n t 8 co n s is ts o f th e fin a l p h a se o f th e n e w V in c e n t-M ira Lom a 5 0 0 kV T ra n s m is s io n L in e
T R T P S e g m e n t 7 co n s is ts o f t h e initial p h a se o f a n e w V in c e n t-M ira L o m a 5 0 0 kV T ra n s m is s io n L in e b e tw e e n V in c e n t a n d th e M e sa S u b s ta tio n s , lo ca ted in
Pro ject. S e g m e n ts 4 -11 a re re fe rre d to as T R T P . T h is s e c tio n o f th e te s tim o n y in clu d es S e g m e n ts 7 a n d 8.
$433,110 SCE-03, Vol 3
Total Project Cost (Nominal, in thousands)
2015 G R C W o rk p a p e r
Tehachapi Renewable Transmission Project - Seg. 8 PIN:6439
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
C E T -E T -T P -R N -6 4 3 9 0 0
C IT-0 0 -O P-N S -0 0 0 1 5 7
C E T -E T -T P -R N -6 4 3 9 0 8
$433,110
14,112
2 ,5 0 2
26 ,9 7 8
115
C E T -E T-T P- RN -6 4 39 1 1 C E T -E T -T P -R N -6 4 3 9 0 8
1,238
15,879 3 1 9 ,8 20
C E T -E T-T P- R N -6 4 39 0 7
C E T -E T-T P- RN -6 4 39 0 5 C E T -E T-T P- R N -6 4 39 0 6
5 ,5 5 0 4 ,5 6 4
C E T -E T-T P- R N -6 4 39 0 2 C E T -E T-T P- R N -6 4 39 0 4
C E T -E T-T P- RN -6 4 39 0 1 C E T -E T-T P- RN -6 4 39 0 3
1,071 7,703 30 ,2 5 4
C E T -E T-T P- R N -6 4 39 0 0
$269,010
13,754
2,352
22 ,1 2 3
$
$
$
97 7 115
$ $
7,511
$
171,515
4,7 0 0
$
$ $
4,6 8 0
$
1,089 7,775 29 ,4 5 3
(72)
(18)
$67,768
35 9
150
35 8
$
$
$
$
$
$72,246
234
27
4 ,8 5 5
3,109 67 ,4 8 2
5,2 5 9
$
378 1,042
56 ,7 3 7
(136)
(173)
422
$24,086
24 ,0 8 6
$
$0
O n th is s ch e d u le E n v iro n m e n ta l a n d R eal Pro p e rtie s lab or c o s ts a re in clu d e d a g a in st th e W B S e le m e n t w h e re th o se c o s t w ill u ltim a te ly settle. T h e s e c o s ts a re in clu d ed in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a
Footnotes:
Total
Real E sta te (L a n d A cq u isitio n )
I T /T e le c o m
D istrib ution
S u b station
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
($ in th o u s a n d s; n om in al)
2015 G R C W o rk p a p e r
Capital Forecast by WBS TRTP PIN: 6439
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
-v] 00
Capital Forecast by W BS
Total
R eal E state
IT /T e le c o m
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
$ $ $ $ $
3 ,7 0 8 2,5 7 5 1,830 2,2 2 3 1,765 2 ,0 7 9
l:R: T R T P 8-9: C h in o -G a n e s h a -P e y to n 6 6 k V C h in o -D ia m o n d Bar- C E T -E T -T P -R N -6 4 3 9 0 8
I:R: T R T P 8-9: C h in o -N a ro d No. 3 6 6 kV a n d C h in o -F ra n cis 66kV. C E T -E T -T P -R N -6 4 3 9 0 8
I:R: T R T P 8-9: C h in o -F ire h o u s e # 1 6 6 k V T / L a n d C hin o -Fireho u; C E T -E T -T P -R N -6 4 3 9 0 8
I:R :E: T R T P 8-9: A rc h ib a ld -C h in o -C o ro n a 6 6 k V T / L ID LE: C hin o - C E T -E T -T P -R N -6 4 3 9 0 8 C E T -E T -T P -R N -6 4 3 9 0 8
I:R :E: T R T P 8-9: C h in o -K im b all 66kV. PIN 6439.
I:R :E: T R T P 8-9: M e s a -H illg e n -In d u s try -M e s a -R e n o 6 6 kV , M esa- C E T -E T -T P -R N -6 4 3 9 0 8
I: T R T P 8-12: Lan d A cq u isitio n . Real Pro p ertie s. PIN 6439.
$433,110
14,112
2 ,5 0 2
$
$
R:E: T R T P 8-9: C h in o L in e R em o val - 1 2 kV D istrib ution . PIN 643 C E T -E T -T P -R N -6 4 3 9 0 8
I: T R T P 8-8: M ira Lom a-V in ce n t: C o n s tru c t n e w 33 m iles 5 0 0 k V C E T -E T -T P -R N -6 4 3 9 0 7
C O S -0 0 -R E-L R -6 4 39 0 0
$ $
341 4 5 ,6 1 6
C E T -E T -T P -R N -6 4 3 9 0 8
I:R :E: T R T P 8-9: C h in o L in e - 12kV D istrib u tion . PIN 6 4 3 9.
CIT-O O -O P-N S-000 15 7
$ $
119 2 ,8 6 4
C E T -E T -T P -R N -6 4 3 9 0 8
I:R :E: T R T P 8-9: Pe ck /B ro o k lin e - 12kV D istrib ution . PIN 6 4 3 9
$
$
4 ,2 2 0
I:R: T R T P 8-9: C h in o -S o q u el 6 6 kV a n d C h in o -P e y to n -S o q u e l 66k C E T -E T -T P -R N -6 4 3 9 0 8
$ $
76 2 6 8 ,6 7 6
R: T R T P 8-8: M ira L om a-V in ce n t: C o n s tru c t n e w 33 m iles 5 0 0 kV C E T -E T -T P -R N -6 4 3 9 0 7
I: T R T P 8-8: M ira Lom a-V in ce n t: C o n s tru c t n e w 33 m iles 5 0 0 k V C E T -E T -T P -R N -6 4 3 9 0 7
$
115
I: T R T P 8: C h in o H ills S ta te Park 5 0 0 kV re ro u te altern a tiv e 4C M . C E T -E T -T P -R N -6 4 3 9 1 1
778
$ $
3 0 ,2 5 4
I: T R T P 8-7: C h in o -M ira L o m a # 1 & # 2 : C o n s tru c t 7 .2 6 m iles C l C E T -E T -T P -R N -6 4 3 9 0 2
3 ,4 7 2
$ $
7,7 0 3
R: T R T P 8-5: C h in o -M e s a 220kV : R e m o v e 5 .6 2 m iles idle C hin o - C E T -E T -T P -R N -6 4 3 9 0 1
4 ,3 2 9
$ $
5 ,5 5 0
R: T R T P 8-6: C h in o -M ira Lom a # 1 , # 2 , # 3 220kV: R e m o v e 7.26 C E T -E T -T P -R N -6 4 3 9 0 3
I:R: T R T P 8-9: C H IN O -C IM G E N 6 6 K V & C H IN O -G A N E S H A -P L A S T C E T -E T -T P -R N -6 4 3 9 0 8
$
4 ,5 6 4
I: T R T P 8-4: C o n s tru c t 0 .4 4 m iles 2 2 0 k V T / L a t w a te r tank / Full* C E T -E T -T P -R N -6 4 3 9 0 4
I:R: T R T P 8-9: C h in o -S o q u el 6 6 kV a n d C h in o -P e y to n -S o q u e l 66k C E T -E T -T P -R N -6 4 3 9 0 8
$
1,071
R: T R T P 8-3: C e n te r-O lin d a & O lin d a - W a ln u t 220kV : R e m o v e 0.( C E T -E T -T P -R N -6 4 3 9 0 0
I:R :E: T R T P 8-9: M S A -H illg e n -In d u s try -M e s a -R e n o 6 6 kV , Mesa-P C E T -E T -T P -R N -6 4 3 9 0 8
$
1,238
R: T R T P 8-1: M e s a -W a ln u t & C e n te r-O lin d a 220kV: R e m o v e l . E C E T -E T -T P -R N -6 4 3 9 0 6
I: T R T P 8-2: M A 1 -T 4 to M A 1 -T 2: C o n s tru c t 1.33 m iles d ou b le-cii C E T -E T -T P -R N -6 4 3 9 0 5
$
$
5 ,4 5 2
15,879
T R T P S e g m e n t 8: L ice n sin g e ffo rts a s so c ia te d w ith th e construct C E T -E T -T P -R N -6 4 3 9 0 7
($ in th o u s a n d s; n om in al)
20 1 5 G R C W o rk p a p e r
TRTP P I N :6439
$269,010
13,754
2,3 5 2
19,302
157
2,6 9 6
113
2,085
1,216
1,854
1,497
1,758
3,0 4 2
3,401
3,6 3 6
492
3,141
148,939
75
115
29 ,4 5 3
7,775
4 ,6 8 0
4 ,7 0 0
1,089
7,511
977
3,1 9 9 $
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
27
2,253
1
$67,768
359
150
7,575
184
168
6
(6)
549
370
333
817
665
819
692
286
331
4 6 ,9 0 8
-
422
(7 2 )
(1 7 3 )
(1 3 6 )
(1 8 )
5,2 5 9
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
234
-
$72,246
16,739
-
-
50,7 4 3
-
378
-
1,042
-
-
3 ,1 0 9
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$24,086
2,000
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD
180 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Tehachapi Renewable Transmission Project - Seg. 3B (PIN:7183)
Transmission System Generation Interconnection
T R A N SM ISSIO N AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
182 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 576 / RO Model ID: 740 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7183
W BS Elem ent
C ET-ET-TP-RN -718302
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.918
2014
0
2015
0
2016
0
2017
0
Total
1.918
7 (a). SYSTEM SH O R T TEXT
H ighwind-W indhub: Instal deep gro nd rods
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
183 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 574 / RO Model ID: 738 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7183
W BS Elem ent
C ET-ET-TP-RN -718300
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
693
2014
0
2015
0
2016
0
2017
0
Total
693
7 (a). SYSTEM SH O R T TEXT
W indhub-Highw ind 230kV T/L: Con struct ne
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
184 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 577 / RO Model ID: 741 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7183
W BS Elem ent
C ET-ET-TP-RN -718303
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Substations
5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
84
2014
0
2015
0
2016
0
2017
0
Total
84
7 (a). SYSTEM SH O R T TEXT
D istribution Lines w ork fo r TR TP Seg 3B
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
185 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 575 / RO Model ID: 739 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7183
W BS Elem ent
C ET-ET-TP-RN-718301
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
-45
2014
0
2015
0
2016
0
2017
0
Total
-45
7 (a). SYSTEM SH O R T TEXT
Highwind: New substation
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
186 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1323 / RO Model ID: 838 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
7183
W BS Elem ent
CIT-00-O P-N S-000277
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
100
2014
0
2015
0
2016
0
2017
0
Total
100
7 (a). SYSTEM SH O R T TEXT
TR TP Seg. 3B - Highwind
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA NA
P ro je c t M a n a q e r
P ro je c t E n q in e e r
R e s p o n s ib le E n q in e e r
P ro je c t S p o n so r
W in d H u b 5 0 0 /2 2 0/6 6 kV a n d H ig h W in d 22 0 /6 6 kV.
e xis tin g a n d th e n e w p ro p o s e d W in d H u b S u b s ta tio n , a n d a n e w 9 .6 -m ile 2 2 0 kV s in g le -circu it tra n s m iss io n lin e b e tw e e n tw o n e w p ro p o s e d su b s ta tio n s ,
kV S u b s ta tio n lo ca ted in th e M o n o lith a re a , b oth lo ca ted in Kern C ou n ty . A ls o in clu d e d is a n e w 25 .6 -m ile 5 0 0 kV s in g le -c ircu it tra n s m iss io n line b e tw e e n th e
S e g m e n t 3 B in clu d e s th e c o n s tru c tio n o f tw o n e w s u b s ta tio n s — W in d H u b 5 0 0 /2 2 0 /6 6 kV S u b s ta tio n lo cated w e s t o f th e M o h a v e a re a a n d H ig h W in d 22 0 /6 6
C a lifo rn ia 's re n e w a b le e n e rg y goals.
w ill d e liv er e le c tricity fro m n e w w in d fa rm s in th e T e h a c h a p i are a to S C E c u s to m e rs a n d th e C aliforn ia tra n s m iss io n grid. T R T P is a vital p art o f m ee ting
te le co m m u n ic a tio n c o m p o n e n t o f o v e r $1 m illion d ollars. A ll s e g m e n ts in clu d e a s e rie s o f n e w a n d u p d a te d e lec tric tra n s m iss io n lin es a n d s u b s ta tio n s that
Pro ject. S e g m e n ts 4 -11 a re re fe rre d to as T R T P . T h is se c tio n o f th e te s tim o n y in clu d es S e g m e n ts 3B , 6 , a n d 9, as th e se particu lar s e g m e n ts have a
T h e T e h a c h a p i R e n e w a b le T ra n s m is s io n P ro je c t (T R T P ) is divid e d in to 11 seg m e n ts. S e g m e n t 1-3 c olle ctive ly a re re fe rre d to as th e A n te lo p e T ra n s m is s io n
SCE-03, Vol 3
GRC Volum e Reference
P ro je c t R e a s o n
$66,250
Total Project Cost (Nominal, in thousands)
2015 G R C W o rk p a p e r
Tehachapi Renewable Transmission Project - Seg. 3B PIN:7183
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
00
$2,073
C E T -E T -T P -R N -7 1 8 3 0 3
C O S -O O -R E-LR -718300
C IT-0 0 -O P-N S -0 0 0 2 7 7
C E T -E T -T P -R N -7 1 8 3 0 1
$ 4 0 ,8 17
C E T -E T -T P -R N -7 1 8 3 0 0
$66,250
$0
$9 2 2
$0
$9 ,0 5 8
$0
$ 1 3 ,3 80
C E T -E T -T P -R N -7 1 8 3 0 2
Total
$
$
$
$
$
$
$
$
$ $
$63,500
822
$
$
$
$
$
$
$
1,989
9,103
$
11,462 4 0 ,1 2 4
Prior
$2,750
100
(45)
84
693
1,918
2013
$0
$0
$0
p ro rata basis.
Real Pro p e rtie s la n d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re sh o w n h ere a s a s e p a ra te line item.
O n th is s ch e d u le E n v iro n m e n ta l a n d R eal Pro p e rtie s lab or c o s ts a re in clu d e d a g a in st th e W B S e le m e n t w h e re th o se c o s t w ill u ltim a te ly settle. T h e s e c o s ts a re in clu d ed in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a
Footnotes:
Total
Real E sta te (L a n d A cq u isitio n )
I T /T e le c o m
D istrib ution
S u b station
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
($ in th o u s a n d s; n om in al)
2015 G R C W o rk p a p e r
Capital Forecast by WBS TRTP PIN: 7183
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo oo
C a p ita l F o re c a st b y W B S
1: T R T P 3 B : L a n d A c q u is it io n . R e a l P r o p e r t ie s . P IN 7 1 8 3 .
C O S -0 0 -R E -L R -7 1 83 0 0
$
$
$
$
$
$
$ 6 3 ,5 0 0
-
822
1 ,9 9 5
544
809
-
-
8 ,2 9 4
-
1 ,9 8 9
3 8 ,1 2 9
1 0 ,9 1 7
P rio r
$
$
$
$
$
$
$
$
$
$
$
$
6
3
$ 2 ,7 5 0
-
100
567
-
-
(4 8 )
-
84
126
1 ,9 1 2
2013
$
$
$
$
$
$
$
$
$
$
$
$
$0
-
-
-
-
-
-
-
-
-
-
-
-
2014
$
$
$
$
$
$
$
$
$
$
$
$
$0
-
-
-
-
-
-
-
-
-
-
-
-
2015
$
$
$
$
$
$
$
$
$
$
$
$
$0
-
-
-
-
-
-
-
-
-
-
-
-
2016
Sum m aries o f each estim ate are included in th is w o rk p a p e r package.
$ 6 6 ,2 5 0
$0
$922
$ 2 ,5 6 3
1: T R T P 3 B : W i n d h u b t o H ig h w in d 2 3 0 k V T /L: C o n s t r u c t a n e w 9 C E T - E T - T P - R N - 7 1 8 3 0 0
C IT - 0 0 - O P - N S - 0 0 0 2 7 7
$550
C ET -E T -T P -R N -7 1 8 30 2
H ig h w in d SS IT
$812
1: T R T P 3 B : H ig h w in d SS W o r k : G r a d e a n d F e n c e a n e w 2 3 0 k V Si C E T - E T - T P - R N - 7 1 8 3 0 1
$0
$ $
$0
$
$
$
$
$ 8 ,2 4 6
C a t h o d ic P r o t e c t io n
1: T R T P 3 B : H ig h w in d SS W o r k : G r a d e a n d F e n c e a n e w 2 3 0 k V Si C E T - E T - T P - R N - 7 1 8 3 0 1
$ 2 ,0 7 3
1: T R T P 3 B : W i n d h u b t o H ig h w in d 2 3 0 k V T /L: C o n s t r u c t a n e w 9 C E T - E T - T P - R N - 7 1 8 3 0 3
$0
$ 1 2 ,8 2 9 $ 3 8 ,2 5 4
C ET -E T -T P -R N -7 1 8 30 2
T o ta l
1: T R T P 3 B : W i n d h u b t o H ig h w in d 2 3 0 k V T / L : C o n s t r u c t a n e w 9 C E T - E T - T P - R N - 7 1 8 3 0 0
C a t h o d ic P r o t e c t io n
W BS
(1) C ost e stim ates f o r each e le m e n t are de ve lo pe d by S ub ject M ate r E xperts in vario u s functional group at Southern C alifornia Edison.
Foo tn o te :
T o ta l
Real Estate
IT/T ele co m
E nvironm ental
Distribution
Substation
Tran s(< 2 0 0 kV )
Tran s(> 2 0 0 kV )
($ in th ousands; nom inal)
201 5 G R C W o rkpape r
P I N :7183
TRTP
$
$
$
$
$
$
$
$
$
$
$
$
$0
-
-
-
-
-
-
-
-
-
-
-
-
2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CO
00
$
R e a l P r o p e r tie s ( L C O R )
T r a n s m is s io n L in e M a jo r E q u ip m e n t (e.g. Insu lato r, G r o u n d W ire , D a m p e rs )
S u b s ta t io n M a jo r E q u ip m e n t (e.g. C irc u it B re a k e rs , D is c o n n e c t S w itch , R e a c t o r s , S tru c tu ra l S te e l)
C iv il M a t e ria ls a n d M is c H a rd w a re
4
5
6
E le c tr ic a l C o n s tru c tio n
C o n s tru c tio n M a n a g e m e n t S e r v ic e s
3
E n v iro n m e n ta l
R e a l P r o p e r tie s A c q u is it io n s
$ $
19,139
$
$
TO TA L
1 A llo c a te d (e.g., c h a r g e b a c k s , S C E la b o r lo a d e r s a n d D iv is io n O v e r h e a d )
T o ta l
66,250
$
$ $
6 ,2 0 0
6,200
922 $
$
$
$
A llo c a te d
$ $
922 $
$ $
3,191
3,191
$ $
1 T e le c o m m u n ic a t io n s
$
$
$
3,925
$
25,166
$
3,925
$
1 1 ,6 3 4
$
$
$
$
$
369 1 ,3 5 4
4 ,8 2 2
$
1 ,7 8 9
8,711
$
$
$
$
$
$
20
$ $
35
1 5 ,5 7 2
$
$ $
-
7,706
1
$ $
4 ,4 4 0
3 ,2 6 5
Total
2 E d is o n C a r r ie r S o lu tio n s T o ta l
IT /T e le c o m
T o ta l
1
R e a l P ro p e rtie s
T o ta l
1
E n v iro n m e n ta l
T o ta l
C iv il a n d S tru c tu ra l C o n s tru c tio n
1
2
C o n s tr u c tio n
T o ta l
$ $
$
$
T r a n s fo r m e r s
3
S te e l a n d H a r d w a r e (e.g. S tu b A n g le s o r A n c h o r B o lts )
2 C o n d u c t o r a n d C o n d u c t o r H a rd w a re
1
M a te ria ls
$
$
R e g u la to ry , L ic e n s in g , a n d L e g a l C o s t s
T o ta l
4
3
$
E n g in e e r in g a n d D e s ig n
$
P r o je c t M a n a g e m e n t (e.g. Pro j. M g m t, P ro j A d m in , Pro j. C o n tro ls , E stim a tin g )
1
2
P ro je c t S u p p o rt
($ in thousands; nominal)
2015 GRC W orkpaper
PIN: 7183
TR TP
Cap ital Forecast by W BS
1
63,500
5,945
5 ,9 4 5
822
-
822
3,178
3 ,1 7 8
3,349
3,349
23,793
1 1 ,0 1 7
8 ,6 7 9
4 ,0 9 7
19,109
1,325
369
1,788
20
35
1 5 ,5 7 2
7,306
-
4 ,1 9 2
3 ,1 1 2
Prior
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
31
29
2
617
32
725
-
-
-
576
2,750
256
256
100
-
100
14
14
576
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
400
-
-
$ $
152 248
1,374
2013
2014
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2015
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2016
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
O
CD
Tehachapi Renewable Transmission Project - Seg. 6 (PIN:5243)
Transmission System Generation Interconnection
T R A N SM ISSIO N AND INTERCONN ECTIO N PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
192 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 460 / RO Model ID: 647 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
5243
W BS Elem ent
C ET-ET-TP-RN -524300
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
11/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
9,664
2014
184
2015
0
2016
0
2017
0
Total
9,848
7 (a). SYSTEM SH O R T TEXT
N E W V IN C E N T -A N F 500KV: C O N STR U C T 5 MILES
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
193 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 461 / RO Model ID: 648 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
5243
W BS Elem ent
C ET-ET-TP-RN-524301
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
11/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
79,923
100,000
2014
24,935
80,000
2015
3,961
60,000
2016
9,531
40,000
2017
0
Total
118,350
20,000
i----- 1
0
2013
2014
2015
7 (a). SYSTEM SH O R T TEXT
N E W VIN C EN T-D U A R TE 500KV: C O N STR U C T N EW
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
194 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 462 / RO Model ID: 649 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
5243
W BS Elem ent
C ET-ET-TP-RN -524302
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
11/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
11,091
2014
306
2015
0
2016
0
2017
0
Total
11,397
7 (a). SYSTEM SH O R T TEXT
A N TELO P E -M E S A 220KV: REM OVE 27 MILES T/L
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
195 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 463 / RO Model ID: 650 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
5243
W BS Elem ent
C ET-ET-TP-RN -524303
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
11/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
4,627
10,000
2014
184
8,000
2015
9,368
6,000
2016
0
4,000
2017
0
Total
14,178
2,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
RIO H O N D O -VIN C E N T #2 220KV: REM OVE 5 MIL
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
196 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1266 / RO Model ID: 806 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
5243
W BS Elem ent
CIT-00-O P-N S-000063
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
11/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
550
2014
0
2015
0
2016
0
2017
0
Total
550
7 (a). SYSTEM SH O R T TEXT
TR TP Segm ent 6
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
197 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 722 / RO Model ID: 788 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
5243
W BS Elem ent
C ET-R P-TP-R N-524300
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission - Land Rights
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
FER C -TR TP Seg 6
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
SCE-03, Vol 3 NA NA NA NA T h e T e h a c h a p i R e n e w a b le T ra n s m is s io n P ro je c t (T R T P ) is divid e d in to 11 seg m e n ts. S e g m e n t 1-3 c olle ctive ly a re re fe rre d to as th e A n te lo p e T ra n s m is s io n
P ro je c t M a n a q e r
P ro je c t E n q in e e r
R e s p o n s ib le E n q in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
S e g m e n t 6 in clu d es a n e w 5 0 0 kV tra n s m iss io n line fro m R io H o n d o to V in c e n t S u b s ta tio n lo ca ted b e tw e e n Irw in d a le a n d Palm dale.
C a lifo rn ia 's re n e w a b le e n e rg y goals.
w ill d e liv er e le c tricity fro m n e w w in d fa rm s in th e T e h a c h a p i are a to S C E c u s to m e rs a n d th e C aliforn ia tra n s m iss io n grid. T R T P is a vital p art o f m ee ting
te le co m m u n ic a tio n c o m p o n e n t o f o v e r $1 m illion d ollars. A ll s e g m e n ts in clu d e a s e rie s o f n e w a n d u p d a te d e lec tric tra n s m iss io n lin es a n d s u b s ta tio n s that
Pro ject. S e g m e n ts 4 -11 a re re fe rre d to as T R T P . T h is se c tio n o f th e te s tim o n y in clu d es S e g m e n ts 3B , 6 , a n d 9, as th e se particu lar s e g m e n ts have a
$291,244
GRC Volum e Reference
Seg. 6
Total Project Cost (Nominal, in thousands)
2015 G R C W o rk p a p e r
Tehachapi Renewable Transmission Project PIN: 5243
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD 00
27 ,3 7 0
C E T -E T -T P -R N -5 2 4 3 0 2 C E T -E T -T P -R N -5 2 4 3 0 3
C E T -E T -T P -R N -5 2 4 3 0 0
$291,244
23,515
C E T -E T -T P -R N -5 2 4 3 0 1
CIT-0 0 -O P-N S -00 0 0 6 3
27 ,0 9 9 2 1 0 ,6 26
C E T -E T -T P -R N -5 2 4 3 0 0 17,251
$136,920
987
1,096
13,192
12,119
9 2 ,2 7 6
$
$
$
$
9,6 6 4
$105,855
1
550
4 ,6 2 7
11,091
7 9 ,9 2 3
$
$
$
$
184
$25,609
184
306
24,935
$13,329
9,368
3,961
$9,531
O n th is s ch e d u le E n v iro n m e n ta l a n d R eal Pro p e rtie s lab or c o s ts a re in clu d e d a g a in st th e W B S e le m e n t w h e re th o se c o s t w ill u ltim a te ly settle. T h e s e c o s ts a re in clu d ed in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a
Footnotes:
Total
Real E sta te (L a n d A cq u isitio n )
I T /T e le c o m
D istrib ution
S u b station
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
($ in th o u s a n d s; n om in al)
2015 G R C W o rk p a p e r
Capital Forecast by WBS TRTP PIN: 5243
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD CD
Capital Forecast by W BS
27,0 9 9 164,510
I: T R T P 6-4: N e w V in c e n t-A N F 500kV : C o n s tru c t 5 m iles single-c C E T -E T -T P -R N -5 2 4 3 0 0
I: T R T P 6-2: N e w V in c e n t-D u a rte 500kV : C o n s tru c t n e w 2 7 m ile C E T -E T -T P -R N -5 2 4 3 0 1
I: T R T P 6-6: L a n d A cq u isitio n . R eal Pro p ertie s. PIN 5243.
C O S -0 0 -R E-L R -5 2 43 0 0
C IT-0 0 -O P-N S -00 0 0 6 3
$ $
17,251 74 ,2 4 1
$136,920
987
1,096
18,035
$
$
13,192
12,119
$
$
$105,855
1 $
550
5,2 2 4
7 4 ,6 9 9
9,664
4,6 2 7
11,091
$25,609
9 ,3 6 6
15,569
184
184
306
$
$
$
$
$
3,961
9,3 6 8
$13,329
S u m m a rie s o f e a ch e stim a te a re in clu d ed in th is w o rk p a p e r package.
$291,244
1,646
4 6 ,1 1 7
27,3 7 0
I: T R T P 6-2: N e w V in c e n t-D u a rte 500kV : C o n s tru c t n e w 2 7 m ile C E T -E T -T P -R N -5 2 4 3 0 1
23,515
R: T R T P 6-3: Rio H o n d o -V in c e n t # 2 220kV: R e m o v e 5 m iles T / L C E T -E T -T P -R N -5 2 4 3 0 3
W BS
R: T R T P 6-1: A n te lo p e -M e s a 220kV: R e m o v e 27 m iles T / L betwe C E T -E T -T P -R N -5 2 4 3 0 2
(1) C o s t e s tim a te s fo r e a ch e le m e n t a re d e v e lo p e d by S u b je c t M a te r E xp erts in va rio u s fu n c tio n a l g ro u p a t S o u th e rn C a lifo rn ia E dison.
R eal E state
IT /T e le c o m
E n v iro n m en ta l
D istrib ution
S u b station
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
($ in th o u s a n d s; n om in al)
20 1 5 G R C W o rk p a p e r
TRTP P I N :5243
$
$
$9,531
9,531
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> o o
201 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Tehachapi Renewable Transmission Project - Seg. 9 (PIN: 6440)
Transmission System Generation Interconnection
TRANSM ISSION AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> o K>
203 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 501 / RO Model ID: 677 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644006
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
14,314
2014
5,704
2015
0
2016
0
2017
0
Total
20,018
7 (a). SYSTEM SH O R T TEXT
Vincent: U pgrade 500kV & 220kV positions
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
204 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 510 / RO Model ID: 685 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644016
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
745
2014
0
2015
0
2016
0
2017
0
Total
745
7 (a). SYSTEM SH O R T TEXT
M esa:Equip Position fo r 1-230KV Line
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
205 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 509 / RO Model ID: 684 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644015
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Distribution Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
Bradbury: Replace 66kV CB
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
206 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R E LIA BILITY PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R eliability Projects D atabase ID: 374 / RO Model ID: 575 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RELIAB
Pin #
6440
W BS Elem ent
CET-ET-TP-RL-644000
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
VAR IO U S: SU BSTATIO N UPGR ADES A T A N TELO PE
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
207 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R E LIA BILITY PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R eliability Projects D atabase ID: 375 / RO Model ID: 576 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RELIAB
Pin #
6440
W BS Elem ent
C ET-ET-TP-RL-644002
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
V incent Substation: R eplace existin
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
208 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 497 / RO Model ID: 674 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644000
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
51
2014
0
2015
0
2016
0
2017
0
Total
51
7 (a). SYSTEM SH O R T TEXT
GO ULD: AD D CB'S ON TR AN SFO R M ER S TO COM PL
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
209 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 499 / RO Model ID: 675 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644003
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
C hino: Equip CBs, protection, cont rol
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
210 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 500 / RO Model ID: 676 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644005
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Lines
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
V IN C E N T SUB: REM OVE M ID W A Y -V IN C E N T #3 SE
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
211 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 502 / RO Model ID: 678 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644007
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1,695
2014
759
2015
0
2016
0
2017
0
Total
2,454
7 (a). SYSTEM SH O R T TEXT
M ira Lom a: Equip CBs, protection, contro
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
212 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 503 / RO Model ID: 679 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644008
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
16
2014
0
2015
0
2016
0
2017
0
Total
16
7 (a). SYSTEM SH O R T TEXT
V IN C ENT: EXTEND 500K V S W ITC H R A C K AD DING
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
213 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 504 / RO Model ID: 680 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644009
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7. C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
793
2014
0
2015
0
2016
0
2017
0
Total
793
7 (a). SYSTEM SH O R T TEXT
A ntelope: U pgrade 500kV position
7 (b). D ETAILED D ESCRIPTION
See w orkpaper fo r details
8. SC OPE
See w orkpaper fo r details
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
214 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 505 / RO Model ID: 681 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644010
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
1.004
2014
0
2015
0
2016
0
2017
0
Total
1.004
7 (a). SYSTEM SH O R T TEXT
W indhub: Upgrade 500kV position
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
215 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 506 / RO Model ID: 682 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644012
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
-26
2014
0
2015
0
2016
0
2017
0
Total
-26
7 (a). SYSTEM SH O R T TEXT
W indhub: C onstruct 500 kV Swyd & A A Bank
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
216 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 508 / RO Model ID: 683 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644014
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
20
2014
0
2015
0
2016
0
2017
0
Total
20
7 (a). SYSTEM SH O R T TEXT
W H IR LW IN D : C O N STR U C T N E W 500/220K V S U B S T
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
217 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 511 / RO Model ID: 686 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644017
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
Blanket
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
2,041
2014
74
2015
0
2016
0
2017
0
Total
2,114
7 (a). SYSTEM SH O R T TEXT
W hirlw ind: C onstruct new 500kV & 200kV s
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
218 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 512 / RO Model ID: 687 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644022
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
C hino: Replace 220-kv relays
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
219 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 513 / RO Model ID: 688 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-ET-TP-RN -644028
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
5/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
751
2014
0
2015
0
2016
0
2017
0
Total
751
7 (a). SYSTEM SH O R T TEXT
S ylm ar Sub: 220kV Replace and upgra
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
220 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R E LIA BILITY PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R eliability Projects D atabase ID: 1286 / RO Model ID: 819 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6440
W BS Elem ent
CIT-00-O P-N S-000158
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind U pgrades Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Load Growth X
Reliability Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
60
2014
0
2015
0
2016
0
2017
0
Total
60
7 (a). SYSTEM SH O R T TEXT
TR TP Segm ent 9
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
221 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 730 / RO Model ID: 794 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6440
W BS Elem ent
C ET-R P-TP-R N-644000
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission - Land Rights
4. A SSET TYPE 5. C LO SE DATE
12/1/2013
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013 2014 2015 2016 2017 Total
7 (a). SYSTEM SH O R T TEXT
FER C -TR TP Seg 9
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
222 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
223 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
. .'H f n t t io in r M c o c o o in N c o- o- •if-f ii• £>omrvinmrvrv(NOCTiT • ■ - • h id in in in in id' ctT ctToo'
CO Cl in in
lommcomoiHCTi^-CTiCTiC
ctTrn
ID ID O o iH o
n rs lO (N fn in iD N N C 0 0 1 0 (N fn ^ ’ N(NCO ciclOOOOOOOOOOOOOOOO O O O O O O O O O O O i H i H i H i H i H ( N ( N
I£ ) I£ ) 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0
11 CJ CJ
hhhhhhlTilTilTilTilTilTilTilTihlTilTilT; hhhhhhlTilTilTilTilTilTilTilTihlTilTilT;
u u u u u u u u u u u u u u u u u u
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
224 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
* '1 I
p . . §. s q | § i r s a 5 r « i r l l i j | ! g § l . sag. ? a s p p § ■■| | I
_ P I
§ ? P |P ^ 3 a ^ r I H ||p I
sissi ? * s p p i §
|
|
i1
................ i mmn mn m ........... fcfcfc fc fcfcfcfcfcfcfcfcfcfcfcfcfcfcfcfcfcfcfcfcfc fcfcfc fcfcfcfcfcfcfcfcfc l
B B S
b
S b b b b b b b b b b b b b b b b b b b b b
HI , Iltt! !ll I illlh
b b b
b b b b b
b b
b b
iiiffllilKifi! ill llsllllll I HIlliliSHIH ill liiHIIII I
iniw iipy m iiiiiL III | 11111S11111!6!11111111 III llllllllj i |
cri m
u
cri
^ m m m c r i ^ g c r i ^ a i c r i ^ o o ^ m m m c r i c r i c r i c r i m
mcncn
cnmmcricricricrimu
1,1
III!
:
I
1 1
i
1
. .
^
I i & I
cri
s I
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
E n g in ee rin g an d D esig n
R eg u lato ry, L ice n sin g , an d L e g a l C o s t s
R e a l P ro p e rtie s ( L C O R )
3
4
T ra n s fo rm e rs
T ra n s m is s io n L in e M a jo r E q u ip m e n t (e.g. Insulator, G ro u n d W ire , D am pe rs)
S u b station M a jo r E q u ip m e n t (e.g. C irc u it B re ake rs, D is c o n n e c t S w itch , R e a c to rs , S tructural S te e l)
3
4
5
$
C o n s tru c tio n M a n a g e m e n t S e rv ic e s
E nv iron m en tal
R e a l P ro p e rtie s A cq u is itio n s $
-
$
TOTAL
$ $
A llo c a te d (e.g., c h a rg e b a c k s , S C E la b o r lo a d e rs an d D ivision O v e rh e a d )
$ $
$
37,875 298,645
-
37 ,8 7 5
$ $ $
3,728
3,728 $
$
$
$
$
4,014
4,014
$ $
9,392
$ $
4,433
110,819
9,392
$
$
3 5 ,4 6 2
7 0 ,9 2 4
101,791 101,791
-
-
-
E d is o n C a rrie r S o lu tio n s
$
To tal
1
$ $
$
31,026
$ $ $ $ $ $ $
$
931
-
$
10,859
$ $
931 18,305
Total
T e le c o m m u n ic a tio n s
A llo c ate d
T o ta l
2
1
IT /T e le co m
To tal
1
R eal P ro p e rties
To tal
1
E n v iro n m e n ta l
To tal $
E le c tric a l C on stru ctio n
3
$
C ivil an d S tructural C on stru ctio n
1 $
$ $ $ $ $ $ $
$
$
$
$
$
2
C o n s tru c tio n
To tal
C ivil M a te ria ls an d M is c H ard w are
C o n d u c to r and C o n d u c to r H ard w are
6
S te e l an d H a rd w a re (e.g. Stub A n g le s o r A n c h o r B olts)
1
2
M ate ria ls
To tal
P ro je c t M a n a g e m e n t (e.g. Proj. M gm t, Proj A d m in , Proj. C on trols, E stim atin g )
1
2
P ro je c t S u p p o rt
($ in th o u s a n d s; n om in al)
20 1 5 G R C W o rk p a p e r
P I N :6440
TRTP
Capital Forecast by WBS
871
270,636
33,231
33,231
3,668
-
3,668
4,014
4,014
7,414
7,414
92,061
3,682
29,459
58,919
101,221 101,221
-
-
-
-
-
29,027
871
10,159
17,126
Prior
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$ $ $ $ $ $ $
$
$
$
$
$
43
43
506
853
60
60
21,473
3,610
3,610
-
0
0
1,180
1,180
14,707
588
4 ,7 0 6
9 ,4 1 3
470 470
-
-
-
-
-
1,446
2013
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$ $ $ $ $ $ $
$
$
$
$
$
17
100 100
-
-
-
-
-
553
17
194
326
6,536
1,035
1,035
-
-
-
798
798
4,050
162
1,296
2,5 9 2
2014
$
$
$
$
$
$
$
$
$
$
$
$
$ $ $ $ $ $ $
$
$
2015
$
$ $
$ $
$
$ $
$ $
$ $
$
$
$ $ $ $ $ $ $
$
$
$
$
2016
$
$ $
$ $
$
$ $
$ $
$ $
$
$
$ $ $ $ $ $ $
$
$
$
$
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> K> cn
K> K> CD
Colorado River Corridor SPS (PIN:7061)
Transmission System Generation Interconnection
TRANSMISSION AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
227 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 566 / RO Model ID: 730 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7061
W BS Elem ent
C ET-ET-TP-RN -706100
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
0
2014
100
2015
731
2016
0
2017
0
Total
831
7 (a). SYSTEM SH O R T TEXT
Devers: Relays fo r D-RB 500kV N-2 SPS
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
228 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 567 / RO Model ID: 731 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7061
W BS Elem ent
C ET-ET-TP-RN-706101
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $ 0
2013 2014
0
2015
831
2016
0
2017
0
Total
831
7 (a). SYSTEM SH O R T TEXT
Red Bluff:R elays fo r D-RB 500kV N-2 SPS
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
229 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 568 / RO Model ID: 732 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7061
W BS Elem ent
C ET-ET-TP-RN -706102
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission Substations
5. C LO SE DATE
6/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $ 0
2013 2014
0
2015
831
2016
0
2017
0
Total
831
7 (a). SYSTEM SH O R T TEXT
C olo R iver:R elays fo r D-RB 500kV N-2 SPS
7 (b). D ETAILED DESCR IPTIO N See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
230 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1326 / RO Model ID: 841 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
7061
W BS Elem ent
CIT-00-O P-N S-000286
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
4. A SSET TYPE
Telecom m unications
5. C LO SE DATE
6/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
100
2014
0
2015
0
2016
0
2017
0
Total
100
7 (a). SYSTEM SH O R T TEXT
SPS related to D C R
7 (b). D ETAILED DESCR IPTIO N See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NA NA NA
A n e w 5 0 0 /2 2 0 kV c o lle cto r s u b s ta tio n (R e d B lu ff) is n e e d e d to in te rc o n n e c t n e w re n e w a b le g e n e ra tio n p ro je cts in th e D e s e rt C e n te r A rea . T h is p ro je ct w ill
P ro je c t M a n a g e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R e a s o n
netw o rk.
e q u ip m e n t a t D ev ers, R e d B lu ff a n d C o lo ra d o R ive r s u b s ta tio n s n e c e ss a ry to p ro v id e re d u n d a n t a n d d iv e rs e c ircu itry fo r p ro te ctio n o f th e 5 0 0 k V T / L
T h e te le co m m u n ic a tio n s s c o p e o f w o rk to s u p p o rt th e n e w s u b s ta tio n a n d tra n s m iss io n lines in clu d e s th e in stallatio n o f va rio u s te le co m m u n ic a tio n s
( P ro je c t # 0 4 8 4 7 ) w ill b e lo o p e d in to R e d B lu ff S u b s ta tio n to fo rm th e C o lo ra d o R iv e r-R e d B lu ff No. 2 a n d D e v e rs -R e d B lu ff No. 2 5 0 0 k V T / L 's .
in to ") R e d B lu ff S u b s ta tio n to fo rm th e C o lo ra d o R iv e r-R e d B lu ff No. 1 a n d D e v e rs -R e d B lu ff N o. 1 5 0 0 k V T / L 's . T h e D e v e rs -C o lo ra d o R ive r No. 2 5 0 0 kV line
tra n s fo rm e r b an ks, in itially e q u ip p e d w it h o n e tra n s fo rm e r b an k. T h e e x is tin g D e v e rs -P a lo V e rd e 5 0 0 kV lin e w ill b e c o n n e c te d in to a n d o u t o f ("lo o p e d
T h e p ro je ct c o n s is ts o f c o n s tru c tin g a n e w 5 0 0 /2 2 0 kV s u b s ta tio n fiv e m iles e a st o f D e s e rt C e n te r, C aliforn ia th a t is u ltim a te ly d e s ig n e d fo r fo u r 50 0 /2 2 0
p ro v id e th e tra n s m iss io n in fra s tru c tu re n e e d e d to in te rc o n n e c t a d d itio n a l c a p a city a lo n g th e D e v e rs -C o lo ra d o R iv e r tra n s m iss io n corrid or.
SCE-03, Vol 3 NA
GRC Volum e Reference
$2,776
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:7061
Colorado River Corridor SPS
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CO
K>
$ 2 ,7 7 6 .0
$283.0
$831.0
CET-ET-TP-RN-7076102
C1T-00-OP-NS-000286
$831.0 $831.0
CET-ET-TP-RN-7076100 CET-ET-TP-RN-7076101
T otal
$ 1 8 3 .0
$183.0
Prior
$ 100.0
$ 100.0
2013
$ 100.0
$ 100.0
2014
$ 2 ,3 9 3 .0
$831.0
$731.0 $831.0
2015
2016
2017
elements on a prorata basis. Real Properties land acquisition costs are recorded against separate WBS item and are therefore shown here as a separate line item.
On this schedule Environmental and Real Properties labor costs are included against the WBS element where those cost will ultimately settle. These costs are included in the Transmission and Substation
F o o tn o tes:
T otal
Real Estate (Land Acquisition)
rr/Telecom
Distribution
Substation
Trans(200kV)
($ in thousands; nominal)
2015 GRC Workpaper
C apital F o re c a st by WBS C R SPS PIN: 7 0 6 1 , OD: 6 /2 0 1 5
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> CO N>
Land Acquisition Real Properties
Telecommunications
Monitoring & mitigation costs
LCOR
CIT-00-OP-NS-000286
EHS
Devers Install Relays for D-RB 500kV N-2 SPS CET-ET-TP-RN-7076100 Red Bluff Substation Install SPS Relay CET-ET-TP-RN-7076101 Colorado River Substation Install SPS Relays CET-ET-TP-RN-7076102
$ 2 ,7 7 6 .0
$283.0
$831.0 $831.0 $831.0
T o ta l
$ 1 8 3 .0
5.0
$ 1 0 0 .0
$100.0
$ 1 0 0 .0
$ 100.0
$ 2 ,3 9 3 .0
$731.0 $831.0 $831.0
(1) Cost estimates for each element are developed by Subject Mater Experts in various functional group at Southern California Edison. Summaries of each estimate are included in this workpaper package.
F o o tn o te :
T o ta l
Real Estate
IT/Telecom
Environmental
Distribution
Substation
Trans(200kV)
($ in thousands; nominal)
2015 GRC Workpaper
PIN : 7 0 6 1 , O D : 6 / 2 0 1 5
C R SPS
C a p ita l F o r e c a s t b y W B S
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CO CO
N>
K> oo
Jasper 220 kV Substation (PIN:6902)
Transmission System Generation Interconnection
T R A N S M IS S IO N AND IN TER C O N N EC TIO N PLA N N IN G
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
235 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 79 / RO M odel ID: 336 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
C USTO M ER R EQ/RELO
Program
W D A T /T O C U S T FUNDED
Pin #
6902
W BS Elem ent
C ET-ET-C R -W C -690200
3. PR O JECT TYPE
Select one
Select one C om pliance: S afety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
Upgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
0
2014
47
2015
119
2016
9
2017
0
Total
174
7 (a). SYSTEM SH O R T TEXT
Jasper(IF)Term .G raniteM tn-Jaspr220G enTie
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
236 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 540 / RO Model ID: 714 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6902
W BS Elem ent
C ET-ET-TP-RN -690203
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
0
2014
700
2015
11,913
2016
706
2017
0
Total
13,320
14,000 12,000 10,000 8,000 6,000 4,000 2,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
Lugo-Pisgah220(N U)LooptoJasper(EarlyInt)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
237 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 539 / RO Model ID: 713 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6902
W BS Elem ent
C ET-ET-TP-RN -690202
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
0
2014
37
2015
94
2016
7
2017
0
Total
138
7 (a). SYSTEM SH O R T TEXT
Pisgah(N U)U pgrade line protection relays
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
238 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 538 / RO Model ID: 712 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6902
W BS Elem ent
C ET-ET-TP-RN-690201
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
0
2014
70
2015
178
2016
13
2017
0
Total
261
7 (a). SYSTEM SH O R T TEXT
Lugo(N U):Upgrade line protection relays
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
239 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 537 / RO Model ID: 711 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
6902
W BS Elem ent
C ET-ET-TP-RN -690200
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
1,553
25,000
2014
3,788
20,000
2015
22,933
15,000
2016
123
10,000
2017
0
Total
28,396
5,000 0
2013
7 (a). SYSTEM SH O R T TEXT
Jasper (NU): Install 220kV switchyard
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2014
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
240 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1626 / RO Model ID: 787 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
(N O T S PEC IFIED)
Program
(N O T S PEC IFIED)
Pin #
6902
W BS Elem ent
C ET-R P-TP-R L-690200
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
4. A SSET TYPE
Transm ission - Fee Land
5. C LO SE DATE
6/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
0
3,000
2014
2,383
2,500
2015
272
2016
0
2017
0
Total
2,655
2,000 1,500 1,000 500
i----- 1
0
2013
7 (a). SYSTEM SH O R T TEXT
(Not Specified)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2014
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
241 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 1338 / RO Model ID: 849 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
6902
W BS Elem ent
CIT-00-O P-N S-000333
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
0
2014
1,493
2015
7,207
2016
492
2017
0
Total
9,191
7 (a). SYSTEM SH O R T TEXT
Res A m erica - J a spe r Substation
7 (b). D ETAILED DESCR IPTIO N See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Distribution circuit costs for System Planning Capital Projects are captured in CET-ET-LG-CI-CAT and CET-PD-CR-RL-RUR. The total costs in CET-ETLG-CI-CAT are included in workpaper entitled "DSP CIRCUIT WORK" and the total costs in CET-PD-CR-RL-RUR are included in workpaper entitled "OTHER RELATED DISTRIBUTION WORK".
Distribution Circuit Costs WBS CET-ET-LG-CI-CAT and CET-PD-CR-RL-RUR
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> K>
A n e w 2 2 0 kV c o lle cto r s u b s ta tio n (Ja sp e r) is n e e d e d to in te rc o n n e c t a n d in te g ra te n e w re n e w a b le g e n e ra tio n in L u c e rn e V alley . T h is p ro je ct w ill p ro v id e th e
P ro je c t R ea so n
A n e w C o o l W a t e r 2 2 0 kV lin e w ill b e te rm in a te d in to Ja s p e r S ub station .
Ja s p e r, C o tto n w o o d , L u g o , Pis g a h , a n d G a le S u b s ta tio n s a s w e ll a s a t C o o l W a t e r G e n e ra tin g S tation .
Ja s p e r S u b station . T h is in clu d e s n e w o v e rh e a d a n d u n d e rg ro u n d fib e r o p tic c a b le s as w e ll a s n e w fib e r o p tic m ultip lex e q u ip m e n t a n d c h a n n e l e q u ip m e n t at
T h e te le co m m u n ic a tio n s s c o p e in clu d e s n e w d ive rsely ro u te d fib e r o p tic te le co m m u n ic a tio n syste m fo r c o m m u n ic a tio n s b e tw e e n e x is tin g S C E fa c ilitie s an d
P ro te c tiv e re lays a n d e q u ip m e n t a re re q u ire d to s u p p o rt a s p e c ia l p ro te ctio n syste m (SPS).
Ja s p e r S u b s ta tio n to fo rm th e J a s p e r-L u g o a n d Ja s p e r-P is g a h 2 2 0 kV lines.
T h e p ro je ct c o n s is ts o f c o n s tru c tin g a n e w 2 2 0 kV s u b s ta tio n . T h e L u g o -P is g a h No. 1 2 2 0 kV line w ill b e c o n n e c te d in to a n d o u t o f (" lo o p e d in to ") th e n ew
tra n s m iss io n in fra s tru c tu re n e e d e d to in te rc o n n e c t w in d g e n e ra tio n a lo n g th e L u g o -P is g a h 2 2 0 kV tra n s m iss io n corridor.
Brian Lau
B la n ca S olare s
P ro je c t E n g in e e r
J o r g e C h a co n
K e n n e th S p ear
P ro je c t M a n a q e r
P ro je c t S p o n so r
SCE-03, Vol 3
GRC Volum e Reference
R e s p o n s ib le E n g in e e r
$57,005
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:6902
Jasper 220 kV Substation
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CO
K>
C a p ita l F o re cast by W B S
CET- RP-TP- RL-690200
CIT-00-OP-NS-000333
CET- PD-CR-RL-RU R
CET-ET-TP-RN-690202 CET-ET-TP-RN-690201 CET-ET-TP-RN-690200
CET-ET-CR-WC-690200 CET-ET-TP-RN-690203
$0 $0
£0 $ 1,1 78
£2.655
$0
$0
$0 $0 $1,178
Prior
$5 7 ,0 0 5
$9,192
$1,691
$138 $261 $29,575
$174 $13,320
To tal
$0 $0
$1,553
£0
$0
$0
$0 $0 $1,553
2013
$47 $700
$ 9,352
£2.383
$1,493
$834
$37 $70 $3,788
2014
$43,571
£272
$7,207
$856
$94 $178 $22,933
$119 $11,913
2015
£0
$492
$0
$7 $13 $123
$9 $706
$ 1,350
2016
2017
On this schedule Environmental and Real Properties labor costs are included against the WBS element where those cost will settle. These costs are included in the Transmission and Substation elements on a prorate basis. Real Properties land acquisition costs are recorded against separate WBS item and are therefore shown here as a separate line item.
F ootnotes:
To ta l
Real Estate (Land Acquisition)
IT/Telecom
Distribution
Substation
Trans(>200kV)
($ in thousands; nominal)
T h is ta ble s h o w s th e c o st fo re c a s t for e a c h W B S . E a c h W B S represents the total c o s t fo re c a s t for project e le m e n ts as s ig n e d to this s p e cific W B S in th e project.
2015 GRC Workpaper
P IN :6 9 0 2
J a s p e r 2 2 0 kV S u b statio n
$0
£0
$0
$0
$0 $0 $0
$0 $0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> 4^ 4^
IT /T e le c o m
E n v iro n m e n ta l
D istrib u tion
S u b station
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
$ 2 0 ,7 86 $5,791
C E T -E T -T P -R N -6 9 0 2 0 0 C E T -E T -T P -R N -6 9 0 2 0 0
Ja s p e r S u b station
L ic e n s in g (le ss C E H & S Lie)
$1,115 $1 ,1 4 2 $761
$1 7 0
C IT -0 0 -O P -N S -0 0 0 3 3 3 C IT -0 0 -O P -N S -0 0 0 3 3 3 C IT -0 0 -O P -N S -0 0 0 3 3 3 C IT -0 0 -O P -N S -0 0 0 3 3 3 C IT -0 0 -O P -N S -0 0 0 3 3 3
LCO R C E T -R P -T P -R L - 6 9 0 2 0 0
T G ra n ite M o u n ta in S u b s ta tio n (IF)
A p p le V a lle y - Ja s p e r
C o tto n w o o d - Ja s p e r
T Ja s p e r S u b s ta tio n
T P isg ah S u b s ta tio n
R eal Pro p e rtie s
L a n d A c g u isitio n
$0
$0
$0
$0
$0
$0
$0
$0
$4 1 6 $2,015
C IT -0 0 -O P -N S -0 0 0 3 3 3
T A p p le V a lle y S u b s ta tio n
$0
$0
$0
$0
$0
$0
$1,178
$443
C IT -0 0 -O P -N S -0 0 0 3 3 3
G a le - Pisg ah
$0
$0
$0
$0
$0
$2,655
$4 6 2 $2 ,1 2 9
C IT -0 0 -O P -N S -0 0 0 3 3 3
T C o tto n w o o d S u b station
$0 $0
$1,1 7 8
Prior
$57,005
$7 0 9
C IT -0 0 -O P -N S -0 0 0 3 3 3
$7 2 4
EHS
E n v iro n m e n ta l - L ice n sin g
T L u g o S u b station
$3,193
EHS
E n v iro n m e n ta l - C o n s tru c tio n
$1,691
$2 3 7
L u g o S u b station
C E T -P D -C R -R L - R U R
$125
C E T -E T -T P -R N -6 9 0 2 0 1
P is g a h S u b s ta tio n
D istrib u tion
$2 1 8
C E T -E T -T P -R N -6 9 0 2 0 2
Ja s p e r S u b s ta tio n (IF )
$0
C E T -E T -T P -R N -6 9 0 2 0 0
C E T -E T -T P -R N -6 9 0 2 0 4
$1 5 8
C E T -E T -C R -W C -6 9 0 2 0 0
S u b -T ra n sm is sio n
$ 1 2 ,0 68
C E T -E T -T P -R N -6 9 0 2 0 3
Total
L u g o -P is g a h L o o p -In
W BS
G ra n ite M tn G e n T ie (IF)
($ in th o u s a n d s; nom in al)
$0
$0
$0
$0
$0
$0
$1,553
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,415
$139
2013
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h p ro je ct e lem e n t. E a c h p ro je ct e le m e n t r e p re s e n ts a d is c re te e le m e n t o f w o rk n e c e s s a r y to c o m p le te th e project.
20 1 5 G R C W o rk p a p e r
PIN 69 0 2
Jasper 220 kV Substation
Capital Forecast by Project Elem ent
$9,352
$2,383
$101
$1 2 4
$1 8 6
$181
$3 2 7
$68
$72
$345
$75
$115
$0
$0
$8 3 4
$1,9 1 7
$1,7 3 8
$70
$37
$64
$0
$46
$6 6 9
2014
$43,571
$272
$69
$597
$895
$874
$1 ,5 8 0
$326
$347
$1 ,6 7 0
$362
$556
$724
$ 3 ,0 2 9
$856
$1,281
$1 8 ,9 09
$155
$82
$142
$0
$103
$1 0 ,7 42
2015
$1,350
$0
$0
$41
$61
$60
$1 0 8
$22
$24
$1 1 4
$25
$38
$0
$1 6 4
$0
$0
$0
$12
$6
$11
$0
$8
$6 5 6
2016
2017
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> cn
$655
$0
$0
$0
$709
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$109
$512
Overhead Type
0.93
0 .9 4
10 .55% In v e n to rie d M ate rial C o s t
0 .7 7 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
12 .00% G ro ss D irect E x p e n d itu re s
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis
0.91 0 .8 9
I T OH
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$34
$0
$0
$115
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$556
$38
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CIT-00-OP-NS-000333
T Lugo S u b s ta tio n
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
G)
N> 4^
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods 6 0 0 17 24
L abor L abor N on -L ab or N on -L ab or L abor
Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x IT OH
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
$617
0
O v e rh e a d
L abor
8
N on -L ab or
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
O v e rh e a d
T o o l E xp en se
1
N on -L ab or
P ro c u re m e n t S e rv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
357
N on -L ab or
O th e r
O th e r
0
0
L abor
C o n tra c t E n g in ee rin g
C o n tra cto r
0
0
L abor
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
0
0
L abor
C o n tra c t C o n s tru c tio n
C o n tra cto r
N on -L ab or
15
L abor
S C E E n g in ee rin g
Labo r
N on -L ab or
0
L abor
S C E P ro je c t M a n a g e m e n t
Labo r
L abor
17
L abor
S C E C ra ft
Labo r
N o n -L a b o r O H
172
N on -L ab or
C o m m u n ic a tio n S yste m s a n d E q u ip m e n t
M aterial
S u p p ly E xp en se
0
N on -L ab or
O th e r M aterial
M aterial
S C E L abo r O H
0
N on -L ab or
S teel P o les
M aterial
O v e rh e a d
0
O v e rh e a d
0
N on -L ab or
M aterial N on -L ab or
0
N on -L ab or
Po les & W o o d Pro d ucts
M aterial
Po le L in e H d w e & C o n n e c to rs
0
N on -L ab or
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel L a ttice T o w e rs
0
N on -L ab or
Pro te c tio n a n d T e s t
M aterial
M aterial
0
N on -L ab or
M aterial
0
N on -L ab or
0
N on -L ab or
C a p a cito rs a n d R e g u la to rs
M aterial Lin e S w itch e s
0
N on -L ab or
R e a c to rs a n d L in e T ra p s
M aterial
S u b s ta tio n T ran sform e r
0
N on -L ab or
M aterial
0
N on -L ab or
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
0
N on -L ab or
C irc u it B reakers
M aterial
M aterial
0
N on -L ab or
M aterial
$0
N on -L ab or
S teel / F a b ric a te d / S tru ctu ral
T o ta ls
Recorded (2012
Committed (2012
To Go (2012
New (2012
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$6 5 5
70
17
0
0
6
0
0
0
0
0
1
357
0
0
0
15
0
17
172
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$655
70
17
0
0
6
0
0
0
0
0
1
357
0
0
0
15
0
17
172
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
W ire , C a b le & B u s Bar
Category
Original Estimate
M aterial
Cost Category
Escalation
M aterial
Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
T Lugo S u b s ta tio n
Workpaper - Southern California Edison / 2015 GRC - APPLICATION K>
$427
$0
$0
$0
$462
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$71
$334
Overhead Type
0.93
0 .9 4
10 .55% In v e n to rie d M ate rial C o s t
0 .7 7 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
12 .00% G ro ss D irect E x p e n d itu re s
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis
0.91 0 .8 9
I T OH
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$22
$0
$0
$75
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$362
$25
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CIT-00-OP-NS-000333
T C o tto n w o o d S u b s ta tio n
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> 4^ 00
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods B-Item M ate rial S ales T a x IT OH
O v e rh e a d
T o ta ls
V e h ic le OH
S C E L abo r O H
O v e rh e a d
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
P ro c u re m e n t S e rv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
O th e r
O th e r
Paid A b se n c e
C o n tra c t E n g in e e rin g
C o n tra cto r
O v e rh e a d
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
T o o l E xp en se
C o n tra c t C o n s tru c tio n
C o n tra cto r
O v e rh e a d
S C E E n g in e e rin g
L abo r
N o n -L a b o r O H
S C E P ro je c t M a n a g e m e n t
L abo r
S u p p ly E xp en se
S C E C ra ft
L abo r
O v e rh e a d
116
N on -L ab or
C o m m u n ic a tio n S yste m s a n d E q u ip m e n t
M aterial
O v e rh e a d
0
N on -L ab or
O th e r M aterial
M aterial
L abor
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
$407
20
11
0
0
11
0
0
0
0
6
0
187
0
0
0
42
0
13
0
N on -L ab or
S teel P o les
Po les & W o o d Pro d ucts
M aterial
M aterial
0
N on -L ab or
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
0
0
N on -L ab or
Pro te c tio n a n d T e s t
M aterial
0
0
N on -L ab or
S u b s ta tio n T ran sform e r
M aterial
N on -L ab or
0
N on -L ab or
N on -L ab or
0
N on -L ab or
Lin e S w itch e s
M aterial
Po le L in e H d w e & C o n n e c to rs
0
N on -L ab or
C a p a cito rs a n d R e g u la to rs
M aterial
S teel L a ttice T o w e rs
0
N on -L ab or
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
0
N on -L ab or
M aterial
0
N on -L ab or
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
0
N on -L ab or
C irc u it B reakers
M aterial
M aterial
0
N on -L ab or
M aterial
$0
N on -L ab or
S teel / F a b ric a te d / S tru ctu ral
L abor
Recorded (2012
Committed (2012
To Go (2012
New (2012
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$427
46
11
0
0
11
0
0
0
0
0
1
187
0
0
0
42
0
13
116
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$427
46
11
0
0
11
0
0
0
0
0
1
187
0
0
0
42
0
13
116
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
W ire , C a b le & B u s Bar
Category
Original Estimate
M aterial
Cost Category
Escalation
M aterial
Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
T C o tto n w o o d S u b s ta tio n
Workpaper - Southern California Edison / 2015 GRC - APPLICATION CD
K>
$202
$0
$0
$0
$218
$0
$0
$0
$0
$0
$0
$0
$61
$131
0 .8 7
N o n -L a b o r
0.91
0 .2 0 % A ll M ate rials
S u p p ly E xp en se
V e h ic le OH
T o o l E xp en se 9 .2 7 % S C E L abor
1 3 .14% S C E C ra ft L abo r
0 .1 5 % A ll M ate rials
1 2 .60% S C E L abor
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
S C E L abo r O H
P ro c u re m e n t S erv ice s C h a rg e b a c k
Pay roll L oad in g s
6 .6 0 % C o n tra ct Labo r, M a te ria ls, O th e r 2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
N o n -L a b o r O H
2 0 .0 0 % In v e n to rie d M ate rial C o s t
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
0.93
0 .9 4
B-Item
0 .8 9
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_____________Rate (%)_____ Basis
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00
$10
$0
$0
$0
$64
1.03
1.03
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$142
$11
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-ET-TP-RN-690200
J a s p e r S u b s ta tio n (IF )
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> Oi O
C o n tra c t C o n s tru c tio n C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k
C o n tra cto r
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
N o n -L a b o r O H S u p p ly E xp en se T o o l E xp en se Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E E n g in ee rin g
Labo r
S C E L abo r O H
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d
S C E C ra ft
Labo r
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
T o ta ls
Escalation
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
Category_________________________ Cost Category_____________________Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
J a s p e r S u b s ta tio n (IF )
Recorded (2012
Committed (2012
To Go (2012
New (2012
0
$0
10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$202
0
1
2
1
0
10
2
7
1
10
10
1
27
2
2
11
10
0
0
0
0
0
19
0
0
0
0
69
0
0
5
$2
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$202
10
0
1
2
1
0
10
2
7
1
10
10
1
27
2
2
11
10
0
0
0
0
0
19
0
0
0
0
69
0
0
5
$2
$20 2
10
0
1
2
1
0
10
2
7
1
10
10
1
27
2
2
11
10
0
0
0
0
0
19
0
0
0
0
69
0
0
5
$2
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
Original Estimate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> cn
L u g o -P isg ah L o op -In
$11,130
$0
$0
$0
$12,068
$0
$0
$0
$0
$0
$0
$0
$636
$9,906
0 .9 2
N o n -L a b o r
0.91
1 .83% A ll M ate rials
V e h ic le OH
5 .6 3 % S C E L abor
1 3 .14% S C E C ra ft L abo r
5 .7 1 % S C E L abor 0 .1 2 % A ll M ate rials
S u p p ly E xp en se
T o o l E xp en se
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
P ro c u re m e n t S erv ice s C h a rg e b a c k
S C E L abo r O H
Pay roll L oad in g s
3 .3 6 % C o n tra ct Labo r, M a te ria ls, O th e r 2 0 .0 0 % S C E L abo r (N o rm al T im e )
N o n -L a b o r O H
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
2 0 .0 0 % In v e n to rie d M ate rial C o s t
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
0.93
0 .9 4
B-Item
0 .9 0
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_____________Rate (%)_____ Basis
Overhead Rates
0 .8 9
L abo r 0 .9 6
0 .9 7 1.00
1.00
$589
$0
$0
$0
$669
1.03
1.03 1.05
1.06
1.08
1.09
1.11
1.12
1.13
1.15
$10,742
$656
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-ET-TP-RN-690203
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> Oi N>
L u g o -P isg ah L o o p-In
C o n tra c t C o n s tru c tio n C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k
C o n tra cto r
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
T o ta ls
N o n -L a b o r O H S u p p ly E xp en se T o o l E xp en se
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E E n g in ee rin g
Labo r
S C E L abo r O H
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d
S C E C ra ft
Labo r
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
S teel P o les
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
M aterial
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
0 0
0 0
0
894
348
0 0 0 $0
22 64 337 $ 1 1 ,1 8 0
0 0
0 0 74
0 4
0 334
0
0 23
0
0
201
72
0 0
4 ,9 2 9
0
192
0 0
207
0
0
0
2 ,9 1 8 6
0 0
170
0
0
222
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$1 6 2
Constant)
(2012 Constant)
Category_________________________ Cost Category_____________________Category
M aterial
Recorded (2012
Original Estimate
Escalation
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
Constant)
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Committed (2012
$ 1 1 ,1 3 0
337
6
22
74
0
4
342
23
0
71
348
894
201
4 ,9 2 9
192
207
0
6
2,918
222
170
0
0
0
0
0
0
0
0
0
0
0
$1 6 2
Constant)
To Go (2012
$ 1 1 ,1 30
337
6
22
74
0
4
342
23
0
71
348
894
201
4 ,9 2 9
192
207
0
6
2 ,9 1 8
222
170
0
0
0
0
0
0
0
0
0
0
0
$162
Constant)
New (2012
Projected Forecast
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> cn co
D istrib u tio n
$1,584
$0
$0
$0
$1,691
$0
$0
$0
$0
$0
$0
$0
$792
$792
Overhead Type
0.93
0 .9 4
13.14% S C E C ra ft L abo r 2 0 .9 7 % S C E L abor
V e h ic le OH
7 .6 0 % A ll M ate rials
2 8 .6 0 % S C E L abor
T o o l E xp en se
S u p p ly E xp en se
S C E L abo r O H
Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s 0 .7 5 %
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
Paid A b se n c e
M ate rial S a le s T a x
16.82% C o n tra ct Labo r, M a te ria ls, O th e r
N o n -L a b o r O H
9 .7 0 %
2 6 .0 0 % S C E Labo r, C o n tra ct L abor
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
M ate rial S ales T a x
3 2 .0 0 % A ll M ate rials
2 0 .0 0 % In v e n to rie d M ate rial C o s t
D istrib u tion P la n n e r OH
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis
0.91 0 .8 9
B-Item
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00
$0
$0
$0
$0
$834
1.03
1.03
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$856
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-PD-CR-RL-RUR
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> Oi 4^
255 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
E n v iro n m e n ta l - C o n stru c tio n
$2,949
$0
$0
$0
$3,193
$0
$0
$0
$0
$0
$0
$0
$0
$2,802
P ro c u re m e n t S erv ice s C h a rg e b a c k
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra ct
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
9 .7 0 % M ate rial S a le s T a x
Pay roll L oad in g s
2 .0 8 % Labo r, M ate rial, C o n tra ct
2 0 .0 0 % S C E L abo r (N o rm al T im e )
M ate rial S ales T a x
Paid A b se n c e
BPI O H
Basis
0.93
0 .9 4
3 .3 0 % G ro ss D irect E x p e n d itu re s
Overhead Type
0.91 0 .8 9
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00
$147
$0
$0
$0
$0
1.03
1.03
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$3,029
$164
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
EHS
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
G)
N> Oi
257 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
258 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
u ~3 -a .2 — "c ro
I
! i
5 £ E a. 1
j 2 «) o uj j -1 V) ^ S- ■ *-’ ro
J 1 3 J5 o2 I o & 3 .2 rob
1 r o c '* - -
2 re
2 21 d> .2
o W 1=? 5 u lu 2g 2u cn r-v co co d o
) < H Z w u H (/I 3 .O «0 «0 «0 «0 «0 «0
Ou8 ro -s y -g c
vo IB£ Ou
c
.2 .2 5
=
5
a_) E
ai a; a; ^ 2 3
[ mm *P
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
259 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
R eal P ro p e r tie s
$159
$0
$0
$0
$170
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$96
$64
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
10 .55% In v e n to rie d M ate rial C o s t
2 .2 0 % Labo r, M ate rial, C o n tra ct
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
BPI O H
Basis
0.93
0 .9 4
3 .3 0 % G ro ss D irect E x p e n d itu re s
Overhead Type
0.91 0 .8 9
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$0
$0
$0
$101
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$69
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
LCOR
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> G) O
R eal P ro p e rtie s
C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S erv ice s C h a rg e b a c k M ate rial M a n a g e m e n t S e rv ice s C h a rg e b a c k S C E L abo r OH N o n -L a b o r O H S u p p ly E xp en se T o o l E xp en se
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
Labo r
Labo r
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
T o ta ls
N o n -L a b o r
N o n -L a b o r
Labo r
Labo r
Labo r
N o n -L a b o r
N o n -L a b o r
Labo r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
Labo r
Labo r
C o n tra c t C o n s tru c tio n
C o n tra cto r
Labo r
Labo r
BPI O H
L abo r C o rrectio n s
Labo r
Labo r Labo r
O v e rh e a d
S C E E n g in ee rin g
Labo r
Labo r
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d C o rre c tio n s
S C E C raft
Labo r
N o n -L a b o r N o n -L a b o r
O v e rh e a d
O th e r M aterial
M aterial
M ate rial S a le s T a x
S teel P o les
M aterial
N o n -L a b o r
O v e rh e a d
S teel L a ttice T o w e rs
M aterial
N o n -L a b o r
B-Item
Po le L in e H d w e & C o n n e c to rs
M aterial
N o n -L a b o r
O v e rh e a d
P o les & W o o d Pro d u cts
M aterial
N o n -L a b o r N o n -L a b o r
Paid A b s e n c e
M e ta ls & F a b ric a te d M e tal Pro d u cts
M aterial
V e h ic le O H
P ro te c tio n a n d T e s t
M aterial
N o n -L a b o r
O v e rh e a d
S u b s ta tio n T ran sform e r
M aterial
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
O v e rh e a d
L in e S w itch e s
M aterial
In s tru m e n t T ran sform e rs
M aterial R e a c to rs a n d L in e T ra p s
E lectric W irin g a n d C o m p o n e n ts
M aterial
C a p a cito rs a n d R e g u la to rs
C ircu it B reakers
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
0 0 0
0 0
3 $1 5 9
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
0
0
Committed (2012
To Go (2012
New (2012
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$159
3
0
0
0
0
24
0
0
0
0
0
0
0
0
0
0
11
0
122
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$159
3
0
0
0
0
24
0
0
0
0
0
0
0
0
0
0
11
0
122
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Projected Forecast Constant)________ Constant)________ Constant)________ Constant)
Recorded (2012
24
0
0
0
0
0
0
0
0
0
0
11
0
122
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
(2012 Constant)
M aterial
Original Estimate
Escalation
Category________________________ Cost Category____________________ Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
Workpaper - Southern California Edison / 2015 GRC - APPLICATION CD
K>
P isg a h S u b s ta tio n
$116
$0
$0
$0
$125
$0
$0
$0
$0
$0
$0
$0
$35
$76
0 .8 7
N o n -L a b o r
0.91
0 .2 0 % A ll M ate rials
S u p p ly E xp en se
V e h ic le OH
T o o l E xp en se 9 .2 7 % S C E L abor
1 3 .14% S C E C ra ft L abo r
0 .1 5 % A ll M ate rials
1 2 .60% S C E L abor
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
S C E L abo r O H
P ro c u re m e n t S erv ice s C h a rg e b a c k
Pay roll L oad in g s
6 .6 0 % C o n tra ct Labo r, M a te ria ls, O th e r 2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
N o n -L a b o r O H
2 0 .0 0 % In v e n to rie d M ate rial C o s t
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
0.93
0 .9 4
B-Item
0 .8 9
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_____________Rate (%)_____ Basis
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00
$6
$0
$0
$0
$37
1.03
1.03
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$82
$6
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-ET-TP-RN-690202
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> G) N>
P isg a h S u b s ta tio n
C o n tra c t C o n s tru c tio n C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k
C o n tra cto r
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
N o n -L a b o r O H S u p p ly E xp en se T o o l E xp en se Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E E n g in ee rin g
Labo r
S C E L abo r O H
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d
S C E C ra ft
Labo r
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
T o ta ls
Escalation
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
Category_________________________ Cost Category_____________________Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
Recorded (2012
Committed (2012
To Go (2012
New (2012
$116
3
0
4
6
5
0
3
5
0
0
3
13
1
4
3
0
38
0
0
0
0
0
0
25
0
0
0
0
0
0
0
0
$3
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$116
3
0
4
5
5
0
3
5
1
0
3
13
1
4
3
0
38
0
0
0
0
0
0
25
0
0
0
0
0
0
0
0
$3
$116
3
0
4
5
5
0
3
5
1
0
3
13
1
4
3
0
38
0
0
0
0
0
0
25
0
0
0
0
0
0
0
0
$3
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
Original Estimate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD CO
K>
Lugo S u b s ta tio n
$220
$0
$0
$0
$237
$0
$0
$0
$0
$0
$0
$0
$66
$143
0 .8 7
N o n -L a b o r
0.91
0 .2 0 % A ll M ate rials
S u p p ly E xp en se
V e h ic le OH
T o o l E xp en se 9 .2 7 % S C E L abor
1 3 .14% S C E C ra ft L abo r
0 .1 5 % A ll M ate rials
1 2 .60% S C E L abor
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
S C E L abo r O H
P ro c u re m e n t S erv ice s C h a rg e b a c k
Pay roll L oad in g s
6 .6 0 % C o n tra ct Labo r, M a te ria ls, O th e r 2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
N o n -L a b o r O H
2 0 .0 0 % In v e n to rie d M ate rial C o s t
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
0.93
0 .9 4
B-Item
0 .8 9
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_____________Rate (%)_____ Basis
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00
$11
$0
$0
$0
$70
1.03
1.03
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$155
$12
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-ET-TP-RN-690201
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
4^
G)
N>
Lugo S u b s ta tio n
C o n tra c t C o n s tru c tio n C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k
C o n tra cto r
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
N o n -L a b o r O H S u p p ly E xp en se T o o l E xp en se Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E E n g in ee rin g
Labo r
S C E L abo r O H
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d
S C E C ra ft
Labo r
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
T o ta ls
Escalation
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
Category_________________________ Cost Category_____________________Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
Recorded (2012
Committed (2012
To Go (2012
New (2012
0
$0
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$220
0
7
11
10
0
6
10
0
1
5
24
3
7
5
0
73
0
0
0
0
0
0
48
0
0
0
0
0
0
0
0
$4
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$220
5
0
7
9
10
0
6
10
2
1
5
24
3
7
5
0
73
0
0
0
0
0
0
48
0
0
0
0
0
0
0
0
$4
$22 0
5
0
7
9
10
0
6
10
2
1
5
24
3
7
5
0
73
0
0
0
0
0
0
48
0
0
0
0
0
0
0
0
$4
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
Original Estimate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> CD cn
$410
$0
$0
$0
$443
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$68
$321
Overhead Type
0.93
0 .9 4
10 .55% In v e n to rie d M ate rial C o s t
0 .7 7 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
12 .00% G ro ss D irect E x p e n d itu re s
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis
0.91 0 .8 9
I T OH
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$21
$0
$0
$72
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$347
$24
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CIT-00-OP-NS-000333
T A pple V alley S u b s ta tio n
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
G) G)
N>
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods 5 0 0 11 17
L abor L abor N on -L ab or N on -L ab or L abor
Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x IT OH
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
$388
0
O v e rh e a d
L abor
6
N on -L ab or
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
O v e rh e a d
T o o l E xp en se
0
N on -L ab or
P ro c u re m e n t S e rv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
205
N on -L ab or
O th e r
O th e r
0
0
L abor
C o n tra c t E n g in ee rin g
C o n tra cto r
0
0
L abor
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
0
0
L abor
C o n tra c t C o n s tru c tio n
C o n tra cto r
N on -L ab or
14
L abor
S C E E n g in ee rin g
Labo r
N on -L ab or
0
L abor
S C E P ro je c t M a n a g e m e n t
Labo r
L abor
13
L abor
S C E C ra ft
Labo r
N o n -L a b o r O H
116
N on -L ab or
C o m m u n ic a tio n S yste m s a n d E q u ip m e n t
M aterial
S u p p ly E xp en se
0
N on -L ab or
O th e r M aterial
M aterial
S C E L abo r O H
0
N on -L ab or
S teel P o les
M aterial
O v e rh e a d
0
O v e rh e a d
0
N on -L ab or
M aterial N on -L ab or
0
N on -L ab or
Po les & W o o d Pro d ucts
M aterial
Po le L in e H d w e & C o n n e c to rs
0
N on -L ab or
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel L a ttice T o w e rs
0
N on -L ab or
Pro te c tio n a n d T e s t
M aterial
M aterial
0
N on -L ab or
M aterial
0
N on -L ab or
0
N on -L ab or
C a p a cito rs a n d R e g u la to rs
M aterial Lin e S w itch e s
0
N on -L ab or
R e a c to rs a n d L in e T ra p s
M aterial
S u b s ta tio n T ran sform e r
0
N on -L ab or
M aterial
0
N on -L ab or
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
0
N on -L ab or
C irc u it B reakers
M aterial
M aterial
0
N on -L ab or
M aterial
$0
N on -L ab or
S teel / F a b ric a te d / S tru ctu ral
T o ta ls
Recorded (2012
Committed (2012
To Go (2012
New (2012
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$410
44
11
0
0
5
0
0
0
0
0
1
205
0
0
0
14
0
13
116
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$410
44
11
0
0
5
0
0
0
0
0
1
205
0
0
0
14
0
13
116
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
W ire , C a b le & B u s Bar
Category
Original Estimate
M aterial
Cost Category
Escalation
M aterial
Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
T A pple V alley S u b s ta tio n
Workpaper - Southern California Edison / 2015 GRC - APPLICATION CD
K>
$19,247
$0
$0
$0
$20,786
$0
$0
$0
$0
$0
$0
$135
$1,646
$17,467
0 .8 7
N o n -L a b o r
0.91
0 .2 0 % A ll M ate rials
S u p p ly E xp en se
V e h ic le OH
T o o l E xp en se 9 .2 7 % S C E L abor
1 3 .14% S C E C ra ft L abo r
0 .1 5 % A ll M ate rials
1 2 .60% S C E L abor
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
S C E L abo r O H
P ro c u re m e n t S erv ice s C h a rg e b a c k
Pay roll L oad in g s
6 .6 0 % C o n tra ct Labo r, M a te ria ls, O th e r 2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
N o n -L a b o r O H
2 0 .0 0 % In v e n to rie d M ate rial C o s t
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
0.93
0 .9 4
B-Item
0 .8 9
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_____________Rate (%)_____ Basis
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00
$0
$0
$0
$139
$1,738
1.03
1.03
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$18,909
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-ET-TP-RN-690200
J a s p e r S u b s ta tio n
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
00
G)
N>
269 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
II
O O O O f N O O i n O O O O r N O
fO in O ID •«-
O O O O t N O O i n O O O O r N O
fO in O
S'
^ ^
H
' O O O O O O O O O O O O O O O O
o o o
o o o
o
o o o o o o o o o o
' O O O O O O O O O O O O O O O O
o o o
o o o
o
o o o o o o o o o o
g g g
»
§ g S I °’ 8 I § 3 R
L
p u n 8B
p !!
o g o o g g o ^ o o o o g o
rf
PC rf
ti
II
111 111
if llll
8 .8
I
1!
11111111111111111 !H
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
G ra n ite M tn G en Tie (IF )
$146
$0
$0
$0
$158
$0
$0
$0
$0
$0
$0
$0
$44
$95
0 .9 2
N o n -L a b o r
0.91
1 .83% A ll M ate rials
V e h ic le OH
5 .6 3 % S C E L abor
1 3 .14% S C E C ra ft L abo r
5 .7 1 % S C E L abor 0 .1 2 % A ll M ate rials
S u p p ly E xp en se
T o o l E xp en se
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
P ro c u re m e n t S erv ice s C h a rg e b a c k
S C E L abo r O H
Pay roll L oad in g s
3 .3 6 % C o n tra ct Labo r, M a te ria ls, O th e r 2 0 .0 0 % S C E L abo r (N o rm al T im e )
N o n -L a b o r O H
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
2 0 .0 0 % In v e n to rie d M ate rial C o s t
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
0.93
0 .9 4
B-Item
0 .9 0
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_____________Rate (%)_____ Basis
Overhead Rates
0 .8 9
L abo r 0 .9 6
0 .9 7 1.00
1.00
$7
$0
$0
$0
$46
1.03
1.03 1.05
1.06
1.08
1.09
1.11
1.12
1.13
1.15
$103
$8
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-ET-CR-W C-690200
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
O
N> -v]
C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k
C o n tra cto r
O th e r
O v e rh e a d
S u p p ly E xp en se T o o l E xp en se Paid A b se n c e V e h ic le OH B-Item M ate rial S ales T a x
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
N o n -L a b o r O H
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
O v e rh e a d
C o n tra c t C o n s tru c tio n
C o n tra cto r
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
S C E E n g in ee rin g
Labo r
S C E L abo r O H
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d
S C E C ra ft
Labo r
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
T o ta ls
Escalation
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
Category_________________________ Cost Category_____________________Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
G ra n ite M tn G en Tie (IF )
Recorded (2012
Committed (2012
To Go (2012
New (2012
$147
3
1
1
3
0
0
4
1
0
1
3
35
4
44
7
6
0
0
0
0
11
0
0
0
0
0
0
0
0
0
0
0
$23
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$146
3
1
1
2
0
0
4
1
0
1
3
35
4
44
7
6
0
0
0
0
11
0
0
0
0
0
0
0
0
0
0
0
$23
$146
3
1
1
2
0
0
4
1
0
1
3
35
4
44
7
6
0
0
0
0
11
0
0
0
0
0
0
0
0
0
0
0
$23
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
Original Estimate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K>
$385
$0
$0
$0
$416
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$64
$301
Overhead Type
0.93
0 .9 4
10 .55% In v e n to rie d M ate rial C o s t
0 .7 7 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
12 .00% G ro ss D irect E x p e n d itu re s
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis
0.91 0 .8 9
I T OH
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$20
$0
$0
$68
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$326
$22
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CIT-00-OP-NS-000333
T G ra n ite M o u n tain S u b s ta tio n (IF )
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N>
N> -v]
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods B-Item M ate rial S ales T a x IT OH
O v e rh e a d
O v e rh e a d
S C E L abo r O H
O v e rh e a d
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
O v e rh e a d
V e h ic le OH
P ro c u re m e n t S e rv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
O th e r
O th e r
Paid A b se n c e
C o n tra c t E n g in ee rin g
C o n tra cto r
O v e rh e a d
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
T o o l E xp en se
C o n tra c t C o n s tru c tio n
C o n tra cto r
O v e rh e a d
S C E E n g in ee rin g
Labo r
N o n -L a b o r O H
S C E P ro je c t M a n a g e m e n t
Labo r
S u p p ly E xp en se
S C E C ra ft
Labo r
O v e rh e a d
C o m m u n ic a tio n S yste m s a n d E q u ip m e n t
M aterial
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
T o ta ls
Escalation
L abor
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
Category_________________________ Cost Category_____________________Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
T G ra n ite M o u n tain S u b s ta tio n (IF )
Recorded (2012
Committed (2012
To Go (2012
New (2012
$366
17
11
0
0
5
0
0
0
0
6
0
183
0
0
0
14
0
13
116
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$3 8 5
41
11
0
0
5
0
0
0
0
0
1
183
0
0
0
14
0
13
116
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$385
41
11
0
0
5
0
0
0
0
0
1
183
0
0
0
14
0
13
116
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Projected Forecast (2012 Constant)______ Constant)_________ Constant)_________ Constant)_________ Constant)
Original Estimate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION CO
K>
L icensing (le s s CEH&S Lie)
$5,586
$0
$0
$87
$646
$5,791
$0
$0
$82
$629
$0
$1,379
$1,822
$1,184
0 .8 7
N o n -L a b o r
0.91
0 .2 0 % A ll M ate rials
S u p p ly E xp en se
V e h ic le OH
T o o l E xp en se 9 .2 7 % S C E L abor
1 3 .14% S C E C ra ft L abo r
0 .1 5 % A ll M ate rials
1 2 .60% S C E L abor
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
S C E L abo r O H
P ro c u re m e n t S erv ice s C h a rg e b a c k
Pay roll L oad in g s
6 .6 0 % C o n tra ct Labo r, M a te ria ls, O th e r 2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
N o n -L a b o r O H
2 0 .0 0 % In v e n to rie d M ate rial C o s t
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
0.93
0 .9 4
B-Item
0 .8 9
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_____________Rate (%)_____ Basis
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00
$0
$467
$0
$1,415
$1,917
1.03
1.03
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$1,281
$0
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$467
2012 YTD_____ 2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost_Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-ET-TP-RN-690200
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
4^
N> -v]
L icensing (le s s CEH&S Lie)
5 0 42 25
6 0 428 34
N on -L ab or N on -L ab or L abor N on -L ab or
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k S C E L abo r O H N o n -L a b o r O H
O v e rh e a d
O v e rh e a d
O v e rh e a d
P ro c u re m e n t S e rv ice s C h a rg e b a c k
O v e rh e a d
38
57
N on -L ab or
O th e r
24
32
O th e r
217
349
L abor
C o n tra c t C o rrectio n s
L abor
C o n tra c t E n g in ee rin g
C o n tra cto r
L abor
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
316
426
L abor
C o n tra c t C o n s tru c tio n
C o n tra cto r
0
0
C o n tra cto r
10
0
L abo r C o rrectio n s
Labo r
0
0 0 28 1 8 $1,201
311 0 0 38 2 10 $6 ,0 1 5
L abor N on -L ab or N on -L ab or L abor L abor L abor
B-Item M ate rial S ales T a x O v e rh e a d C o rre c tio n s T e le c o m O H BPI OH
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
T o ta ls
82 28
410
L abor
Paid A b se n c e V e h ic le OH
O v e rh e a d
0
L abor
O v e rh e a d
O v e rh e a d
0
0 454
N on -L ab or
S u p p ly E xp en se T o o l E xp en se
O v e rh e a d
L abor
L abor
L abor
L abor
19
S C E E n g in ee rin g
Labo r
359
S C E P ro je c t M a n a g e m e n t
Labo r
0
0
0
S C E C ra ft
Labo r
N on -L ab or
$0
Constant)
(2012 Constant) $0
Recorded (2012
Original Estimate
0
C o m m u n ic a tio n S yste m s a n d E q u ip m e n t
M aterial
N on -L ab or
Category
Escalation
3 ,4 5 7
O th e r M aterial
Cost Category
M aterial
Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
Constant)
$42
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
42
0
0
0
0
0
0
0
$0
Committed (2012
0
$0
$ 4 ,3 4 4
0
0
1
0
0
273
299
454
0
0
371
0
0
5
0
6
0
0
(14)
(25)
(484)
3,457
Constant)
To Go (2012
0
$0
$5 ,5 8 6
8
1
28
0
0
301
381
454
0
25
413
0
5
44
24
265
316
0
(4)
(7)
(126)
3 ,4 5 7
Constant)
New (2012
Projected Forecast
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> cn
Land A c q uisition
$2,512
$0
$0
$0
$2,655
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$2,261
$251
0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
10 .55% In v e n to rie d M ate rial C o s t
2 .2 0 % Labo r, M ate rial, C o n tra ct
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
BPI O H
Basis
0.93
0 .9 4
3 .3 0 % G ro ss D irect E x p e n d itu re s
Overhead Type
0.91 0 .8 9
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$0
$0
$0
$2,383
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$272
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CET-RP-TP-RL-690200
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> -v] G)
Land A cquisition
C o n tra c t Pro je c t M a n a g e m e n t C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S erv ice s C h a rg e b a c k M ate rial M a n a g e m e n t S e rv ice s C h a rg e b a c k S C E L abo r OH N o n -L a b o r O H S u p p ly E xp en se T o o l E xp en se
C o n tra cto r
C o n tra cto r
O th e r
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
Labo r
Labo r
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
T o ta ls
N o n -L a b o r
N o n -L a b o r
Labo r
Labo r
Labo r
N o n -L a b o r
N o n -L a b o r
Labo r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
Labo r
Labo r
C o n tra c t C o n s tru c tio n
C o n tra cto r
Labo r
Labo r
BPI O H
L abo r C o rrectio n s
Labo r
Labo r Labo r
O v e rh e a d
S C E E n g in ee rin g
Labo r
Labo r
S C E P ro je c t M a n a g e m e n t
Labo r
O v e rh e a d C o rre c tio n s
S C E C raft
Labo r
N o n -L a b o r N o n -L a b o r
O v e rh e a d
O th e r M aterial
M aterial
M ate rial S a le s T a x
S teel P o les
M aterial
N o n -L a b o r
O v e rh e a d
S teel L a ttice T o w e rs
M aterial
N o n -L a b o r
B-Item
Po le L in e H d w e & C o n n e c to rs
M aterial
N o n -L a b o r
O v e rh e a d
P o les & W o o d Pro d u cts
M aterial
N o n -L a b o r N o n -L a b o r
Paid A b s e n c e
M e ta ls & F a b ric a te d M e tal Pro d u cts
M aterial
V e h ic le O H
P ro te c tio n a n d T e s t
M aterial
N o n -L a b o r
O v e rh e a d
S u b s ta tio n T ran sform e r
M aterial
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
N o n -L a b o r
O v e rh e a d
L in e S w itch e s
M aterial
In s tru m e n t T ran sform e rs
M aterial R e a c to rs a n d L in e T ra p s
E lectric W irin g a n d C o m p o n e n ts
M aterial
C a p a cito rs a n d R e g u la to rs
C ircu it B reakers
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
0 0 0
0 0 0
0 0 0 0
24 0 0 0
0 $0
3 $ 2 ,4 7 2
0
0
0
0
0
0 0
0 0
0 0
0
0
0
461
14
0
0
0
0
1,852 0
0
0
0
0 0
0
0 119
0
0
0
0
0
0
0
0
0 0
0
0
0
0
0 0
0
0
0
0
0
0
0
$0
0
$0
Constant)
(2012 Constant)
M aterial
Recorded (2012
Original Estimate
Escalation
Category________________________ Cost Category____________________ Category
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
Constant)
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Committed (2012
0
0
119
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$ 2 ,5 1 2
43
0
0
0
0
24
0
0
0
0
0
14
461
0
0
1,852
Constant)
To Go (2012
0
0
119
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$2,5 1 2
43
0
0
0
0
24
0
0
0
0
0
14
461
0
0
1,852
Constant)
New (2012
Projected Forecast
Workpaper - Southern California Edison / 2015 GRC - APPLICATION K>
$1,867
$0
$0
$0
$2,015
$0
$0
$0
$1
$1
($1)
2012 YTD
($1)
2012 YTD $0
$310
$1,460
0.91 0.93
0 .9 4
4 4 .2 0 % S C E L abor
1.03% Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
T e le c o m O H
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
9 .7 0 % M ate rial S a le s T a x
1 0 .55% In v e n to rie d M ate rial C o s t
12 4 .0 0% A ll M ate rials
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis_______________
0 .8 9
Paid A b se n c e
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
B-Item
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_________
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$97
$0
$0
$327
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$1,580
$108
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CIT-00-OP-NS-000333
A pple V alley - J a s p e r
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> -v] 00
C o n tra c t E n g in ee rin g
O th e r
P ro c u re m e n t S e rv ice s C h a rg e b a c k M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k Paid A b se n c e B-Item M ate rial S ales T a x T e le c o m OH
C o n tra cto r
O th e r
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
O v e rh e a d
T o ta ls
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
L abor
L abo r C o rrectio n s
S C E E n g in ee rin g
Labo r
C o n tra c t C o n s tru c tio n
S C E P ro je c t M a n a g e m e n t
Labo r
Labo r
S C E C ra ft
Labo r
C o n tra cto r
L abor
O th e r M aterial
M aterial
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
P o les & W o o d Pro d ucts
M aterial
N on -L ab or
W ire , C a b le & B u s Bar
0 0 0 0 $0
22 297 $ 1 ,8 7 0
0
15 135
0
3
276
0
0
0
0
0
0
(2)
0
227
0
2 0
0 243
0
0
0
0
88
430
$0
$1 3 4
Constant)
(2012 Constant)
Category_________________________ Cost Category_____________________Category
M aterial
Recorded (2012
Original Estimate
Escalation
($ in thousands)
Constant Dollar Base Year: 2012
PIN: 6902
Project Name: Jasper 220 kV Substation
A pple V alley - J a s p e r
Constant)
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
Committed (2012
$ 1 ,8 6 7
296
22
276
134
14
3
(0)
0
0
227
3
243
(3)
430
0
88
$1 3 4
Constant)
To Go (2012
$1 ,8 6 7
296
22
276
134
14
3
(0)
0
0
227
1
243
(1)
430
0
88
$134
Constant)
New (2012
Projected Forecast
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD
K>
C o tto n w o o d - J a s p e r
$1,033
$0
$0
$0
$1,115
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$172
$808
0.91 0.93
0 .9 4
4 4 .2 0 % S C E L abor
1.03% Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
T e le c o m O H
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
9 .7 0 % M ate rial S a le s T a x
1 0 .55% In v e n to rie d M ate rial C o s t
12 4 .0 0% A ll M ate rials
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis_______________
0 .8 9
Paid A b se n c e
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
B-Item
A d m in is tra tiv e a n d G eneral
___________ Overhead Type_________
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$54
$0
$0
$181
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$874
$60
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
___________ Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CIT-00-OP-NS-000333
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> 00 O
281 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
$1,056
$0
$0
$0
$1,142
$0
$0
$0
$0
$0
$0
2012 YTD
$0
2012 YTD $0
$175
$826
Overhead Type
0.93
0 .9 4
10 .55% In v e n to rie d M ate rial C o s t
0 .7 7 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
12 .00% G ro ss D irect E x p e n d itu re s
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
Basis
0.91 0 .8 9
I T OH
A d m in is tra tiv e a n d G eneral
Rate (%)
0 .8 7
N o n -L a b o r
Overhead Rates
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$55
$0
$0
$186
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$895
$61
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
$0
2012_______ 2013_______ 2014_______ 2015_______ 2016_______ 2017
___________Escalation Type______________ 2008_______ 2009_______ 2010_______ 2011_______ 2012_______2013_______ 2014_______ 2015_______ 2016_______ 2017
Escalation Factors
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Nominal W ork Order Forecast
G ro ss D irect E x p e n d itu re
____________Cost Category_______________ Total_______ 2008_______ 2009_______ 2010_______2011
Constant W ork Order Forecast (2012)
($ in thousands)
PIN: 6902
Project Name: Jasper 220 kV Substation
CIT-00-OP-NS-000333
T J a s p e r S u b s ta tio n
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> 00 N>
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods B-Item M ate rial S ales T a x IT OH
O v e rh e a d
T o ta ls
V e h ic le OH
S C E L abo r O H
O v e rh e a d
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
P ro c u re m e n t S e rv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
O th e r
O th e r
Paid A b se n c e
C o n tra c t E n g in ee rin g
C o n tra cto r
O v e rh e a d
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
T o o l E xp en se
C o n tra c t C o n s tru c tio n
C o n tra cto r
O v e rh e a d
S C E E n g in ee rin g
Labo r
N o n -L a b o r O H
S C E P ro je c t M a n a g e m e n t
Labo r
S u p p ly E xp en se
S C E C ra ft
Labo r
O v e rh e a d
C o m m u n ic a tio n S yste m s a n d E q u ip m e n t
M aterial
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
L abor
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
C a te g ory_________________________________ C o s t C a te g ory______________________ E scalatio n C a te g o ry
($ in th o u s a n d s)
C o n s ta n t D ollar Base Y e a r: 20 1 2
PIN: 6902
P ro je c t N am e: Ja s p e r 2 2 0 kV S u b station
T J a s p e r S u b s ta tio n
R e c o rd e d (2 0 1 2
C o m m itte d (2 0 1 2
T o G o (2 0 1 2
P ro je c te d F o recast
$ 1 ,0 5 7
96
67
0
0
24
0
0
0
0
19
4
0
0
0
40
61
0
58
686
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$ 1 ,0 5 6
113
67
0
0
24
0
0
0
0
0
6
0
0
0
40
61
0
58
686
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$1 ,0 5 6
113
67
0
0
24
0
0
0
0
0
6
0
0
0
40
61
0
58
686
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
(2 0 1 2 C o n s ta n t)_________ C o n s ta n t)____________ C o n s ta n t)_____________C o n s ta n t)_______ N e w (2 0 1 2 C o n s ta n t)
O rig ina l E stim ate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION K> 00 OO
$704
$0
$0
$0
$761
$0
$0
$0
$0
$0
$0
2012 Y T D
$0
2012 Y T D $0
$117
$550
O v e rh e a d T y p e
0.93
0 .9 4
10 .55% In v e n to rie d M ate rial C o s t
0 .7 7 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
6 5 .0 0 % G ro ss D irect E x p e n d itu re s
Pay roll L oad in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b se n c e
9 .7 0 % M ate rial S a le s T a x
12 .00% G ro ss D irect E x p e n d itu re s
M ate rial S ales T a x
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
3 .3 0 % G ro ss D irect E x p e n d itu re s
B asis
0.91 0 .8 9
I T OH
A d m in is tra tiv e a n d G eneral
R a te (% )
0 .8 7
N o n -L a b o r
O v e rh e a d R ate s
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$37
$0
$0
$124
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$597
$41
2012 _________ 2013_________ 2 0 1 4 _________ 2015_________ 2016__________2017
$0
2012 _________ 2013_________ 2 0 1 4 _________ 2015_________ 2016_________ 2017
_______________E sc a la tio n T y p e ____________________2 0 0 8 _________ 20 0 9_________ 2010_________ 2011_________ 20 1 2 _________ 2013_________ 2014 _________ 2015_________ 2 0 1 6 _________ 20 1 7
E scalatio n Facto rs
G ro ss D irect E x p e n d itu re
_______________ C o s t C a te g ory ____________________ T o ta l_________ 20 0 8_________ 2009__________2010_________ 20 1 1
N om in al W o rk O rd e r Fo re c a s t
G ro ss D irect E x p e n d itu re
________________C o s t C a te g ory ____________________ T o ta l_________ 20 0 8_________ 2009_________ 2010_________ 20 1 1
C o n s ta n t W o rk O rd e r F o re c a s t (2012)
($ in th o u s a n d s)
PIN: 6902
P ro je c t N am e: Ja s p e r 2 2 0 kV S u b station
C IT-0 0 -O P-N S -00 0 3 3 3
T Pisg ah S u b station
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> oo
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods M ate rial S ales T a x IT OH
O v e rh e a d
T o ta ls
B-Item
O v e rh e a d
S C E L abo r O H
O v e rh e a d
O v e rh e a d
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
O v e rh e a d
V e h ic le OH
P ro c u re m e n t S e rv ice s C h a rg e b a c k
O v e rh e a d
O v e rh e a d
O th e r
O th e r
Paid A b se n c e
C o n tra c t E n g in ee rin g
C o n tra cto r
O v e rh e a d
C o n tra c t Pro je c t M a n a g e m e n t
C o n tra cto r
T o o l E xp en se
C o n tra c t C o n s tru c tio n
C o n tra cto r
O v e rh e a d
S C E E n g in ee rin g
Labo r
N o n -L a b o r O H
S C E P ro je c t M a n a g e m e n t
Labo r
S u p p ly E xp en se
S C E C ra ft
Labo r
O v e rh e a d
C o m m u n ic a tio n S yste m s a n d E q u ip m e n t
M aterial
O v e rh e a d
O th e r M aterial
P o les & W o o d Pro d ucts
M aterial
M aterial
M e ta ls & F a b ric a te d M etal Pro d u cts
M aterial
S teel P o les
P ro te c tio n a n d T e s t
M aterial
M aterial
S u b s ta tio n T ran sform e r
M aterial
Po le L in e H d w e & C o n n e c to rs
L in e S w itch e s
M aterial
S teel L a ttice T o w e rs
C a p a cito rs a n d R e g u la to rs
M aterial
M aterial
R e a c to rs a n d L in e T ra p s
M aterial
M aterial
E lectric W irin g a n d C o m p o n e n ts In s tru m e n t T ran sform e rs
C irc u it B reakers
M aterial
M aterial
S teel / F a b ric a te d / S tru ctu ral
M aterial
M aterial
W ire , C a b le & B u s Bar
M aterial
L abor
N on -L ab or
N on -L ab or
L abor
L abor
L abor
N on -L ab or
N on -L ab or
L abor
N on -L ab or
N on -L ab or
N on -L ab or
L abor
L abor
L abor
L abor
L abor
L abor
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
N on -L ab or
C a te g ory_________________________________ C o s t C a te g ory______________________ E scalatio n C a te g o ry
($ in th o u s a n d s)
C o n s ta n t D ollar Base Y e a r: 20 1 2
PIN: 6902
P ro je c t N am e: Ja s p e r 2 2 0 kV S u b station
T Pisg ah S u b station
R e c o rd e d (2 0 1 2
C o m m itte d (2 0 1 2
T o G o (2 0 1 2
P ro je c te d F o recast
$657
29
20
0
0
7
0
0
0
0
0
2
357
0
0
0
15
0
23
205
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$704
75
20
0
0
7
0
0
0
0
0
2
357
0
0
0
15
0
23
205
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$704
75
20
0
0
7
0
0
0
0
0
2
357
0
0
0
15
0
23
205
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
(2 0 1 2 C o n s ta n t)_________ C o n s ta n t)____________ C o n s ta n t)_____________C o n s ta n t)_______ N e w (2 0 1 2 C o n s ta n t)
O rig ina l E stim ate
Workpaper - Southern California Edison / 2015 GRC - APPLICATION K> 00 cn
$669
$0
$0
$0
$724
$0
$0
$0
$0
$0
$0
2012 Y T D
$0
2012 Y T D $0
$0
$669
0 .8 7
N o n -L a b o r
0.91 0 .8 9
0.93
0 .9 4
3 .3 0 % G ro ss D irect E x p e n d itu re s 2 .0 8 % L abo r, M ate rial, C o n tra ct
6 5 .0 0 % G ro ss D irect E x p e n d itu re s 0 .7 5 % Pro c u re d M a te ria l a n d C o n tra c t C o s t
Pay roll L o a d in g s
P ro c u re m e n t S erv ice s C h a rg e b a c k
9 .7 0 % M ate rial S a le s T a x 2 0 .0 0 % S C E L abo r (N o rm al T im e )
Paid A b s e n c e
M ate rial S ales T a x
1 8 .19% In v e n to rie d M ate rial C o s t
BPI O H
M ate rial M a n a g e m e n t S erv ice s C h a rg e b a c k
A d m in is tra tiv e a n d G e ne ral
_______________ O v e rh e a d T y p e __________________ R a te (% )_______ B asis___________________
O v e rh e a d R ate s
0 .8 9
L abo r 0 .9 7
0 .9 7 1.00
1.00 1.03
1.03
$0
$0
$0
$0
1.05 1.06
1.08
1.08
1.11
1.11
1.15
1.14
$724
$0
2012 _________ 2013_________ 2 0 1 4 _________ 2015_________ 2016__________2017
$0
2012 _________ 2013_________ 2 0 1 4 _________ 2015_________ 2016__________2017
_______________E sc a la tio n T y p e ____________________2 0 0 8 _________ 20 0 9_________ 2010_________ 2011_________ 20 1 2 _________ 2013_________ 2014 _________ 2015_________ 2 0 1 6 _________ 20 1 7
E scalatio n Facto rs
G ro ss D irect E x p e n d itu re
_______________ C o s t_C a te g ory ____________________ T o ta l_________ 20 0 8_________ 2009__________2010_________ 20 1 1
N om in al W o rk O rd e r F o re c a s t
G ro ss D irect E x p e n d itu re
________________C o s t C a te g ory____________________ T o ta l_________ 20 0 8_________ 2009__________2010_________ 20 1 1
C o n s ta n t W o rk O rd e r F o re c a s t (2012)
($ in th o u s a n d s)
PIN: 6902
P ro je c t N am e: Ja s p e r 2 2 0 kV S u b station
EHS
E n v iro n m e n ta l - L ice n sin g
$0
$0
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> oo CD
Pole Line H d w e & C on n ectors Steel Lattice T o w e rs Steel Poles O th e r Material
SCE Craft SCE Project M an ag em en t SCE E ngin eerin g L abor C orrections
C on tract C onstruction C on tract Project M an ag e m e n t C on tract Engineering C on tract C orrections
O ther
Pro cure m e nt Services C ha rg eb ack
Material
Material
Material
Material
Labor
Labor
Labor
Labor
Contractor
Contractor
Contractor
Contractor
O ther
Overhead
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods Paid A b se nce V eh icle OH B-Item Material Sales T a x O ve rh ead C orrections BPI OH
Overhead
Overhead
Overhead
Overhead
Overhead
Overhead
Overhead
Overhead
T o tals
N on -L ab or OH S up p ly Expense T o o l Expense
Overhead
Material M an ag e m e n t Services C ha rg eb ack
Poles & W o o d Products
Material
SCE L abo r OH
M etals & Fabricated Metal Products
Material
Overhead
Protection and T e st
Material
Overhead
Line S w itches S ubstation T ra n s fo rm e r
C apacitors and Regulators
Material
Material
Reactors and Line T ra p s
Material
Material
Electric W irin g an d C om p o nen ts Instrum e nt T ra n s fo rm e rs
C ircuit Breakers
Material
Material
Steel / Fabricated / Structural
Material
W ire , C ab le & Bus Bar
Material
C ost C ategory
Material
C ategory
($ in thousands)
Con stan t D ollar Base Ye ar: 2012
PIN: 6902
Project Nam e: Ja s p e r 220 kV Substation
Environm ental - Licensing
L abor
L abor
N on -Lab or
N on -Lab or
L abor
L abor
L abor
N on -Lab or
N on -Lab or
L abor
N on -Lab or
N on -Lab or
N on -Lab or
L abor
L abor
L abor
L abor
L abor
L abor
L abor
L abor
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
N on -Lab or
Escalation C ateg ory
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0
0
0 0 0 0
0
0 0 0 0 0 0 0 0 0 0 0 0 $0
0
0 190 0 0
331
1 0 0 0 0 0 23 0 0 0 0 6 $668
0
0
29 0
87
0
0
0
0
$0
0
C onstant)
(2012 C onstant)
$0
R ecord ed (2012
Original E stim ate Con stan t)
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
C om m itted (2012 Con stan t)
6
1
0
0
0
23
0
0
0
0
0
1
331
0
0
190
0
0
0
29
87
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$669
T o Go (2012
Projected Forecast
$669
6
1
0
0
0
23
0
0
0
0
0
1
331
0
0
190
0
0
0
29
87
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
N e w (2012 Constant)
Workpaper - Southern California Edison / 2015 GRC - APPLICATION 00
K>
K> oo oo
PRIMM 220 kV Substation (PIN:7426)
Transmission System Generation Interconnection
TRANSMISSION AND INTERCONNECTION PLANNING
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
289 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 584 / RO Model ID: 748 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7426
W BS Elem ent
C ET-ET-TP-RN -742600
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Lines
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
2,136
2014
13,644
2015
3,477
2016
0
2017
0
Total
19,257
15,000
10,000
5,000
0
2013
7 (a). SYSTEM SH O R T TEXT
Prim m (POS NU): N ew 220kV Substation
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
2014
2015
2016
2017
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
290 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R KSH E ET: W D A T /T O TAR IFF INTER C O N NEC TIO N S O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: G eneration Interconnection Program Detail: W D A T/TO Tariff Interconnections D atabase ID: 1360 / RO Model ID: 869 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
7246
W BS Elem ent
CIT-00-O P-N S-000370
3. PR O JECT TYPE
Select one
Select one X
C om pliance: Safety, Environm ental, Licenses
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
10/1/2015
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
300
2014
3,000
2015
2,800
2016
0
2017
0
Total
6,100
3,500 3,000 2,500 2,000 1,500 1,000 500 0
2013
7 (a). SYSTEM SH O R T TEXT
Silver State 220kV Sw itchyard (Prim m )
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2014
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
S CE -03, V ol 3 NA NA NA NA
A n e w 2 2 0 kV c o lle c t o r s u b s ta tio n (P rim m ) is n e e d e d to in te rc o n n e c t n e w re n e w a b le g e n e ra tio n p ro je c ts in P rim m , N e v a d a .
G R C Volum e Reference
P ro je c t M a n a g e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n s o r
P ro je c t R e a s o n
T h is p ro je c t w ill p ro v id e th e
A ls o , a s in g le 2 2 0 kV g e n e ra tio n tie lin e w ill be
T h e e x is tin g E ld o ra d o -Iv a n p a h N o. 1 2 2 0 kV lin e w ill b e c o n n e c te d in to a n d o u t
e q u ip m e n t a t P rim m , E ld o ra d o , a n d Iv a n p a h S u b s ta tio n w ill b e in sta lle d to s u p p o rt th e n e w fib e r o p t ic lin es.
Prim m S u b s ta tio n to m e e t th e d iv e rs e ro u tin g r e q u ire m e n t s fo r th e Iv a n p a h - P rim m 2 2 0 kV tra n s m is s io n lin e.
A ll re q u ire d lig h t-w a v e c h a n n e l a n d re la te d te rm in a l
T h e t e le c o m m u n ic a tio n s s c o p e o f w o r k to s u p p o r t th e n e w s u b s ta tio n a n d tra n s m is s io n lin e s in c lu d e s th e in s ta lla tio n o f f ib e r o p t ic c a b le b e tw e e n Iv a n p a h an d
in te rc o n n e c te d to t h e n e w s u b s ta tio n .
o f ( " lo o p e d in to ") th e n e w P rim m S u b s ta tio n to fo rm th e E ld o ra d o -P rim m a n d I v a n p a h - P rim m 2 2 0 kV T / L s .
T h e p ro je c t c o n s is t s o f c o n s tru c tin g a n e w 2 2 0 kV s u b s ta tio n ( s w itc h in g s ta tio n ).
tra n s m is s io n in fra s tru c tu re n e e d e d to in te rc o n n e c t s o la r g e n e ra tio n a lo n g th e E ld o ra d o -I v a n p a h 2 2 0 kV tra n s m is s io n co rrid o r.
$25,614
Total Project C o st (Nom inal, in thousands)
2 0 1 5 G R C W o rk p a p e r
PIN:7426
P RIM M 220 kV Substation
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD
K>
C IT -0 0 -O P -N S -0 0 0 3 7 0
C E T -E T -T P -R N -7 4 2 6 0 0
C E T -E T -T P -R N -7 4 2 6 0 0
$ 2 5 ,6 1 4
$6,100
$ 1 6 ,3 0 5
$ 3 ,2 0 9
T o ta l P rio r
$257
$242
$15
p r o r a ta b a s is .
$ 1 6 ,6 4 4
$ 3 ,0 0 0
$ 1 1 ,3 4 0
$ 2 ,3 0 4
2014
$ 6 ,2 7 7
$ 2 ,8 0 0
$ 2 ,5 8 7
2015
R e a l P r o p e r t ie s la n d a c q u is it io n c o s t s a r e r e c o r d e d a g a in s t s e p a r a t e W B S ite m a n d a r e t h e r e f o r e s h o w n h e r e a s a s e p a r a t e lin e ite m .
T h e s e c o s t s a r e in c lu d e d in t h e T r a n s m is s io n a n d S u b s t a t io n e le m e n t s o n a
$ 2 ,4 3 6
$300
$ 2 ,1 3 6
2013
O n t h i s s c h e d u le E n v ir o n m e n t a l a n d R e a l P r o p e r t ie s la b o r c o s t s a r e in c lu d e d a g a in s t t h e W B S e le m e n t w h e r e t h o s e c o s t w ill u lt im a t e ly s e t tle .
F o o tn o te s:
T o ta l
R e a l E s t a t e ( L a n d A c q u is it io n )
I T / T e le c o m
D is t r ib u t io n
S u b s t a t io n
T ra n s (< 2 0 0 k V )
T ra n s (> 2 0 0 k V )
( $ in t h o u s a n d s ; n o m in a l)
2 0 1 5 G R C W o rk p a p e r
PIN : 7 4 2 6 , O D : 9 / 2 0 1 5
P R I M M 2 2 0 kV S u b s ta tio n
C a p ita l F o r e c a s t b y W B S
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
N> CD N>
R e a l P r o p e r t ie s
L a n d A c q u is it io n
T e le c o m m u n ic a t io n s
M o n it o r in g & m itig a t io n c o s ts
N e w 2 2 0 k V S u b s ta t io n
L o o p in to P rim m S u b s ta t io n
LCOR
C IT -0 0 -O P -N S -0 0 0 3 7 0
EHS
C E T -E T -T P -R N -7 4 2 6 0 0
C E T -E T -T P -R N -7 4 2 6 0 0
W BS
$ 2 5 ,6 1 4
$6,100
$ 1 6 ,3 0 5
$ 3 ,2 0 9
T o ta l
$242
$15
-
$ 2 ,4 3 6
$300
$ 2 ,1 3 6
2013
$ 1 6 ,6 4 4
$ 3 ,0 0 0
$ 1 1 ,3 4 0
$ 2 ,3 0 4
2014 $890
$ 6 ,2 7 7
$ 2 ,8
$ 2 ,5 8 7
2015
2016
S u m m a r ie s o f e a c h e s t im a t e a r e in c lu d e d in t h is w o r k p a p e r p a c k a g e .
$257
P rio r
( 1 ) C o s t e s t im a t e s f o r e a c h e le m e n t a r e d e v e lo p e d b y S u b j e c t M a t e r E x p e r t s in v a r io u s f u n c t io n a l g r o u p a t S o u t h e r n C a lifo r n ia E d is o n .
F oo tn o te :
T o ta l
R e a l E s t a te
I T / T e le c o m
E n v ir o n m e n t a l
D is t r ib u t io n
S u b s ta t io n
T ra n s(< 2 0 0 k V )
T ra n s(> 2 0 0 k V )
( $ in t h o u s a n d s ; n o m in a l)
2 0 1 5 G R C W o rk p a p e r
P IN: 7 4 2 6 , O D : 9 / 2 0 1 5
P R IM M 2 2 0 kV S u b sta tio n
C a p ita l F o re c a st b y W B S
2 017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
CD CO
N>
294 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
295 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Whirlwind #2AA Bank Upgrade (PIN:7067)
Transmission System Generation Interconnection
T R A N S M IS S IO N AND IN TER C O N N EC TIO N PLA NN IN G
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
K> CD CD
297 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 569 / RO Model ID: 733 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
TRANS PROJECTS
Program
TRANS PROJ RENEW ABLE
Pin #
7067
W BS Elem ent
C ET-ET-TP-RN -706700
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
12/1/2014
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) 2 0 15 GR C - C a p i t a l E x p e n d i t u r e s F o re c a s t
Yr
SCE $
2013
19,791
25,000
2014
22,670
20,000
2015
0
15,000
2016
0
10,000
2017
0
Total
42,461
5,000 0
2013
2014
7 (a). SYSTEM SH O R T TEXT
W hirlw ind2nd A A Xfm rBank & A A B ank N-1 SPS
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
2015
2016
2017
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
298 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1623 / RO Model ID: 734 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
(N O T S PEC IFIED)
Program
(N O T S PEC IFIED)
Pin #
7067
W BS Elem ent
C ET-ET-TP-RN-706701
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, S pare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (See Below)
Transm ission Substations
4. A SSET TYPE 5. C LO SE DATE
12/1/2016
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
0
2014
0
2015
20,957
2016
23,205
2017
0
Total
44,163
7 (a). SYSTEM SH O R T TEXT
(Not Specified)
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8.
See w orkpaper fo r details
SC O PE
9. JUSTIFICATION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
299 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Southern C alifornia Edison Com pany C APITAL W O R KP A PE R S - 2015 GRC PR O JE C T D ETAIL W O R K S H E ET: R EN EW A BLE PROJECTS O rganizational U nit Sum m ary: T&D Testim ony Sum m ary: SC E-03, V olum e 3 M ajor Program : TRA NSM ISSIO N PROJECTS Category: TRANS PROJECTS Detail: R enew able Projects D atabase ID: 1373 / RO Model ID: 872 1. W ITN ESS
Robert G. W oods
2. PR O JECT DETAIL Program Group
O PER ATIO N S - IT
Program
N ETW O R K SER VICES
Pin #
7067
W BS Elem ent
CIT-00-O P-N S-000388
3. PR O JECT TYPE
Select one
Select one C om pliance: Safety, Environm ental, Licenses
X
C ustom er Growth
Replacem ents in Kind
Load Growth
U pgrades
Reliability
Blanket: FE, Tools, Spare Parts, Lab, C om puter Equip
Capitalized Softw are V arious (S ee Below)
Telecom m unications
4. A SSET TYPE 5. C LO SE DATE
12/1/2016
6. RIIM ELIGIBLE
No
7.
C O ST ESTIM ATES (N O M IN A L $000) Yr
SCE $
2013
36
2014
43
2015
36
2016
37
2017
0
Total
153
7 (a). SYSTEM SH O R T TEXT
W hirlw ind 2nd A A Bank & SPS
7 (b). D ETAILED DESCR IPTIO N
See w orkpaper fo r details
8. SC O PE
See w orkpaper fo r details
9. JUSTIFICA TION
See w orkpaper fo r details
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Distribution circuit costs for System Planning Capital Projects are captured in CET-ET-LG-CI-CAT and CET-PD-CR-RL-RUR. The total costs in CET-ETLG-CI-CAT are included in workpaper entitled "DSP CIRCUIT WORK" and the total costs in CET-PD-CR-RL-RUR are included in workpaper entitled "OTHER RELATED DISTRIBUTION WORK".
Distribution Circuit Costs WBS CET-ET-LG-CI-CAT and CET-PD-CR-RL-RUR
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo o o
SCE-03, Vol 3 C h ip C h a pe lla C h a rle s Cai C h a rle s Cai O d e t B onilla
W h irlw in d S u b s ta tio n is lo ca ted in T e h a c h a p i. A n e w 5 0 0 /2 2 0 kV tra n s fo rm e r b an k a n d s p e c ia l p ro te ctio n s c h e m e (S PS ) is n e e d e d a t W h irlw in d S u b station
GRC Volum e Reference
P ro je c t M a n a q e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R ea so n
D iv e rse t e le co m m u n ic a tio n p a th s a n d term in al
A d d itio n a l re n e w a b le g e n e ra to rs in th e T e h a c h a p i a re a a re e x p e cte d to s ig n L a rg e G e n e ra to r
c irc u it b re ake rs a n d d is c o n n e c t s w itch e s as d e sc rib e d a b ov e.
In te r c o n n e c tio n A g re e m e n ts (L G IA ) in 2013. T h e s e g e n e ra to rs w ill trig g e r a th ird 5 0 0 /2 2 0 kV tra n s fo rm e r b a n k a t W h irlw in d S u b s ta tio n a n d as so c ia te d
e q u ip m e n t a re re q u ire d a t W h irlw in d to s u p p o rt th e SPS.
s w itc h ra c k a t W h irlw in d w ill b e e q u ip p e d e a ch w ith tw o c ircu it b re a k e rs a n d fo u r d is c o n n e c t sw itch e s.
T h e s c o p e o f th e p ro je ct in clu d e s in stallin g a n e w 5 0 0 /2 2 0 kV tra n s fo rm e r b an k. O n e p osition o n th e 5 0 0 kV s w itc h ra c k a n d o n e p osition on th e 2 2 0 kV
to in cre a s e s u b s ta tio n c a p a c ity a n d in te rc o n n e c t n e w re n e w a b le s o la r g e n e ra tio n .
$42,808
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:7067
W hirlw ind #2AA Bank Upgrade
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
o
CO
Capital Forecast by W BS
C E T -E T -T P -R N -7 0 6 7 0 0
C IT-0 0 -O P -N S -0 0 0 3 8 8
C E T -E T -L G -C I-C A T
C E T -E T -T P -R N -7 0 6 7 0 0
$42,808
$75
$0
$42,733
$0
Total
$1,373
$2
$0
$1,3 7 2
$0
Prior
$19,827
$36
$0
$ 1 9 ,7 91
$0
2013
$22,713
$43
$0
$2 2 ,6 70
$0
2014
$0
$0
$0
$0
$0
2015
$0
$0
$0
$0
$0
2016
R eal P ro p e rtie s lan d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re s h o w n h e re a s a s e p a ra te lin e item .
$0
$0
$0
$0
$0
2017
O n th is s c h e d u le E n v iro n m e n ta l a n d Real P ro p e rtie s lab or c o s ts a re in clu d e d a g a in s t th e W B S e le m e n t w h e re th o s e c o s t w ill settle. T h e s e c o s ts a re in clu d e d in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a p ro ra te basis.
Footnotes:
Total
IT /T e le c o m
D istrib u tion
S u b station
T ra n s (< 2 0 0 k V )
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h W B S . E a c h W B S re p re s e n ts th e total c o s t fo re c a s t fo r p ro je ct e le m e n ts a s s ig n e d to th is s p e c ific W B S in th e project.
20 1 5 G R C W o rk p a p e r
PIN:7067
W hirlw ind #2AA Bank Upgrade
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
NO
oo o
303 Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
Whirlwind #3AA Bank Upgrade (PIN:7067)
Transmission System Generation Interconnection
T R A N S M IS S IO N AND IN TER C O N N EC TIO N PLA N N IN G
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo o
SCE-03, Vol 3 C h ip C h a pe lla C h a rle s Cai C h a rle s Cai O d e t B onilla
W h irlw in d S u b s ta tio n is lo ca ted in T e h a c h a p i. A n e w 5 0 0 /2 2 0 kV tra n s fo rm e r b an k a n d s p e c ia l p ro te ctio n s c h e m e (S PS ) is n e e d e d a t W h irlw in d S u b station
GRC Volum e Reference
P ro je c t M a n a q e r
P ro je c t E n g in e e r
R e s p o n s ib le E n g in e e r
P ro je c t S p o n so r
P ro je c t R ea so n
D iv e rse t e le co m m u n ic a tio n p a th s a n d term in al
A d d itio n a l re n e w a b le g e n e ra to rs in th e T e h a c h a p i a re a a re e x p e cte d to s ig n L a rg e G e n e ra to r
c irc u it b re ake rs a n d d is c o n n e c t s w itch e s as d e sc rib e d a b ov e.
In te r c o n n e c tio n A g re e m e n ts (L G IA ) in 2013. T h e s e g e n e ra to rs w ill trig g e r a th ird 5 0 0 /2 2 0 kV tra n s fo rm e r b a n k a t W h irlw in d S u b s ta tio n a n d as so c ia te d
e q u ip m e n t a re re q u ire d a t W h irlw in d to s u p p o rt th e SPS.
s w itc h ra c k a t W h irlw in d w ill b e e q u ip p e d e a ch w ith tw o c ircu it b re a k e rs a n d fo u r d is c o n n e c t sw itch e s.
T h e s c o p e o f th e p ro je ct in clu d e s in stallin g a n e w 5 0 0 /2 2 0 kV tra n s fo rm e r b an k. O n e p osition o n th e 5 0 0 kV s w itc h ra c k a n d o n e p osition on th e 2 2 0 kV
to in cre a s e s u b s ta tio n c a p a c ity a n d in te rc o n n e c t n e w re n e w a b le s o la r g e n e ra tio n .
$45,342
Total Project Cost (Nominal, in thousands)
20 1 5 G R C W o rk p a p e r
PIN:7067
W hirlw ind #3AA Bank Upgrade
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
o cn
CO
Capital Forecast by W BS
C IT-0 0 -O P -N S -0 0 0 3 8 8
C E T -E T -L G -C I-C A T
C E T -E T -T P -R N -7 0 6 7 0 1
C E T -E T -T P -R N -7 0 6 7 0 1
$0
$0
$79
$0
$0
$0
Prior
$45,342
$0
$4 5 ,2 62
$0
Total
$0
$0
$0
$0
$0
2013
$0
$0
$0
$0
$0
2014
$20,993
$36
$0
$ 2 0 ,9 57
$0
2015
$23,243
$37
$0
$2 3 ,2 05
$0
2016
R eal P ro p e rtie s lan d a c q u is itio n c o s ts a re re co rd e d a g a in st s e p a ra te W B S item a n d a re th e re fo re s h o w n h e re a s a s e p a ra te lin e item .
$0
$0
$0
$0
$0
2017
O n th is s c h e d u le E n v iro n m e n ta l a n d Real P ro p e rtie s lab or c o s ts a re in clu d e d a g a in s t th e W B S e le m e n t w h e re th o s e c o s t w ill settle. T h e s e c o s ts a re in clu d e d in th e T ra n s m is s io n a n d S u b s ta tio n e le m e n ts o n a p ro ra te basis.
Footnotes:
Total
IT /T e le c o m
D istrib u tion
S u b station
T ra n s (< 2 0 0 k V )
($ in th o u s a n d s; nom in al)
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h W B S . E a c h W B S re p re s e n ts th e total c o s t fo re c a s t fo r p ro je ct e le m e n ts a s s ig n e d to th is s p e c ific W B S in th e project.
20 1 5 G R C W o rk p a p e r
PIN:7067
W hirlw ind #3AA Bank Upgrade
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo o CD
Capital Forecast by Project Elem ent
Total
R eal E state
IT /T e le c o m
E n v iro n m e n ta l
S u b station
IT
CES
W h irlw in d S u b station
($ in th o u s a n d s; nom in al)
C IT-0 0 -O P -N S -0 0 0 3 8 8
EHS
C E T -E T -T P -R N -7 0 6 7 0 1
W BS
$45,342
$79
$27
$ 4 5 ,2 36
Total
$0
$0
$0
$0
Prior
T h is t a b le s h o w s th e c o s t fo re c a s t fo r e a c h p ro je ct e lem e n t. E a c h p ro je ct e le m e n t r e p re s e n ts a d is c re te e le m e n t o f w o rk n e c e s s a r y to c o m p le te th e project.
20 1 5 G R C W o rk p a p e r
PIN 70 6 7
W hirlw ind #3AA Bank Upgrade
$0
$0
$0
$0
2013
$0
$0
$0
$0
2014
$20,993
$36
$13
$2 0 ,9 44
2015
$23,243
$37
$9
$ 2 3 ,1 96
2016
$0
$0
$0
$0
2017
Workpaper - Southern California Edison / 2015 GRC - APPLICATION
Exhibit No. SCE-03 / Transmission & Distribution / Vol. 03 / Pt.01 Witness: R. Woods
oo o